Home / Financial Firm (Unknown - Insurer) / Determination 297952
Determination 297952
Declinature of roof repair claim
Summary
The complainant's home claim after Cyclone Yasi included a roof replacement of about $18,450 and rectification of substandard repairs by the FSP's repairer. AFCA accepted the insurer's expert evidence that the roof damage was long-standing and excluded, so the roof claim was refused, but ordered that both parties obtain quotes from non-associated repairers for the interior damage and the FSP choose the most reasonably costed quote.
Once the insured establishes a prima facie claim, the insurer bears the onus of proving an exclusion for wear and tear, gradual deterioration, rust and poor maintenance, which it discharged on the independent expert evidence.
Issues
- Claim denial primary · not upheld
“The FSP is entitled to refuse to pay the claim to repair or replace the roof; the roof was not damaged in the cyclone and its condition is due to wear and tear, rust and failure to maintain.”
- Inadequate claim investigation secondary · unclear
“The FSP accepts that upon the initial inspection for repairs the roof was not in fact inspected; AFCA did not decide the effect of this oversight.”
- Repairs or contractors secondary · upheld
“The FSP's repairers undertook repairs which were later found to be substandard, and the FSP has accepted responsibility for the defective repairs.”
Subjects and remedies
reassess claimrepair or rectify
Text of the determination
Case No: 297952 Determination Page 1 of 9
Case number: 297952
General Insurance - Domestic Insurance - Home Building - Service - Delay in
complaint handling
30 September 2013
Background
1. I have reviewed all the material submitted by the parties and save where I
make note specifically, I am satisfied the background as set out in the
Recommendation is accurate and is as follows.
2. The Applicant holds a Home Building policy of insurance with the Financial
Services Provider (FSP). The policy was issued on 20 September 2010 and
covered a residential property.
3. On 11 March 2011 the Applicant lodged a claim for damage resulting from
Cyclone Yasi. The FSP undertook repair works to the insured property which
it agrees were substandard during a further inspection by building consultant
“S”. S also discovered the roof was in poor condition and was allowing
rainwater to enter the home and cause water damage.
4. The FSP agreed to rectify the substandard works identified by S but only
after the Applicant agrees to repair or replace her roof.
5. T he Applicant disputes the FSP’s declinature of the entire roof and is
dissatisfied with the service provided by the FSP.
6. The Applicant did not agree with the FSP’s decision, hence the dispute
which was the subject of a Recommendation. The Recommendation was
partly in favour of the Applicant and was not accepted by the FSP. In the
circumstances, the matter has been referred to me for Determination.
Summary of Applicant’s p osition
7. I have reviewed all the material submitted by the parties and save where I
make note specifically, I am satisfied the Applicant’s position as set out in
the Recommendation is accurate and is as follows.
8. The Applicant enclosed a detailed chronology of events surrounding the
original repairs to the property and this was set out in full in the
Recommendation. I note the FSP has agreed that this work was
substandard and will pay for repairs so I do not propose to set that out again.
Determination
Case No: 297952 Determination Page 2 of 9
What remains to be resolved is the mechanism about how to choose a
repairer.
9. The Applicant made serious allegations regarding the workman provided by
the assessor and said the builder was fired for taking advantage of Yasi
claims. She would like the repairs to be carried out by a builder who is not
associated with the FSP due to her experience.
10. The Applicant provided a roofing tax invoice dated 10 December 2012, in the
sum of $18,450 (GST inclusive).
11. The Applicant notes the roof was not checked until 16 months after Cyclone
Yasi and the rust likely occurred after this event due to the debris and
seawater. Further, just prior to S and “ Su ” checking the roof, a small tornado
occurred. The Applicant then utilised roof sealant and after this time, it did
not leak.
12. The Applicant’s louver windows face down and the only way for rain to come
in is if it was coming upwards, which is what occurred with Cyclone Yasi.
13. The Applicant notes the FSP’s submissions and responds as follows:
S’s report was done a substantial amount of time after Cyclone Yasi,
making it difficult for him to claim the damage pre-existed given
Townsvi lle’s heat and humidity. Corrosion would have occurred quite
quickly in the conditions caused by and after Cyclone Yasi.
The Applicant had requested a roof check at the commencement of
works. She questions the professionalism of undertaking works without
checking the roof after the advent of a major cyclone.
The Applicant’s roof did not leak prior to Cyclone Yasi and the
downpipes are newer than the roof. The Applicant went onto the roof
herself after Su and S, to seal holes in the sheet roofing and around the
WC seals. The pantry still leaks.
There are two holes in the roof sheet that allowed water into the WC
and pantry. However, the WC had water entry via Cyclone from the
direction of the rain. Water then came through the light fixture due to
the Tornado which occurred in Townsville on 20 March 2012.
