Text of the determination
Case No: 295859 Determination Page 1 of 14
D
Case number: 295859
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim for inundation – flood and flash floodA
12 December 2012
Background
1. The Applicant insured his home and contents in Graceville with the Financial
Services Provider (FSP). The relevant period of insurance operated for
twelve months beginning from 23 February 2010. During this period, the
building was insured up to a sum of $544,000 and the contents for $136,000.
2. On 13 January 2011, the Applicant lodged a claim under the policy due to
extensive water inundation following severe weather events in Queensland.
3. The FSP denied the claim on the basis the damage was due to “flood”. The
Applicant, through his solicitors, has disputed this. For the sake of simplicity,
reference to the Applicant will include his legal representatives.
4. Both the Applicant and the FSP have provided detailed submissions on the
relevant issues. For the sake of brevity, the Panel will only briefly summarise
these submissions given all of the material made available has been
exchanged with the other party.
Summary of Applicant ’s position
5. The Applicant submits the following as alternative arguments in response to
the FSP‟s decision:
a. The FSP failed to clearly inform the Applicant of the policy terms and
conditions under section 35 of the Insurance Contracts Act (1984) “the
Act”. The Applicant does not recall being supplied with a Product
Disclosure Statement “PDS”.
b. The first premium was paid by credit card prior to the PDS being sent
out. The Applicant did not receive a PDS prior to the policy inception or
information regarding the flood exclusion in circumstances that it was
reasonably practicable to do so. Accordingly, the Applicant argues that
the FSP has not met its obligations under section 69 of the Act.
c. The FSP represented to him at policy inception that he had
comprehensive cover. The Applicant would have sought alternative
insurance had he been aware the policy did not cover flood as his
parents-in-law were affected by the 1974 flood. The Applicant alleges
Determination
Case No: 295859 Determination Page 2 of 14
he relied on the representation of comprehensive cover to his
detriment.
d. The policy structure as it relates to storm, tempest and flood is overly
technical and confusing. In particular, the definition of flood is too broad
and there is overlap with the flash flood cover which is confusing. The
policy does not meet the requirements to clearly inform under the Act or
„clear, concise and effective disclosure‟ under the Corporations Act.
e. The inundation of the property was caused by flash flood as
characterised by the FSP‟s policy. Alternatively the loss was caused by
stormwater run-off.
f. The damage was due to “Flash flood and stormwater run - off”, which is
an insured event. In particular, the inundation was due to heavy rain
that fell from 4am on 11 January 2011 which resulted in the Wivenhoe
Dam operators elevating their strategy to W4. This decision resulted in
massive discharges of water into the Brisbane River that ultimately
inundated his property.
g. The Applicant recalls it was raining heavily on the morning of Tuesday
11 January 2011. At 1pm the stormwater run-off from surrounding
areas had begun to pool across the street directly outside the
Applicant‟s home. At 2pm this water entered the house and by 3pm the
water had reached 1 foot in the downstairs area of the property. The
water increased as the day continued and eventually met with water
that had risen from a nearby stormwater channel situated behind the
property. By the time the Applicant e vacuated the property at 10pm on
the Tuesday, the water was chest deep.
h. The Applicant states that his property was inundated at approximately
2pm on Tuesday 11 January 2011. As the inundation occurred within
24 hours of the rain which fell over the Wivenhoe Dam it is therefore
covered by the flash flood and stormwater run- off definition in the FSP‟s
policy.
i. The FSP‟s hydrologist, “SC”, has only conducted a desk top review of
the data relevant to the property site rather than undertaking a proper
site inspection.
j. The Applicant seeks interest on the basis that under section 57 of the
Act it was unreasonable for the FSP to refuse the claim in the first
instance. Accordingly, the Applicant should be entitled to interest from
the date of the initial refusal of the claim.
6. The Applicant seeks to be indemnified for his claim.
Summary of FSP’s position
7. The FSP has enclosed an assessor report dated 18 February 2011. The
Panel notes the reserve placed on the building was $78,500 and on contents
$45,200. The building was described as major damage and all the contents
were noted as „destroyed‟.
