Home / Financial Firm (Unknown - Insurer) / Determination 296771
Determination 296771
Denial of flood damage claim (flash flood limit)
Summary
The applicant's Jindalee property was inundated in January 2011 and the FSP denied the claim as flood, which is excluded. AFCA determined in favour of the FSP.
Flood is excluded, the policy clearly informed the insured under section 35 of the Act, and the inundation occurred after the 24-hour window required for flash flood cover.
Issues
- Claim denial primary · not upheld“The Panel determines that the FSP has established the loss was caused by flood, as defined by the policy.”
- Failure to disclose secondary · not upheld“the FSP has met its obligations under Section 35 of the Act and is entitled to rely on the terms and conditions of the policy.”
- Product terms interpretation secondary · not upheld“the inundation does not constitute a flash flood event within 24 hours of the heavy rain under the policy.”
Subjects and remedies
home or building damagenatural disasterno remedy
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Case No: 296771 Determination Page 1 of 7
Case number: 296771
General Insurance - Domestic Insurance - Home Building - Flood - FSP
Decision - Denial of claim
22 January 2013
Background
1. The Applicant held a home building and contents policy with the Financial
Services Provider (FSP).
2. In January 2011, the Applicant‟s property in Jindalee was inundated with
water following severe weather events in Queensland.
3. The FSP assessed the claim and arranged a hydrology report. The FSP
refused liability on the basis the loss was caused by flood which is an
exclusion under the policy.
4. The Applicant disputed the decision on the basis that he did not receive the
Product Disclosure Statement (PDS) with the terms and conditions of the
policy, the FSP‟s policy terms are unclear and the l oss was caused by a
flash flood event.
5. The FSP maintains the loss is excluded under the policy.
Summary of Applicant’s position
6. The Applicant is represented. For clarity and convenience in this
Determination, the submissions of the Applicant and his representative will
hereafter be referred to as those of “the Applicant”.
7. The Applicant says he does not recall receiving a copy of the PDS. The FSP
has failed to prove it sent him a PDS and therefore as per Section 35 of the
Insurance Contracts Act 1984 (the Act) the FSP is not entitled to rely on the
flood exclusion. He should be covered under the standard cover for flood
provided under the Insurance Contracts Regulations 1985 .
8. Further, the Applicant says the policy is unclear and fails the FSP‟s
obliga tion to „clearly inform‟ under Section 35 of the Act. The policy limits for
flash flood are not clearly expressed or set out in the policy.
9. The loss was caused by flash flood as the result of releases from the
Wivenhoe Dam. Therefore the policy responds to the loss as it covers flash
Determination
Case No: 296771 Determination Page 2 of 7
flood within 24 hours of a storm, and the heavy rain commencing on 11
January 2011 was a separate storm event.
10. He left the property at around 12:00 noon on 11 January 2011 and at that
time water was already covering Lanena Street up to the corner of
Burrendah Road. It is therefore possible the home was inundated prior to
8:00am on 12 January 2011.
11. The Financial Ombudsman Service has previously determined that W4
releases from the Wivenhoe Dam constitute a flash flooding event under the
FSP‟s policy (refer cases 241943, 233682, 244117 and 239848).
12. The nearest rain gauge to his property collecting data at the time of the
event was 7km from his home and therefore data used in reference to his
home cannot be considered accurate.
13. The Applicant seeks to have his claim paid under the policy with interest and
legal costs.
Summary of FSP’s position
14. The FSP says the policy excludes loss caused by flood. The expert evidence
establishes the loss was caused by flood and therefore the claim is excluded
under the terms and conditions of the policy.
15. It provides dispatch material to prove the Applicant was provided a new PDS
in 2009.
16. It rejects the Applicant‟s submission that the policy is unclear and points to
previous determinations by the Service that state the policy meets the
requirement to „clearly inform‟ (refer case 239722 ).
17. The FSP does not accept that there was a flash flood within 24-hours as the
rain from 9 January 2011 caused the Wivenhoe Dam to be at an elevated
level, and it cannot be reasonably argued that the rain in the early hours of
11 January 2011 was the proximate cause of the loss.
18. In this case, it has been est ablished that the Applicant‟s inundation occurred
after 4:00am on 12 January 2011, so the Service‟s „broad approach‟ does
not apply to bring the loss within the scope of cover.