S’s report states that the damage to the roofing has not been “solely
caused by the storm event” – being Cyclone Yasi. The Applicant
submits that the storm event is therefore partly the cause of the
damage.
14. The Applicant would be prepared to accept joint responsibility for the roof
and full repairs to the WC and pantry including repainting, replacement of the
power point and repairs to the water damaged flooring.
15. The Applicant rebutted the submissions made by the FSP after the
Recommendation, reiterated her position and provided further photographs
and letters dated 16 July 2013 and 10 June 2013 to which I will refer later in
this Determination.
Case No: 297952 Determination Page 3 of 9
Summary of FSP’ s position
16. I have reviewed all the material submitted by the parties and save where I
make note specifically, I am satisfied the FSP’s position as set out in the
Recommendation is accurate and is as follows.
17. The FSP relies on the following policy terms and conditions:
“General Exclusions
We do not insure you for any loss or damage that is caused by or arises from:
...
i. Wear and tear, gradual deterioration or fading
ii. Rust, corrosion, oxidisation, mould, mildew or atmospheric conditions....
iii. Failure to keep the property insured in good condition
...
Storm
We will cover
Loss or damage caused by storm, including cyclone, hail, wind, snow or
rain.
We won’t cover...
Loss or damage caused by or resulting from
...
iv. Gradual deterioration from the rain
v. Rain entering the buildings because of poor maintenance, or where
windows, doors or openings are not closed.”
18. The FSP relies on S’s report dated 19 April 2012 from which I note the
following:
S inspected the roof on 13 April 2012.
The roof was in poor condition and there was evidence of surface
corrosion to approximately 80% of the roof area. The corrosion was
significant enough that it had resulted in holes in the roof sheet surface
which allowed water to penetrate into the roof void and deposit on the
plasterboard ceiling lining of the pantry and WC. There was evidence of
ongoing repairs in the form of metal patches and flexible sealant. This
was indicative that the roof cover had been leaking for an extended
period of time.
The internal box gutters were in good condition.
The lead seals around the WC vent showed signs of advance
corrosion.
S formed the view that the ongoing water ingress to the walk in pantry
and the separate WC resulting in damage that now exists is the result
of the corroded roof and its associated flashings. These could not
provide a suitable waterproof cover to the residence.
Case No: 297952 Determination Page 4 of 9
S concluded this ongoing resultant damage is similar to that first
observed following the Cyclone Yasi event. Further that:
“...the damage that now exists to the roof cover of the residence has been
occurring over an extended period of time and has not been solely caused by
the Storm Event (Cyclone Yasi).”
S noted that as a matter of course, the builder and Su should have
inspected the roof prior to commencing the repairs and confirmed the
source of the water ingress.
The repairs by Su can be considered building defects in as much as the
Applicant’s residence has not been returned to a similar condition
similar to that prior to Cyclone Yasi. The workmanship is particularly
poor in and around the pantry and pantry shelves.
S said that prior to any rectification of the building defects and prior to
the completion of the repair of the resultant damage, the roof needs to
be removed and replaced to ensure the house is waterproof.
S noted the repairs to the roof should be considered the responsibility
of the Applicant.
19. The FSP confirms it has agreed to appoint a new repairer to rectify the faulty
repair works undertaken by the previous repairer.
20. The FSP does not dispute that a cyclone event has occurred or that the
policy covers this type of event. However, the policy excludes loss or
damage caused by wear and tear, gradual deterioration, and rust, the failure
to keep the insured property in good condition or due to rain entering the
building as a result of poor maintenance.
21. The FSP relies on the report of its expert S, to maintain declinature for the
roof on the basis the loss or damage arises from a cause specifically
excluded by the policy. The FSP further submits the proximate cause was
not the Cyclone event rather it was wear and tear, gradual deterioration and
maintenance issues. Further, the Applicant has produced no contradictory
expert evidence to support her contentions that the roof was damaged in the
cyclone or that it has undergone significant deterioration in the 16 months
between the cyclone and the inspection by S.
22. The FSP accepts that upon the initial inspection for repairs that the roof was
not in fact inspected. It says the first time the Applicant raised any concerns
that any damage to the roof was caused by the Cyclone was at the
reinspection. However, the FSP submits that such an oversight at the first
inspection does not alter the fact that the roof was in poor condition and
deteriorated prior to the cyclone event.
23. The Applicant has produced no evidence in support of her claim that the
storm event and subsequent climatic conditions caused the loss.
