Home / Financial Firm (Unknown - Insurer) / Determination 296917

Determination 296917

Flood damage to home in Chelmer refused as excluded; applicant contended the inundation was covered flash flood

FirmFinancial Firm (Unknown - Insurer)
Decided2013-03-14
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

Claim for flood damage to the insured's home and contents was refused as excluded flood. AFCA found the inundation was covered flash flood, to be quantified by scope of works within policy limits, with interest on contents from 10 March 2011. The $12,500 compassionate payment may be deducted.

The policy's flash flood cover applies where inundation occurs within 24 hours of heavy rainfall, which the Panel found was met on the evidence and a site inspection.

Issues

Subjects and remedies

deceased estatehome or building damagenatural disasterpay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 296917 Determination Page 1 of 8 Case number: 296917 General Insurance - Domestic Insurance - Home Building - FSP Decision - Flood - Denial of claim 28 February 2013 The Applicant is the daughter of the insured (who is now deceased). Background 1. The insured held a home building and contents policy with the Financial Services Provider (FSP). 2. In January 2011, the insured‟s home in Chelmer was inundated with water following severe weather events in Queensland. 3. The FSP assessed the claim and refused liability on the basis the loss was caused by flood, which is an exclusion under the policy. However, the FSP did pay the Applicant $12,500 from its compassionate fund. 4. The Applicant disputed the decision, saying that the loss was caused by flash flood, which is an event covered under the policy. 5. The FSP reviewed the decision and maintained the loss is excluded under the policy. Summary of Applicant ’s position 6. The Applicant says the property was inundated in the early hours of 12 January 2011, being within 24 hours of a storm and therefore the loss is covered under the terms and conditions of the policy. 7. The FSP‟s information indicates the property falls into „Category 3‟, meaning the W4 releases from the Wivenhoe Dam had a substantial impact on the inundation. 8. Neighbours who are also insured by the FSP had a dispute with the Service and were successful. 9. The Applicant seeks the full cost to repair the home and replace damaged contents. Determination Case No: 296917 Determination Page 2 of 8 Summary of FSP’s position 10. The FSP says the policy excludes loss caused by flood. 11. The expert evidence establishes the loss was caused by flood and therefore the claim is excluded under the terms and conditions of the policy. 12. The Applicant was paid $12,500 from its compassionate fund. 13. The FSP does not accept that there was a flash flood within 24-hours as the rain from 9 January 2011 caused the Wivenhoe Dam to be at an elevated level and it cannot be reasonably argued that the rain in the early hours of 11 January 2011 was the proximate cause of the loss. 14. The Wayne Tank principle also applies to exclude the claim because a significant cause of the loss (the rain from 9 January 2011 onwards) is excluded under the policy. 15. There are also concerns the evidence from the engineers controlling the dam was not reliable and therefore decisions should not be made based on the statements from those engineers. 16. The FSP relies on the following policy provisions: Certificate of Insurance “ What optional covers are included and not included Home Contents ... Flood and storm surge not included not included...” Product Disclosure Statement (PDS) “ Words / terms with special meanings Word / term Meaning ... Flood Rising water which enters your home as a result of it running off or overflowing from any origin or cause. This policy does not cover flood unless we have agreed and it is shown on your certificate of insurance. Flash flood and stormwater run - off A sudden flood caused by heavy rain that fell no more than 24 hours prior to the flash flood or stormwater run - off. ... Storm A violent disturbance of the atmosphere associated with strong winds including a cyclone, lightening, heavy rain, hail or snow, but not continuous bad weather by itself. Case No: 296917 Determination Page 3 of 8 ... Insured events you are covered for Damage caused by weather... What is covered What is not covered Storm Loss or damage:  caused by rain, hail or snow after it has reached the ground... ... Flash flood and stormwater run-off A sudden flood caused by heavy rain that fell no more than 24 hours prior to the flash flood or stormwater run - off Loss or damage caused:  by flood... ... Your home The most we will pay you for home claims What is covered What is not covered Flash flood and stormwater run-off We will pay up to 50% of your home sum insured or $25,000, whichever is higher. ... ... Your contents The most we will pay you for contents claims What is covered What is not covered ... ... Flash flood and stormwater run-off We will pay up to 50% of your contents sum insured or $25,000, whichever is higher, but not exceeding your contents sum insured. ... ...” Issues 17. Whether the loss was caused by flash flood, as defined by the policy? Case No: 296917 Determination Page 4 of 8 18. Whether the FSP has met its obligations to the Applicant under the terms and conditions of the policy? Reasons for decision 19. As advised to the parties, the Financial Ombudsman Service has considered it appropriate to refer this dispute directly to the Panel in accordance with the Operational Guidelines to the Service‟s Terms of Reference. This is because of the potential amount of the claim and the issues to be considered. