Text of the determination
Case No: 295660 Determination Page 1 of 4
Case number: 295660
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of Claim
12 August 2013
Background
1. I have reviewed all the material submitted by the parties and save where I
make note specifically, I am satisfied the Background as set out in the
Recommendation is accurate and is as follows.
2. The Applicants hold a home insurance policy with the Financial Services
Provider (FSP) which provides complete replacement cover for their building,
contents for a sum insured of $43,400 and portable contents cover for a sum
insured of $1,000. A nil excess applies to all claims and the policy was
current at the time of the reported damage.
3. The Applicants contacted the FSP on 26 April 2012 to advise that when they
awoke that morning, they noticed that their garage ceiling had fallen down.
The claim was recorded by the FSP as a possible wind damage claim and it
arranged a make safe and an assessment of the damage.
4. The FSP‟s assessor indicated the claim may be one fo r acceptance and
appointed a builder to attend to report on the cause and extent of damage.
The appointed builder advised that the ceiling had not suffered any damage
as a result of an insured event and noted a number of issues with the ceiling
and how it had been installed.
5. The FSP denied the claim as no defined event had caused the damage and
in fact the cause of the damage fell within the exclusions of the insurance
policy issued.
6. The Applicants dispute the decision of the FSP.
Conclusions in Recommendation
7. The case manager provided the parties with a Recommendation on the
issues in dispute. The Recommendation was in favour of the FSP. A copy of
the Recommendation is attached to this Determination.
8. The FSP accepted the Recommendation but it was rejected by the
Applicants.
Determination
Case No: 295660 Determination Page 2 of 4
Further submissions
9. The Applicants rejected the Recommendation and provided further
documentary information in support of their position being an email from NS
the building surveyor dated 15 May 2013. NS said:
“I have reviewed the infor mation you have sent me and its difficult to provide
an expert opinion of what caused the ceiling to collapse, other than what from
what I have seen the plasterboard was not properly fixed out.
There seems to be a lack of ceiling framing battens and back blocking which
are normally used with 10mm plasterboard. These limit the span of the
plasterboard to around 400 mm between battems..
You mentioned there was a storm event shortly before the ceiling failed of
course this could be a factor if wind pressure made its way into the ceiling
cavity but I am not in a position to say whether this occurred or not.
You should review the installation guide in your email – page 10 that details
recommendations for installations of garage ceilings in particular and see how
this relates to what was done onsite.” (sic)
10. The Applicants also rely on s46 of the Act and say:
“I further submit that any liability under s 46 of the Insurance Act from pre -
existing defects should be considered as a co-contributory cause to the
western side ceiling collapse given that it took close to 10 years after
construction before only the western side of the ceiling collapsed at the time
or shortly after relatively strong westerly winds. This is further supported by
the fact that two heavy double garage doors on the eastern side of the garage
did NOT result in an accompanying ceiling collapse from the eastern side of
the garage.” (sic)
11. The FSP accepted the Recommendation and did not provide any further
documentary information in support of its position save to respond to the
Applicants on 11 June 2013 and submit:
“Section 46 does not trigger as there was no insured event acting on the
property, and that even if there was, no resultant damage was caused by said
defect.” (sic)
Ombudsman’s consideratio n
12. I have decided this case on its merits, having regard to the relevant law,
good industry practice, codes of practice and previous FOS decisions. I have
taken into account all the material submitted by the parties, both before and
after the Recommendation. I am satisfied that the documentation I have
relied on has been provided to both parties.
13. I have carefully considered the case manager‟s Recommendation, and I am
satisfied that it contains an accurate summary of the background to this
dispute, the parti es‟ positions, the issues to be determined, any applicable
paragraphs of the Terms of Reference and any relevant law.
Case No: 295660 Determination Page 3 of 4
14. I agree with the case manager‟s reasons for the Recommendation and the
recommended outcome. The Applicants do have the onus of proof to adduce
evidence that on the balance of probabilities that the damage was caused by
an insured event, namely storm. Having reviewed the weather records from
both parties I am not satisfied that the damage was not caused by the
insured event storm as defined, as the records taken from nearest the house
do not indicate strong winds at the relevant times and the expert US found
no evidence of rainwater entry.
