Claim declined as flood, which is excluded; flash flood not established
Summary
The Applicant's home was inundated by the Balonne River in February 2012 and the FSP declined the claim as flood, which is excluded unless flash flood. The Panel found the inundation occurred outside the 24-hour flash flood window and that the 2010 payment did not create flood cover.
Flash flood requires river flooding within 24 hours of the storm commencing, and the hydrology showed the river inundation came from rainfall more than 24 hours earlier.
Issues
- Claim denial primary · not upheld
“The Panel is unable to conclude that the water inundation is as the result of flash flooding, as defined by the policy.”
- Misleading conduct secondary · not upheld
“The FSP's actions in accepting the 2010 claim were not misleading or designed to induce a belief that all flooding was covered.”
Subjects and remedies
natural disasterno remedy
Text of the determination
Case No: 296682 Determination Page 1 of 7
Case number: 296682
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim
8 March 2013
Background
1. The Applicant holds a Home Building and Contents policy with the Financial
Services Provider (FSP). The policy covers a residential home for insured
events including flash flood, but not flood.
2. The Applicant lodged a claim for damage on 7 February 2012 for overflow of
the Balonne River at the insured address.
3. The FSP declined the claim on the basis the damage arose from flood,
which is excluded and not flash flood which is covered.
4. The Applicant disputes the declinature on the basis of significant rainfall and
states that, on the basis of a previous claim in 2010, the FSP misled her into
believing she had flood cover.
Summary of Applicant’s position
5. The Applicant has enclosed an engineering report regarding the prior claim
in 2010. The Panel notes the report refers to the cause of damage as flood,
numerous times.
6. The Applicant has provided her diary entries in relation to the 2010 and 2012
flood claims. The diary notes indicate that the Applicant had a high degree of
contact with various contractors and agents of the FSP during these claims.
Further, that during the 2012 claim she was sometimes required to follow up
with the FSP more than once for responses to enquiries. The Applicant
further notes that the criticisms by the FSP of her for not returning calls are
unwarranted given several messages were updates which did not appear to
require a response and she cannot take calls during the day due to her
employment.
7. The Applicant states that after the 2010 claim, the FSP paid for repairs.
There was no letter explaining the basis for the payment was a gesture of
good will and that she would not be covered in the future. If the Applicant
had been aware this was the case, then she would have sought flood cover
with another insurer.
8. The Applicant‟s property was flooded again in February 2012, in
circumstances which were similar to the 2010 flood. The FSP has now
Determination
Case No: 296682 Determination Page 2 of 7
informed her that they paid the 2010 claim under the insured event of storm.
However, the Applicant believed she was being paid for flood at this time.
9. The Applicant submits the prior conduct of the FSP in accepting the 2010
claim misled her into believing she had flood cover.
10. The Applicant notes the area received 225mm of rain in the week leading up
to the 2012 inundation. The ground was too saturated to sustain a levee and
the flood occurred.
11. The Applicant notes that she has received $47,080 as a compassionate
payment, but notes this constitutes 30% of repairs which total approximately
$150,000.
Summary of FSP’s position
12. The FSP relies on the following policy terms and conditions:
“Glossary of words with special meaning
...
Flash flooding The overflow of any lake, river, creek, stormwater channel,
canal or any other watercourse (whether natural, altered or man made),
caused by storm, where the flooding occurs within 24 hours of the storm
having commenced.
...
Flood The inundation of normally dry land by water which has overflowed,
escaped or been released from a lake, river, creek, storm water channel,
canal or any other watercourse whether natural, altered or man made.
Unless the damage is caused by flash flooding, this policy does not cover
flood.
...
Storm - a violent wind (including cyclones), sometimes combined with
thunder, heavy falls of rain, hail or snow; or
- thunderstorms or hailstorms, sometimes accompanied by heavy falls
of rain or snow.
It is not persistent bad weather or heavy or persistent rain by itself.
...
General exclusions – apply to the overall policy
Unless included in additional cover, we will not cover loss, damage or legal
liability caused by:
- Flood unless it is flash flooding;
...
Flash flooding
...
The maximum amount we will pay is limited to:
Case No: 296682 Determination Page 3 of 7
- 15% of the nominated sum insured, where the building is insured by this
policy; and
- 25% of the contents sum insured, where contents are insured by this
policy.”
13. The FSP has enclosed the record of the claim lodgement in 2010. The date
of incident is listed as 5 March 2010 and the cause of damage was storm.
The description states “whole house flooded”.
14. The FSP has enclosed the assessor report dated 24 March 2010, relating to
the old claim. The assessor notes that a monsoon low press ure system
moved through South-West Queensland bringing record rain. Further, that
the area of the Applicant‟s residence received more than 125mm of rain on 2
March 2010 which led to flooding of the district.
