Home / Financial Firm (Unknown - Insurer) / Determination 298104

Determination 298104

Storm damage claim denied for retaining wall collapse

FirmFinancial Firm (Unknown - Insurer)
Decided2013-08-05
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed$20,450
SourceAFCA PDF

Summary

The applicant's retaining wall collapsed after heavy rain, and the FSP denied the storm claim on engineering evidence that the wall was structurally inadequate. The Ombudsman found the structural defect was the dominant cause, so the exclusions applied and the claim was properly denied.

Where an insured peril and an excluded cause both contribute, the dominant cause governs, and the expert reports showed structural inadequacy was dominant.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 298104 Determination Page 1 of 7 Case number: 298104 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of claim-Exclusion / condition 31 July 2013 Background 1. I have reviewed all the material submitted by the parties and save where I make note specifically, I am satisfied the background as set out in the Recommendation is accurate and is as follows. 2. On 1 March 2011, the Applicant entered into a contract to purchase a property. Settlement was due to occur on 15 April 2011. The Applicant arranged insurance cover with the Financial Services Provider (FSP) to cover the property when he purchased the property. 3. On 5 April 2011, the Applicant lodged a claim for storm damage to a retaining wall that occurred on or about 24 March 2011. 4. The FS P engaged an engineer (“F”) to inspect the retaining wall and determine the likely cause of the collapse. Based on the engineer’s findings, the FSP denied the claim. 5. The Applicant has disputed this decision. 6. The Applicant did not agree with the FSP’s decis ion, hence the dispute which was the subject of a Recommendation. The Recommendation was in favour of the FSP and was not accepted by the Applicant. The FSP accepted the Recommendation. In the circumstances, the matter has been referred to me for Determination. Summary of Applicant’s p osition 7. I have reviewed all the material submitted by the parties and save where I make note specifically, I am satisfied the Applicant’s position as set out in the Recommendation is accurate and is as follows. 8. The Applicant h as submitted the following in disputing the FSP’s decision:  The cause of the collapse was storm and heavy rainfall on 24 March 2011 as corroborated by information from the Bureau of Meteorology and an engineer’s report he obtained (“ JM"). Further, the retaining wall had stood for many years prior to the collapse. Determination Case No: 298104 Determination Page 2 of 7  Engineer F, was biased towards the FSP when attending the property and exaggerated several other things in his report.  F’s report contained numerous inaccuracies. For instance, he referred to a gravel driveway directly behind the retaining wall when in fact it is a gravelled path.  The FSP’s Panel did not properly address his concerns and the FSP ignored some of his engineer’s findings and F’s findings and “cherry picked” information from the rep orts. For instance, F concluded that the collapse was due to vegetation growing at the location. However, the FSP focused on F’s other findings in denying the claim.  The claim was complicated by the fact the wall collapsed before settlement of the property. The FSP was asked to obtain a report from the engineer engaged by the vendor’s insurance company , as this would have supported an insurance payout but the FSP ignored this request.  The FSP, in its submissions to the Service, has introduced new grounds. This is unfair given the decision provided at the end of its internal dispute resolution (IDR) process was meant to be final.  Case law relied on by the FSP does not apply as the damage was caused by a storm event alone. 9. The Applicant says the FSP used the wrong rainfall data from the Bureau. The Applicant has produced material from the Bureau of Meteorology at station CW which shows rain on 4 successive days from 21 March 2011 at 11.2mm, 3.0mm, 17.6mm and 49.4mm. 10. Based on the above, the Applicant maintains he is entitled to indemnity for the losses sustained. He has estimated the repairs to be $20,000 and is also seeking $450 for make safe work conducted. 11. The Applicant rejected the Recommendation and provided no further relevant documentary information in support of his position but wrote two letters dated 23 April and 7 June 2013 which essentially reiterate contentions made already, that the storm alone caused the wall to collapse. He also says;  he was a long standing client of the FSP  that he incepted this policy on 1 March 2011  that he was not advised of the collapse of the wall by the vendor until 4 April 2011  that an engineer from the vendor’s insurer inspected the property to scope the works and this report would have supported his claim, but the FSP ignored his request to get the report  the FSP delayed in sending out engineer F and that he has made his report without correct observations Case No: 298104 Determination Page 3 of 7  the FSP’ s lawyers are relying on inaccurate documents obtained by “ C ” about the rainfall. Summary of FSP’ s position 12. I have reviewed all the material submitted by the parties and save where I make note specifically, I am satisfied the FSP’s position as set out in the Recommendation is accurate and is as follows. 13. The FSP refutes the Applicant’s allegation that it has introd uced new grounds to the Service as the exclusions referred to in its submission were reflected in its initial claims decision. 14. The FSP says the reports must be read in their entirety and although JM states rain caused the wall to collapse, JM also supports its contention that the wall was structurally inadequate. 