15. Further the expert US concluded he found no evidence of the damage being
caused by an insured event but rather was of the view that the damage was
as a result of wear and tear and the wrong fixing configuration being used.
16. Finally, the submissions made by the Applicants that this was not the cause
of the damage were refuted by the FSP and having reviewed all the material,
the opinion of US, including the photographs and the manufacturer‟s
standards I am not convinced on the balance of probabilities that an insured
event caused the damage. There is no compelling evidence that the winds
were high enough or that there was sustained wind. Furthermore, the more
compelling evidence is that the garage ceiling was not affixed in the way
recommended by the manufacturer.
17. The claim for $2000 for preparing the documents in this dispute is excluded
under the policy - the relevant policy terms are clear and unambiguous and
are set out above.
18. After the recommendation an opinion was offered by NS a building surveyor.
In my view NS does not support the Applicants. He is unable to say why the
ceiling collapsed save that the “plasterboard as not properly fixed out” which
supports the FSP‟s view of the cause of damage.
19. He does say that “(a storm event) could be a factor” but this is proffered with
insufficient certainty to be adequate evidence to convince me that on the
balance of probabilities a storm caused the damage.
20. The Applicants have also sought to rely upon section 46 of the Insurance
Contracts Act (“the Act”) which says as follows:
Pre-existing defect or imperfection
(1) This section applies where a claim under a contract of insurance (other
than a contract of insurance that is included in a class of contracts
declared by the regulations to be a class of contracts in relation to which
this section does not apply) is made in respect of a loss that occurred as a
result, in whole or in part, of a defect or imperfection in a thing.
(2) Where, at the time when the contract was entered into, the insured was
not aware of, and a reasonable person in the circumstances could not be
expected to have been aware of, the defect or imperfection, the insurer
may not rely on a provision included in the contract that has the effect of
limiting or excluding the insurer's liability under the contract by reference
Case No: 295660 Determination Page 4 of 4
to the condition, at a time before the contract was entered into, of the
thing.
21. In my view for the Applicants to obtain the relief provided under section 46 of
the Act they must establish that the damage occurred as a result of an event
covered by the policy, subject to the requirement that there is no exclusion
that operates to the detriment of the claim.
22. The Applicants have the onus to establish the damage was caused by an
event covered by the policy, and must establish (through evidence) that this
was the case. It is not the responsibility of the FSP to prove that the damage
was caused by an event covered by the policy. It is an accepted insurance
principle that if the Applicant establishes a prima facie case that there is an
insured event, the FSP then has the burden of establishing the claimed
damage is excluded by the policy but it is only in this event that is, if there is
an applicable exclusion that section 46 of the Act comes into play.
23. In short, as in my view the Applicants have not established the insured
event of storm caused the damage, section 46 of the Act has no application
to this dispute.
24. Even if the Applicants were able to establish that the storm caused the
damage and the FSP was left to rely on an exclusion to defeat the claim,
section 46 of the Act would still not apply in regard to US's reference to
defects. Pursuant to the legal authority of Greg Nelson v The Hollard
Insurance Company Pty Ltd [2010] NSWSC 199 a provision of the policy is
only affected by section 46 of the Act if it contains a temporal reference to
the defect at the time the contract was entered into. This contract does not
and so s46 is inapplicable for this reason also.
25. Therefore having considered all the material both before and after the
Recommendation, it does not change my view that the case manager‟s
Recommendation was correct.
Determination
26. I determine in favour of the FSP.
Case No: 295660 Recommendation Page 1 of 7
Case number: 295660
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of Claim
30 April 2013
Background
1. The Applicants hold a home insurance policy with the Financial Services
Provider (FSP) which provides complete replacement cover for their building,
contents for a sum insured of $43,400 and portable contents cover for a sum
insured of $1,000. A nil excess applies to all claims and the policy was
current at the time of the reported damage.