15. The FSP has enclosed the record of the claim lodgement in 2012. The Panel
notes the following information is recorded:
The time of incident is recorded as 10.00am on 30 January 2012.
The cause is listed as flash flood.
The Applicant reported that “River has risen after 11 inches of rain
and water has gone through the property”.
16. The FSP has enclosed an assessor‟s report from a site inspection on 14
February 2012 or 14 March 2012 (two separate dates are listed). The
assessor confirmed the damage arose as a result of “flash flooding” and
estimated the building repairs as $117,703.22.
17. The FSP has enclosed a building report dated 4 April 2012, which concludes
that flood waters entered the building to a height of approximately 1 meter
above floor level.
18. The FSP has enclosed a hydrology report from “W” dated 6 March 2012.
The Panel notes the following from this report:
Sustained rainfall across the catchment upstream of St George
between 28 January 2012 and 3 February 2012 would have
generated significant runoff and flow into the streams and rivers.
St George is located predominantly on the Southern extent of the
Balonne River and is approximately 450 kilometres West of Brisbane.
The Balonne River is approximately 80 meters to the West of the
property. The topography is relatively flat and there are several flow
paths, 4.5kms from the property.
The Balonne River is classified as a large watercourse so the river
levels would react slowly to rainfall.
The site of the property is a raised single story dwelling that is situated
at approximately 190-200m AHD.
W obtained the following information from the Applicant:
Case No: 296682 Determination Page 4 of 7
The Applicant‟s daughter was present in St George during the
February 2012 event, but not at the site.
She believed the initial inundation occurred at the site sometime
on 5 February 2012. The flows receded by 9-10 February 2012.
The peak depth of inundation was 1.35m above the floor level of
the dwelling (estimated to be 2.05m above ground level.
W confirmed the level of inundation was approximately 1.3m above
floor level. The river peaked on 7 February 2012.
The rainfall records indicate the following:
Approximately 30mm of rainfall accumulated between 1 .00am on
28 January 2012 and 4.00pm on 29 January 2012.
Rainfall of 20mm fell between 1.00am and 5.00am on 31 January
2012 which is the equivalent of a 1year ARI.
A period of continuous rainfall then commenced at 5 .00am on 1
February 2012 delivering 170mm over a 52 hour period ending at
9.30am on 3 February 2012. The rainfall intensity is estimated to
have a 10-20year ARI.
W considers the rainfall data indicates that local ponding may have
occurred although the water should have been contained by the local
storm water drainage networks.
The river gauge 3.5kms downstream from the property shows river
levels responding at around 6am on “29 February 2012”. Th e water
levels continued to rise before peaking at 13.38m at 11.20am on 7
February 2012. The level is 7.4m above the designated major flood
level of 6m.
W considered when the „start‟ of the storm that led to the elevated
flood levels in the Balonne River occurred. W noted that while a
moderately intense period of rainfall was recorded at St George
commencing at 5.00am on 1 February 2012, the Balonne River in this
region was already higher than the designated major flood level of 6m
at this time. This indicates that the causative rainfall that led to the
flooding on the Balonne River was caused by rain that fell in the
upstream reaches of the catchment.
W states that the rainfall event recorded in Roma on 26 January 2012
is the most indicative of the rainfall that ultimately led to the elevated
levels in the Balonne River at St George. The Balonne River gauge at
Surat reacted rapidly to this rainfall with levels in St George reacting
approximately 60 hours after this rainfall.
W notes that the Balonne River level at St George reached a level of
0.35m below its eventual peak at 9.00am on 6 February 2012. This
would be the time of the initial inundation of the floor level which is 10
days after the original onset of causative rain.
W concludes that St Gorge was inundated by flows exceeding the
confines of the Balonne River and onwards towards the site. This
occurred more than 24 hours after the onset of the causative rainfall in
the upstream catchment.
Case No: 296682 Determination Page 5 of 7
19. The FSP relies on the hydrologist evidence to demonstrate the inundation
did not arise as a result of flash flooding. The FSP states the loss falls under
the flood definition of the policy as the inundation occurred more than 24
hours after the commencement of the storm. This is because there is no
evidence of any rainfall which fell in the catchment area and affected the rise
of the Balonne River after 3 February 2012. As the inundation occurred on 6
February 2012 the inundation occurred over 24 hours after the
commencement of the storm.
20. The March 2010 claim was paid on the basis that the property was
inundated within 24 hours of the commencement of the storm. It was not
paid under storm as advised to the Applicant and this was an error made by
the FSP. The claim was paid under flash flood and it was only the policy
limits that had been waived as a gesture of good will. Further, the
acceptance of the claim in 2010 was due to flash flooding based on the
evidence. Each claim is judged on its merits and does not set a precedent
for the acceptance of any future claims. The policy does not cover flood and
this is clearly stated in the Product Disclosure Statement (PDS) sent to the
Applicant in 2009.
