Denial of body corporate flood-related water inundation and shopfront glass claim
Text of the determination
Case No: 296492 Determination Page 1 of 12
Case number: 296492
General Insurance - Small Business/Farm Insurance - Commercial Property -
FSP Decision - Denial of claim
21 May 2013
Background
1. The Applicant is the representative of a commercial strata -title body
corporate whose insurance policy is underwritten by the Financial Services
Provider (FSP). The policy covers the unit owners of the body corporate plus
common areas of the body corporate. The Applicant represents the body
corporate plus a portion of unit owners. For the sake of convenience, the
representative, the body corporate and represented unit owners will be
referred to collectively as ―the Applicant‖.
2. In January 2011, the Applicant‘s property was damaged as a result of water
inundation. Shop front glass at the property was further damaged as a result
of emergency crews. The Applicant subsequently lodged a claim for the
damage.
3. The FSP declined the claim on the basis the damage arose from flood which
is specifically excluded under the policy. The FSP further declined the glass
damage on the basis the proximate damage was flood.
4. The Applicant disputes the declinature on the basis the damage arose from
stormwater inundation and that the glass damage did not occur temporally to
the flood but afterwards.
Summary of Applicant’s position
5. The Applicant has enclosed a letter dated 25 January 2011 from ―AS‖ who
has a store in ―P Street‖ Laidley. AS states that at 1.30pm the water was
knee high and the emergency vehicles were travelling at a speed that
created waves which then proceeded to break shop front windows.
6. The Applicant has enclosed a number of emails from a broker. The Panel
notes the following from same:
The damage caused by the emergency crew vehicles should be
considered an intervening event.
The case of Elilade Pty Ltd v Nonpareil Pty Ltd [2002] FCA should be
applied to the circumstances of this matter as stormwater inundation
Determination
Case No: 296492 Determination Page 2 of 12
occurred prior to flood inundation. Accordingly the Wayne Tank
principle should not apply.
All other insurers have treated this matter as stormwater inundation
rather than flood.
7. The Applicant has enclosed an email from ‗WeatherWatch‖ from which the
Panel notes the following:
There were warnings for Gatton-Grantham at 12.16pm EST and
2.34pm EST. It is unclear what date this occurred on but due to the
timing of events in this region the Panel considers it was for 10 January
2011, given this was the date of flash flooding in these towns.
Radar can be known to underestimate rainfall in the region. Rainfall
was confined into the upper reaches of the Lockyer/Sandy Creek
catchments, both of which are small creeks and rarely carry much
water.
Topography of the region with mountainous areas means water flow
would carry great acceleration.
The high intensity storm had a very large geographical area.
The south-east of Queensland experienced serious flash flooding.
Toowoomba in particular suffered ―massive flash flooding‖.
8. The Applicant has enclosed data from a number of rainfall gauges from
which the Panel notes the following:
On 10 January 2011 in Toowoomba 83.6mm fell to 9am. On 11
January 2011 to 9am 123.4mm of rain fell.
On 10 January 2011 in Gatton 87.2mm of rain fell to 9am. On 11
January 2011, 79mm of rain fell to 9am.
On 10 January 2011, 57mm fell in Helidon whilst on 11 January 2011
29mm of rain fell.
On 10 January 2011, 58mm fell in Laidley whilst on 11 January 2011
and 12 January 2011, 55mm and 100mm fell respectively in Laidley.
9. The Applicant has enclosed a number of tax invoices and/or quotations for
the damage.
10. The Applicant submits that the water inundation occurred during the
catastrophe of 2011 and this event should be covered by the policy. Further,
the damage done to the building by emergency services personnel should
also be indemnified.
11. The Applicant states that the town of Grantham which is upstream from
Laidley was impacted on 10 January 2011 by stormwater. The stormwater
then flowed towards Laidley arriving in the town business district at
approximately 12.00pm on 11 January 2011. Businesses were then
requested to evacuate as the water rose throughout the day and then
Case No: 296492 Determination Page 3 of 12
peaked in the evening. This water should not be considered flood given it is
stormwater.
12. The Applicant further notes that the FSP‘s hydrologist acknowledges
stormwater inundation entered the property prior to any flood water.