Case No: 295859 Determination Page 3 of 14
8. The FSP has enclosed proof of dispatch documentation from which the
Panel notes the following:
The FSP has produced data streams which indicate that in 2009 a PDS
was sent with the policy renewal. The data streams indicate that a PDS
document was taken from the relevant hopper containing same. The
policy documentation was sent to the Applicant‟s current listed address.
The FSP has produced data streams which indicate that a SPDS was
sent with the policy renewal in 2010. The data streams indicate that a
SPDS was taken from the relevant hopper containing same. The policy
documentation was sent to the Applicant‟s current listed address.
The postal reconciliation does not indicate any returned mail for either
of these documents.
The renewal insurance documentation has been reproduced and the
Panel notes the flood exclusion was listed in these documents.
9. The FSP has enclosed a statement from an employee “PJ”. PJ provides the
following evidence:
New authorised representatives are told that if the policy is sold over
the counter in person then they must hand the PDS to the customer
along with their certificate of insurance or quote.
Authorised representatives are trained to tell customers that
comprehensive flood cover is not included as standard with the policy.
Authorised representatives are trained to explain to customers that any
application for flood cover must be made in writing and is subject to
approval from underwriting.
10. In response to the Applicant ‟ s arguments, the FSP submits the following:
a. It has provided evidence to corroborate that a PDS was sent to the
Applicant with the 2009 renewal and the Supplementary PDS “SPDS”
was sent on renewal in 2010, all prior to the claim. Further, the policy
structure and layout in conjunction with this evidence enables it to rely
on the exclusion clause of “flood” pursuant to Section 35(2) of the Act.
In addition to this, the Applicant received a renewal document each
year which stated flood was not covered.
b. The FSP has been unable to obtain a recording of the telephone call
incepting the policy 9 year ago and the customer service operator no
longer works there. The FSP considers it unlikely the Applicant was
informed the policy was „comprehensive‟ given this is a motor vehicle
insurance policy term rather than home and building policy terminology.
Further, the FSP notes that even if such a statement was made then
the Applicant also received documentation confirming there was no
flood cover.
c. The inundation was caused by flood which is excluded from cover.
11. The FSP relies on a number hydrology reports authored by SC from which
the Panel notes the following :
Case No: 295859 Determination Page 4 of 14
The level of the subject property varies between 4.1m AHD and 6.2m
AHD. The minimum habitable floor level was not available. The
FloodWise summary confirms this data. The property is in an overland
flow path which means that during high rainfall excess run-off will travel
overland to low lying drainage paths. This commonly occurs when
underground drainage exceeds its capacity.
The lowest level of the insured dwelling on the land is approximately
4.5m AHD. There is curb and channelling along the street in which the
property is located and there are stormwater drainage pits directly in
front of the subject property. There is further a catchment to the west of
the property which leads to a low point at the front of the subject
property.
The water catchment would flow from north and south along the street
to the low point where it would drain through the stormwater pits into
the pipe network which leads to the gully to the north-east of the
property. The gully falls to Oxley Creek which in turn drains to the
Brisbane River.
The gauge records show that approximately 85mm of rain fell from 9-10
January 2011. A further 43mm fell during the course of the day on 11
January 2011. The most intense rainfall of 15mm occurred between
11am and 12pm on 11 January 2011. There was no rainfall recorded
after 5pm on 11 January 2011.
The pooling of water outside the property was not due to stormwater
run-off alone. SC considers that in the absence of backflow effect the
volume of rainfall would not overwhelm the capacity of the local
stormwater infrastructure. Backflow occurs when the river level rises,
this leads to water travelling back up the storm pipes. If there is an area
of higher ground between the watercourse and given property it is
possible for the property to be inundated by the rising level of the river.
This is even though the water has not travelled directly from the banks
of the river to the site of the property because of the obstruction posed
by higher ground.
