Home / Financial Firm (Unknown - Insurer) / Determination 295576
Determination 295576
Claim declined under 72-hour window for earth movement damage after stormwater overflow
Summary
After a stormwater drain overflowed in January 2011, the applicants' house cracked and shifted months later, and the FSP declined the claim because the damage did not become evident within 72 hours. AFCA found the damage became evident about 13 months after the event and made no order against the FSP.
The policy covers earth movement from storm and rainwater only where the damage becomes evident within 72 hours, and the applicants did not show otherwise.
Subjects and remedies
home or building damagenatural disasterno remedy
Text of the determination
Case No: 295576 Determination Page 1 of 5
Case number: 295576
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim - Exclusion/Condition - 72 Hour Exclusion
07 May 2013
Background
1. The Applicants held a home and contents insurance policy with the Financial
Services Provider (FSP) covering their home building. The policy was
current at the time of the loss.
2. On 11 January 2011, a stormwater drain across the road from the
Applicants ‟ property blocked and overflowed. Water pooled in the drain and
flowed into the Applicants ‟ yard and under their residence.
3. In the following months the Applicants noticed the house had begun to shift
and crack. They subsequently lodged a claim for the damage with the FSP.
4. The FSP appointed an engineer „C‟ to inspect the premises and to ascertain
the cause and extent of the damage. After considering C‟s report , the FSP
advised the Applicants their claim was not one for acceptance, as the cause
of the damage was not an event insured by the policy.
5. The Applicants are seeking a review of the FSP‟s decision to decline their
claim.
Summary of Applicants ’ position
6. The Applicants say as a result of heavy rainfall over a period of
approximately two weeks, the stormwater drain over the road backed up and
water pooled and flowed into their property.
7. The Applicants notified the council of the issue and they sent out a team to
rectify the drainage problem. Since the council fixed the drain, water has not
flowed into their yard or under the house again.
8. When the damage started to become evident, the Applicants contacted the
council. The council declined to offer them any assistance and told them,
they should lodge an insurance claim.
Determination
Case No: 295576 Determination Page 2 of 5
9. The Applicants says the damage to their house has caused them significant
stress. They are seeking for the house to be restored to the condition it was
in prior to the drain overflow.
Summary of FSP’s position
10. The FSP says whilst it will cover damage caused by erosion, or other earth
movement, which has occurred as a result of stormwater runoff, it will only
cover such damage where the damage is evident within 72 hours of the
stormwater event.
11. The FSP does not dispute the cause of the damage as being erosion caused
by stormwater runoff. However, the Applicants did not lodge a claim for the
damage until nearly 15 months after the event occurring. Therefore, the FSP
says the damage did not occur within the 72 hour timeframe, which would
trigger the insuring clause of the policy.
12. The FSP‟s engineer , C, concluded the damage had arisen as a result of the
stormwater overflow from the drain, but did not consider the damage had
occurred within the 72 hour timeframe. Rather, C considered the damage
had arisen months later. The FSP says the Applicants agreed with these
findings. Therefore, the FSP says the exclusion operates to defeat the claim.
13. The FSP says the Applicants have provided no evidence to contradict the
findings of C and it is therefore entitled to rely on C‟s evidenc e to decline the
claim.
14. The FSP relies on the following policy provisions:
“ Insured event
6. Storm and rainwater
Including loss or damage from:
The escape of rainwater from any water pipe, drain or gutter
Surface run-off rainwater from within surrounding areas that occurs within
24 hours of a storm or heavy rain
Including loss or damage caused by erosion, subsidence, landslide, mudslide
or any other earth movement that occurs within 72 hours of a storm or heavy
rain and as a result of that storm or heavy rain.
...
GENERAL EXCLUSIONS APPLYING TO THE WHOLE POLICY
We will not cover:
Earth movement
loss or damage or the incurring of legal liability caused by erosion,
vibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage or any
other earth movement.
Case No: 295576 Determination Page 3 of 5
But subject to the policy terms and conditions, we will cover loss or damage
caused by earth movement that occurs within 72 hours and as a direct result
of the following insured events:
Earthquake
Explosion, or
Storm and rainwater.”