13. The Applicant refers to submissions made in Determination number 247517,
which were summarised in that Determination as follows:
The Applicant says the FSP‘s hydrology report fails to take into account
a number of factors, including the saturated ground conditions, the
impact of debris and heavy rainfall on the ability of the drains to cope
with the amount of storm water, and the ferocity of the storm which
swept through the township on the day of the inundation, and as a
result, the report is unreliable.
The FSP‘s hydrologist report, upon which it relies to deny the claim for
damage to the building, leaves open the possibility that some damage
was caused by storm water runoff.
Video footage of the inundation event shows water flowing past and
around his unit, towards the drainage channel to the west, indicating
that this water was storm water.
14. More recently the Applicant has lodged a detailed submission concerning the
relevant case law, previous decisions of the Service, the loss suffered by the
Applicant and the principles associated with the Service‘s decision making
role.
Summary of FSP’s position
15. The FSP relies on the following policy terms and conditions:
―Definitions
...
Flood means:
The inundation of normally dry land by water escaping or being released from
the normal confines of a:
1. Canal;
2. Dam;
3. Natural water course or lake (whether or not altered or modified);
or
4. Reservoir.
...
Section 1 – Buildings
WHAT‘S NOT COVERED
...
Case No: 296492 Determination Page 4 of 12
6. Loss or damage that arises from:
...
c) Flood; the sea other tha n tsunami.‖
16. The FSP relies on the assessor‘s report dated 14 February 2011 from which
the Panel notes the following:
The property is a low set – high ceiling commercial shopping complex.
The habitable floor level above surrounding level is at street and
footpath level.
The ground level at the property is higher than footpath level (200mm
higher than the street gutter).
The rainfall was heaviest on 11 January 2011 and continued
throughout the morning to early afternoon. The heavy rain stopped
around 3pm.
Th e assessor recorded the inundation as ―PM‖ on 11 January 2011
with the peak inundation at 1.2m.
The water came from an unknown source and was dirty.
17. The FSP also relies on an assessor‘s report dated 4 March 2011 , from which
the following is noted:
On 10 January 2011, flash flooding occurred in Toowoomba. The water
then flowed from the Toowoomba range down into the western area of
the Lockyer Valley.
A second violent storm occurred on 11 January 2011, through the
Laidley district causing widespread damage. It is reported that Laidley
received in excess of 270mm of rain on 11 January 2011, up until 3pm.
As a result of rainfall, the Laidley CBD was cut off around 7.30am, with
the main street of Laidley becoming isolated and inundated with water.
Water was reported to have flowed from the Little Liverpool Range then
through the Laidley township before entering the Laidley Creek
catchment.
With rainfall continuing, the lower lying areas of Laidley then became
inundated causing widespread damage.
Damage occurred to both shops themselves as well as common areas.
Photographs of the external shop front area indicate it is at the
intersection of P Street and ―W Street‖. There is a dip in the sidewalk
area which leads to a pedestrian crossing on the corner outside the
premise.
18. The FSP also relies on the hydrology report dated 22 March 2011, from
which the Panel notes the following:
A volunteer at the Op Shop stated there was no water in the shop or
street on Monday evening. However, they could not get to the shop the
Case No: 296492 Determination Page 5 of 12
next day as this is when the event happened. Other tenants were not
available for comment at the time of the hydrologist‘s inspection.
The property is located on the western side of P Street at the
intersection with W street. This is approximately 240m south of the
railway crossing in Laidley. The floor level of each tenancy is similar to
the adjacent ground level. W street slopes downwards in a westerly
direction so that the floor level of the Op Shop is approximately 200mm
lower than the floor level of the other tenancies.
Laidley Creek flows in a northerly direction approximately 700m west of
the town centre. The creek has a large catchment area to the township
of Laidley and would be considered a watercourse.
There is a floodplain drainage channel which drains through the
township of Laidley and discharges into Laidley Creek north-east of
Forest Hill. Through Laidley, the channel has been highly modified,
however, upstream and downstream of the town, the channel appears
to be in a more natural state. The drainage channel has a catchment of
approximately 22km² to the railway crossing in Laidley.
