Home / Financial Firm (Unknown - Insurer) / Determination 297862
Determination 297862
Flood inundation claim denied under flood exclusion, flash flood cover disputed
Summary
The applicants' Queensland home was inundated in January 2011 and the FSP denied the claim as excluded flood, paying $12,500 from its compassionate fund. AFCA found the first 300mm of inundation before 4am on 12 January 2011 was covered flash flood, ordered repair or replacement up to policy limits with interest, and declined non-financial loss compensation.
Flash flood cover under the policy applies only to flooding occurring within 24 hours of the heavy rain that caused it, so the flood exclusion applied to later inundation, and the FSP had adequately disclosed the exclusion under the Insurance Contracts Act.
Issues
- Claim denial primary · upheld
“The FSP is to meet the cost of repairing or replacing the building and contents damaged by the inundation up to a level of 300mm above the slab”
- Failure to disclose secondary · not upheld
“the Panel finds that the FSP has met its obligations under Section 35 of the Act and is entitled to rely on the terms and conditions”
Subjects and remedies
home or building damagenatural disasterpay claimpay interest
Text of the determination
Case No: 297862 Determination Page 1 of 9
Case number: 297862
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim
12 February 2013
Background
1. The female Applicant held a home building and contents policy with the
Financial Services Provider (FSP).
2. In January 2011, the Applicants‟ home in Jindalee was inundated with water
following severe weather events in Queensland.
3. The FSP assessed the claim and refused liability on the basis the loss was
caused by flood, which is an exclusion under the policy. However, the FSP
paid the Applicants $12,500 from its compassionate fund.
4. The Applicants disputed the decision, arguing the loss was caused by flash
flood and the FSP had failed to clearly inform them of the flood exclusion.
5. The FSP maintained the loss is excluded under the policy.
Summary of Applicant s’ position
6. The Applicants say the property was inundated within 24 hours of a storm
and therefore the loss is covered under the terms and conditions of the
policy.
7. The property was inundated before 4:00am on 12 January 2011 and the
Service‟s „broad approach‟ to the W4 releases from the Wivenhoe Dam
applies to cover the claim.
8. There are a number of large stormwater drains in the area and these were
blocked, with water from the drain at the rear of the property rising by
approximately 5m before the female Applicant evacuated the property at
6:00am on 12 January 2011.
9. They are unsure if the Product Disclosure Statement (PDS) was sent to
them before the premium was paid.
10. The PDS‟s definition of „flood‟ is also too broad and fails the FSP‟s obligation
to clearly inform.
Determination
Case No: 297862 Determination Page 2 of 9
11. The FSP‟s hydrologist uses definitions that do not appear in the PDS.
12. The hydrologist has also failed to take into account local topographical
features.
13. The Applicants seek to have their claim paid with interest and in addition is
seeking compensation for the stress caused by the FSP‟s handling of the
claim.
Summary of FSP’s position
14. The FSP says the policy excludes loss caused by flood.
15. The expert evidence establishes the loss was caused by flood and therefore
the claim is excluded under the terms and conditions of the policy. It rejects
the Applicants‟ suggestions that the hydrologi st failed to take into account
local topographical features.
16. It provides documentation to support its submission that the PDS with the
flood exclusion was posted to the Applicants in 2009.
17. The Applicants were paid $12,500 from its compassionate fund.
18. The FSP does not accept that there was a flash flood within 24-hours as the
rain from 9 January 2011 caused the Wivenhoe Dam to be at an elevated
level and it cannot be reasonably argued that the rain in the early hours of 11
January 2011 was the proximate cause of the loss.
19. The Wayne Tank principle also applies to exclude the claim because a
significant cause of the loss (the rain from 9 January 2011 onwards) is
excluded under the policy.
20. There are also concerns the evidence from the engineers controlling the
dam was not reliable and therefore decisions should not be made based on
the statements from those engineers.
21. The FSP relies on the following policy provisions:
Certificate of Insurance
“ What optional covers are included and not included
Home Contents
...