19. There are also concerns the evidence from the engineers controlling the
dam was not reliable and therefore decisions should not be made based on
the statements from those engineers.
20. The FSP relies on the following policy provisions:
Certificate of Insurance
“ What optional covers are included and not included
Home Contents
Case No: 296771 Determination Page 3 of 7
...
Flood and storm surge not included not included ...”
Product Disclosure Statement (PDS)
“ Words / terms with special meanings
Word / term Meaning
...
Flood Rising water which enters your home as a result of it
running off or overflowing from any origin or cause.
This policy does not cover flood unless we have
agreed and it is shown on your certificate of insurance.
Flash flood and
stormwater run - off
A sudden flood caused by heavy rain that fell no more
than 24 hours prior to the flash flood or st ormwater
run - off.
...
Storm A violent disturbance of the atmosphere associated
with strong winds including a cyclone, lightening,
heavy rain, hail or snow, but not continuous bad
weather by itself.
...
Insured events you are covered for
Damage caused by weather...
What is covered What is not covered
Storm Loss or damage:
caused by rain, hail or snow
after it has reached the
ground...
...
Flash flood and stormwater run - off
A sudden flood caused by heavy rain
that fell no more than 24 hours prior to
the flash flood or stormwater run - off
Loss or damage caused:
by flood...
...
Your home
The most we will pay you for home claims
What is covered What is not covered
Case No: 296771 Determination Page 4 of 7
Flash flood and stormwater run - off
We will pay up to 50% of your home sum
insured or $25,000, whichever is higher.
...
...
Your contents
The most we will pay you for contents claims
What is covered What is not covered
... ...
Flash flood and stormwater run - off
We will pay up to 50% of your contents
sum insured or $25,000, whichever is
higher, but not exceeding your contents
sum insured.
...
...”
Issues
21. Whether the FSP clearly informed the Applicant of the flood exclusion?
22. Whether the loss was caused by flood or flash flood?
23. Whether the FSP is entitled to refuse liability under the terms and conditions
of the policy?
Reasons for decision
24. As advised to the parties, the Financial Ombudsman Service has considered
it appropriate to refer this dispute directly to the Panel in accordance with the
Operational Guidelines to the Service‟s Ter ms of Reference. This is because
of the potential amount of the claim and the issues to be considered. This
dispute has not been the subject of a FOS Recommendation and has
proceeded directly to Determination.
25. This decision has been made by a Panel consisting of an Ombudsman, a
representative with experience in insurance matters and a representative
with experience in consumer claims.
Whether the FSP clearly informed the Applicant of the flood exclusion?
26. Section 35 of the Act provides that an insurer must notify an insured of
derogation from the standard cover provided under the Insurance Contracts
Regulations 1985 . As it applies to this case, the FSP was required to advise
the Applicant it did not offer t he standard cover of „flood‟ under the policy.
Case No: 296771 Determination Page 5 of 7
27. Usually, the provision of a PDS which contains the terms and conditions of
cover and its exclusions, to an insured within 14 days of the inception of the
new policy (or after 14 days but before a loss has occurred) is sufficient for
the FSP to meet its obligations to the Applicant, as provided under Section
69 of the Act.
28. The Applicant says he does not recall receiving the PDS. The FSP has
provided dispatch material, indicating it sent a PDS to the Applicant in 2009.
29. A copy of the 2009 renewal attached to the material states on „Page 1‟ that a
PDS is enclosed. In addition, the Panel notes that the “Renewal – Certificate
of Insurance” issued to the Applicant also specifically states „flood and storm
surge‟ is no t included with the policy; the Applicant has not denied receiving
the Certificates of Insurance sent to him.
30. Based on the evidence presented, the Panel is satisfied on the balance of
probabilities that the FSP sent the Applicant a PDS in 2009. The 2009 a nd
2010 renewal Certificates of Insurance also specifically state that flood is not
included.
31. The Panel has reviewed the terms and conditions of the policy and is
satisfied the policy wording sufficiently outlines that while flash flood within
24-hours of heavy rain is covered, other flooding is excluded.