A rainfall gauge 1.2km from the premise recorded a peak rainfall
intensity of 42.4mm/hour at 7am on Tuesday 11 January 2011. It
should be noted that for a 12 hour storm this had an ARI greater than
100 year event.
The relevant weir alert recorded that the water level reached its peak at
approximately 9am on 11 January 2011. The peak is approximately
106.3mGH. Further, it can be seen that the creek was at this
approximate level around 6-7pm on 10 January 2011 without the
significant rainfall recorded at this time. The weir level then drops
sharply at approximately 9-10pm to 104.50mGH.
The hydrologist notes that based on the topography and size of the
catchment the peak level of inundation (a maximum of 1.4m above floor
level) could not have been caused by stormwater runoff alone.
The peak level of inundation at the property was caused by floodwaters
overflowing from Laidley Creek which flowed along the drainage
channel through the town.
Given the floor level of the subject property is close to ground level, it is
possible that the property was initially inundated above floor level by
stormwater prior to inundation by floodwaters.
19. The FSP also relies on a hydrology report dated 27 September 2012 from
which the Panel notes the following:
During times of high creek flow, floodwater from the Laidley Creek
would overflow its banks upstream of Laidley and drain in to the
floodplain drainage channel. Based on available topographic data,
floodwater overflows from Laidley Creek and into the floodplain
drainage channel when the water level at the weir alert reached 106.2m
AHD. The weir reached 106.2m AHD at approximately 6pm on 10
January 2011 and again at 9am on 11 January 2011 where it remained
Case No: 296492 Determination Page 6 of 12
for the next 18 hours. The hydrologist believes that the floodwater
would have been flowing in the floodwater drainage channel through
Laidley from 6pm on 10 January 2011.
The subject property is located within an overflow path of the floodplain
drainage channel. The topographic information indicates that
floodwater flowing in the floodplain drainage channel can overtop its
banks and drain into the overflow path once the water level in the
drainage channel reaches approximately 103m AHD.
Water on the northern section P Street would drain in a southerly
direction past the property and into the piped stormwater drainage
system located next to the property. If the capacity of the piped
stormwater drainage system is reached, stormwater would pool in the
kerb and channel system in P and W Streets in front of the property.
Once the capacity of the kerb and channel is reached, water can then
overtop the kerb and overflow into the subject property. The footpath
outside the property is located at least 100mm above the adjacent kerb
and channel level.
The hydrologist located a new witness whose offices are located
directly opposite the insured premise. The hydrologist obtained the
following information from this individual:
i. The witness resides at a location that backs onto the floodplain
drainage channel on the northern side of the railway line. During
rainfall and flooding events she monitors the water level in the
floodplain drainage channel.
ii. At around 10.00am on 11 January 2011 she noted that the water
level in the floodplain drainage channel at the rear of her property
was close to a level which may require moving items from the
offices.
iii. When she arrived at the office there was water in P Street which
was flowing in a westerly direction towards the floodplain drainage
channel. There was not a significant amount of debris in the water
and the water was not that high.
iv. The witness does not believe the water in the street could have
come from the floodplain drainage channel but was stormwater
runoff from a nearby hill.
The hydrologist has now reviewed footage of the inundation and notes
the initial inundation of the premise occurred between 9-10am on 11
January 2011.
The hydrologist concluded that at around 9-10am that floodwater from
Laidley Creek would have been flowing in the floodplain drainage
channel at this time. The floodwater flowing in the channel had reached
a level sufficient to overtop the bank and flow along the overflow path
towards the subject property.
The rainfall intensity was lower than the heavier rainfall burst that
occurred prior to 7.00am. It is possible that the water that initially
Case No: 296492 Determination Page 7 of 12
inundated the subject property above floor level was a combination of
stormwater runoff from the local catchment and Laidley Creek
floodwater that had overflowed form the floodplain drainage channel.
Based on the information available, it is not possible to accurately
define the time of initial inundation above floor level or the proportion of
stormwater runoff, if any, that contributed to the initial inundation.
