Home / Financial Firm (Unknown - Insurer) / Determination 297518
Determination 297518
Denial of building water damage claim under maintenance and wear exclusions
Summary
The owner of a strata unit claimed $2,733.50 for 2012 balcony waterproofing and water damage, which the insurer denied as maintenance related. AFCA determined the applicant was not entitled to the reimbursement claimed.
The 2012 loss resulted from a maintenance or structural defect excluded under the policy, and the 2009 repair payment did not create estoppel or liability for the later loss.
Issues
- Claim denial primary · not upheld“neither insurer is obliged to accept the 2012 claim for damage that is maintenance related (and excluded under the 2012 policy)”
- Inadequate claim investigation secondary · not upheld“the Applicant argues Repairer T failed to identify the cause of the damage in 2009; the Panel does not accept estoppel applies”
Subjects and remedies
no remedy
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Case No: 297518 Determination Page 1 of 11
Case number: 297518
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of Claim - Policy Exclusion - Maintenance Issues
05 August 2013
Background
1. I have reviewed all the material submitted by the parties and save where I
make note specifically, I am satisfied the background as set out in the
Recommendation is accurate and is as follows. Much of the background is
also set out under Reasons for Decision.
2. Body Corporate held a building insurance policy with Insurer X from 25
February 2004 to 25 February 2011.
3. Body Corporate held a strata insurance policy with Insurer Y from 25
February 2011 to 25 February 2013.
4. Insurer X and Insurer Y belong to the Z Group of Companies.
5. Based on a letter dated 7 January 2010 from Insurer X to the Applicant, it
appears that the change in insurers (from Insurer X to Insurer Y) was
brought about by “some changes to the way Z sell and distribute [Insurer X‟s]
insurance pr oducts”.
6. The named Financial Services Provider (FSP) in this dispute is a partner of
Insurer Y and is also a part of the Z Group of Companies.
7. The Applicant is the owner of one of the insured units.
8. The Applicant made a claim on Insurer X in 2009. Now the Applicant seeks
reimbursement of $2,733.50 from Insurer Y and $100 excess for the costs to
repair damage done in 2012 in the same area. He says that “it is apparent
that this has been an ongoing problem for some years and it is clear that the
Insurer X and their approved repairers have not addressed the source of the
problem correctly on at least two occasions”. He says he is prejudiced as he
can no longer claim on the Builders Warranty Insurance.
9. Insurer Y denied the claim as it does not believe it is liable for the claim. It
says that it is maintenance and it is not covered under the policies. It notes
that the work done in 2009 by D and says D is not an Insurer X panel
repairer and so it is not responsible for D‟s work. It also contends, in 2009
the Applicant was put on notice by Insurer X to identify the cause of the
water ingress.
Determination
Case No: 297518 Determination Page 2 of 11
10. The Applicant did not agree with the FSP‟s decision, hence the dispute
which was the subject of a Recommendation. The Recommendation was in
favour of the FSP and was not accepted by the Applicant. The FSP accepted
the Recommendation. In the circumstances, the matter has been referred to
me for Determination.
Summary of Applicant’s p osition
11. I have reviewed all the material submitted by the parties and save where I
make note s pecifically, I am satisfied the Applicant‟s position as set out in
the Recommendation is accurate and is as follows.
12. The Applicant says that because the Repairer, “T”, and the Insurer Y‟s
“parent company” admittedly got it “wrong as to how the water entered the
garage ceiling in 2009” by reimbursing him $1,760 for the balcony pillar/wall
repair by “R”, estoppel applies and Insurer Y is also responsible for the
maintenance repairs in 2012, because of the failure by Insurer X and T to
identify the cause of the damage. The damage continued in the ensuing
period between 2009 and 2012.
13. It was never mentioned before, that the 2009 payment was one made as a
gesture of good faith.
14. He has provided photographs of the balcony which identify where the work
was done in 2009 and where the water entered in 2012.
15. The Applicant seeks reimbursement of $2,733.50 from Insurer Y and $100
exce ss for damage done in the same area in 2012. He says that “it is
apparent that this has been an ongoing problem for some years and it is
clear that the Insurer X and their approved repairers have not addressed the
source of the problem correctly on at leas t two occasions”. He says he is
prejudiced as he can no longer claim on the Builders Warranty Insurance.