The Brisbane River reached a level of 4.1m AHD at approximately
1.49pm on 11 January 2011 which would have been sufficient to
inundate the minimum level of the property. At approximately 3.37pm
on 11 January 2011 the Brisbane River reached a level of 4.5m AHD
which would have been sufficient to inundate the insured dwelling.
SC concluded in his „Key Conclusions‟ of 7 June 2012 that the
Brisbane River reached the approximate bench level mark of 4.5m
AHD at 3.37pm on Tuesday 11 January 2011. The distance of the
property from the Wivenhoe is 108.9km and the effects of the W4
releases first reached the property at approximately 2.39pm on 11
January 2011. SC noted that due to W4 releases the river reached a
height of 6.9mAHD which is approximately 2.4m above the benchmark
level at 4am on 12 January 2012. The river later peaked at 9.2m AHD
which was approximately 4.7m above the bench mark at 12.24am on
13 January 2011.
Case No: 295859 Determination Page 5 of 14
The Bremer River contributed in the order of 15-25% to the Brisbane
River‟s peak flow.
A small proportion of the overall depth of the Brisbane River prior to
6am on 12 January 2011 may be partially attributable to the rain that
fell in the Bremer River catchment on 11 January 2011. However, the
overwhelming influence on the flooding of the Brisbane River was the
rain that fell days earlier over the Wivenhoe Dam catchment and
subsequent releases from the dam.
12. The FSP relies on the following policy provisions to deny the Applicant‟s
claim:
Page 4 of the Certificate of Insurance (COI)
“ What optional covers are included and not included
Home Contents
...
Flood and storm surge not included not included...”
Pages 10-12 of the PDS
“ Words / terms with special meanings
Word / term Meaning
...
Flood Rising water which enters your home as a result of it
running off or overflowing from any origin or cause.
This policy does not cover flood unless we have
agreed and it is shown on your certificate of insurance.
Flash flood and
stormwater run - off
A sudden flood caused by heavy rain that fell no more
than 24 hours prior to the flash flood or stormwater
run - off .
...
Storm A violent disturbance of the atmosphere associated
with strong w inds including a cyclone, light ning, heavy
rain, hail or snow, but not continuous bad weather by
itself.
...”
Pages 17-18 of the PDS
“ Insured events you are covered for
Damage caused by weather...
What is covered What is not covered
Storm Loss or damage:
Case No: 295859 Determination Page 6 of 14
caused by rain, hail or snow
after it has reached the
ground...
...
Flash flood and stormwater run - off
A sudden flood caused by heavy rain
that fell no more than 24 hours prior to
the flash flood or stormwater run - off
Loss or damage caused:
by flood...
...”
Page 27 of the PDS
“ Your home
The most we will pay you for home claims
What is covered What is not covered
Flash flood and stormwater run-off
We will pay up to 50% of your home sum
insured or $25,000, whichever is higher.
...
...”
Page 32 of the PDS
“ Your contents
The most we will pay you for contents claims
What is covered What is not covered
... ...
Flash flood and stormwater run-off
We will pay up to 50% of your contents
sum insured or $25,000, whichever is
higher , but not exceeding your contents
sum insured .
...
...”
Issues
13. Whether the FSP misrepresented the policy cover to the Applicant prior to
policy inception.
14. Whether the FSP provided the PDS in accordance with section 35 of the Act.
15. Whether the FSP breached section 69 of the Act.
16. Whether the Applicant was “clearly informed” about what the policy covered.
Case No: 295859 Determination Page 7 of 14
17. Whether the cause of the Applicant‟s loss was covered under the policy.
Reasons for decision
18. Due to the nature of the dispute, the parties have been informed that the
matter has been referred to the Panel for Determination in line with the
Operational Guidelines to FOS‟s Terms of Reference. This dispute has not
been the subject of a FOS Recommenda tion and has proceeded directly to
Determination.
19. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in the insurance industry and a
representative with extensive experience in consumer claims.