The hydrologist then concludes that the water that initially inundated
the property above floor level was a combination of stormwater runoff
from the local catchment and Laidley Creek floodwater that had
overflowed from the floodplain drainage channel. Based on the
information before the hydrologist, however, it is not possible to
accurately define the initial inundation above level or the proportion of
stormwater runoff, if any, that contributed to the initial inundation.
20. The FSP has referred to the original determination number 247517 as
upholding its position on the glass damage. It is clear that, but for the flood
damage, the glass damage would not have occurred.
21. The FSP relies on the hydrology reports which concluded that there was no
rainwater run-off inundation which inundated the premise alone. Further,
even if there was a mixture of stormwater and flood water which inundated
the premise then the Wayne Tank principle applies.
22. The FSP notes the repair cost and spreadsheet provided by the Applicant do
not establish the scope of works of the repairs and cannot be properly
reviewed by it.
23. The FSP has submitted that this Determination and dispute numbered
297014 should be dealt with as one matter as the Applicant in the other
matter is still under the same body corporate policy, represented by the
manager of the body corporate and relies on the same
evidence/submissions.
24. The FSP has responded to the Applicant‘s recent submissions.
Issues
25. Whether disputes numbered 296492 and 297014 should be dealt with
separately or together.
26. Whether the FSP was entitled to decline the Applicant‘s claim for water
inundation.
27. Whether the FSP was entitled to decline the Applicant‘s claim for glass
damage.
Case No: 296492 Determination Page 8 of 12
Reasons for decision
28. There has been an exchange of material between each party and the Panel
is satisfied each party has had an opportunity to reply to the issues raised.
29. The Panel has read each party‘s submissions and materials and will only
refer to the relevant submissions and materials raised.
30. Due to the nature of the dispute, the matter has been referred to the Panel
for Determination in line with the Operational Guidelines to the Service‘s
Terms of Reference. This dispute has not been the subject of a FOS
Recommendation and has proceeded directly to Determination.
31. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in insurance industry matters and a
representative with extensive experience in consumer claims.
32. There are three discrete issues (listed above) which the Panel will deal with
separately.
Whether disputes numbered 296492 and 297014 should be dealt with
separately or together
33. The Panel acknowledges that the disputes numbered 296492 and 297014
are similar and arising from a claim under the same bod y corporate policy
and property. Further, the submissions are the same.
34. It is important to note the basis for a unit owner to claim is as the owner of a
building. The body corporate does not specifically own the unit property but
does own common property and insures the entire premise under the body
corporate name. A unit owner is able to claim on the basis that he/she is a
beneficiary under the policy.
35. The body corporate appears to be making a claim with the authority of a
portion of the unit owners and for common property under dispute number
296492. In contrast, the Applicant in 297014, is a unit owner specifically
claiming as a beneficiary for his own property.
36. The Applicant under 297014 is not required to join his claim with the body
corporate under 296492 and may proceed separately in the same manner as
the Applicant in the original dispute of 247517.
37. The Panel considers that the subject matter and legal entitlement to claim, of
each party, is substantially different. For example, only the body corporate
may claim for common areas and the Applicant in 297014 has no such
standing. Given this, the matters are better dealt with as separate disputes.
Case No: 296492 Determination Page 9 of 12
Whether the FSP was entitled to decline the Applicant’s claim for water
inundation
38. It is a principle of general insurance law that the insured bears the onus to
establish, on the face of the facts, that they have suffered a loss caused by
an incident or event which is covered by the policy; this is known as a prima
facie claim. Once so established, the onus shifts to the insurer to prove that
a policy exclusion applies.
39. In this case, the policy covers accidental damage to the Applicant‘s building.
The Panel notes that the policy does not include a definition of ‗accidental‘,
so the Panel accepts the common or ordinary meaning of the word.
According to the Macquarie Dictionary, accidental means ― happening by
chance or accident, or unexpectedly‖ .
40. There is no dispute that the Applicant‘s property was damaged by water
inundation and the Panel accepts that this event was unexpected and
unintended from the Applicant‘s perspective. As such, the Panel finds that
the Applicant has established a prima facie claim under the policy and the
onus shifts to the FSP to prove that an exclusion applies; in this case, the
flood exclusion.