24. The FSP rejected the Recommendation and provided further documentary
information in support of its position from S. It essentially reiterated its
contentions and made a number of further submissions in letters dated 13
Case No: 297952 Determination Page 5 of 9
June 2013 and 27 May 2013 and provided a further report from S. I will refer
to this later in the Determination.
Issue
25. Whether the FSP has appropriately settled the Applicant’s claim.
Reasons for Decision
26. There has been an exchange of material between each party, and I am
satisfied each party has had an opportunity to reply to the issues raised.
27. Each FOS case is decided on its merits, taking into account the facts of the
case. I have reviewed all the material submitted by the parties both before
and after the Recommendation was issued, in order to reach my decision. I
will only refer to the relevant submissions and materials raised.
The defective repairs
28. The Recommendation was that each party obtain and exchange quotations
for repairs to the internal damage to the residence from repairers who hold
no association with the FSP. It noted the repairers should be properly
qualified to perform the necessary works and that the FSP will be entitled to
choose the most reasonably costed repair quotation on the basis this
quotation addresses the works required to be performed.
29. The FSP has responded that it “accepts the FOS recommendation in relation
to the defective repairs and is prepared to arrange for an independent
repairer to provide a quotation for the rectification of same.”
30. The FSP references paragraph 24 of the Recommendation which says:
“24. In this regard, I consider it would be fair in all the circumstances to allow
both parties to obtain repair quotations from repairers not associated with
the FSP. The FSP may then arrange for the preferred repairer to
undertake the works.”
31. The Applicant says in her letter dated 10 June 2013;
“I am not happy to have FSP organize a repairer and I am prepared to get as
many quotes as required for myself for them to choose.
I wish to receive quoted amount chosen by FSP as the quote chosen by FSP
will not necessarily be the people I use to repair my property.
I have given FSP more than a fair go at providing their professional repairers
who have not been that professional and believe I am quite capable of getting
my own quotes.”
32. I note the following is not in dispute:
Case No: 297952 Determination Page 6 of 9
The Applicant held a valid policy covering her residential home at the
time of the loss and damage.
The Applicant lodged a claim as a result of Cyclone Yasi and as such
an event is covered by the policy, the FSP accepted the claim.
The FSP’s repairers undertook repairs which were later found to be
substandard.
The Applicant made several complaints regarding the standard of
repairs during the handling of the original claim.
The FSP has accepted responsibility for the defective repairs and
internal damage to the residence.
33. After the Recommendation, I note the FSP continues to accept responsibility
for the defective repairs and accepts that both parties obtain repair
quotations from repairers not associated with the FSP.
34. The Applicant rejects this part of the Recommendation and says she is “quite
capable of getting her own quotes.” However, I do not think that is fa ir in all
the circumstances and not usual insurance practice or in accordance with
the policy terms and conditions about settlement of a claim.
35. I am of the view, that despite the very poor performance of Su, the FSP is
still entitled to obtain a repair quotation especially as it agrees it will not be a
repairer associated with the FSP and that the repairers will be properly
qualified to perform the necessary works.
36. The Applicant will also have the same right to obtain repair quotations but
ultimately the policy provides that the FSP is entitled to pay the reasonable
cost of repair or a cash amount. Accordingly, it must satisfy itself what repair
work will be done referrable to the cyclone damage to the interior of the
house and referrable to the water damage to the interior of the house which
has occurred since (as Su did not inspect the roof) and that it will therefore
satisfy itself that it will pay the reasonable cost of those repairs.
37. In all the circumstances, I am of the view, that once the parties have
submitted their own quotes, then the FSP should still be entitled to choose
the most reasonably costed repair quotation on the basis the parties agree
this quotation addresses all the works required to be performed.
Damage to the roof
38. The parties agree the roof is damaged and the Applicant accepts she has
some responsibility for the roof but she also contends that some of the
damage was caused by Cyclone Yasi. Conversely, the FSP says all the
damage was long term and pre-existed Cyclone Yasi.
39. It is an accepted principle of general insurance law that an insured bears the
onus to establish on the balance of probabilities that the insured has suffered
a loss caused by an event to which the policy responds. This is known as a
prima facie claim. Once so established, the onus shifts to the insurer to
Case No: 297952 Determination Page 7 of 9
prove on the balance of probabilities that an exclusion applies if it seeks to
deny or limit its liability for the loss.
40. Accordingly, in this matter the Applicant must prove on the balance of
probabilities that the loss was caused by the cyclone and if that is
established, the onus shifts to the FSP to prove on the balance of
probabilities the application of exclusions which exclude loss or damage
caused by wear and tear, gradual deterioration, rust, the failure to keep the
insured property in good condition or due to rain entering the building as a
result of poor maintenance.
The evidence and the parties’ submissions.
