Remaining water and storm damage to home refused for lack of insured event

FirmFinancial Firm (Unknown - Insurer)
Decided2013-05-29
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicants claimed for ceiling and structural water damage to their home that had followed cyclone and storm events, and the FSP refused the remaining damage. AFCA found the applicants had not proven an insured event and the damage fell within gradual deterioration and wear exclusions, though it criticised the FSP's investigation.

The onus was on the applicants to show a specific insured event caused the loss, and speculation about possible causes did not meet that onus, while deterioration and wear were excluded.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 295708 Determination Page 1 of 8 Case number: 295708 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of Claim - Exclusion/Condition 28 May 2013 Background 1. The Applicants held a home building and contents insurance policy with the Financial Services Provider (FSP) from 18 August 2005 to 18 August 2007 and from 6 September 2007 to 6 September 2009. 2. The Applicants lodged a claim with the FSP when the property sustained water damage as a result of severe weather conditions in February 2010. Some parts of the ceiling too had collapsed around this time. 3. Part of the total damage identified at that time was accepted by another insurer „Q‟ (who was on risk at that time) resulting from the February 2010 event. During the assessment of that claim Q suggested that the remaining damage predated the February 2010 event and related to a period of time before Q‟s period of insurance commenced. 4. Since the property was previously insured with the FSP from 2005 to 2009 when the insurance cover was changed over to Q, the Applicants believe the remaining parts of the damage should be accepted under the FSP‟s policy . 5. The FSP denies liability for the claim. Although it had previously accepted a claim by the Applicants for damage which resulted from Cyclone Larry in 2006, it had accepted liability and repairs were completed, this further damage would have been subsequent to that event. It further submits that the damage relates to several weather events which occurred over a period of time and also due to structural defaults in the building which is excluded under the policy. 6. The Applicants expect the FSP to accept the remaining parts of the claim. Summary of Applicants ’ position 7. The Applicants say severe storm damage sustained to the ceiling was accepted and repaired by the FSP and the same location sustained further damage resulting in the collapse of the ceiling causing severe damage to t he internals and water logging the footings of the house in certain areas in between the internal and external wall. Determination Case No: 295708 Determination Page 2 of 8 8. Since the Service‟s Determination in their dispute against Q found that the damage was sustained prior to the policy period with Q, the Applicants believe the loss should be covered under the FSP‟s policy. Further because the building inspection before the purchase of property in 2005 did not highlight any issues in regards to the condition/structural issues with the building, the damage must have occurred during the period they were insured with the FSP. 9. The Applicants are unable to contact the building inspector. However, they have forwarded a copy of his invoice to the FSP confirming the payment made to him. 10. The Applicants have since repaired/replaced the roof and they expect the FSP to honour the remaining parts of the claim. Summary of FSP’s position 11. The FSP says the Applicants have not established that the loss was caused by an insured event during the period of insurance. 12. There is no evidence the current loss relates to the damage caused by Cyclone Larry in 2006 or as a result of the subsequent repair work organised by the FSP. 13. The FSP relies on the findings of its expert engineer S. 14. Even if it is accepted that the claim falls within the policy provisions, it is entitled to maintain denial of the claim relying on the following policy provisions: “ What’s not Covered ... 4. Faulty Design a) Fault error or omission in design. b) Latent, structural or inherent defect. 5. Gradual Deterioration Gradual Deterioration ... 9. Wear Wear and tear” Issue 15. Whether the FSP is entitled to deny the Applicants‟ claim. Case No: 295708 Determination Page 3 of 8 Reasons for decision 16. Due to the nature of this dispute, FOS has considered it appropriate to refer this dispute to a Panel in accordance with the Operational Guidelines to the FOS Terms of Reference. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 17. This decision has been made by a Panel consisting of an Ombudsman and two Panel members with extensive experience in insurance matters and consumer disputes. 18. The Panel is satisfied that a full exchange of information has taken place between each party and that each party has had the opportunity to address any issues raised. 19. The onus of proof rests on the Applicants to establish that, on the balance of probabilities, they have suffered a loss caused by an insured risk. Once the Applicants have established that the loss was caused by a risk insured under their policy, the onus then shifts to the FSP to show that, on the balance of probabilities, the loss falls within an exclusion clause in the policy. 20. The issue remains whether the remaining parts of the damage sustained to the property were as a result of an insured event which occurred within the policy period with the FSP and also whether the cause of the loss is excluded under the policy. 21. The Applicants do not dispute receipt of the policy documents and the Panel is satisfied in these circumstances that the FSP has met its obligations to clearly inform them of the terms and conditions of the policy. 22. The Panel notes the following from the loss assessor (L)‟s reports prepared after the damage sustained to the property as a result of Cyclone Larry in March 2006. Second Report dated 10 April 2006 “Flashing and bitumen fabric based tiles on the top section of the roof commonly known as the “pigeon house” have been extensively damaged by the storm” ... Obtain quotes for roof repairs” Third Report dated 4 May 2006 “The photograph was taken before the writer‟s camera “died”. If the photograph is examined it is possible to see on the upper section of roof where pieces of the stone chipped bituminised external cladding have been torn off by the force of the wind.” Fifth Report dated 21 June 2006 “Apart from the roof, your insured have also obtained 2 quotes for major damage to the building, each quote covers removal and replacement of the damaged roof tiles, Case No: 295708 Determination Page 4 of 8 ... while the more economical quote was from [D – Applicants‟ son‟s carpentr y business] for an amount of $7,780. In an anticipation of your concurrence we have approved the quote from [D]” Seventh Report dated 21 August 2006 “we attach a Tax Invoice from D covering ..., replacement of the cyclone damaged bitumen roof tiles, ... we recommend payment of the above mentioned repairs. 