21. The FSP notes it attempted contact with the Applicant on 11 occasions and
was unable to contact her.
Issues
22. Whether the FSP‟s prior conduct misled the Applicant into believing flood
was covered.
23. Whether the FSP was entitled to decline the Applicant‟s claim for damage
arising from water inundation.
Reasons for decision
24. There has been an exchange of material between each party and the Panel
is satisfied each party has had an opportunity to reply to the issues raised.
25. The Panel has read each party‟s submissions and materials and will only
refer to the relevant submissions and materials raised.
26. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in insurance industry matters and a
representative with extensive experience in consumer claims.
27. The Panel considers there are two discrete issues (listed above) which will
be dealt with separately below.
Whether the FSP’s prior misconduct misled the Applicant into believing flood
was covered
28. The parties do not dispute the following:
Case No: 296682 Determination Page 6 of 7
The Applicant held valid policies of insurance in 2010 and 2012
covering the residence.
The Applicant received the PDS which contained the inclusion of flash
flood cover and the exclusion for flood.
The FSP paid the Applicant‟s claim in 2010 on the basis it occurred as
a result of flash flooding, but the payment limits were waived.
29. The Panel notes that the building engineer expert engaged in 2010 provided
a report which kept referring to flood. The Applicant has provided a copy of
this report to demonstrate there was no information before her, explaining
flood was an excluded event.
30. The FSP submit that the Applicant was sent the PDS which provided
information regarding the flash flooding cover and the flooding exclusion.
Further, the FSP states it covered the 2010 incident because it arose from
flash flooding as defined by its policy.
31. On this basis, the Panel has difficulty accepting that the FSP has acted
contrary to its policy terms and conditions. In fact, the FSP would be required
to accept the claimed event as it arose from flash flooding.
32. Given this, the Panel finds that the FSP‟s actions in accepting the 2010
claim, were not misleading or designed to induce a deliberate belief in the
Applicant, that all types of flooding were accepted by its policy.
33. The Panel does not find the actions of the FSP in accepting the 2010 claim
would bind it in relation to future flood claims.
34. The Panel does have some concerns that the rainfall giving rise to the 2010
claim commenced on 2 March 2010 and the inundation purportedly occurred
on 5 March 2010. This would bring it outside of the 24 hour period. However,
if the claim was paid in error, the FSP would not be bound to future
payments on the same basis.
Whether the FSP was entitled to decline the Applicant’s claim for damage
arising from water inundation
35. The question before the Panel is whether the damage arises from flash
flooding or flood as defined by the PDS.
36. First, there are multiple dates detailed for the loss. The most
contemporaneous record is claim lodgement which lists the loss as 30
January 2012. The Applicant, who was not at the residence during the
inundation, later queries whether it may have been 5 February 2012.
37. Second, the hydrologist notes the rainfall from 28 January 2012 until 3
February 2012. However, the hydrologist does so in a ma nner which
suggests 3 separate periods of rainfall being:
Rainfall between 1.00am on 28 January 2012 and 4.00pm on 29
January 2012.
Case No: 296682 Determination Page 7 of 7
Rainfall between 1.00am and 5.00am on 31 January 2012.
Rainfall between 5.00am on 1 February 2012 and 3 February 2012.
38. The hydrologist utilises rainfall data from 26 January 2012 in Roma as the
reason there was a general rise in the Balonne River. However, it was not
this rainfall which caused flash flooding from the River. Accordingly, the
Panel does not consider it appropriate to determine this as the
commencement of the storm which caused the flooding of the River. This is
because the River did not flood as a result of this particular rainfall, but
rather consecutive periods of rainfall.
39. In order to be deemed flash flood under the policy definition, the flooding
from the river must occur within 24 consecutive hours of the storm having
commenced.
40. The evidence from the hydrologist is that the river did not reach a level
sufficient to inundate the property until 9.00am on 6 February 2012. If the
Panel were to count from the highest continuous rainfall commencing at
5.00am on 1 February 2012, this would still be outside of the 24 hour period
of the storm‟s commencement. Given this, the Panel is unable to conclude
that the water inundation is as the result of flash flooding, as defined by the
policy.
41. The information suggests that the water came from the Balonne River due to
the increase in river level as a result of increased intake from rainfall
catchments. As the level of the Balonne River rose due to storms that had
occurred from a period commencing over 24 hours prior to the flooding, the
water coming from the River is defined as flood under the policy.
42. As the policy does not cover flood, the Panel is unable to find the FSP liable
to cover the Applicant‟s claim for water inundation.
Determination
43. On the basis of the available information the Panel determines the FSP‟s
prior conduct did not mislead the Applicant into believing flood was covered.
44. On the basis of the available information the Panel determines the FSP was
entitled to decline the Applicant‟s claim for damage arising from water
inundation.