20. It is appropriate to consider the issues under the various headings.
Whether the FSP misrepresented the cover to the Applicant prior to policy
inception
21. The Applicant has alleged the FSP misrepresented cover to him by stating it
was comprehensive. The Panel notes that whilst flood cover was important
to the Applicant, it is unclear whether he actually asked specific questions on
flood cover. The manner in which the submissions are presented, do not
raise an allegation the Applicant was told flood was covered b ut rather that
he was told the policy was comprehensive.
22. The Panel does not consider that a statement a policy would
„comprehensively‟ insure the property would be understood by a reasonable
person to mean the FSP covers everything without any exclusions of cover.
23. There is insufficient evidence before the Panel to establis h a
misrepresentation was made.
Whether the FSP provided the PDS in accordance with section 35 of the Act
24. The Applicant states he does not recall receiving the PDS.
25. The FSP has produced evidence regarding the updated PDS documentation
forwarded to the Applicant‟s current address in 2009. Further, the FSP has
provided evidence of providing the SPDS document to the Applicant in 2010
at the same time as the renewal.
26. The Panel accepts that the PDS and SPDS applicable to the relevant period
of damage in 2011 had been forwarded to the Applicant prior to the period of
damage and renewal of the relevant policy. Further, the renewal
documentation also confirmed flood was not covered by the FSP.
Case No: 295859 Determination Page 8 of 14
27. The Panel accepts that the FSP provided the written terms and conditions of
the policy, contained in the PDS and SPDS, prior to the relevant policy of
insurance.
Whether the FSP breached section 69 of the Act
28. The Applicant has alleged that he did not receive the PDS prior to the
inception of the policy as he paid by credit card prior to the receipt of the
written document. This appears to refer to the original policy inception in
2003.
29. First, the Panel notes that each policy of insurance is a 12 month contract of
insurance. Each contract term is treated separately. The Panel notes that
prior to the 2010 renewal commencement date the Applicant had received
the PDS, SPDS and renewal document stating flood was not covered. Given
this, the FSP has met its obligations under sections 35 and 69 of the Act for
the relevant period of insurance.
30. In order to comply with the Act the FSP is required to provide the information
in writing within 14 days of the Insurance Contract being entered into. If
notice in writing is given later then the notice will be treated as being given
from the date of service of the notice.
Whether the Applicant was clearly informed as to what the policy covered
31. It is established law that in order to satisfy the requirement to clearly inform,
the language of section 35 (2) allows for a proposed insured to be clearly
informed by providing the relevant documentation in writing and that the
relevant exclusion and/or limitation in this case is clear and unambiguous
and in a manner which a person of average intelligence and education is
likely to have little difficulty in finding and understanding if that person reads
the policy in question.
32. The Panel has reviewed the FSP‟s policy on a number of occasions. The
policy is indexed with relevant sections covering the insured events. The
policy sets out the definitions of storm and flash flood and stormwater runoff.
The policy clearly identifies that flood and storm surge is an optional cover
but otherwise flood is excluded from cover. The Certificate of Insurance also
clearly identifies that with respect to the Applicant‟s policy , flood and storm
surge is not covered. Having considered the Applicant‟s submissions and the
FSP‟s policy documents, the Panel is satisfied that the FSP has met its
obligations to clearly inform the Applicant of the extent of the exclusions and
limitations in accordance with the requirements of the Act.
Water Inundation
Releases from Wivenhoe Dam & Proximate Cause
33. The central issue for Determination in this dispute is whether the inundation
of the Applicant‟s home on 11 January 2011 was due to flash flood as
Case No: 295859 Determination Page 9 of 14
defined within the terms of the policy, that is whether rain that fell no more
than 24 hours prior to the inu ndation of the Applicant‟s property was the
proximate cause of the inundation.
34. On 21 May 2012 FOS issued a memorandum to all relevant stakeholders
advising that after considerable deliberation of all material available to it, the
Panel formed a view that the heavy rain occurring from approximately
4.00am on 11 January 2011 and in particular the heavy rain between
4.00am and 8.00am on 11 January 2011 was a proximate cause of the W4
strategy being invoked and therefore a proximate cause or trigger that led to
the flooding of many of the properties along the Brisbane River.