23. The Panel notes that by November 2006, the Applicants were residing back at the property and the repairs were all completed except for the repair of a pot belly flue and cap. 24. It is noted that the repairs took some time as the Applicants and the FSP were unable to source trades, plasterers and painters who were willing to attend to the repairs at the time. 25. It is unclear to the Panel whether the above delays could have caused further damage to the property which may have not been captured in L‟s report and the Applicants too were away from the property most of the time due to work and the condition of the property. 26. The roofer C‟s report dated 18 November 2010 states: “On inspection of roof as requested it wa s found that severe weather conditions to the mineral felt slates has caused damage i.e. ripping and tearing away from structure randomly across entire roof causing water penetration.” 27. The above report indicates damage to shingles as a result of severe wea ther events rather than age related as suggested by the experts. 28. The Panel notes the previous owner of the property had attended to parts of the replacement of the shingles prior to the property sale as M was shown a pack of roof shingles left behind (packed in 2004) by the previous owner when the property was sold to the Applicants. 29. The building consultant M‟s report dated 22 March 2010 states: “The builder has attended and advised that there is severe rotting of all roof framing/underlying plywood and cedar walls. He suspects rainwater is gaining entry from flashing and around the apex widows, and has been doing so for some time. We noted on our visit that at some time in the past the surface of some shingles has been torn off assumedly by winds of some force, and the assumedly this would be Cyclone Larry. The repairing builder appears to have inserted some flat head nails to secure these damaged shingles but considered them still to be water proof. We understand from the [Applicants] that water from Cyclone Larry caused substantial internal damage, but the builder attending did not find any building damage. The [Applicants] were not present when repairs were attended. Case No: 295708 Determination Page 5 of 8 ... “A) The originating source and cause of the damage is through the open windows at the clerestory roof. This has been a slow process over a long period of time (pre-cyclone Larry) and greatly intensified by cyclone Larry. In times of extreme weather conditions, rainwater is driven onto the flyscreens, through the open windows (particularly at the corners of the hexagon-shaped clerestory windows) and drains down onto the internal window sill framing. The gale force winds (category 4) of cyclone Larry, would have driven the water straight through the flyscreens and onto the landing below; consequently causing the damage to the carpet and flooring. In the same process, copious amounts of water would also find its way into the ceiling cavity via the inadequate (lack of) internal sill detail. … B) The contributing cause here are the internal fixed fly screens and the absence of an internal system for closing the windows plus the way the internal windows sills were constructed, allows ingress of water.” (sic) 30. Engineer S‟s report dated 30 August 2010 states: “ Condition of Shingles The shingles on the dwelling are understood to be the original shingles from the construction of the dwelling and are now 25 years old or almost twice their serviceable life in a hot environment. The shingles on the north western side are showing significant deterioration due to the higher exposure on this side and repairs by installing new shingles over the existing have already been undertaken in this area. This repair method increases the heat retention and therefore the rate of deterioration of the asphalt shingles. Damage evident included hardening, lifting, loss of tabs and exposure of staples which would lead to leakage. Asphalt shingles on the higher facets of the "Hexadome' are laid on a slope less than the minimum recommended. No ventilation is provided to the underside of the plywood. ... Water Damage to Floors Water damage was found in the plywood floor of the lower level of the `Hexadome'. This damage is considered to be caused by entry of water to the void through openings such as windows. It is not possible to put a time on this damage occurring or attribute this to the open clerestory windows due to their orientation relative to prevailing winds. ... Water Damage to 'Hexadome' Water infiltration has occurred into the 'Hexadome' structure causing the collapse of the internal lining of a facet of the 'Hexadome', water staining internal linings of 'Hexadome', and rotting of the external red cedar cladding and timbers of the clerestory windows. It is expected that this damage will be Case No: 295708 Determination Page 6 of 8 found to be more extensive and severe than that found during the inspection of 5 August 2010. ... This problem was investigated by [M] (Report dated 22 March 2010) who found that water entry was caused solely by the matters relating to the installation and operation of the clerestory windows. These findings were not supported by observations made on site during the inspection of 5 August 2010 however the recommendations regarding replacement of the windows with a more suitable type which can be operated from inside the void is supported. The insured described the function of the clerestory windows as the windows on the side exposed to weather (eastern side) being kept closed and the windows on the side not exposed to weather (western side) being kept open for ventilation of the dome. Wind roses for Mareeba Airport confirming the prevailing wind directions are shown in figure 1. The quantity of water entering through the open clerestory windows would be significantly less than suggested by this report. ... Rotting of timbers was found in the structure of the clerestory windows above the level of the sill, the collapsed internal lining