Flood and storm surge not included not included...”
Product Disclosure Statement (PDS)
“ Words / terms with special meanings
Word / term Meaning
...
Case No: 297862 Determination Page 3 of 9
Flood Rising water which enters your home as a result of it
running off or overflowing from any origin or cause.
This policy does not cover flood unless we have
agreed and it is shown on your certificate of insurance.
Flash flood and
stormwater run - off
A sudden flood caused by heavy rain that fell no more
than 24 hours prior to the flash flood o r stormwater
run - off.
...
Storm A violent disturbance of the atmosphere associated
with strong winds including a cyclone, lightening,
heavy rain, hail or snow, but not continuous bad
weather by itself.
...
Insured events you are covered for
Damage caused by weather...
What is covered What is not covered
Storm Loss or damage:
caused by rain, hail or snow
after it has reached the
ground...
...
Flash flood and stormwater run-off
A sudden flood caused by heavy rain
that fell no more than 24 hours prior to
the flash flood or stormwater run - off
Loss or damage caused:
by flood...
...
Your home
The most we will pay you for home claims
What is covered What is not covered
Flash flood and stormwater run-off
We will pay up to 50% of your home sum
insured or $25,000, whichever is higher.
...
...
Your contents
The most we will pay you for contents claims
What is covered What is not covered
Case No: 297862 Determination Page 4 of 9
... ...
Flash flood and stormwater run - off
We will pay up to 50% of your contents
sum insured or $25,000, whichever is
higher, but not exceeding your contents
sum insured.
...
...”
Issues
22. Whether the FSP has met its onus to clearly inform the Applicants of the
flood exclusion?
23. Whether the loss was caused by flash flood, as defined by the policy?
24. Whether the FSP is required to indemnify the Applicants under the terms
and conditions of the policy?
Reasons for decision
25. As advised to the parties, the Financial Ombudsman Service has considered
it appropriate to refer this dispute directly to the Panel in accordance with the
Operational Guidelines to the Service‟s Terms of Reference. This is because
of the potential amount of the claim and the issues to be considered. This
dispute has not been the subject of a FOS Recommendation and has
proceeded directly to Determination.
26. This decision has been made by a Panel consisting of an Ombudsman, an
insurance industry representative and a consumer representative.
Whether the FSP clearly informed the Applicants of the flood exclusion?
27. Section 35 of the Insurance Contracts Act 1984 (the Act) provides that an
insurer must notify an insured of derogation from the standard cover
provided under the Insurance Contracts Regulations 1985 . As it applies to
this case, the FSP was required to advise the Applicants that it did not offer
the sta ndard cover of „flood‟ under the policy.
28. Usually, the provision of a PDS which contains the terms and conditions of
cover (and its exclusions) within 14 days of the inception of the new policy
(or after 14 days but before a loss has occurred) is sufficient for the FSP to
meet its obligations to the Applicants, as provided under Section 69 of the
Act.
29. The evidence before the Panel indicates that a PDS was sent to the
Applicants before the loss. The Applicants have questioned whether they
received the PDS before paying the premium; however, as noted by the
Case No: 297862 Determination Page 5 of 9
FSP, its obligation as provided by Section 69 of the Act, requires that an
insurer will be able to rely on a provision so long as the insured is clearly
informed of the effect of a provision at some time before the loss occurred.
30. The Panel has reviewed the terms and conditions of the policy and is
satisfied the policy wording sufficiently outlines that while flash flood within
24-hours of heavy rain is covered, other flooding is excluded.
31. In the Panel‟s view the wording is clear and effectively provides that where a
flood occurs within 24 hours of the heavy rain which caused it, the loss is
covered under the event of flash flood.
32. The policy also limits cover under flash flooding to 50% of the sum insured or
$25,000, whichever is higher, for each of the building and contents sums
insured.
33. In reviewing this case, the Panel is satisfied the PDS clearly outlines the
exclusions and limits under the policy. This includes the limits to coverage in
respect to flash flood; that is, 50% of the building and contents sums insured
or $25,000, whichever is higher.