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 20. This decision has been made by a Panel consisting of an Ombudsman, and decision makers with extensive insurance industry and consumer rights experience. The Product Disclosure Statement 21. In reviewing the dispute, the Applicant made some reference to having a PDS dated 2011. The Case Manager at the Service discussed this issue with the Applicant on 31 January 2013 and she confirmed that she received a PDS in 2011; however, was not sure as to PDSs received before the loss in January 2011, noting the insured at the time of the loss was actually her now deceased father. 22. Based on this information, the Panel is satisfied there is no specific evidence or submission to indicate a PDS was not received by the insured prior to the loss. 23. While not specifically in dispute, the Panel notes that it has reviewed the FSP‟s PDS in a number of the Queenslan d flood disputes and has previously determined that the terms and conditions of the policy are clear. 24. Accordingly, the Panel is satisfied the FSP has met its obligations to clearly inform the insured of the terms and conditions of the contract in accordance with Section 35 of the Insurance Contract Act 1984 ( the Act ) . Whether the loss was caused by flash flood, as defined by the policy? 25. The Panel notes that the policy provides limited cover for „flash flood‟. In order for the Applicant to be entitled to this limited cover, the following elements must be established:  there was a sudden flood;  there was a heavy rain that occurred within 24 hours prior to that flood;  the sudden flood was caused by that heavy rain. 26. The Financial Ombudsman Service has determined in other disputes, following consideration of all material exchanged, that the heavy rainfall commencing around 4.00am on 11 January 2011 was a proximate or Case No: 296917 Determination Page 5 of 8 effective cause of the adoption of the W4 release strategy. It has previously been determined that this combined with the heavy rain over the Brisbane River from about 4.00am that day and the heavy rain that commenced falling over the Bremer River was the proximate cause of inundation of many properties downstream of the Wivenhoe Dam. 27. Given the wording of the FSP‟s policy in respect to flash flood, it has been found that the inundation in these earlier determinations is properly categorised as flash flood providing the inundation occurs within 24 hours of the commencement of the heavy rainfall. 28. The Panel has considered the further evidence and submissions and the additional material provided by the FSP in this dispute and it is not satisfied that the evidence which led to the earlier determinations, in respect of „flash flood‟ has been significantly chal lenged in any material way. 29. For the Applicant ‟s claim to succeed and fall within the definition of „flash flood‟ within the terms of the policy, it is necessary for the Applicant to establish the property was inundated within 24 hours of this heavy rainfall. As the Panel accepts the heavy rainfall commenced at approximately 4.00am on 11 January 2011 the inundation would have to occur before 4.00am on 12 January 2011. 30. The FSP‟s hydrologist, in his Statement dated 11 December 2012 says by 4:00am on 12 January 2011, the river level would have been at 7m AHD, which is 300mm above the relevant benchmark level (noted as „Elevated – possible storage areas) of the insured property. 31. In the circumstances, the Panel is satisfied that most likely the Applicant‟s property was inundated to a level of at least 300mm above the relevant benchmark level being the elevated possible storage areas of the insured property. 32. It is apparent from the hydrology information that the hydrologist did not attend the Applicant‟s site, in fo rming his view. Following previous inspections with houses in the Applicant‟s street, the Panel is aware that there are significant variations in the individual topographical features of each house. To be satisfied as to the inundation of the Applicant‟s p roperty in this matter, the Panel Chair Ombudsman conducted a site inspection of the property on 14 February 2013 with the Applicant and the FSP‟s representative present. 33. The Applicant‟s house can be described as a typical Queenslander with the lower section of the home built slightly lower than the road. Although on stilts, this section of the house has now been built in, and the area built so that the Applicant ‟ s father (original owner) could relax in this area. The area includes a laundry, bathroom, shower, toilet as well as a living area. 34. The hydrologist assessed, the benchmark level as being at the back of the house. The floor of the lower section appears to be lower than this Case No: 296917 Determination Page 6 of 8 benchmark level. It is clear that by 4.00am on 12 January 2011 the lower section of the home would have been inundated above floor level. 35. The actual height of the inundation is not, in the Panel‟s view of significant concern given the Applicant‟s advice that sewerage had spread throughout the lower area of the house causing total contamination of the walls, furnishings etc. 36. The Panel is satisfied that this area would have been inundated significantly by 4.00am on 12 January 2011 and that such inundation would be properly classified as flash flood. The Panel is satisfied that the lower section of the Applicant‟s property would have been inundated to a level of at least 300mm above floor level and that such inundation would have included inundation as a result of sewerage spreading through the lower area. Quantum 37. The flash flood provisions of the policy limit the extent of cover to 50% of the sum insured or the sum of $25,000 whichever is higher. In this dispute, the Applicant‟s home is insured for the sum of $172,000 whilst the contents are insured for $43,000. Pursuant to the policy, the relevant maximum liability for the home building would be $86,000 whilst the maximum liability for the home contents would be $25,000 being the greater of the amount of 50% of the home sum insured or $25,000. 