Report of S dated 19 April 2012
41. S inspected the property on 13 April 2012. I note the cyclone occurred during
February 2011.
42. S also took photographs of the roof which I have considered carefully. I
agree they show;
Advanced surface corrosion
Pre existing roof patches and corrosion holes
Poorly sealed overflow outlet in the box gutter
Flexible sealant repairs
Leaking seal around the vent pipe
Example of extra screwing of the roof to try to keep it waterproof.
An area on the eaves lining where an overflow vent has been removed
and capped of
Interior damage caused by recent water damage.
After the recommendation, the FSP essentially reiterated its contentions and
made a number of further submissions in letters dated 13 June 2013 and 27
May 2013 and provided a further report from S.
Report of S dated 24 May 2013
43. S provides a more specific opinion and says;
the pre-existing rust and deterioration have been present for about 5
years prior to the inspection (say from April 2007).
The roof should have been replaced in about 2009 before the cyclone.
No storm created openings were evident on the roof at the time of his
inspection.
The water from the cyclone entered the house through the pre existing
access points of corrosion and deterioration.
Case No: 297952 Determination Page 8 of 9
44. The FSP submits the Wayne Tank principle applies as the events were
concurrent and not consecutive as the deterioration was ongoing and not a
single point before the cyclone.
45. The Applicant rebutted the submissions made by the FSP after the
Recommendation, reiterated her position and provided further photographs
and letters dated 16 July 2013 and 10 June 2013. She says;
The expert did not go on the roof.
Google maps in 2010 shows the roof “looks nowhere near as bad as
they say it should be looking.”
The cyclone moved the roof and the gutters and the roof leaked.
The cyclone caused the corrosion to accelerate.
She has been in the house since 2000 and had no leaks until the
cyclone.
If there were repairs to the roof they were done before she purchased
the house.
She wants the pantry and the toilet repaired and part of the roof
expense.
46. The FSP further rebuts allegations of the Applicant and says;
It is clear from the photographs and the report that S did go on the roof
The photographs support its position
It has an expert report and the Applicant has none to support any of her
contentions
The Google maps images are too far way to be compelling evidence of
the state of the roof.
Analysis
47. I have carefully considered the parties’ submissions and the material
presented, particularly the photographs. I am of the view, that they show the
roof is rusted and in a poor state. I note the attempts at repair. The Applicant
says she did not make those repairs and says she has been in the house
since 2000, although I do note she also said she made some repairs after
the Cyclone and after Su and S had been on the roof.
48. Although the Applicant says the roof did not ever leak before the cyclone in
2011, even if this is so, there is no independent evidence that the roof was
actually damaged in the cyclone. In my view, looking at the photographs, the
state of the rust and the repairs (some of which must have been done before
2000 if the Applicant did not effect them), I accept the expert independent
evidence of S, that all the damage to the roof is long standing and pre-dates
the cyclone.
49. Having read the report of S in full and looked at the photographs, I also
accept that he is qualified to comment on the state of the roof and the cause
Case No: 297952 Determination Page 9 of 9
of the state of the roof and I accept that he gained access to the roof from
the ladder provided by Su and the independent roofer, “ CLR ” .
50. Although the Applicant says Google maps in 2010 support her contention,
there is no evidence from her in that regard nor is there any independent
expert evidence to rebut the expert evidence of S.
51. Accordingly, I am satisfied that on the balance of probabilities, the roof was
not damaged in the cyclone and that its current condition is due to wear and
tear, gradual deterioration, rust and the failure to keep the insured property
in good condition. In view of that finding, the FSP is entitled to deny the claim
to repair the roof.
52. The FSP has said that it will pay to repair the damage to the interior of the
house but the Applicant must repair or replace the roof. It is prudent and
usual insurance practice to refrain from repairing the interior of a property
until the exterior is structurally sound.
53. The policy provides the FSP may chose to pay the reasonable cost of repair
or pay a cash amount being the amount it would reasonably cost to repair
the property. In all the circumstances of this matter, and if the parties cannot
agree on what work needs to be done to the roof to ensure it is structurally
sound, then the FSP may consider its option to cash settle the claim for the
interior damage to the house after receipt of the excess (assuming it has not
been paid already).
Determination
54. On the basis of the available information and for the reasons stated, the FSP
is entitled to refuse to pay the claim to repair or replace the roof.
55. On the basis of the available information and for the reasons stated, I
determine that within 14 days of the Applicant accepting this Determination;
a. each party obtain and exchange quotations for repairs to the internal
damage to the residence from repairers who hold no association with
the FSP. The repairers should be properly qualified to perform the
necessary works.
b. The FSP will be entitled to choose the most reasonably costed repair
quotation on the basis this quotation addresses the works required to
be performed.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.