16. The Applicant rejected the Recommendation and said on 11 June 2012:
“I believe (the Case Manager) is wrong in her comments .... Repairer D was
only required to waterproof the grouting between the balcony tiles and this he
did satisfactorily. This was what was requested by Repairer T who was
appointed by Insurer X. Repairer T never identified the problem that was
detected by Repairer R in 2012.
Accordingly I believe Insurer X are responsible for the failure of Repairer T
who was acting as the Insurer‟s agent to correctly identify the problem and
accordingly, I reject ... (the) decision.”
17. Further on 9 July 2012, the Applicant advised:
“Other than commentin g that I cannot understand why (FSP) continue to refer
to a roof tiler having a look for any problems on the roof as the roof is not
involved with the problem on the balcony, I have nothing further to add.”
Case No: 297518 Determination Page 3 of 11
Summary of FSP’ s position
18. I have reviewed all the material submitted by the parties and save where I
make note specifically, I am satisfied the FSP‟s position as set out in the
Recommendation is accurate and is as follows.
19. It accepts that Repairer T confirmed Repairer D‟s assertion , that the origin of
the water ingress in 2009 was in fact the cracking in the balcony parapet
wall. It says that it is clear from the 2012 claim, that the waterproofing of the
balcony was still an area of concern which requires rectification. It also says
that in 2009, Repairer T recommended that the Applicant arrange for the
balcony to be re-sealed and arrange an inspection to determine any further
maintenance issues and that the Applicant did not do this. Had he done this,
he may have mitigated his current loss.
20. It argues that “it has no responsibility to search for , or identify issues which
are not claimable under the subject policy, such as faults that existed prior to
the insured event, maintenance related concerns or structural and design
defects.”
21. It says the Applicant was on notice of his responsibilities to repair the
balcony when the claim was denied by letter dated 21 July 2009.
22. In any event, it says the current problem identifies the incorrect installation of
the waterproofing membrane which was not installed by D.
23. The FSP also contends that neither T nor Insurer X instructed D and that
Insurer X is not responsible for D. It notes D is not an Insurer X panel
repairer and so it is not responsible for D‟s work .
24. The FSP says the Applicant has failed to show the waterproofing issue is
caused by an insured event or by the fault of Insurer X or repairer T. The
FSP also says that maintenance related issues are not covered under the
policy with Insurer X and the policy with Insurer Y. The two policies are
separate.
25. The FSP relied on policy conditions from 2009 and 2012 polices as follows:
“ Relevant Policy Provisions
Insurer X
Your Responsibilities (cont) Page 9
Your other responsibilities
You must:
Keep your Building and Common Contents in good condition.
This includes:
Repairing faults or fixing defects ...
Case No: 297518 Determination Page 4 of 11
What is not insured under your Building or Common Contents cover
Page 28
wear, tear, rust
What is not insured under your Building or Common Contents cover
(cont) Page 29
failing to take reasonable care
defect, structural fault, faulty design
How claims are paid Page 34
Your Building and Comment Contents claims
We will not:
x Fix a fault that existed before the loss or damage occurred.
Insurer Y
About your cover Page 4
Building cover
When we insure your building, we will cover it for accidental loss or damage
or theft, in the period of insurance if the loss, damage or theft is not excluded
by any part of your policy.
What is not covered under any part of your policy Page 23
We do not cover the cost of replacing or repairing:
Other building defects
building defects or faults or fixing building design problems.
Wear, tear, rust
wear, tear, rust, fading, gradual deterioration such as (but not limited to):
>> tile grouting breaking down
We do not cover loss or damage to your building or common contents
caused by: Page 27
Failing to take reasonable care
caused by, or as a result of, your failure to take reasonable care of your
building or common contents.
Defect, structural fault, faulty design
>> caused by a defect (eg. defective materials or workmanship), structural
fault or design fault that you knew about (or should reasonably have known
about) and did not fix before the loss or damage occurred.
This means that if there are signs that a defect was previously the cause of
loss or damage (eg. rain previously leaked into your building due to a defect
and you did not fix it) then we will not pay a later claim for further damage
from this defect.
How we settle your claim Page 37
We will not:
>> fix a fault that existed before the loss or damage occurred.”
Case No: 297518 Determination Page 5 of 11
26. The FSP accepted the Recommendation and did not provide any further
documentary information in support of its position save to reiterate its
position and to rebut the Applicant‟s contentions after the Recommendation
in its email dated 1 July 2013.