2. The Applicants contacted the FSP on 26 April 2012 to advise that when they
awoke that morning, they noticed that their garage ceiling had fallen down.
The claim was recorded by the FSP as a possible wind damage claim and it
arranged a make safe and an assessment of the damage.
3. The FSP‟s assessor indicated the claim may be one for acceptance and
appointed a builder to attend to report on the cause and extent of damage.
The appointed builder advised that the ceiling had not suffered any damage
as a result of an insured event and noted a number of issues with the ceiling
and how it had been installed.
4. The FSP denied the claim as no defined event had caused the damage and
in fact the cause of the damage fell within the exclusions of the insurance
policy issued.
5. The Applicants dispute the decision of the FSP.
Summary of Applicants’ p osition
6. The Applicants are represented by their son. For the sake of clarity and
brevity, I will refer hereafter to the Appl icants and their representative as “the
Applicants”.
7. The Applicants noticed strong winds in the area of their home in the days
prior to the ceiling collapsing. They have provided documentation obtained
Recommendation
Case No: 295660 Determination Page 2 of 7
from weather stations confirming strong wind gusts being recorded in the
area.
8. The ceiling collapse originated from the western edge of the garage ceiling
and this supports their view that the damaged was caused by storms or very
strong westerly winds.
9. There is also the possibility that the damage has been co ntributed to by
lightning vibrations as a large lightning storm was experienced by the
Applicants prior to the collapse.
10. The ceiling was properly installed under the approval of a building surveyor,
NS, approximately 10 years prior to it collapsing. NS has advised them that
defective roof installations normally show up in ceiling collapses much
sooner than the 10 year time gap indicated in this instance.
11. They dispute that the ceiling was installed incorrectly and have provided
details of the installation guide confirming this.
12. They question the qualifications of the FSP‟s appointed builder. They had
been assured a qualified builder would attend to provide a report on the
cause and extent of damage however the builder who attended the property
has no such building practitioner qualifications.
13. The Applicants have effected repairs to the ceiling for a total cost of $6,259
and seek to have these costs refunded to them by the FSP. They also seek
to be compensated for their time in preparing their dispute appeal against
the FSP for a total amount of $2,000.
Summary of FSP’ s position
14. The FSP does not dispute that the policy provides cover for storm damage
which includes damage caused by violent wind, thunderstorm or a heavy fall
of rain, snow or hail.
15. The Applicants have not established that an insured event has caused the
damage to the ceiling, the subject of this claim.
16. Its appointed builder, US, has provided a report and photographs which
indicate the ceiling was not properly installed in line with the manufacturer ‟s
instructions.
17. There is no evidence of any water entry to the ceiling space or any evidence
that lightning or storm have contributed in any way to the damage being
claimed.
18. The repairs required to rectify the damage are maintenance related and
therefore excluded under the policy terms and conditions.
Case No: 295660 Determination Page 3 of 7
19. The FSP relies on the following policy provisions of its Product Disclosure
Statement (PDS):
“ What you are covered for – Insured Events
We cover you for loss or damage to the building caused by an insured event
which happens during the period of cover. There are some things we do not
cover and these are shown in the „We do not cover‟ section of the following
tables on pages 17 to 25 and in the „What we do not cover – general
exclusions‟ on pages 32 to 36.
...
Storm
We cover We do not cover
Loss or damage to the building
caused by a storm
...
loss or damage caused by erosion,
vibration, subsidence, landslip, landslide,
mudslide, collapse, shrinkage or any
other earth movement, but we will cover
loss or damage to the building caused by
a landslide or subsidence that occurs
within 72 hours of, and directly because
of, a storm and not because of erosion
over time, structural fault or design fault;
...”
(Pages 16 to 18)
“ What we do not cover – general exclusions
You are not covered under any section of your policy for damage, loss, cost or
legal liability that is caused by, arises from or involves:
...