15. Case law supports its position - if there are concurrent proximate causes of the wall collapse, one covered and the other excluded by the policy, the FSP is not liable under the policy. 16. In regards to substantiating its claim decision, the FSP relies on both F’s report and JM’s report and the following policy provisions: “ Defined Events Cover We will pay for loss or damage at the Address caused by the following Defined Events: ... 8. Storm or rainwater, but we will not pay for loss of or damage: ... d. that occurs as a result of a structural defect, faulty design or faulty workmanship. ... What you are not insured for ... 2. Loss of or damage to your property caused by: ... e. faulty materials, faulty workmanship, wrong or incorrect design, plan or specification or failure of design; f. wear, tear, rust, corrosion, depreciation, gradual deterioration, mildew, mould, dampness of atmosphere or variations in temperature.” 17. The FSP accepted the Recommendation and did not provide any further documentary information in support of its position save for an email and attachments dated 6 May 2013 in which it rebuts contentions made by the Applicant. Case No: 298104 Determination Page 4 of 7 Issue 18. Whether the FSP is entitled to deny the Applicant’s c laim. Reasons for Decision 19. There has been an exchange of material between each party and I am satisfied each party has had an opportunity to reply on the issues raised. 20. Each FOS case is decided on its merits, taking into account the facts of the case. I have reviewed all the material submitted by the parties both before and after the Recommendation was issued, in order to reach my decision. I will only refer to the relevant submissions and materials raised. 21. It is an accepted principle of insurance law that the onus is on the Applicant to establish, on the balance of probabilities, that he suffered a loss caused by a risk insured against (in this case, storm damage). Once this is established, the onus shifts to the FSP to show, on the balance of probabilities, the claim falls within an exclusion in the policy. 22. I have reviewed all the expert material relied on by the parties and save where I make note specifically, I am satisfied the position as set out in the Recommendation is accurate and is as follows. Expert Evidence 23. The loss assessor C attended the property on 7 April 2011. He notes the then owner of the property had been away and so only first noticed the collapse of the wall on his return on 24 March 2011. He arranged for an engineer F to advise about the cause of the collapsed stone wall. 24. Engineer F, inspected the wall on 6 May 2011 and provided a report that day that stated the following: “ Site Observations ... Its height varied from approximately 450mm to a maximum height at the rear of the dwelling of approximately 2.0 metres. The age of the wall could not be determined; however severe weathering of bed-joints was seen, indicating the stone wall was probably constructed prior to the current dwelling. ... A salt glazed drainage channel has been constructed at the base of the retaining wall, which was poorly maintained. The stone retaining wall had totally collapsed in one location and a partially in another location approximately 5.0m to the east. Settlement of the stone retaining wall was also seen (Please refer to photographs attached). The collapse was, in the writers’ opinion, due to the presence of vegetation growing at that location (Refer to paragraph 13). It is understood the collapse occurred in March of this year. ... Case No: 298104 Determination Page 5 of 7 Comments on findings The rock wall which is approximately 1.8 metres in height at the location of the collapse appears not to have a shear key or drainage to reduce the lateral pressure. Walls typical of this form of construction would usually be designed with a thicker stem and would be embedded (ie a shear key) to overcome the effects of sliding or rotation. Industry standard factors of safety in design of retaining walls would typically be greater than 1.5. From the enclosed calculations you will find the existing wall has not been designed to that criteria for both sliding and overturning moments and has factor of less that 1 imply it can collapse at any time – with or without rain. It is the writers opinion that there are at least four mechanisms of failure contributing to the stone retaining walls collapse, partial collapse and settlement. The wall is structurally inadequate because: i. It is too slender (insufficient width for its’ height) ii. There is no drainage in the backfill iii. There is no shear key to resist sliding iv. Insufficient footings v. The wall has been poorly maintained vi. The planting of trees and shrubs in inappropriate locations The main collapse is a rotational failure. The base of the stem not having a shear key has failed by sliding through the weight of the saturated soil behind it. The significant rainfall over the past 12 months has contributed to this, however if the wall had been constructed with adequate drainage and if it had a shear key this would not have mattered. Conclusion The stone wall is structurally inadequate as a retaining wall. It appears it has deteriorated over a long period not due to a single event.”(sic) 25. The Applicant produced material from the Bureau of Meteorology at station CW which shows rain on four successive days from 21 March 2011 at 11.2mm, 3.0mm, 17.6mm and 49.4mm. The FSP does not dispute these findings. 