35. At that time, the Panel noted that in relation to the approach that each
dispute would depend upon the individual and unique factors relevant to the
dispute and in that regard the parties were invited to make further
submissions in relation to disputes before FOS.
36. In view of this, the FSP provided detailed further submissions to FOS on 3
October 2012 in relation to this dispute. Included with the submissions were
the following documents:
A Reference document dated 28 August 2012 for disputes relating to
Queensland Floods (this is a general reference document) relating to
the various submissions the FSP makes in relation to a number of
issues. Not all issues raised in the reference document appear in the
current dispute;
Letter from the FSP‟s hydrologist attaching a key information sheet for
the Applicant‟s property;
Hydrologist report “Investigations of January 2011 inundation event –
Brisbane” dated March 2011;
Statement from hydrologist dated 7 June 2012.
Certificate of Insurance.
Product Disclosure Statement.
Statement by SC
Key correspondence
Loss adjusters report
Documentation of despatch of PDS
Statement of PMJ.
37. The FSP maintains that on any reasonable view, the damage sustained to
the downstream properties was the combined effect of all of the rainfall and
not just the rain that had fallen from 4.00am on 11 January 2011 leading to
the implementation of the W4 strategy from 8.00am that day.
38. There is no dispute that heavy rain fell over the Wivenhoe Dam catchment
area and in fact parts of the Brisbane River from approximately 4.00am on
Case No: 295859 Determination Page 10 of 14
11 January 2011. It is not disputed that in addition to this there was heavy
rain over the Bremer River which influenced the level of the Brisbane River
and that rain commenced at approximately 6.00am on 11 January 2011.
39. The FSP‟s hydrologist has relied on data from SEQWater dated 2 March
2011 which confirms the rapid increase in releases from the Wivenhoe Dam
from 8.00am on 11 January 2011. Examination of the SEQWater report
identifies the rapid increase in the inflows to the Wivenhoe Dam
commencing from about 4.00am, 11 January 2011. The report confirms the
inflows into the dam had been decreasing from as early as 8.00am from 10
January 2011 with steady decreases from approximately 3.00pm on 10
January 2011 to 2.00am on 11 January 2011.
40. The Queensland Flood Commission of Inquiry report confirms that prior to
4.00am on 11 January 2011 and in fact prior to 8.00am of 11 January 2011
the dam releases were being managed at the W3 strategy. Whilst it is
accepted that the W3 strategy had led to an increase in the levels of the
Brisbane River, the W3 strategy was designed to avoid where possible
inundation of the properties below the Wivenhoe Dam by flooding from the
Brisbane River.
41. There is no dispute that there were two significant rainfall spikes with rain
that fell from 9 to 10 January 2011 being considered the first spike and rain
that commenced falling from approximately 4.00am on 11 January 2011
being the second spike.
42. There is no dispute that following the second spike that the W4 strategy was
adopted. The FSP has argued that the switch to strategy W4 was not the
natural and ordinary consequence of the rain that fell and in fact the move to
W4 strategy was not taken in accordance with the Wivenhoe Dam manual.
In the Panel‟s view, the Queensland Flood Commission of Inquiry final report
does not find the adoption of the W4 strateg y at 8.00am on 11 January 2011
was inconsistent with the manual. Although there may be issues as to how
the Wivenhoe Dam had been managed prior to this time, there is nothing in
the material that has been provided to the Panel to suggest that the earlier
management of the Wivenhoe Dam influenced to any significant degree, the
adoption of the W4 release strategy at 8.00am on 11 January 2011.
43. The ICA hydrology and the information provided by the FSP‟s hydrologist
confirms that the increased releases from the Wivenhoe Dam after the
adoption of the W4 strategy led to the development of a flood wave that
ultimately caused the flooding of many properties downstream of the
Wivenhoe Dam.
