Text of the determination
Case No: 296918 Determination Page 1 of 10
Case number: 296918
General Insurance - Farm Insurance - Home Building and Contents - Farm
Property - Storm - FSP Decision - Denial of claim - Exclusion/Condition - Flood
20 March 2013
Background
1. The Applicant and a co-insured held a farm insurance policy with the
Financial Services Provider (FSP) which covered domestic building and
contents against accidental damage and farm property against listed insured
events. The period of insurance operated for 12 months beginning from 16
September 2010.
2. On 19 January 2012, due to confusion with their broker, the Applicant lodged
a claim under the policy as a result of extensive water inundation following
two separate severe weather events in Dalby, Queensland, which occurred
between December 2010 and January 2011.
3. The FSP denied the claim on the basis that the damage was due to “flood”.
The Applicant, through her solicitors, has disputed this.
4. For the sake of simplicity, reference to the Applicant will include her legal
representatives.
5. The Applicant and the FSP have provided detailed submissions on the
relevant issues. For the sake of brevity, the Panel will only summarise these
submissions given all of the material made available has been exchanged
with the other party.
Summary of Applicant’s position
6. The Applicant lodged her claim in January 2012, following some confusion
with the broker (D). She submits the following as alternative arguments in
response to the FSP‟s decision:
a. D, which clearly presented itself as acting agent of the FSP, did not
ensure appropriate and adequate insurance for her assets.
b. The FSP failed to comply with its duty to “clearly inform” her of the
relevant policy provisions as per section 35 of the Insurance Contracts
Act 1984 (the Act).
c. The FSP has failed to establish that the inundation was caused by
flood. The loss falls within the policy covered event of “storm”.
Determination
Case No: 296918 Determination Page 2 of 10
7. The Applicant seeks to be indemnified for her claim.
Summary of FSP’s position
8. The Applicant‟s property was damaged on two occasions by floodwaters on
28 – 29 December 2010 and 13 January 2011. In response to the Applicant ‟ s
arguments, the FSP submits the following:
a. It denies D is an agent of the FSP. Pursuant to 71 of the Act, it
complied with its legal obligations to the Applicant by providing the
Product Disclosure Statement (PDS) to D. The FSP cannot comment
on any issues between the Applicant and D.
b. Its policy wording is clear and unambiguous. By providing the PDS to D
it is satisfied it complied with its obligations under the Act.
c. No damage occurred during rain periods, so the loss was not a result of
“storm, rainwater or wind”, but “flood” and is excluded under the policy.
It relies on the evidence from hydrologist W to establish the cause of
the loss was “flood”.
9. The FSP relies on the following policy provisions within the PDS:
“ Words that have a special meaning in this policy
In this policy there are words that have a special meaning. These words that
apply to all of the policy are listed below.
The meaning of other words that apply to specific sections of the policy are
shown in the relevant section under the heading „Words that have a special
meaning in this section‟.
Flood is when water from a river, creek, lake, swamp, watercourse,
reservoir, dam or navigable canal (whether they are in their original
state or have been modified), overflows onto normally dry land.
Water that escapes from an irrigation canal is not flood.
We also regard any rainwater on your property
that cannot run off into a river, creek, lake, swamp, watercourse,
reservoir, dam or navigable canal (whether they are in their
original state or have been modified) because it is overflowing in
flood, and/or
that mixes with the floodwater coming from the river, creek, lake
swamp, watercourse, reservoir, dam, or navigable canal (whether
they are in their original state or have been modified). As water
coming from a flood.
...
What all sections of this policy do NOT cover
Any cover we provide is subject to the following exclusions.
We will NOT pay claims arising from the following:
Flood, storm surge, the action of the sea, tidal wave or high water. This
exclusion is not applicable to Sections 7, 9 and 10 of this policy.
Case No: 296918 Determination Page 3 of 10
...
Section 1
Domestic Buildings and Domestic Contents
What is insured
The property set out on your schedule is insured if it is destroyed, lost or
damaged. It is insured only if you own or are liable for the property.
...
Cover 2 – Accidental Damage
We will cover your domestic farm buildings and domestic contents, shown on
your schedule, for any accidental damage or accidental loss including that
caused by the following:
Storm, rainwater or wind ...
We will not cover your domestic farm buildings and domestic contents for
accidental damage or accidental loss caused by or arising from the following:
Flood
...
Section 2
Farm Property
What is insured
The property set out on your schedule is insured against destruction, loss or
damage. It is insured only if you own, or are liable for, the property.
...
Cover 1 – Listed Events
We will cover the farm property for the events listed below while at the
situation. There must be damage or loss from one of these events to the farm
property for you to make a claim.
Fire or explosion
Lightning or thunderbolt.
