Remaining water and storm damage to home refused for lack of insured event
Summary
The applicants claimed for ceiling and structural water damage to their home that had followed cyclone and storm events, and the FSP refused the remaining damage. AFCA found the applicants had not proven an insured event and the damage fell within gradual deterioration and wear exclusions, though it criticised the FSP's investigation.
The onus was on the applicants to show a specific insured event caused the loss, and speculation about possible causes did not meet that onus, while deterioration and wear were excluded.
Issues
- Claim denial primary · not upheld
“In the Panel's view the Applicants have not established that the damage was a result of an event insured against under the policy.”
- Inadequate claim investigation secondary · upheld
“The Panel is of the opinion the FSP was required to conduct further investigation after the removal of the linings to assess the cause of the damage.”
Subjects and remedies
home or building damagenatural disasterno remedy
Text of the determination
Case No: 295708 Determination Page 1 of 8
Case number: 295708
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of Claim - Exclusion/Condition
28 May 2013
Background
1. The Applicants held a home building and contents insurance policy with the
Financial Services Provider (FSP) from 18 August 2005 to 18 August 2007
and from 6 September 2007 to 6 September 2009.
2. The Applicants lodged a claim with the FSP when the property sustained
water damage as a result of severe weather conditions in February 2010.
Some parts of the ceiling too had collapsed around this time.
3. Part of the total damage identified at that time was accepted by another
insurer „Q‟ (who was on risk at that time) resulting from the February 2010
event. During the assessment of that claim Q suggested that the remaining
damage predated the February 2010 event and related to a period of time
before Q‟s period of insurance commenced.
4. Since the property was previously insured with the FSP from 2005 to 2009
when the insurance cover was changed over to Q, the Applicants believe the
remaining parts of the damage should be accepted under the FSP‟s policy .
5. The FSP denies liability for the claim. Although it had previously accepted a
claim by the Applicants for damage which resulted from Cyclone Larry in
2006, it had accepted liability and repairs were completed, this further
damage would have been subsequent to that event. It further submits that
the damage relates to several weather events which occurred over a period
of time and also due to structural defaults in the building which is excluded
under the policy.
6. The Applicants expect the FSP to accept the remaining parts of the claim.
Summary of Applicants ’ position
7. The Applicants say severe storm damage sustained to the ceiling was
accepted and repaired by the FSP and the same location sustained further
damage resulting in the collapse of the ceiling causing severe damage to t he
internals and water logging the footings of the house in certain areas in
between the internal and external wall.
Determination
Case No: 295708 Determination Page 2 of 8
8. Since the Service‟s Determination in their dispute against Q found that the
damage was sustained prior to the policy period with Q, the Applicants
believe the loss should be covered under the FSP‟s policy. Further because
the building inspection before the purchase of property in 2005 did not
highlight any issues in regards to the condition/structural issues with the
building, the damage must have occurred during the period they were
insured with the FSP.
9. The Applicants are unable to contact the building inspector. However, they
have forwarded a copy of his invoice to the FSP confirming the payment
made to him.
10. The Applicants have since repaired/replaced the roof and they expect the
FSP to honour the remaining parts of the claim.
Summary of FSP’s position
11. The FSP says the Applicants have not established that the loss was caused
by an insured event during the period of insurance.
12. There is no evidence the current loss relates to the damage caused by
Cyclone Larry in 2006 or as a result of the subsequent repair work organised
by the FSP.
13. The FSP relies on the findings of its expert engineer S.
14. Even if it is accepted that the claim falls within the policy provisions, it is
entitled to maintain denial of the claim relying on the following policy
provisions:
“ What’s not Covered
...
4. Faulty Design
a) Fault error or omission in design.
b) Latent, structural or inherent defect.
5. Gradual Deterioration
Gradual Deterioration
...
9. Wear
Wear and tear”
Issue
15. Whether the FSP is entitled to deny the Applicants‟ claim.
Case No: 295708 Determination Page 3 of 8
Reasons for decision
16. Due to the nature of this dispute, FOS has considered it appropriate to refer
this dispute to a Panel in accordance with the Operational Guidelines to the
FOS Terms of Reference. This dispute has not been the subject of a FOS
Recommendation and has proceeded directly to Determination.