44. The question arises as to what was the proximate cause of this inundation.
In determining the proximate cause of the inundation it is necessary to look
at the effective or dominant cause of the inundation. The Panel agrees with
the FSP‟s general submission that the proximate cause is a cause
determined by common sense evaluation of the relevant facts. In the event
that there are two or more proximate causes, one within the policy and the
other excluded, the policy does not respond. The proximate cause is not
Case No: 295859 Determination Page 11 of 14
determined by identifying the last event or final trigger but by determining
what is the dominant, effective, direct or efficient cause of the loss.
45. The FSP has maintained that the impact on the Wivenhoe Dam from the
rainfall that fell in the early hours of 11 January 2011 was only 29% while
71% of the volume of the inflow came from the rain that fell on 9 and 10
January 2011 or earlier. The FSP maintains that to find the rainfall which had
fallen from 4.00am on 11 January 2011 is the proximate cause is without
foundation as such an approach produces an entirely artificial outcome.
46. With due respect to the FSP‟s argument the Panel disagrees. Whilst the
Panel accepts there has been a significant impact on the levels of the
Wivenhoe Dam by the rainfall that commenced falling on or about 9 January
2011 or earlier, the Panel is satisfied having regard to the information that
has been exchanged and the relevant legal principles, that the heavy rain
that commenced falling on or about 4.00am on 11 January 2011 was a
proximate or effective cause of the adoption of the W4 strategy.
47. The Panel is also satisfied that whilst the level of the Brisbane River may
have been increasing under the W3 strategy, it was the heavy rainfall from
approximately 4.00am on 11 January 2011 that caused the need to adopt
the W4 strategy at 8.00am on the same day.
The Applicant’s Inundation
48. SC‟s statement of 7 June 2012 indicates the effect of the W4 releases first
reached the vicinity of the Applicant‟s property at 2.39pm on 11 January
2011. He estimated that the property was first inundated by the Brisbane
River at 3.37pm on 11 January 2011 and by 4am on 12 January 2011 the
property was inundated up to approximately 2.4m above the relevant
benchmark level.
49. The relevant benchmark level, at 4.5m with annotation „ elevated (possible
storage areas) ‟ was SC‟s estimate of the lowest point of the house. This
evidence has not been refuted by the Applicant i n any manner.
50. SC has disagreed that the pooling water viewed by the Applicant was
stormwater run-off and considered it backflow. Given the rainfall data
provided by SC and the placement of stormwater drains in close proximity to
the insured property, the Panel accepts the water inundation was from
backflow effects.
51. There is no evidence from the assessor or the Applicant regarding the
ultimate inundation level of the home. The Panel notes the only information
on this comes from SC who stated the peak inunda tion was 4.7m above the
benchmark level at 12.24am on 13 January 2011.
52. The evidence before the Panel confirms that the W4 release effects were
seen at the property around 2.39pm on 11 January 2011. The property was
then inundated at approximately 3.37pm this same day. The inundation level
rose to approximately 2.4m above the benchmark by 4am on 12 January
Case No: 295859 Determination Page 12 of 14
2011 and occurred within 24 hours of the commencement of the heavy
rainfall prior to peaking on 13 January 2011 at approximately 4.7m.
Accordingly, the Applicant is entitled to claim up to 2.4m inundation under
the flash flood provisions of the policy as this is within the 24 hour period.
Inundation after the relevant 24 hour period is not covered under the terms
of the policy and properly classified as flood.
Quantum
53. The Renewal Certificate of Insurance for the relevant period provides a sum
insured of $544,000 for the home with contents of $136,000. Pursuant to the
policy cap for the insured event of “Flash flood and stormwater runoff”,
liability is limited to a maximum of 50% of the sum insured that is, up to
$272,000 for the damage to the building and $68,000 for the contents.
54. Given the time since the loss was sustained, the Panel accepts that the
parties may be unable to provide an exact estimate of the total loss
sustained, or a breakdown of that loss.