41. It is not clear from the evidence what time the inundation commenced.
However, based on information provided to the FSP‘s hydrolo gist, a
volunteer worker at the opportunity shop closed the unit shop for the day in
the afternoon of Monday 10 January 2011 and could not access the shop the
following day. It is unclear from the information when the tenant‘s employee
attempted to attend at the premise. This is contrasted with the assessor‘s
report which indicates the area may have been cut off as early as 7.30am on
11 January 2011.
42. The hydrologist believes the flooding occurred between 9am-10am on 11
January 2011. The hydrologist‘s witnes s, however, confirms that when she
attended the area at 10am there was water in P Street which was flowing in
a westerly direction towards the floodplain drainage channel. The witness
does not believe the water in the street could have come from the floodplain
drainage channel but was stormwater run-off from a nearby hill. The
information provided by the witness accords with the YouTube footage
previously provided to the Panel which shows water flowing in a westerly
direction towards the floodplain drainage channel.
43. The Panel therefore accepts that at about 10.00am on 11 January 2011,
water was recorded as flowing past the Applicant‘s building along W street in
a westerly direction.
44. The hydrologist concluded floodwater flowing in the channel had reached a
level sufficient to overtop the bank and flow along the overflow path towards
the subject property. Further, the initial inundation was a mixture of storm
and flood water. There is no evidence regarding the length of time it would
take from overtopping at this location to the inundation of the insured
property above the floor level. It is further noted that on 10 January 2011, the
Case No: 296492 Determination Page 10 of 12
creek reached a similar height without inundating Laidley CBD. Further, it is
unexplained why the sharp drop in the weir level without any substantive
rainfall would not have allowed for the subsiding of water in the relevant
stormwater channel. The hydrologist noted in the original report that there
was a slope to the street, which altered the shop levels by 200mm. The
effect of this floor level is not addressed in the first or second hydrology
reports.
45. The hydrologist clearly states that it is not possible to accurately define the
time of initial inundation above floor level or the proportion of stormwater run-
off that contributed to the initial inundation. However, it was believed to be a
mixture of storm and flood waters.
46. Whilst the Panel accepts that the peak inundation was unlikely to be caused
by stormwater alone, given the total rainfall and the peak inundation of 1.4m,
this does not address the issue of initial inundation. The original hydrology
report indicates the stormwater may have inundated the Applicant‘s property
prior to the arrival of the floodwaters. Although, the Panel observes that the
original report, which had the same data as the secondary hydrology report,
plus access to some witness evidence, allows for the possibility of
stormwater inundation, rather than confirmation that it occurred. It appears
this opinion has changed markedly based on the same data and new
witness evidence in the second hydrology report. However, the witness
confirms westerly flowing water in the street at 10am and states it was not
from the floodplain/stormwater channel. Further, the witness is not asked to
comment on the depth of the water in the street. It is unclear how this
witness evidence actually confirms that the stormwater has mixed with
floodwater given her observations.
47. Nevertheless, the cover provided by the policy is for ‗accidental damage‘ and
given that the Panel has accepted a prima facie claim has been established,
the onus is on the FSP to prove its exclusion, that is, to prove that the initial
inundation was a result of flood, not stormwater.
48. After reviewing both hydrology reports, the Panel is satisfied that at 10am on
11 January 2011, Laidley Creek had — for a second time in less than 24
hours — reached its peak of about 106.25m GH and it remained at or
around this level until about 3am, on 12 January 2011.
49. The Panel notes that at the time when peak rainfall was recorded at the
Showgrounds Weir Alert (at about 7.00am on 11 January 2011), Laidley
Creek had reached nearly 106m GH and was less than 0.5m from its peak.
50. The Panel also observes that the hydrology report by W states that the short
duration rainfalls (between 1 and 3 hours) were not particularly intense, with
an ARI of between 2 and 5 year events. However, for a 12 hour storm the
storm had an ARI of 100 years.