from the facet of the dome was below the most deteriorated section of the asphalt shingles, water staining of internal linings was present on the eastern side of the dome away from the described point of water entry and there was a metal flashing below the sill of the clerestory windows. It could not be confirmed from the visual inspection if it was possible for water collecting in the channels of the window sill to flow into the void or the structure of the 'Hexadome' as concluded in the MCS report. Damage to shingles was noted in the MCS report but not investigated further in relation to possible contribution to the damage occurring. ... The majority of the water causing damage to the 'Hexadome' is entering through the asphalt shingles which have reached the end of their serviceable life. The damage resulting from this entry of water would have been occurring from the time that the shingles reached the end of their serviceable life however the owner would not have been aware of the problem until the resulting damage was found. Based on an average serviceable life for the asphalt shingles of less than 20 years in a tropical climate the damage would have commenced prior to 2005, the time the current owners purchased the property. Deflection of 'Hexadome" There was visible permanent deflections of the 'Hexadome' and the possibility of this occurring due to Cyclone Larry was discussed on site. While such damage is possible it is considered very unlikely in this instance due to: Maximum wind gust recorded at Mareeba is well below the claimed design wind speed for the site; Case No: 295708 Determination Page 7 of 8 The open clerestory windows would have reduced the internal pressure coefficient and therefore the uplift on the 'Hexadome'; and No damage was identified in the inspections and repairs undertaken immediately following the cyclone. The deflections observed on site are considered to be the result of the fabrication and erection of the 'Hexadome' however inspection of the joints in the structure when sheeting is removed is recommended. Survey of the structure as discussed on site is not recommended at this time as there is no survey of the dwelling following erection to compare this with. Checking of the geometry following removal of the linings is recommended with the inspection of the joints. Correction of any misalignments using force is not recommended due to the stresses that would be generated in the structure. ... Conclusions The condition of the asphalt shingles due to their age is considered to be the major cause of water entry into the structure of the 'Hexadome' that is causing the collapse of the internal linings and rotting of the external cladding of the dwelling. The flat roof slopes of the upper sections, lack of ventilation of the underside of the plywood and the tropical environment are significant in reducing the low serviceable life of the asphalt shingles. Water entering through the sill of the clerestory windows in the manner described in the MCS report could not be confirmed. The extent and severity of the damage to the structure is expected to be greater than is currently visible. This damage would have been occurring since the asphalt shingles reached the end of their serviceable life (prior to 2005) however owner would not be aware of the damage until linings collapsed. The water damage to the plywood floor on the lower level of the 'Hexadome' is considered to be due to water entering through openings such as windows. From current information it is not possible to provide a timing for this damage or relate it to a particular weather event such as Cyclone Larry. Damage may be due to several weather events. The observed deflections in the structure are considered to be the result of fabrication and erection tolerances rather than damage resulting from Cyclone Larry however joints between facets of the 'Hexadome' should be inspected when linings are removed. Checking of the geometry of the "Hexadome' should occur as part of this inspection. Internal lining damage adjacent to the dormer window on the upper level and column on the lower level of the „Hexadome‟ that is ou t of plumb will require further investigation when linings are removed.” 31. The above report appears inconclusive and the Panel is of the opinion the FSP was required to conduct further investigation after the removal of the linings to assess whether the damage was related to the Cyclone Larry or subsequent storm events or some other cause excluded by the policy. 32. In order to succeed in their claim, the onus is on the Applicants to show, on the balance of probabilities that the damage claimed resulted from an e vent insured against under the policy. A number of factors have been suggested as being the cause or causes of the damage including, unresolved damage Case No: 295708 Determination Page 8 of 8 from Cyclone Larry, subsequent storms between 2006 and 2009, as well as deteriorated shingles and/or other points of water entry. 33. It is clear that the damage has occurred over an extended period of time and deterioration had been ongoing, probably for many years; possibly since Cyclone Larry or may even have predated that event. 34. Having carefully considered all of the evidence, the Panel is not persuaded that the Applicants have established a prima facie claim under the policy, that is, there is insufficient evidence to show that a specific event or events has caused the loss. Speculation as to what may or could have caused the loss is not sufficient to meet the Applicants‟ onus. 35. The Applicants have also suggested that the damage may have been caused by Cyclone Larry, or the resultant repairs, however they have not provided sufficient evidence to show on the balance of probabilities that this was the proximate cause. 36. The Panel further notes that damage resulting from gradual deterioration and wear and tear over time are both excluded under the policy. 37. In the Panel‟s view the Applicants have not established that the damage was a result of an event insured against under the policy. 38. The Applicants have raised an issue regarding the application of Section 46 of the Insurance Contracts Act 1984 and the Panel is satisfied that since the FSP is not relying on an exclusion which specifically refers to a “pre -existing building defect”, this section does not assist the Applicants in this instance. Determination 39. On the basis of the available information, the Panel determines the FSP was entitled to refuse indemnity for the claimed loss.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.