Home / Financial Firm (Unknown - Insurer) / Determination 297427
Determination 297427
Denial of claim
Summary
A storm damage claim for a leaking balcony was denied by the FSP as wear and tear, deterioration and faulty workmanship. AFCA found the Applicant had not shown a single storm caused the damage and that the 2008 repairs were likely defective.
The Applicant did not establish a storm event as the cause, and the FSP showed the wear and tear, deterioration and faulty workmanship exclusions applied.
Issues
- Claim denial primary · not upheld“the FSP is entitled to deny the claim according to the terms and conditions of the policy”
Subjects and remedies
home or building damagenatural disasterno remedy
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Case No: 297427 Determination Page 1 of 7
Case number: 297427
General Insurance - Domestic Insurance - Home Building and Contents - Storm
- FSP Decision - Denial of claim - Prima facie claim - Wear and Tear - Faulty
workmanship
17 July 2013
Background
1. I have reviewed all the material submitted by the parties and save where I
make note specifically, I am satisfied the Background as set out in the
Recommendation is accurate and is as follows.
2. The Applicant held a home building and contents insurance policy with the
Financial Services Provider (FSP) which was in force at the time of the loss.
The policy provided cover against listed insured events.
3. On 18 January 2012, the Applicant lodged a claim for storm damage to his
home building which allegedly occurred on 25 December 2011.
4. The FSP denied the claim on the basis that the cause of damage is wear
and tear and/or faulty workmanship, which are causes excluded from cover
under the policy.
5. The Applicant disagrees with this decision and says that the damage was
caused by the storm event. He wants the FSP to pay his claim in full.
6. The Applicant did not agree with the FSP’s decision, hence the dispute
which was the subject of a Recommendation. The Recommendation was in
favour of the FSP and was not accepted by the Applicant. The FSP accepted
the Recommendation. In the circumstances, the matter has been referred to
me for Determination.
Summary of Applicant’s p osition
7. I have reviewed all the material submitted by the parties and save where I
make note specifically, I am satisfied the Appl icant’s position as set out in
the Recommendation is accurate and is as follows.
8. On 25 December 2011, there was a substantial amount of rain which caused
the balcony of his property to start leaking as water penetrated the tiles
causing water damage to the underlay and plaster in the garage below.
Determination
Case No: 297427 Determination Page 2 of 7
9. The FSP’s builder (P) inspected the damage two months after the storm
event. The FSP alleged that the balcony was incorrectly waterproofed.
10. He disputes this and contends that the balcony was waterproofed correctly
and was structurally sound. His plumber (GM) and builder (PA) concur that
the balcony had been waterproofed and that excessive amounts of rain were
the cause of damage.
11. The FSP also alleged that the balcony is more than 15 years old. The FSP
then attributed the damage to wear and tear. However, the building is not 30
years old as P claims, but approximately 12 years old.
12. Further, in 2008, builder CK was authorised by the FSP to completely
refurbish the balcony, including waterproofing, plastering, tiling, grouting and
sealing due to a previous heavy rainfall that caused similar damage. Thus
the balcony was only four years old at the time of the rainfall. The Applicant
says the stain on the balcony may be from the previous leak in 2008 but the
crack on the grouting came after the storm.
13. He is satisfied CK’s job in 2008 was completed to a satisfactory standard
and he says CK is not liable for the damage occurred during the storm.
14. The balcony is now under repair and he wants the FSP to pay for his claim.
15. The Applicant rejected the Recommendation and provided no further
documentary information in support of his position save for an email dated
13 June which essentially reiterated his position.
Summary of FSP’ s position
16. I have reviewed all the material submitted b y the parties and save where I
make note specifically, I am satisfied the FSP’s position as set out in the
Recommendation is accurate and is as follows.
17. GM and PA have failed to explain how the water penetrated through the
balcony. The FSP contacted GM for further explanation and was told that the
balcony had been there for approximately 15 years and that GM could not
confirm how the water had penetrated the tiles.
18. Following P’s report, it concluded the damage had been occurring for a
period of time and was likely due to breakdown or lack of a waterproof
membrane.
19. If it is established that CK carried out the repairs in 2008, it is P’s opinion that
they were not completed correctly.
20. The Applicant has not provided evidence to establish that the repairs were
carried out by a registered builder, so wear and tear is still probable.
Case No: 297427 Determination Page 3 of 7
21. As to the 2008 claim, it confirms the claim was accepted for the resultant
damage to the garage only and that the issued settlement was an effort to
assist the Applicant with his request to retain CK but was not an acceptance
of liability for the damage to the balcony tiles.
22. The Applicant has failed to establish a prima facie claim as the damage was
not the result of a one-off storm event. Further, the FSP has established that
exclusions for wear and tear, deterioration and faulty design or workmanship
are applicable.