Earthquake, subterranean fire, volcanic eruption or tsunami.
Malicious damage, including vandalism ...
Deliberate or intentional acts other than vandalism and theft ...
Liquid that escapes from:
A fixed pipe or something attached to a pipe, fixed gutter, fixed tank
or a drain.
A bath, basin, shower, sink, toilet or tiled floor that has drainage
holes.
A washing machine or dishwasher ...
Accidental breakage ...
Riots, civil commotions, industrial or political disturbances.
Case No: 296918 Determination Page 4 of 10
Impact by an aircraft, spacecraft or satellite, or anything dropped from
them.
Impact by a falling tree or part of a tree ...
Impact by a falling television or radio antenna, mast or dish.
Impact by any animal or bird ...
Impact by vehicles or watercraft.
Storm, rainwater or wind ...
Landslide or subsidence ... ”
Issues
10. Whether D is an agent of the FSP and if so whether the FSP and D had an
obligation to advise the Applicant as to the adequacy of the policy and failed
to do so.
11. Whether the Applicant was “clearly informed” about what the policy did and
did not cover.
12. Whether the cause of the Applicant‟s loss was covered und er the policy.
Reasons for decision
13. As advised to the parties, due to the nature of the dispute, the Financial
Ombudsman Service (FOS) has considered it appropriate to refer this
dispute direct to the Panel for Determination in accordance with the
Operational Guidelines to the FOS Terms of Reference.
14. The decision has been made by a Panel consisting of an Ombudsman, a
person with extensive experience in insurance industry matters and a person
with extensive experience in consumer claims.
15. The Panel is satisfied that a full exchange of relevant information has taken
place between the parties and each party has had the opportunity to address
the issues raised.
16. There is no dispute that the Applicant‟s property and contents located in the
Dalby region were damaged by water inundation on two occasions.
17. It is appropriate to consider the issues under the various headings.
Adequacy of the policy cover
18. The Applicant contends that D is an agent of the FSP and that D (on behalf
of the FSP) failed to advise her about the adequacy of the policy in
comparison to her previous insurer which did offer flood cover.
Case No: 296918 Determination Page 5 of 10
19. The FSP denies that D is one of its authorised agents and argues that D was
instead the Applicant‟s broker. On that basis, the FSP alleges that under
section 71 of the Act, its obligation to communicate with the Applicant was
limited to forwarding any information relating to the policy to D.
Was D an agent of the FSP or the Applicant’s broker?
20. The Applicant argues that from the content of the “enclosures” (policy
documents) and the actions and behaviour of D‟s staff, D clearly held itself
out to her as acting as agent of the FSP. She further contends that calling
itself “broker” does not preclude D from acting as agent in particular
circumstances.
21. To support her c ase, the Applicant refers to the wording found in D‟s
Financial Services Guide (FSG). However, the Panel notes that this
document has a date of applicability starting on 1 April 2012.
22. The Panel is of the view that, considering that the Applicant in a Statutory
Declaration has outlined that the actions and representations by D took
place in 2010 and 2011, this FSG is of no assistance to the Applicant‟s
argument.
23. The Panel notes that the Applicant‟s further arguments, including the
reference to the Statement of Advice (SOA) and her statements contained in
the Statutory Declaration, assume that D is an agent of the FSP without
further explanation.
24. The Panel is not satisfied that the Applicant has provided sufficient evidence
to establish that D is an agent of the FSP.
25. Further, the FSP has also provided documentation to support the position
that D is a broker acting for the Applicant, including the SOA given to the
Applicant in 2010, extracts from D‟s website explaining it is a broker and a
document entitled “Broker Administration Agreement” between D and the
FSP.
26. This last document in particular is dated 7 April 2009 and makes clear that
there is no “binder, employment joint venture, partnership or principal and
agent relationship between the Broker and the Insur er” and that “[t]he Broker
acts as agent for each of the Broker‟s Clients and not as agent for the
insurer, in providing financial product advice or dealing in any financial
product.”
27. A letter of 17 November 2011 issued by D says “After thorough investigat ion
I am denying your claim emphatically”. In response to this, an entry of 24
January 2012 in the FSP‟s claim notes shows that an FSP‟s staff member
was surprised that D had declined the claim without lodging it with the FSP
for consideration. The FSP‟s staff member notes that it is the FSP‟s role to
manage the claim and D‟s role only to sell the insurance products.
Case No: 296918 Determination Page 6 of 10
28. The Panel also researched the ASIC website to verify whether D is
registered in the Australian Financial Services Authorised Representatives
Register. There is no record or evidence of D being an authorised
representative of any insurer.