34. The Panel finds this limit is expressed clearly under a heading relating to
policy limits. The page number of where to find the table of limits is also
listed i n the „Index‟ at the beginning of the policy.
35. The Certificate of Insurance also clearly states that the Applicants did not
have the flood cover option selected on their policy.
36. Accordingly, the Panel finds that the FSP has met its obligations under
Section 35 of the Act and is entitled to rely on the terms and conditions of the
policy.
Whether the loss was caused by flash flood, as defined by the policy?
37. The FSP‟s hydrologist, in his Key Conclusions statement attached to his
letter dated 4 October 2012 says that by 4:00am on 12 January 2011, the
river level would have been at 9.9m AHD, which is 300mm above the
relevant benchmark level of the property.
38. This is roughly consistent with the Applicants‟ version that the home was
inundated sometime after 2:00am on 12 January 2011.
39. The Panel notes that the policy provides limited cover for „flash flood‟. In
order for the Applicants to be entitled to this limited cover, the following
elements must be established:
there was a sudden flood;
there was a heavy rain that occurred within 24 hours prior to that flood;
the sudden flood was caused by that heavy rain.
40. The Financial Ombudsman Service has determined in other disputes,
following consideration of all material exchanged, that the heavy rainfall
Case No: 297862 Determination Page 6 of 9
commencing around 4.00am on 11 January 2011 was a proximate or
effective cause of the adoption of the W4 release strategy. It has previously
been determined that this combined with the heavy rain over the Brisbane
River from about 4.00am that day and the heavy rain that commenced falling
over the Bremer River was the proximate cause of inundation of many
properties downstream of the Wivenhoe Dam.
41. Given the wording of the FSP‟s policy in respect to flash flood, it has been
found that the inundation in these earlier determinations is properly
categorised as flash flood providing the inundation occurs within 24 hours of
the commencement of the heavy rainfall.
42. The Panel has considered the further evidence and submissions and the
additional material provided by the FSP in this dispute and it is not satisfied
that the evidence which led to the earlier determinations, in respect of „flash
flood‟ has been significantly challenged in any material way.
43. For the Applicant s‟ claim to succeed and fall within the definition of „fla sh
flood‟ within the terms of the policy, it is necessary for the Applicant s to
establish the property was inundated within 24 hours of this heavy rainfall.
As the Panel accepts the heavy rainfall commenced at approximately
4.00am on 11 January 2011 the inundation would have to occur before
4.00am on 12 January 2011.
44. It has been established that that the property was inundated to a level of
300mm by 4:00am on 12 January 2011.
45. Accordingly, in line with the „broad approach‟ the Panel is satisfied the water
that initially inundated the insured property was „flash flood‟ as defined by the
policy, to a level of 300mm above the slab on ground.
46. For the sake of clarity, the FSP is not liable for any damage which would
have occurred after 4.00am on 12 January 2011, being the expiry of the 24
hour period in which cover for flash flood was in effect.
Quantum
47. The Renewal Certificate of Insurance for the relevant period provides a sum
insured of $262,000 for the home building and $127,000 for the home
contents . Pursuan t to the policy cap for the insured event of “Flash flood and
stormwater runoff”, the FSP is liable up to the amounts of $131,000 for the
home building and $63,500 for the home contents.
48. The information available to the Panel does not allow it to determine the
extent of the loss sustained as a result of the inundation; however, to a level
of 300mm, the Panel would anticipate the loss particularly to the contents
was relatively severe.
49. Insofar as damage to the home building is concerned the Panel notes that
the Applicants say their home was severely damaged by the inundation and
as a result it has been demolished and rebuilt according to council
Case No: 297862 Determination Page 7 of 9
regulation. However, there is no evidence as to the extent of damage to the
building that would have been caused by inundation up to 300mm prior to
4.00am on 12 January 2011 (being the relevant period of cover for flash
flood).