38. The available information does not enable the Panel to determine the extent of the actual damage sustained to the Applicant‟s property or the extent of the loss sustained as a result of the inundation of the lower level of the property to a level of 300mm above floor level. 39. Whilst the Panel acknowledges that some of the repairs have been completed, the Panel considers it is only fair in the circumstances that the FSP be given the opportunity of obtaining a statement of works to determine the extent of the damage sustained and contents lost. The FSP is to obtain such Scope of Works as soon as practicable after receipt of this Determination and acceptance of same by the Applicant and the parties are asked to work together cooperatively to reach agreement as to the likely cost of repairs of the building and cost of replacement of the contents lost as a result of the inundation. 40. In the event that the parties are unable to reach agreement, then the parties are invited to make further submissions to the Panel and the Panel will determine the extent of the loss. 41. Insofar as the FSP reportedly made payment of a compassionate sum to the Applicant of $12,500, the Financial Ombudsman Service does not have jurisdiction to deal with this payment but acknowledges that the FSP, given the terms on which the compassionate payment was made, may be entitled to deduct this payment from any settlement sum. Case No: 296917 Determination Page 7 of 8 Interest 42. The Panel has also considered whether interest ought to be payable in this dispute. 43. The FSP has argued that interest is only payable from the date from whic h it was unreasonable to withhold payment. The FSP maintains that it is entitled to a reasonable period to investigate and determine its position and given the complex nature of the flood disputes, the delays are not unreasonable. Further complex situations require substantial periods of time for independent bodies such as the Queensland Flood Commission of Inquiry and FOS, to make conclusions on the issues in dispute. 44. The FSP maintains that it did not act unreasonably in this dispute and therefore interest is not payable. Alternatively, if some period of interest is to be awarded, it should be reduced to account for the substantial delays through the course of the process which were not the FSP‟s fault. 45. Section 57 of the Insurance Contracts Act requires interest be paid when it becomes “unreasonable for the insurer to have withheld payment”. An examination of relevant case law indicates that most probably, interest will be awarded from either when an insurer first emphatically denied liability or disputed a matter, or from when in the normal course of events the claim should have been paid if liability had not been disputed. 46. In this dispute the Panel accepts that the FSP was entitled to withhold payment of the settlement monies until such time as it had properly investigated the dispute and made its decision as to liability. 47. The FSP made its original decision to deny the claim after receiving relevant assessment reports, hydrology reports and other information. The FSP was aware of the terms of its policy and aware of the relevant provisions under which liability might arise and chose to deny the claim having reviewed those relevant provisions and the evidence available to it. 48. In the Panel‟s view, at that point the FSP has made its decision on the claim and it is appropriate that from that time interest be paid unless it can be established that the Applicant withheld information from the FSP that would have led to an alteration of its decision. 49. The evidence before the Panel indicates the FSP declined the claim by letter dated 10/03/2011. 50. The Panel is of the view that it is most likely the Applicant suffered a total loss of contents and that the loss of contents payable under the relevant flash flood provisions would exceed the sum of $25,000 being the maximum liability of the FSP under the terms of the policy. The Applicant has already replaced the damaged contents and in the circumstances it is therefore appropriate that interest be awarded with respect to the loss of contents in accordance with Section 57 of the Act and that the FSP pay interest on this Case No: 296917 Determination Page 8 of 8 amount from 10 March 2011 to date of payment of the claim with respect to that loss. 51. Insofar as the interest with respect to the building repairs, the Panel notes that whilst some of these repairs have been conducted, that the Scope of Works is to be conducted with respect to these repairs and that such Scope of Works will determine the cost of the repairs and damage based on current rates. In the circumstances, subject to the Scope of Works being calculated on current rates, the Panel determines that it is not appropriate that interest be payable on the cost of the building repairs. Determination 52. The FSP is to meet the cost of repairing or replacing the building and contents damaged by the inundation up to a level of 300mm above the floor throughout the lower level. Any payment is subject to a limit of no more than $86,000 for the buildings and $25,000 for the contents, pursuant to the relevant policy limits. 53. Insofar as the FSP is to cash settle the claim, the FSP is to pay interest from 10 March 2011 on the contents claim to the date of payment of the claim, in accordance with Section 57 of the Act. Otherwise, the FSP is to settle the building damages claim based on the Scope of Works assessed at the current applicable rates and agreed between the parties.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.