Issue
27. Whether the Applicant is entitled to a reimbursement of $2,733.50 for the
waterproofing of the balcony in 2012.
Reasons for Decision
28. There has been an exchange of material between each party and I am
satisfied each party has had an opportunity to reply to the issues raised.
29. Each FOS case is decided on its merits, taking into account the facts of the
case. I have reviewed all the material submitted by the parties both before
and after the Recommendation was issued, in order to reach my decision. I
will only refer to the relevant submissions and materials raised.
30. Having reviewed all the material submitted by the parties and save where I
make note specifically, I am satisfied the following represents an accurate
summary as set out in the Recommendation and is as follows .
2009 claim
31. On 21 May 2009, while the policy with Insurer X was effective, the Applicant
lodged a claim with Insurer X for damage to the garage ceiling from a storm
on 20 May 2009 and provided a quote for the repairs from “B” in the amount
of $2,634.50. He had purchased the property in March 2009. He says he
was told by neighbours that the previous owners had some problems too
with the garage ceiling.
32. Repairer T inspected the building on 16 June 2009 and made a report which
relevantly states:
“On inspection of the roof cavity the leak appears to be a water proofing
concern to the balcony above the area of concern. The roofer has suggested
having the area re-sealed.
...
MAINTENANCE / DEFECT ISSUES:
On inspection we identified the following maintenance issues
Re-seal the balcony area above the garage to prevent water entering
We recommend the insured arrange for the repair of the above maintenance
issues as well as a detailed inspection of the roof area by a suitably qualified
roofer to identify any other maintenance issues that may have contributed to
the water ingress.”
Case No: 297518 Determination Page 6 of 11
33. On 21 July 2009, Insurer X partially accepted the claim as follows:
a. Insurer X did not accept the claim for repairs to the waterproofing of the
balcony area above the garage due to maintenance issues. FSP‟s
Repairer T, assessed the balcony on 16 June 2009 and identified the
issue as a maintenance issue and scoped the work to repair the ceiling
of the garage, after the Applicant had re-sealed the balcony above the
garage to prevent water from entering the garage ceiling.
b. T also noted on that report; “ we recommend the insured arrange for the
repair of the above maintenance issue as well as a detailed inspection
of the roof area by a suitably qualified roofer to identify any other
maintenance issues that may have contributed to the water ingress .”
c. Insurer X accepted the resultant damage to the garage ceiling as it
considered the Applicant may not have reasonably known about the
waterproofing issues on the balcony.
d. Insurer X said it would authorise the repair of the resultant damage
after repairs in relation to waterproofing have been completed.
34. The Applicant then organised the waterproofing of the balcony by Repairer
D, at the cost of $220 as T could not do water proofing. The Applicant says
the work done by D was “limited to what they were instructed to do by T”. T
denies this.
35. Repairer D waterproofed the balcony. His quote says he was to “water seal
balcony, terracotta tiles and perimeters”. However, he later informed the
Applicant that the grouting was not the problem. D said the problem was the
balcony pillar.
36. The Applicant informed Repairer T of Repairer D‟s opinion. Repairer T
reinspected the property again and removed the damaged ceiling to be able
to identify where the water was coming from. Repairer T “noticed that water
had entered via cracking to render of a balcony parapet wall area and not
the base, as first thought”. Repairer T said this was a maintenance issue
which the Applicant should attend to at his expense.
37. The Applicant then appointed Repairer “R” to repair the render of the
balcony pillar/wall. The Applicant paid R $1,760 for this work.
38. The Applicant complained to Insurer X. He argued that Insurer X cannot
change its mind on how the water entry occurred and expect the Applicant to
pay twice for maintenance repairs.
39. On 9 September 2009, Repairer R wrote to Insurer X stating he did not
believe that the initial cracking was caused by general wear and tear.
40. Insurer X then reimbursed $1,760 to the Applicant.
Case No: 297518 Determination Page 7 of 11
2012 claim
41. On 25 January 2012, while the policy with Insurer Y was effective, the
Applicant lodged a claim with Insurer Y for water damage to the garage
ceiling due to a storm.