Consequential losses or extra costs following an incident covered by
your policy
consequential loss (financial and non-financial loss) or extra costs following
an incident covered by your policy including:
...;
costs, including the cost of your time, to prove your loss or to help us
with your claim;
...
Defect, structural fault or design fault
a defect, structural fault or design fault that you knew about (or should
reasonably have known about) and did not fix before the loss or damage
Case No: 295660 Determination Page 4 of 7
occurred (e.g. if there are signs that a defect previously caused damage, we
will not pay a later claim for further damage from this defect).
...
Failing to take care of the building or contents
your failure to:
take reasonable care of the building and contents;
keep the buildings and contents well maintained and in good
condition. For the meaning of „good condition‟ see the “What do we
mean by that‟ section on page 51;
fix faults and defects as soon as you become aware of them.”
(Pages 32 to 34)
Issues
20. Whether the FS P is entitled to deny the Applicants‟ claim.
Reasons for Recommendation
21. I am satisfied there has been a full exchange of material between the parties
and that each party has had the opportunity of clarifying the issues that arise
from the material.
The claim and investigation of cause
22. The Applicants have provided detailed information obtained from various
websites in relation to weather conditions in the area of the property around
the time of the damage. The Applicants suggest that a wind gust recorded
three days prior to the ceiling collapse could have caused an uplift of the roof
tiles, thus allowing water or moisture into the roof cavity and causing the
ceiling to collapse.
23. The Applicants also say that they experienced strong noise and vibrations
from a lightning storm the night before they discovered the damage to their
ceiling.
24. To further support their opinion on the cause of the damage, the Applicants
say that the entire western side of the ceiling collapsed leaving intact the
entire eastern side of the ceiling. The recorded high winds were very strong
westerly winds.
25. The FSP does not dispute the weather records provided by the Applicants in
support of their claim. It also does not dispute that the Applicants‟ ceiling has
collapsed.
Case No: 295660 Determination Page 5 of 7
26. The FSP says that the weather records provided by the Applicants in relation
to the wind speed recorded in their area, only shows the maximum “wind
gust” recorded. It also says that this maximum wind gust occurred three days
prior to the Applicants‟ ceiling collapsing and the records were not relative to
the area where the Applicants‟ property is.
27. The FSP sourced similar information from weather stations closer to the
Applicants‟ residence and discovered that the strongest wind gust recorded
did not exceed 48kmh and there was no sustained wind exceeding 22kmh
for the week preceding the date the damage was discovered.
28. The FSP concedes that it has not been able to provide any information to
suggest that there was no lightning storm in the Applicants‟ area prior to the
discovery of damage. However it points out that the Applicants have also not
been able to provide any information to confirm that lightning storms did
occur. In any event, the FSP says that damage caused by “vibration” as a
result of a thunderstorm is excluded under the insured event of “storm”.
29. The FSP also relies on the report from US which indicates that there is no
evidence of any damage being caused by an insured event. The report from
US reads, in part:
“CAUSE OF DAMAGE:
General inspection found no evidence or rainwater entry to the upper surface
of the garage ceiling plaster and no storm created openings or damage to the
terracotta tiled roof above. The roof pointing had minimal deterioration and
this has occurred over time due to weathering; however this has not
contributed to any rainwater entry or the damage.”
30. The Applicants also sought advice from NS and have relied upon his verbal
advice that if there had been any issues with the construction of the ceiling
or its design, the issues would have presented themselves earlier than 10
years after its construction.
31. The Applicants have also provided detailed material regarding the
specifications of the ceiling material and installation guides from the
manufacturer. They say that the ceiling was installed correctly according to
this guide. This has been confirmed to them by various plasterers who have
attended the property since the damage occurred to provide quotations for
the repairs etc. They vehemently deny that the damage has been caused by
any sort of defect or structural fault or incorrect installation.