29. Further, the High Court of Australia established in Con-Stan Industries of
Australia Pty Ltd v Nor wich Winterthur Insurance (Australia) Ltd (1986) CLR
226 that:
“under the general principles of the law of agency, a broker is the agent of the
assured, not the insurer ... There will be rare circumstances in which a broker
may also be an agent of the insurer, but the courts will not readily infer such a
relationship because a broker so placed faces a clear conflict of interest
between his duty to the assured on the one hand and to the insurer on the
other.”
30. Having reviewed the evidence at hand, the Panel considers there is no
evidence establishing that D was an authorised representative of the FSP.
Accordingly, the Panel is satisfied that D was an agent (broker) for the
Applicant.
Did the FSP have an obligation to advise the Applicant as to the adequacy of
the policy?
31. The Panel notes the crux of the Applicant‟s argume nt is based on D‟s
actions and representations as to whether the policy was adequate to the
Applicant‟s needs.
32. Insofar as these issues are between the Applicant and her broker, they are
not relevant to this dispute and the Panel will not address them.
33. That said, the Panel notes that there is still an argument asserted by the
Applicant as to whether the FSP had an obligation to advise the Applicant as
to the adequacy of the policy. However, section 71 of the Act establishes
that not to be the case.
Considera tion of “ Flood ” Definition in the PDS
34. The Panel considers the following section of the Act is relevant to this
dispute:
Section 71 of the Act provides that the requirement to provide notice or
a document to an insured before a contract of insurance is entered into,
does not apply if the contract was arranged by an insurance broker.
The exception to this is where the broker is acting under a binder to the
insurer rather than as an agent of the insured.
35. The parties have argued as to whether section 35 of the Act is applicable,
whether the Applicant was alerted to the flood exclusion and whether the
wording of the policy is clear and unambiguous.
Case No: 296918 Determination Page 7 of 10
36. Despite consideration of the potential application of sections 35 or 37 of the
Act, the Panel is satisfied that, as it has established that D is a broker for the
Applicant, in this instance section 71 of the Act applies.
37. Section 71 of the Act applies to the production of notices or documents. In
circumstances where an insured has an insurance broker acting for them, an
insurer is not required to comply with (amongst others) sections 35 and 37 of
the Act, in respect of the insured.
38. As such, despite the Applicant‟s submissions in relation to the “clearly
informed” issue pursuant to section 71 of the Act, the FSP is entitled to rely
upon the terms and conditions of the policy.
Water Inundation
39. The Applicant argues that the damage was caused by a “storm” which is an
insured event under the policy. She also argues that the FSP has failed to
establish that the cause of the loss was “flood”.
40. The FSP contends in summary, that the evidence provided supports the fact
that the property was damaged by flood.
Evidence
41. The Applicant has not sought to rely on any expert evidence. Howe ver, she
has mentioned a neighbour‟s account of events, which refers to a “huge
downpour of rain in the Warwick catchment” and storms in late December
2010 and January 2011. She has also referred to weather events data from
the Bureau of Meteorology (BOM) but has not specified any particular
information.
42. To support its position that the damage was caused by “flood”, the FSP has
provided reports from its loss assessor C and from hydrologist W. C‟s report
dated 14 February 2012 says in summary that:
The site was inspected on 7 February 2012. Located at the site are two
domestic buildings, a main dwelling and a caretaker‟s cottage.
The main dwelling is a two-storey weatherboard building with a pitched
timber-frame metal roof. This building is in excellent order. Also located
in the area are farm sheds.
During the months of December 2010 and January 2011, properties
were inundated on numerous occasions as a result of water escaping
from the neighbouring Condamine River (the River).
Local rainfall was reported on 26 December 2010. Water surrounding
townships such as Warwick and Cecil Plains then caused the River to
reach record heights and caused widespread flooding.
On 10 January 2011, the River reportedly rose again and a second
event not as high as the initial i nundation of 28 December 2010,
occurred. This again affected the insured property.
Case No: 296918 Determination Page 8 of 10
The property has sustained extensive damage to the main dwelling,
contents, the small cottage and a machinery shed. The damage
sustained was a result of water inundation.
43. C‟ s report is accompanied by six photographs showing different parts of the
property and damage to fixtures and contents.
44. W‟s report is dated 29 March 2012 and says in summary:
The property, inspected on 14 March 2012, consists of a double-storey
residential building, a second single-storey residential building and a
machinery (shearing) shed.
In December 2010, the lower level of the double-storey building was
inundated to approximately 230mm above habitable floor level (680mm
above ground level).
The single-storey building and the machinery shed have similar floor
levels to that of the double-storey building and were also inundated to a
similar above-floor level.
The peak inundation level in January 2011, was lower than the one in
December 2010.
The subject p roperty is located in the River‟s catchment, approximately
2.5km west of the River. The topography of the area is quite flat with no
defined catchment draining to the subject property.