42. Insurer Y partially accepted the claim as follows:
a. Insurer Y did not accept the claim for repairs to the waterproofing of the
balcony due to maintenance issues. FSP‟s Repairer, “H”, noted “gaps
in the grout as the tiles met the sliding door at the corners and in the
centre of the door... The waterproofing membrane has either been
compromised at some point, or was incomplete on installation and
didn‟t seal up under and to the sides of the door correctly”;
b. Insurer Y accepted the resultant damage to the garage ceiling;
c. Repairer H advised the Applicant that repairs to the garage ceiling will
not be done until the maintenance issues have been addressed. H
notes:
“Leak has not been repaired & insured is not sure where water is entering
home. Insured said this is a re occurring leak problem which has occurred
twice since he has own property and once that he is aware of to previous
owner. I Recommend plumbers report to identify leak ingress, cause of
damage and if maintenance is required to stop leaks prior to commencing
repairs.”
d. A plumbers report was done. H further notes:
“Called to report on leaks to garage ceiling.
On inspection of the area above the damage I found an aluminium sliding
door leading out onto a tiled balcony. There were gaps in the grout as the
tiles met the sliding door at the corners and in the centre of the door. In
driving rain water would enter here and run down getting behind the wall
and flooring and entering the ceiling space below.
The waterproofing membrane has either been compromised at some point,
or was incomplet e on installation and didn‟t seal up under and to the sides
of the door correctly.
The problems with the balcony are a maintenance issue only. Insured has
been advised of maintenance and knows that repairs can‟t be done until
maintenance issues are rectifi ed.”
43. The Applicant organised the waterproofing of the balcony by “M”. He paid
$2,733.50 for the waterproofing. The work done by M included:
“ Balcony Repairs
Jack hammer the existing floor and skirting tiles and dump off site. Clean the
existing for surface ready for the new waterproofing.
Apply new waterproofing membrane to the floor area, perimeter and up wall
100mm. Supply and lay new terra cotta floor and skirting tiles to match the
existing or as close as possible. Grout the new tiles.
Silicon seal the perimeter of balcony.”
Case No: 297518 Determination Page 8 of 11
44. It is established insurance law that the onus rests with the Applicant to
prove, on the balance of probabilities, that the loss is covered by an insured
event under the policies or by the fault of Insurer X and repairer T, for failing
to correctly identify the reason for the damage in 2009.
45. The onus then shifts to the FSP to establish the loss falls within an exclusion
from cover.
46. In my view, for the Applicant to succeed, he must show that Insurer X and/or
repairer T did get it wrong in 2009 and that the damage in 2012 would not
have occurred had a better analysis of the cause of damage been made in
2009.
47. The material before me establishes that, the damage in the 2009 was first
identified by T having occurred because of lack of water proofing to the
balcony over the garage and so that area was to be resealed. D did that
work. His quote says the work he did was: “water seal balcony, terracotta
tiles and perimeters.”
48. D then advised the Applicant this was not the cause of the problem. D
identified the problem was the balcony pillar. T reinspected the area and in
fact removed the damaged ceiling to see where the water was coming from.
T then agreed; “... that water had entered via cracking to render of a balcony
parapet wall area and not the base as first thought”.
49. R repaired the cracking on or before 27 July 2009 as he sent an account for
the repairs on that date in the amount of $1,760.
50. In 2012, the cause of the leaking was identified by H, in the area above the
damage where there is an aluminium sliding door, leading out on to the
balcony. H said there were gaps in the grout here. He concluded:
“The waterproofing membra ne has either been compromised at some point,
or was incomplete on installation and didn‟t seal up under and to the sides of
the door correctly.”
51. M applied new waterproof membrane and sealed the perimeter of the
balcony with silicone.
52. I have looked at photographs taken by the Applicant of the areas from which
the water issued in 2009 (the pillar) and 2012 (gaps in the grout proximate to
the aluminium door). The water has not issued from the same area and in
my view, the resulting damage is therefore not necessarily caused by the
same issue.
53. Furthermore, I have carefully reviewed Insurer X‟s records and they indicate
that neither Insurer X nor T instructed D about the scope of work to be done
on or about 10 July 2009 and this accords with usual insurance practice as
the work done was not covered by the policy, as the work done was to rectify
a maintenance issue.
Case No: 297518 Determination Page 9 of 11
54. In any event, the work done by D is not to the water membrane nor is it
relevant to the damage caused in 2009 as D identifies another reason for the
water ingress at that time and after inspection, T agrees. R does this repair
work.