26. The Applicant relies on JM who is a structural engineer/building surveyor. He inspected the wall on 6 April 2011. His report was dated 14 May 2011 and contained the following of relevance: “The construction of the wall was generally sound, being constructed of stone bonded together with mortar. In some places, it was evident that some of the mortar had deteriorated, and there was little or no bond between stone and mortar. The wall was not reinforced, however, there were some steel tubes noted at the rear of the wall where it had collapsed. I do not know what the purpose of these is. The tubes were driven vertically down behind the wall. It was also noted that a type of cover was placed on the driveway side of the wall. It is not known what the purpose of this cover is; it appears to be a type of geo-textile. Case No: 298104 Determination Page 6 of 7 ... The length of the wall that had failed was around 4m. Failure was due to excessive amounts of water backing up against the rear of the wall. The source of the water was rain. There was evidence of partial failure in other sections in the wall. The wall had collapsed from the driveway side towards the side where the dwelling was located. A layer of mud was visible at the bottom of the wall, and it was evident that the water had flowed out from behind the wall carrying the retained earth behind the wall with it. The location and layout of the mud clearly showed laminar flow, and the direction of the water flow from behind the wall to the lawn area at the front of it. Although it appears the wall is able to carry the active pressure and surcharge, it was not constructed to carry any hydraulic load from water collected at the rear of the wall. A mechanism to remove water at the bottom of the wall was not evident. This is usually an agricultural type drain to collect water at the bottom of the wall that effectively removes any lateral water pressure from the vertical face of the wall. Also, there was no evidence that open perpends were allowed for at the bottom of the wall... It is doubtful that structural engineering principles were used to design the wall.....” 27. The evidence supports the contention that there was heavy rainfall that precipitated the collapse of the retaining wall and so I accept that the Applicant is able to establish a claim at first instance. The burden of proof now shifts to the FSP to establish on the balance of probabilities the applicability of an exclusion that enables it to deny the claim. 28. In my view, the FSP succeeds in this regard as I am of the view that both the reports of F and JM support the contention that the wall collapsed for a variety of reasons as set out by F and summarised above, which made the wall structurally inadequate as a retaining wall. 29. Although JM says the wall failed as “excessive amounts of water backed up against the rear of the wall...” he goes on to say “it was not constructed to carry any hydraulic load from water collected at the rear of the wall” and that “it is doubtful that structural eng ineering principles were used to design the wall.” I am strongly of the view that JM’s report if read in full , supports the FSP’s position and does not support the Applicant when he contends the sole cause of the collapse of the wall was the heavy rainfall. 30. The FSP is also correct in its submission that the case law assists it in matters such as this. If there are two causes of loss, one insured and one excluded, then the insurer is entitled to rely on the exclusion to deny the claim. 31. The Courts will enquire as to the dominant reason for the damage. This is not necessarily the last event in time. In my view, the experts support the view that the dominant reason for the collapse of the wall was the fact that it was structurally inadequate as described in the expert reports. In my view, the FSP has established therefore on the balance of probabilities that it can rely on the relevant policy exclusions. Case No: 298104 Determination Page 7 of 7 32. As I am of the view that the reports have to be read in their totality, it does not change my view even if I was to accept there were inaccuracies in F’s report. Even if there were, as I read the report in its totality any alleged inaccuracies make no material difference to the import of both expert opinions. 33. I also do not accept that F was biased or exaggerated or that his report was based on incorrect observations, nor do I accept the FSP “cherry picked” from the reports. In any event, as stated, both reports if read in their totality do not support the Applicant in his contention that the sole cause of the collapse of the wall was the heavy rainfall. 34. The Applicant says the vendor’s insurer has a report from its expert that supports his position. However, this contention is made only on the basis of what the Applicant says he was told by the vendor. He has prod uced no signed statement from the vendor nor has he asked the vendor to obtain that report (assuming that a report was commissioned by the vendor’s insurer). In any event, even if the report was produced and it did support the Applicant, the FSP would still have the opportunity to ask F and JM to comment further. Furthermore, the preponderance of the evidence supports the FSP. 35. Finally, the Applicant has argued that the FSP has introduced new grounds for its denial and this is unfair. Firstly, the Service’s Terms of Reference do not preclude a party from introducing a new ground and secondly, even if this is so, it makes no difference to my decision as the grounds relied on are not substantially different and the Applicant has not been prejudiced in all the circumstances of this dispute. 36. In short, I accept the FSP is entitled to deny the Applicant’s claim based on general exclusion clause section 2(e) and the limitation to the insured event of storm as set out under category (d). Determination 37. On the basis of the available information and for the reasons stated, I determine that the FSP is entitled to deny the Applicant’s claim.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.