23. The FSP relies on the following policy provisions contained in the Product
Disclosure Statement (PDS):
“ What you are not covered for – general exclusions
we will NOT cover
loss, damage, injury or death that occurs as a result of ...
wear, tear, rust, corrosion, deterioration or erosion
...
faulty design or workmanship ” .
24. The FSP accepted the Recommendation and did not provide any further
documentary information in support of its position.
Issue
25. Whether the FSP is entitled to deny the claim according to the terms and
conditions of the policy.
Reasons for Decision
26. There has been an exchange of material between each party, and I am
satisfied each party has had an opportunity to reply to the issues raised.
27. Each FOS case is decided on its merits, taking into account the facts of the
case. I have reviewed all the material submitted by the parties both before
and after the Recommendation was issued, in order to reach my decision. I
will only refer to the relevant submissions and materials raised.
28. In matters such as these, insurance law provides that the Applicant has the
onus to establish on the balance of probabilities that the claim falls within the
definition of an insured event, that is, a storm in this case. Once established,
the onus then shifts to the FSP to establish the application of the policy
terms or exclusions upon which it relies to deny or limit the claim.
29. The Applicant relies on GM and PA to prove the damage to the balcony
happened as a result of the storm on 25 December 2011.
Case No: 297427 Determination Page 4 of 7
30. The Applicant has provided two reports to support his position. PA’s report of
22 July 2012 says:
“A representative of [PA] inspected the above property and has come to the
conclusion that the damage sustained to the outside balcony was due to the
amount of rain that the balcony gathered in previous rain events. The tiles and
water proof membrane could not withstand the amount of water that had fallen
and therefore forcing itself into the sub floo r of the balcony” [sic].
31. GM’s report dated 7 June 2012 says:
“(GM) inspected the above address balcony and underneath damage to
plaster due to excessive amounts of water leaking through tiles of balcony
and have found traces of waterproofing to under side of tiles and have
concluded that due to amount of rain and hail nothing could stop that amount
of damage done to balcony and plaster. Need to be pulled up re-cement
sheetered & water proofed at reasonable satisfaction.”
32. The Applicant also provided some material from CK including a quote dated
17 January 2008 and an Invoice dated 10 April 2008. CK and the Applicant
say the work done was completed according to the job description in the said
documents. The quote relevantly indicates the work that was done:
“ Remove 5.5x1.5 terracotta tiles from balcony
Reseal balcony with waterproof sealant and prepare for new tiles
Replace approx 8.25 terracotta tiles re- grout and reseal”.
33. The Applicant also says in a letter exchanged on 3 January 2012, that:
“In response t o (FSP) claiming that they are unaware that another claim was
lodged for similar damage in 2008 and are saying in their opinion ONLY that
no repairs have been done. However if you compare the photos supplied by
FSP in 2007 to the ones in 2012 you can clearly see the damage is in
different sections of the balcony and not in the exact same location. So the
proof is in the photos, that damage shown in the 2007 photos are not in the
exact same location to the damage shown to the 2012 photos.”
34. The Applicant did not allow the FSP’s builder P to reinspect the damage to
the balcony earlier this year as the balcony was already under repairs and
he doubted his independence.
35. The FSP argues that the damage was not as a result of a single storm event
but that it had been ongoing. It developed this view after its expert P
assessed the damage on 21 February 2012. However, in this report P is
unsure about the claim and Scopes of Work at an estimated cost of
$15,153.60. In his first report to the FSP, P said:
“Inspection of t he balcony revealed that sections of the tiles are beginning to
lift, crack and grout become dislodged.
Inspection below the balcony was a garage ceiling with a plaster lining. The
plaster had been water damaged and needed to be removed which the
insured has arranged. I was able to clearly see water damage to the yellow-
tongue underlay of the balcony tiles. The damage to the balcony underlay is
consistent with water damage. The balcony should have a water proof
membrane and the tiles should be able to withstand the elements. It is likely
Case No: 297427 Determination Page 5 of 7
that the tiles have been leaking for a period of time and the heavy rain
experienced on the 21/12/11 has allowed large amounts of water to penetrate
an already deteriorating balcony causing the damage.
We believe that the damage has been occurring for some time and is most
likely due to a breakdown of the waterproof membrane or a lack thereof.
The claim is submitted as unsure as if the balcony was in good condition
water should not have been able to penetrate through the tiles causing the
damage to the subfloor and plasterboard below.”
36. The Applicant produced material from CK and photographs of the balcony
taken back in 2008, and the FSP reviewed the matter. I note also a site visit
by P in December 2007 in which he says:
“Site Attend Date 11/12/2007 11:30
...
(Applicant) advised that the evening of Monday 3/12/07 torrential rain fell on
his property slightly flooding the balcony above the garage. The water has
seeped through the tiled balc ony into the ceiling below.....”