17. This decision has been made by a Panel consisting of an Ombudsman and
two Panel members with extensive experience in insurance matters and
consumer disputes.
18. The Panel is satisfied that a full exchange of information has taken place
between each party and that each party has had the opportunity to address
any issues raised.
19. The onus of proof rests on the Applicants to establish that, on the balance of
probabilities, they have suffered a loss caused by an insured risk. Once the
Applicants have established that the loss was caused by a risk insured under
their policy, the onus then shifts to the FSP to show that, on the balance of
probabilities, the loss falls within an exclusion clause in the policy.
20. The issue remains whether the remaining parts of the damage sustained to
the property were as a result of an insured event which occurred within the
policy period with the FSP and also whether the cause of the loss is
excluded under the policy.
21. The Applicants do not dispute receipt of the policy documents and the Panel
is satisfied in these circumstances that the FSP has met its obligations to
clearly inform them of the terms and conditions of the policy.
22. The Panel notes the following from the loss assessor (L)‟s reports prepared
after the damage sustained to the property as a result of Cyclone Larry in
March 2006.
Second Report dated 10 April 2006
“Flashing and bitumen fabric based tiles on the top section of the roof
commonly known as the “pigeon house” have been extensively damaged by
the storm”
...
Obtain quotes for roof repairs”
Third Report dated 4 May 2006
“The photograph was taken before the writer‟s camera “died”. If the
photograph is examined it is possible to see on the upper section of roof
where pieces of the stone chipped bituminised external cladding have been
torn off by the force of the wind.”
Fifth Report dated 21 June 2006
“Apart from the roof, your insured have also obtained 2 quotes for major
damage to the building, each quote covers removal and replacement of the
damaged roof tiles,
Case No: 295708 Determination Page 4 of 8
...
while the more economical quote was from [D – Applicants‟ son‟s carpentr y
business] for an amount of $7,780. In an anticipation of your concurrence we
have approved the quote from [D]”
Seventh Report dated 21 August 2006
“we attach a Tax Invoice from D covering ..., replacement of the cyclone
damaged bitumen roof tiles,
...
we recommend payment of the above mentioned repairs.
23. The Panel notes that by November 2006, the Applicants were residing back
at the property and the repairs were all completed except for the repair of a
pot belly flue and cap.
24. It is noted that the repairs took some time as the Applicants and the FSP
were unable to source trades, plasterers and painters who were willing to
attend to the repairs at the time.
25. It is unclear to the Panel whether the above delays could have caused
further damage to the property which may have not been captured in L‟s
report and the Applicants too were away from the property most of the time
due to work and the condition of the property.
26. The roofer C‟s report dated 18 November 2010 states:
“On inspection of roof as requested it wa s found that severe weather
conditions to the mineral felt slates has caused damage i.e. ripping and
tearing away from structure randomly across entire roof causing water
penetration.”
27. The above report indicates damage to shingles as a result of severe wea ther
events rather than age related as suggested by the experts.
28. The Panel notes the previous owner of the property had attended to parts of
the replacement of the shingles prior to the property sale as M was shown a
pack of roof shingles left behind (packed in 2004) by the previous owner
when the property was sold to the Applicants.
29. The building consultant M‟s report dated 22 March 2010 states:
“The builder has attended and advised that there is severe rotting of all roof
framing/underlying plywood and cedar walls. He suspects rainwater is gaining
entry from flashing and around the apex widows, and has been doing so for
some time.
We noted on our visit that at some time in the past the surface of some
shingles has been torn off assumedly by winds of some force, and the
assumedly this would be Cyclone Larry. The repairing builder appears to have
inserted some flat head nails to secure these damaged shingles but
considered them still to be water proof. We understand from the [Applicants]
that water from Cyclone Larry caused substantial internal damage, but the
builder attending did not find any building damage. The [Applicants] were not
present when repairs were attended.
Case No: 295708 Determination Page 5 of 8
...