55. The Panel notes the FSP‟s assessor‟s report of 13 February 2011 suggested
a reserve of $78,500 for building damage and $45,200 for contents. The
report further suggested: „building, partially damaged – major, entire
structure‟ and „contents, all contents destroyed‟. The property is a 2 storey
property and it is unclear from the available information if inundation to a
level of 2.4m above benchmark which is set at the front entrance of the
house would inundate the second level of the house. Most likely at peak
inundation of 4.7m above benchmark there would be inundation and damage
to the second level.
56. In order to determine the extent of the loss sustained the FSP is asked to
prepare a scope of works to assess the damage sustained by inundation to a
level of 2.4m above benchmark. The Panel accepts such inundation would
cause the majority of damage to building and contents contained on the first
floor of the home as well as outdoor items covered under the policy. In so far
as inundation at 2.4m above benchmark would have caused damage to the
second level of the property this will need to be assessed in the scope of
works.
57. The parties are asked to work cooperatively together to establish the extent
of the loss sustained and to reach an agreement as to cost of repairs and
replacement of the various contents lost.
58. Insofar as the FSP may have made payment of a compassionate sum to the
Applicant, FOS does not have jurisdiction to deal with this payment but
acknowledges that the FSP, given the terms on which the compassionate
payment was made, may be entitled to deduct this payment from any
settlement sum.
59. The Panel has also considered the issue of interest.
Case No: 295859 Determination Page 13 of 14
60. The FSP has argued that interest is only payable from the date from which it
was unreasonable to withhold payment. The FSP maintains that it is entitled
to a reasonable period to investigate and determine its position, and given
the complex nature of the flood disputes, the delays are not unreasonable.
Further complex situations require substantial periods of time for
independent bodies such as the Queensland Flood Commission of Inquiry
and FOS, to make conclusions on the issues in dispute.
61. The FSP maintains that it did not act unreasonably in this dispute and
therefore interest is not payable. Alternatively if some period of interest is to
be awarded it should be reduced to account for the substantial delays
through the course of the process which were not the FSP‟s fault.
62. Section 57 of the Insurance Contracts Act req uires interest be paid when it
becomes “unreasonable for the insurer to have withheld payment”. An
examination of relevant case law indicates that most probably, interest will
be awarded from either when an insurer first emphatically denied liability or
disputed a matter, or from when in the normal course of events the claim
should have been paid if liability had not been disputed.
63. In this dispute the Panel accepts that the FSP was entitled to withhold
payment of the settlement monies until such time as it had properly
investigated the dispute and made its decision as to liability.
64. The FSP made its original decision to deny the claim after receiving relevant
assessment reports, hydrology reports and other information. The FSP was
aware of the terms of its policy and aware of the relevant provisions under
which liability might arise and chose to deny the claim having reviewed those
relevant provisions and the evidence available to it.
65. In the Panel‟s view, at that point the FSP has made its decision on the cl aim
and it is appropriate that from that time interest be paid unless it can be
established that the Applicant had withheld information from the FSP that
would have led to an alteration of its decision.
66. Accordingly, the Panel determines that it is appropriate that the FSP in this
dispute pay interest from the day upon which the FSP determined to deny
liability of the Applicant‟s claim, until payment of the claim.
Determination
67. The FSP is to meet the cost of repairs incurred by the Applicant and the cost
of the replacement of items damaged as a result of the inundation of the
property or up to a level of 2.4m above benchmark level. Any payment is
subject to the limitations under the “flash flood” provisions of the policy.
68. Any damage caused by inundation above 2.4m above benchmark in the
Panel‟s view most likely occurred after 4.00am, 12 January, 2011 has
occurred outside the relevant 24 hour period and is therefore excluded from
cover under the flood exclusions.
Case No: 295859 Determination Page 14 of 14
69. Insofar as the FSP is to cash settle the claim, the FSP is to pay interest from
6 April 2011 to date of payment of the claim, in accordance with Section 57
of the Act.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.