...
“C omments Upon inspection of the ceramic tiled balcony which appeared to
be in good condition, we could not specifically determine the exact area where
the water was able to penetrate the balcony and cause water damage to the
plaster ceiling below. The damage may have resulted from the balcony being
unable to cope with the large volume of water due to the storm conditions on
3/12/07. There appears to be no maintenance repairs or storm damage
repairs required to the balcony. Your insured’s claim relates to the resultant
damage to the garage area. We await your decision regarding liability. It
appears your insured is under insured.”
37. P was asked to review this claim in view of the old claim and he looked at
photographs taken of the balcony after both claims and said in an undated
letter:
“ ...have been asked to provide my opinion as to whether the [Applicant] had
repaired their tiled balcony back in 2008 as part of another claim.
While during my inspection I was unaware that another claim was lodged for
similar damage back in 2008 after reviewing my photos and those of the
previous estimator it is in my opinion only that rectification repairs were not
completed to the tiled balcony.”
38. P also replied to some queries from the FSP in a letter dated 16 January
2013. He said:
“If the tiles on the balcony did have waterproofing carried out to them in 2007
is it possible or likely that this waterproofing had broken down over the last 4
years as per normal wear and tear? I believe the waterproofing was
completed in 2008 as p er the report from the insured’s builder. The
waterproofing membrane should not have broken down and failed over the
last 3-4 years if installed correctly.
If the grouting and waterproofing was installed correctly and was in good
condition is it possible for the large volume of water from the storm event to
penetrate the tiles to cause the claimed damage? It is in my opinion that if the
Case No: 297427 Determination Page 6 of 7
waterproofing and grouting is installed correctly and in good condition that a
one off storm event would not be sufficient to cause the claimed damage. The
damage appears to be on-going.
In your opinion on the balance of probabilities is it possible for the damage to
the balcony to be caused by this one off storm event or is it due to water
penetrating this area over a period of time from a number of events? It is in
my opinion that it is highly unlikely that a one off storm event would damage
the balcony to this extent. The balcony is external and undercover and should
be designed to cope with water. The damage sighted appears to be on-going
water penetration. ”
39. To succeed, the Applicant has to establish on the balance of probabilities
that the storm event of 25 December 2011 caused the claimed damage. PA
does not assist as he is of the view that the damage “was due to rain that
gathered in previous rain events ( my emphasis ) .” P is also of that view as he
says it is “likely the tiles have been leaking for a period of time.”
40. GM may assist as he says the damage is “due to excessive amounts of
water leaking through the tiles” and that “due to amount of rain and hail
nothing coul d stop that amount of damage”. If I were to assume he is
referring to rain and damage on 25 December 2011 which was known to be
excessive, then perhaps on balance he supports the Applicant’s contention
that the excessive rain on that day caused the damage.
41. However, the Applicant has to establish this on the balance of probabilities
and I am of the view that he failed to establish the insured event of a single
storm event caused the damage as the preponderance of evidence is not to
that effect. PA and P say it happened over time and GM is not definitive.
42. Furthermore, I have considered carefully the photographs taken some few
weeks after the accident by P and the damage seems extensive and evident
of long standing damage.
43. Even if I were to accept that the damage was caused in the storm then
consideration of the claim does not end there. The FSP says that damage
has been occurring for a long time and that it was due to a breakdown of the
waterproof membrane or lack thereof and so it is excluded under the policy.
44. There is a dispute as to whether CK did the work or not in 2008 but if I
accept he did the work, then P says the work was done poorly and that a
one off storm event would not have damaged the balcony to this extent.
45. GM has not commented on P’s opinion an d when asked by the FSP to clarify
about his own view, he said he could not confirm how the water penetrated
the tiles.
46. PA says that the tiles and waterproof membrane could not withstand the
amount of water that had fallen but also does not comment specifically on
the state of the balcony or the standard of the work done by CK or comment
on P’s opinion about CK’s work.
Case No: 297427 Determination Page 7 of 7
47. Arguably, PA and GM’s opinions contradict P’s in respect to the
waterproofing membrane. P says it is likely not to have been installed
correctly and PA and GM contend that regardless of its correct installation, it
would not have been able to cope with the amount of water in the storm.
48. However, in my view, the Applicant has not adduced sufficient or persuasive
evidence which rebuts P’s op inion about the work done by CK in 2008. And
so, on the evidence before me if I were to accept the damage was caused by
the storm, then I find that on the balance of probabilities the FSP can
establish the requisite evidence to rely on the exclusion which is that the
damage was caused because of the faulty workmanship done by CK when
he repaired the balcony in 2008.
Determination
49. On the basis of the available information, and for the reasons stated, I
determine that the FSP is entitled to deny the claim according to the terms
and conditions of the policy.