32. In the Panel‟s view the wording is clear and effectively provides that where a
flood occurs within 24-hours of the heavy rain which caused it, the loss is
covered under the event of flash flood.
33. The FSP has had a number of disputes with the Financial Ombudsman
Service in relation to the Queensland weather events of December 2010 and
January 2011.
34. The Panel has considered the FSP‟s policy wording in previous
determinations and it was satisfied in those cases that the PDS clearly
outlines the exclusions and limits under the policy. This includes the limits to
coverage in respect to flash flood; that is, 50% of the contents sum insured
or $25,000, whichever is higher.
35. The Panel found those limits to be expressed clearly under a heading
relating to policy limits. The page number of where to find the table of limits
is also listed in the „Index‟ at the beginning of the policy. The Panel, in this
matter, notes there is no material difference with respect to the policy and as
such, a person of average intelligence and education, should they choose to
read the policy, would be able to understand that whilst flash flood within 24
hours is covered, other flood damage is not.
36. The Certificate of Insurance also clearly states that the Applicant did not
have the flood cover option selected on his policy.
Case No: 296771 Determination Page 6 of 7
37. Accordingly, the Panel finds that the FSP has met its obligations under
Section 35 of the Act and is entitled to rely on the terms and conditions of the
policy.
Whether the loss was caused by stormwater runoff or flood as defined by the
policy?
38. The Applicant says that he evacuated the property around 12:00 noon on 11
January 2011.
39. The policy excludes cover for flood, but provides limited cover for „flash
flood‟. In orde r for the Applicant to be entitled to this limited cover, the
following elements must be established:
there was a sudden flood;
there was a heavy rain that occurred within 24 hours prior to that flood;
the sudden flood was caused by that heavy rain.
40. The Service has determined in other disputes, following consideration of all
material exchanged, that the heavy rainfall commencing around 4.00am on
11 January 2011 was a proximate or effective cause of the adoption of the
W4 release strategy. It has previously been determined that this, combined
with the heavy rain over the Brisbane River from about 4.00am that day and
the heavy rain that commenced falling over the Bremer River was the
proximate cause of inundation of many properties downstream of the
Wivenhoe Dam.
41. Given the wording of the FSP‟s policy in respect to flash flood, it has been
found that the inundation in these earlier determinations is properly
categorised as flash flood providing the inundation occurs within 24 hours of
the commencement of the heavy rainfall.
42. For the Applicant‟s claim to succeed and fall within the definition of „flash
flood‟ within the terms of the policy, it is necessary for the Applicant to
establish the property was inundated within 24 hours of this heavy rainfall.
As the Panel accepts the heavy rainfall commenced at approximately
4.00am on 11 January 2011, the inundation would have to occur prior to
4.00am on 12 January 2011.
43. The Key Conclusions Statement attached to SC‟s report of 7 June 2012
notes that the property has a minimum land level of 10.5m AHD and
maximum land level of 13.2m AHD. The approximate benchmark level (the
lowest point of the structure of the house on the land) is noted as being
11.7m AHD.
44. The Statement also identifies that at 4.00am on 12 January 2011 the
Brisbane River level was at 9.9m AHD which would have been 1.8m below
the benchmark level of the property. According to SC, the inundation of the
property above benchmark did not occur until 12:55pm on 12 January 2011.
Case No: 296771 Determination Page 7 of 7
45. The hydrological evidence indicates the property was inundated after
4:00am on 12 January 2011.
46. The Panel accepts that the levels estimated by SC may not be entirely
accurate, however, in the absence of any evidence to the contrary; the
estimates may be relied upon.
47. Accordingly, the inundation does not constitute a „flash flood‟ event within 24
hours of the heavy rain under the policy, but is correctly classified as flood
and therefore excluded under the policy terms.
48. With regard to the previous determinations quoted by the Applicant where
the loss was found to be flash flooding, it is noted the inundations at those
properties occurred before 4:00am on 12 January 2011.
Determination
49. On the basis of the available information the Panel determines that the FSP
has established the loss was caused by flood, as defined by the policy and
the FSP is therefore entitled to refuse liability.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.