55. I agree the 2009 payment to R was not recorded by insurer X as one made
as a gesture of good faith. It is not clear to me why the payment for R was
made at all, as the ent ry in insurer X‟s records on 11 September 2009 says:
“in review of this email and report from R we will cover internal ceiling damage
however not the cracking to the top ledge of the front balcony parapet.”
56. However, the next entry on 14 September 2009 indicated it received the
invoice from R and “invoice states, cracks were caused by water damage”
and it was for this reason, R‟s invoice was paid. However, when I examine
the invoice from R dated 27 July 2009, it does not say this. The letter from R
dated 9 September 2009 sets out R‟s view but it is the same as the view he
expressed in his email to Insurer X on or about 10 September 2009.
57. In any event, for whatever reason, R was paid by insurer X and so the
Applicant argues that Insurer Y is estopped from denying the 2012 claim
because in 2009, Insurer X reimbursed the Applicant $1,760 for these
repairs to the balcony pillar.
58. However, the cause of the damage is identified in 2012 by H, as a problem
with the waterproofing membrane and Insurer X had not previously admitted
it was liable for the waterproofing of the balcony. Indeed, D says this was not
a problem in 2009.
59. Accordingly, in my view, neither insurer is obliged to accept the 2012 claim
for damage that is maintenance related (and excluded under the 2012
policy), even if it accepted the claim for repair to damage done by R in 2009.
60. Moreover, I am satisfied that Insurer X advised the Applicant in writing of his
obligations under the policy in its letter dated on 21 July 2009. Its letter says
relevantly:
“Unfortunately, we cannot accept the repairs to the water proofing of your
balcony area of your claim. The report received from our appointed builder T
states:
„On inspection we identified the following maintenance issues:
The leak appears to be a water proofing concern to the balcony above
the area of concern. The roofer has suggested having the area re-
sealed.
Re-seal the balcony area above the Garage to prevent water entering.
There is no sign of any storm damage to this roof.
We recommend the insured arrange for the repair of the above maintenance
issues as well as a detailed inspection of the roof area by a suitably qualified
roofer to identify any other maintenance issues that may have contributed to
the water ingress.’.... (my emphasis)
Case No: 297518 Determination Page 10 of 11
Further you must also:
Keep the home, unit and contents well maintained and in good condition, this
includes rectifying faults or defects such as fixing roofs, gutters, drains, water
pipes and tiles areas when they leak or need repair.
....
We must inform you that if the balcony issues are not rectified, any future
claims relating to these issues will not be accepted.”
....
61. The above letter puts the Applicant on notice as to what he must do at that
time. It repeats his responsibilities under the policy, and makes it clear that
he will not be covered, if damage occurs through a defect previously
identified and which he did not fix. The Applicant was clearly on notice that if
other maintenance issues on the balcony are not identified, then any future
claims will not be accepted.
62. The Applicant knew that some issues had been identified by D and rectified
by D and R. Insurer X clearly put him on notice that he also needed to
engage an expert to ensure there were no other maintenance issues that
may have contributed to the water ingress at that time.
63. If the problem identified by H in 2012 was apparent in 2009, and rectified by
the Applicant, then the 2012 damage would not have occurred as it would
have been rectified by the Applicant in or about 2009 had he arranged for
“ suitably qualified roofer to identify any other maintenance issues that may
have co ntributed to the water ingress”.
64. However, the cause of damage in the area of water ingress as identified by
H in 2012 may not have been apparent in 2009, as H says the “wate rproof
membrane has been compromised at some point...” The compromise may
have been after 2009. In any event, it is still not the responsibility of Insurer
Y, as it is still a maintenance issue or a structural defect which is not covered
under its policy.
65. In short, the Applicant has not satisfied me on the balance of probabilities,
that the 2012 loss is covered by an insured event under the policies or by the
fault of Insurer X and repairer T for failing to correctly identify the reason for
the damage in 2009. Further, because of the view of H, I am not satisfied
that the cause of the damage in 2009 is necessarily the same cause of the
2012 damage.
66. Further, the FSP has satisfied me that the loss sustained in 2012 is because
of a maintenance issue as identified by H and is excluded for cover under
the 2012 policy.
Case No: 297518 Determination Page 11 of 11
Determination
67. On the basis of the available information and for the reasons stated, I
determine that the Applicant is not entitled to a reimbursement of $2,733.50
for the waterproofing of the balcony in 2012.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.