51. The Panel is of the view that on the balance of probabilities and in the
absence of evidence to the contrary, following a low level initial inundation by
stormwater runoff, this runoff would have dissipated or mixed with the
Case No: 296492 Determination Page 11 of 12
floodwater which had already escaped from Laidley Creek and the drainage
channel running through the Laidley township.
52. The Panel recognises established case law which provides that if there are
two concurrent causes of a loss, where one is subject to cover and the other
is not, an insurer is not liable for the loss (refer to Wayne Tank and Pump Co
Ltd v Employers Liability Assurance Corp Ltd [1974] QB 57 ).
53. The Panel notes the FSP‘s reliance on the Wayne Tank principle and
particularly its submission ― Where an insured cause (rainwater) is
overwhelmed by an excluded cause (flood) the whole of the damage is
excluded under the case law…”
54. This application is misconceived; application of the Wayne Tank principle
allows that where rainwater and floodwater damage occur concurrently, then
the principle allows the exclusion to prevail. However, where rainwater is
subsequently overwhelmed by floodwater then such events are not
concurrent but sequential and the FSP would be liable for the damage
caused prior to the floodwater damage. This principle is clarified by the case
of Elilade, referred to in the Applicant‘s submissions.
55. The Panel therefore determines that the FSP is to indemnify the Applicant
for the initial low level inundation which occurred prior to the floodwater.
There is no conclusive evidence to determine the exact height of the initial
inundation, therefore the Panel will rely on its mandate to do what it
considers is fair in all the circumstances.
56. Having considered the evidence and noted the information gathered on site,
the Panel determines that rainwater runoff is likely to have inundated the
property to a height of 150mm, prior to the subsequent inundation by
floodwater. Any damage above that height would be excluded from cover.
57. The quantum documentation provided by the Applicant is insufficient for the
Panel to determine the loss. It is unknown whether the body corporate or
owners may be registered for GST purposes or the specific losses suffered
by each party claiming. The spreadsheet does not act as proof of loss and
there is no assessment report on the quantum to assist.
Whether the FSP was entitled to decline the Applicant’s cl aim for glass
damage
58. The Applicant says that army and emergency personnel, driving trucks along
the main road, pushed debris towards the shop front windows at the
insured‘s premises and this caused them to break. The Applicant has
submitted that it was the action of the personnel driving the trucks which was
the cause of the damage to the windows, not the flood which happened the
day before. Furthermore, the Applicant has alleged the cause of the breaking
glass should be deemed a new and intervening act.
59. The FSP has relied on its previous submission that the proximate cause of
the damage to the Applicant‘s windows was flood; if it weren‘t for the flood
Case No: 296492 Determination Page 12 of 12
water in the streets, the damage would not have occurred. Further, it says
that where coverage for a peril is provided under a policy and the actions of
the emergency services cause damage while dealing with the peril (event),
then cover is extended as if the peril had caused the damage.
60. After reviewing the submissions of both parties, the Panel is satisfied that the
township of Laidley was in flood when the army / emergency services trucks
pushed debris into the Applicant‘s windows, causing the damage.
61. The Panel also accepts that if it were not for the flood, no damage could
have been caused and as such flood is a proximate cause of the damage.
Due to the operation of the Wayne Tank principle, the FSP is entitled to deny
liability for the damage.
62. The Panel therefore finds that the FSP is not liable for the damage to the
Applicant‘s unit‘s shop front windows.
Determination
63. On the basis of the available information the Panel determines that the FSP
is to indemnify the Applicant for damage caused by rainwater runoff, up to a
height of 150mm, above the floor level of the property.
64. The FSP is to assess the extent of the damage so caused and provide a
scope of works and costing to rectify the damage. The FSP is then to enter
into discussions with the Applicant to agree on an amount for settlement.
The Panel encourages the parties to work cooperatively to finalise this
matter. Should the parties be unable to agree on the settlement amount, the
parties can seek a further determination from the Panel on the amount.
65. The FSP is also to pay interest on the agreed amount at the statutory rate in
accordance with Section 57 of the Insurance Contracts Act 1984, from 30
March 2011, being the date on which it denied liability for the claim, to the
date of settlement.
66. The Applicant is not entitled to be indemnified for the damage for the
breakage of his unit‘s shop front windows.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.