“A) The originating source and cause of the damage is through the open
windows at the clerestory roof. This has been a slow process over a long
period of time (pre-cyclone Larry) and greatly intensified by cyclone Larry.
In times of extreme weather conditions, rainwater is driven onto the
flyscreens, through the open windows (particularly at the corners of the
hexagon-shaped clerestory windows) and drains down onto the internal
window sill framing.
The gale force winds (category 4) of cyclone Larry, would have driven the
water straight through the flyscreens and onto the landing below;
consequently causing the damage to the carpet and flooring. In the same
process, copious amounts of water would also find its way into the ceiling
cavity via the inadequate (lack of) internal sill detail.
…
B) The contributing cause here are the internal fixed fly screens and the
absence of an internal system for closing the windows plus the way the
internal windows sills were constructed, allows ingress of water.” (sic)
30. Engineer S‟s report dated 30 August 2010 states:
“ Condition of Shingles
The shingles on the dwelling are understood to be the original shingles
from the construction of the dwelling and are now 25 years old or almost
twice their serviceable life in a hot environment.
The shingles on the north western side are showing significant
deterioration due to the higher exposure on this side and repairs by installing
new shingles over the existing have already been undertaken in this area.
This repair method increases the heat retention and therefore the rate of
deterioration of the asphalt shingles.
Damage evident included hardening, lifting, loss of tabs and exposure of
staples which would lead to leakage.
Asphalt shingles on the higher facets of the "Hexadome' are laid on a slope
less than the minimum recommended.
No ventilation is provided to the underside of the plywood.
...
Water Damage to Floors
Water damage was found in the plywood floor of the lower level of the
`Hexadome'. This damage is considered to be caused by entry of water to the
void through openings such as windows. It is not possible to put a time on this
damage occurring or attribute this to the open clerestory windows due to their
orientation relative to prevailing winds.
...
Water Damage to 'Hexadome'
Water infiltration has occurred into the 'Hexadome' structure causing the
collapse of the internal lining of a facet of the 'Hexadome', water staining
internal linings of 'Hexadome', and rotting of the external red cedar cladding
and timbers of the clerestory windows. It is expected that this damage will be
Case No: 295708 Determination Page 6 of 8
found to be more extensive and severe than that found during the inspection
of 5 August 2010.
...
This problem was investigated by [M] (Report dated 22 March 2010) who
found that water entry was caused solely by the matters relating to the
installation and operation of the clerestory windows. These findings were not
supported by observations made on site during the inspection of 5 August
2010 however the recommendations regarding replacement of the windows
with a more suitable type which can be operated from inside the void is
supported.
The insured described the function of the clerestory windows as the
windows on the side exposed to weather (eastern side) being kept closed
and the windows on the side not exposed to weather (western side) being
kept open for ventilation of the dome. Wind roses for Mareeba Airport
confirming the prevailing wind directions are shown in figure 1. The quantity of
water entering through the open clerestory windows would be significantly
less than suggested by this report.
...
Rotting of timbers was found in the structure of the clerestory windows above
the level of the sill, the collapsed internal lining from the facet of the dome was
below the most deteriorated section of the asphalt shingles, water staining of
internal linings was present on the eastern side of the dome away from the
described point of water entry and there was a metal flashing below the sill of
the clerestory windows.
It could not be confirmed from the visual inspection if it was possible for water
collecting in the channels of the window sill to flow into the void or the
structure of the 'Hexadome' as concluded in the MCS report.
Damage to shingles was noted in the MCS report but not investigated further
in relation to possible contribution to the damage occurring.
...
The majority of the water causing damage to the 'Hexadome' is entering
through the asphalt shingles which have reached the end of their serviceable
life.
The damage resulting from this entry of water would have been occurring
from the time that the shingles reached the end of their serviceable life
however the owner would not have been aware of the problem until the
resulting damage was found. Based on an average serviceable life for the
asphalt shingles of less than 20 years in a tropical climate the damage would
have commenced prior to 2005, the time the current owners purchased the
property.
Deflection of 'Hexadome"
There was visible permanent deflections of the 'Hexadome' and the possibility
of this occurring due to Cyclone Larry was discussed on site.