50. In the absence of any accurate assessment with respect to this, the parties
are asked to work together to develop a relevant list of the building and
contents damage and to work together to reach agreement as to the cost of
repairs and/or replacement of the various building and contents damage as a
result of the inundation to the property as detailed above.
51. In the event that the parties are unable to reach agreement, then the parties
are invited to make further submissions to the Panel and the Panel will
determine the extent of the loss.
52. Insofar as the FSP reportedly made payment of a compassionate sum to the
Applicants of $12,500, the Financial Ombudsman Service does not have
jurisdiction to deal with this payment but acknowledges that the FSP, given
the terms on which the compassionate payment was made, may be entitled
to deduct this payment from any settlement sum.
Interest
53. The Panel has also considered whether interest ought to be payable in this
dispute.
54. The FSP has argued that interest is only payable from the date from which it
was unreasonable to withhold payment. The FSP maintains that it is entitled
to a reasonable period to investigate and determine its position and given
the complex nature of the flood disputes, the delays are not unreasonable.
Further complex situations require substantial periods of time for
independent bodies such as the Queensland Flood Commission of Inquiry
and FOS, to make conclusions on the issues in dispute.
55. The FSP maintains that it did not act unreasonably in this dispute and
therefore interest is not payable. Alternatively if some period of interest is to
be awarded it should be reduced to account for the substa ntial delays
through the course of the process which were not the FSP‟s fault.
56. Section 57 of the Act requires interest be paid when it becomes
“unreasonable for the insurer to have withheld payment”. An examination of
relevant case law indicates that most probably, interest will be awarded from
either when an insurer first emphatically denied liability or disputed a matter,
or from when in the normal course of events the claim should have been
paid if liability had not been disputed.
57. In this dispute the Panel accepts that the FSP was entitled to withhold
payment of the settlement monies until such time as it had properly
investigated the dispute and made its decision as to liability.
Case No: 297862 Determination Page 8 of 9
58. The FSP made its original decision to deny the claim after receiving relevant
assessment reports, hydrology reports and other information. The FSP was
aware of the terms of its policy and aware of the relevant provisions under
which liability might arise and chose to deny the claim having reviewed those
relevant provisions and the evidence available to it.
59. In the Panel‟s view, at that point the FSP has made its decision on the claim
and it is appropriate that from that time interest be paid unless it can be
established that the Applicants withheld information from the FSP that would
have led to an alteration of its decision.
60. The evidence before the Panel indicates the Applicants requested IDR
reviews in June 2011 and July 2012.
61. Accordingly, the Panel determines that it is appropriate that the FSP in this
dispute pay interest from 10 March 2011 (the date when the claim was first
declined), until payment of the claim.
Compensation
62. The Applicants seek compensation for the stress caused by the FSP‟s
handling of the claim.
63. The Panel has considered the issue and notes that in order for
compensation for non-financial loss to apply under paragraphs 9.3 of the
Terms of Reference, an “unusual degree or extent of physical
inconvenience, time taken to resolve the situation or interference with the
Applicant’s expectation of enjoyment or peace of mind” has to occur.
64. In this case there is no doubt the Applicants have been placed in a stressful
situation due to the flood event and the subsequent claim.
65. However, the fact that the claim was denied and the Service has taken a
different view based on the „broad approach‟ to the W4 releases, does not
dictate that compensation is payable.
66. The Panel has reviewed the claim and while it acknowledges the issues t hat
have arisen for the Applicants as the result of the loss, it has not persuaded
compensation is payable, particularly given the enormity of the storm events
that impacted upon the Applicants, Queensland generally and the FSP in
2011.
Determination
67. The FSP is to meet the cost of repairing or replacing the building and
contents damaged by the inundation up to a level of 300mm above the slab
on the ground. Any payment is subject to a limit of no more than $131,000
for the buildings and $63.500 for the conte nts, pursuant to the relevant policy
limits.
Case No: 297862 Determination Page 9 of 9
68. Insofar as the FSP is to cash settle the claim, the FSP is to pay interest from
10 March 2011 to the date of payment of the claim, in accordance with
Section 57 of the Act.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.