32. The FSP has reviewed the installation guide provided by the Applicants and
suggests that the Applicants may have misread the information provided. In
this respect, it relies on the report from US which on this aspect, reads:
“It was noted that there was no sarking installed under the roof tiles to limit
condensation and no ceiling insulation was fitted to the garage ceiling. It was
also found that no additional battens above the timber perimeter had been
fitted, and there is minimal adhesive glue used to the cornice meaning that the
ceiling plaster was only fixed at 600mm spacing‟s [sic]
Case No: 295660 Determination Page 6 of 7
With no sarking installed, condensation forms in the ceiling space, during
rainy and humid conditions. The associated weakening, wear, tear and
deterioration of the plaster sheets is due to absorption of moisture over time,
which carport and garage ceilings are prone to. The moisture weakens the
plaster sheeting and adds to the weight of the ceiling causing sections to sag
and eventually the ceiling can collapse. As the plaster cornice is not adhered
to the permitter beams, there is a lack of support around the edges of the
ceiling which also contributes to the collapse.
...
CONCLUSION
There was no evidence found of any defined event contributing to the damage
that now exists. Therefore it is my professional opinion that the damage is the
result of wear and tear over time and the wrong fixing configuration being
used.”
33. It says that the Applicants have failed to provide any expert evidence to
support their opinion that the damage has been contributed to by storm.
FSP’s expert
34. The Applicants say that the FSP‟s expert holds no recognised building
qualification and as such, the information provided by him is unreliable. They
were advised that a suitably qualified building expert would attend to provide
a report on the cause and extent of damage and they do not believe the
person who attended was in fact suitably qualified. The Applicants have
searched for the individual‟s regist ration with the relevant state Building
Commission (BC) and could find no such registration. They could also not
find any registration for the company, US.
35. The FSP has provided details of the relevant qualifications of US‟s
representative who attended the Applicants property. In addition, it says that
only an individual can be registered with the relevant state building
commission and that only one individual in an organisation needs to be
registered. It also says that it is not a requirement for an individ ual to be
registered with the relevant commission to be qualified to provide an expert
opinion.
Consideration of the evidence
36. I have reviewed the material provided by both parties as detailed above.
37. I am of the opinion that in this instance, whilst the Applicants have completed
a detailed investigation of weather in the area at the time of the ceiling
collapse and provided documentation in support of this, they have not
provided any expert opinion to support their view.
38. The weather records relied upon by both parties does not categorically
demonstrate the exact weather experienced at the Applicants‟ property prior
to the ceiling collapsing. It is therefore speculative on the part of the
Applicants to attribute the damage to the ceiling to storm.
Case No: 295660 Determination Page 7 of 7
39. The FSP however appointed its expert to attend the property so that a
physical examination of the damage could better determine the cause. This
examination concluded that there was no evidence of storm damage to the
ceiling and no evidence to suggest any insured event caused the damage.
40. When reviewing the qualifications of the representative of US I am satisfied
that he is suitably qualified to provide an opinion on the cause of the damage
to the Applicants‟ property.
41. The onus of proof rests on the Applicants to establish that, on the balance of
probabilities, they have suffered a loss caused by an insured event. Once
the Applicants have established that the loss was caused by an event
insured under their policy, the onus then shifts to the FSP to show that, on
the balance of probabilities, the loss falls within an exclusion clause in the
policy.
42. I am therefore of the opinion that in this instance, the Applicants have not
discharged their onus of proof to show that, on the balance of probabilities,
that their damaged ceiling is as a result of an insured event.
43. Additionally, the FSP has provided reasons for the ceiling collapse and I am
satisfied that the causes provided are in fact excluded from cover.
44. With respect to the Applicants‟ claim for $2,000 to prepare docu ments
relevant to the dispute, I note that the PDS specifically excludes such costs,
and as such, the FSP would not be required to reimburse the Applicants in
this regard.
Recommendation
45. On the basis of the available information I recommend that the FSP was
entitled to deny the Applicants‟ claim in this instance.
46. I further recommend that the FSP is not required to pay the Applicants‟ costs
of $2,000 for preparing documents relevant to the dispute.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.