While such damage is possible it is considered very unlikely in this instance
due to:
Maximum wind gust recorded at Mareeba is well below the claimed design
wind speed for the site;
Case No: 295708 Determination Page 7 of 8
The open clerestory windows would have reduced the internal pressure
coefficient and therefore the uplift on the 'Hexadome'; and
No damage was identified in the inspections and repairs undertaken
immediately following the cyclone.
The deflections observed on site are considered to be the result of the
fabrication and erection of the 'Hexadome' however inspection of the joints in
the structure when sheeting is removed is recommended.
Survey of the structure as discussed on site is not recommended at this time
as there is no survey of the dwelling following erection to compare this with.
Checking of the geometry following removal of the linings is recommended
with the inspection of the joints. Correction of any misalignments using force
is not recommended due to the stresses that would be generated in the
structure.
...
Conclusions
The condition of the asphalt shingles due to their age is considered to be the
major cause of water entry into the structure of the 'Hexadome' that is
causing the collapse of the internal linings and rotting of the external
cladding of the dwelling. The flat roof slopes of the upper sections, lack of
ventilation of the underside of the plywood and the tropical environment
are significant in reducing the low serviceable life of the asphalt shingles.
Water entering through the sill of the clerestory windows in the manner
described in the MCS report could not be confirmed. The extent and
severity of the damage to the structure is expected to be greater than is
currently visible. This damage would have been occurring since the
asphalt shingles reached the end of their serviceable life (prior to 2005)
however owner would not be aware of the damage until linings collapsed.
The water damage to the plywood floor on the lower level of the
'Hexadome' is considered to be due to water entering through openings
such as windows. From current information it is not possible to provide a
timing for this damage or relate it to a particular weather event such as
Cyclone Larry. Damage may be due to several weather events.
The observed deflections in the structure are considered to be the result of
fabrication and erection tolerances rather than damage resulting from
Cyclone Larry however joints between facets of the 'Hexadome' should be
inspected when linings are removed. Checking of the geometry of the
"Hexadome' should occur as part of this inspection.
Internal lining damage adjacent to the dormer window on the upper level
and column on the lower level of the „Hexadome‟ that is ou t of plumb will
require further investigation when linings are removed.”
31. The above report appears inconclusive and the Panel is of the opinion the
FSP was required to conduct further investigation after the removal of the
linings to assess whether the damage was related to the Cyclone Larry or
subsequent storm events or some other cause excluded by the policy.
32. In order to succeed in their claim, the onus is on the Applicants to show, on
the balance of probabilities that the damage claimed resulted from an e vent
insured against under the policy. A number of factors have been suggested
as being the cause or causes of the damage including, unresolved damage
Case No: 295708 Determination Page 8 of 8
from Cyclone Larry, subsequent storms between 2006 and 2009, as well as
deteriorated shingles and/or other points of water entry.
33. It is clear that the damage has occurred over an extended period of time and
deterioration had been ongoing, probably for many years; possibly since
Cyclone Larry or may even have predated that event.
34. Having carefully considered all of the evidence, the Panel is not persuaded
that the Applicants have established a prima facie claim under the policy,
that is, there is insufficient evidence to show that a specific event or events
has caused the loss. Speculation as to what may or could have caused the
loss is not sufficient to meet the Applicants‟ onus.
35. The Applicants have also suggested that the damage may have been
caused by Cyclone Larry, or the resultant repairs, however they have not
provided sufficient evidence to show on the balance of probabilities that this
was the proximate cause.
36. The Panel further notes that damage resulting from gradual deterioration and
wear and tear over time are both excluded under the policy.
37. In the Panel‟s view the Applicants have not established that the damage was
a result of an event insured against under the policy.
38. The Applicants have raised an issue regarding the application of Section 46
of the Insurance Contracts Act 1984 and the Panel is satisfied that since the
FSP is not relying on an exclusion which specifically refers to a “pre -existing
building defect”, this section does not assist the Applicants in this instance.
Determination
39. On the basis of the available information, the Panel determines the FSP was
entitled to refuse indemnity for the claimed loss.