Following data from the Loudoun Bridge (27.7km downstream) and
Cecil Weir (31.6km upstream) water level gauges, the water levels
would have first peaked at the property between 8pm on 28 December
2010 and 11am on 29 December 2010 and for the second event, the
peak would have occurred between 8 .00am – 3.40pm on 13 January
2011.
Data extracted from the Dalby Alert rainfall station (approximately
21.6km north of the property) shows a total of 101mm rainfall recorded
for the period 26 – 30 December 2010, with a peak hourly rainfall
intensity of 24.2mm/hr in the hour to 12 noon on 27 December 2010.
There was no significant rainfall recorded at this station after about
3.00pm on 27 December 2010.
The Applicant said that the property was first inundated on 28 or 29
December 2010, more than 12 hours after the peak rainfall intensity
and at least nine hours after the rainfall had ceased in the vicinity of the
property. The reported timing of inundation corresponds to flooding
from the River.
Records for the period 9 – 13 January 2011, shows a total of 81mm
rainfall, with a peak hourly rainfall intensity of 16.6mm/hr in the hour to
5.00pm on 9 January 2011. No significant rainfall was recorded at the
Dalby Alert rainfall station‟s gauge after 7 .00am on 11 January 2011.
Case No: 296918 Determination Page 9 of 10
The Applicant stated that the property was inundated on 13 January
2011, more than two days after the rainfall had effectively stopped. The
reported timing of inundation corresponds with flooding from the River.
Had there been peak stormwater runoff at the site for any of the two
events, it would have occurred within one hour of the peak rainfall
intensity.
Water levels at Cecil Weir and Loudoun Bridge gauges were above
major flood classification for approximately 3 – 4 days. The Applicant
stated the inundation at the property lasted approximately one week,
which is consistent with flooding from the River.
The recorded rainfalls at the Dalby Alert rainfall station had an average
recurrence interval (ARI) of less than one year. This means that higher
rainfall intensities are regularly experienced in the Dalby area.
Considering the difference in the timing of peak rainfall intensities or
rainfall ceasing and the timing of inundation, W concludes that the
property was not inundated by stormwater runoff but by floodwaters
overflowing from the River.
45. W‟s report also includes six images sho wing the exterior of the house and
some internal damage.
Analysis
46. The Applicant alleges that the damage was caused by the insured event of
“storm”; however, she has not provided any evidence to support this. She
has mentioned data from BOM but has not specified which records she
refers to, nor provided an explanation as to the relevance of this information.
The Panel notes this is unsurprising as the Applicant admits she was
overseas during December 2010 and January 2011 and consequently is
reliant upon the advice of neighbours who attested to: “the huge downpour of
rain in the Warwick catchment and storms in late December 2010 and further
rainfall and storms in January 2011”.
47. However, as a significant part of the dispute relates to damage to the
domestic bu ildings, which in turn are indemnified per „Accidental Damage‟
coverage, pursuant to Australian insurance case law it is accepted that prima
facie the Applicant has established a claim against the policy; consequently,
the onus of proof of establishing a policy exclusion, in this case flood, falls
wholly to the FSP‟s account.
48. The only available evidence as to the cause of loss comes from the reports
provided by the FSP, which both conclude that the loss was due to flood.
49. In particular, W‟s hydrology report notes the considerable difference in timing
between the peak rainfall intensity or the time when rainfall effectively
ceased and the time of inundation obtained from recorded weather data and
the Applicant‟s account of events.
Case No: 296918 Determination Page 10 of 10
50. The Panel also accepts in general terms that stormwater runoff occurs in
relatively close time proximity to the relevant storm event. In this case the
Applicant has advised that the first inundation of the property occurred on
28/29 December 2010 which is 12 hours after the peak inte nsity rainfall at
the Dalby gauge and 9 hours after the rainfall had ceased in the vicinity of
the property; the second inundation event occurred on 13 January 2011 (as
advised by the Applicant), which is more than two days after rain had
effectively stopped.
51. W‟s findings also suggest that the timing of inundation generally coincided
with the reported river water levels peaking at the closest water level
gauges.
52. In the absence of any evidence to the contrary and on balance of
probabilities, the Panel is satisfied that the FSP has established that the
inundation of the property both in December 2010 and January 2011 was
caused by floodwaters from the Condamine River.
53. Therefore, the Panel is satisfied that the FSP is not liable for the claim.
Determination
54. On the basis of the available information, the Panel determines that:
The FSP was not required to advise the Applicant as to the adequacy
of the policy.
The FSP complied with its obligations under the Insurance Contracts
Act 1984 and in this instance, due to the involvement of a broker; the
FSP was not required to clearly inform the Applicant of the provisions of
the policy.
The FSP is entitled to deny liability for the claim.