Issue
15. Whether the FSP is entitled to decline the claim.
Reasons for decision
16. Due to the nature of this dispute, FOS has considered it appropriate to
expedite the dispute in accordance with the Operational Guidelines to the
FOS Terms of Reference. This dispute has not been the subject of a FOS
Recommendation and has proceeded directly to Determination.
17. I am satisfied a full exchange of information has taken place between the
parties and each party has had the opportunity to address any issues raised.
18. As the Applicants have brought the claim before the FSP, they bear the onus
of establishing that the claimed loss, on the balance of probabilities, falls
within the terms of cover provided by the insurance policy. This is known as
a prima facie claim. Once a prima facie claim has been established, the onus
then shifts to the FSP to demonstrate that the loss is somehow excluded
from cover.
19. The pertinent facts that are not disputed are as follows:
On 11 January 2011, after preceding heavy rainfall, a drain located
near the Applicants ‟ property, backs up and overflows into the
Applicants ‟ property.
On or around 26 May 2011, the Applicants notify the local council of
the problems with the drain.
During June and September 2011, the council undertook works to
improve the capacity of the drain, to limit future occurrences of the
drain becoming blocked.
On 21 February 2012, the Applicants write to the local council seeking
restitution for the damage sustained to their home caused by the
overflow event.
On 16 May 2012, the council writes to the Applicants requesting
further details of the damage sustained to their home.
On 4 April 2012, the Applicants lodged a claim for the damage with the
FSP.
Case No: 295576 Determination Page 4 of 5
On 25 June 2012, the council advise the Applicants that they have
placed the matter in the hands of their insurers.
20. There is no dispute that stormwater runo ff has penetrated the Applicants ‟
property on the day in question. The Applicants have provided photographic
and video evidence of the water flowing under the home, causing channels
in the soil around the support pillars of the home.
21. Upon lodgement of the claim, the FSP appointed C to inspect the damaged
premises. C‟s report provides:
“We believe that the water runoff beneath the Insured‟s premises h as had an
adverse effect over a period of time of the structural stability of the house. The
owner has stated that the damage did not appear until some months after the
water inundation beneath the property. We would agree with this assumption
that the damage did not occur in the first weeks after the water flow beneath
the property. We believe that the water has come to be under the Insured‟s
property due to an incorrectly constructed drainage system on the council side
of the road across from the Insured‟ s premises. Since the council has dug a
deeper channel, the Insured‟s property has not suffered any water inundation.
In summary, we believe that the cause of the visible damage at the Insured‟s
premises is due to ground movement of reactive soils which has been caused
by an inundation of flowing water beneath the property due to a weak or
poorly constructed council drainage system. We do not believe that the
damage happened within a weekly timeframe following the inundation on the
11 th January 2011, more s o in the following months later.”
22. C also noted a number of general maintenance issues with the home, he
considered unrelated to this event.
23. Having regard to the information before me, it is clear the drain overflowed
on 11 January 2011. However, there is no information before me confirming
when the Applicants first noticed damage occurring to their home. I note the
Applicants appear to have first made contact with the council seeking
restitution for the damage on 21 February 2012. In my view, it is reasonable
to assume the Applicants did so shortly after noticing the damage occurring,
which would place the damage becoming evident around 13 months post-
event.
24. I note the Applicants did report the overflowing drain to the council on 26
May 2011, although there is no evidence before me to suggest they raised
the issue of damage occurring to the premises at that time. Furthermore,
even if I were to accept they did, I note that 26 May 2011 still falls well
outside of the 72 hour timeframe for which the FSP‟s polic y will respond.
25. The Applicants have not provided any evidence to suggest the damage
arose within 72 hours of the event nor ha ve they provided any information
contradicting the conclusions C reached in his report. Accordingly, it is my
view I can place sign ificant weight on C‟s testimony that the damage did not
present until many months after the event.
Case No: 295576 Determination Page 5 of 5
26. From reading the correspondence between the Applicants and the council, it
is clear there is additional information exchanged between the two which
may have assisted in this matter. Unfortunately, this has not been provided
to me. It does appear the council has lodged a claim with their insurers for
this event; however, the subsequent investigations undertaken by the council
and the outcome of that claim are unknown to me. The Applicants did advise
the Service during a telephone conversation on 11 April 2013, that the
council insurers had denied their claim. Unfortunately, I have no further
information in that regard.
27. In any event, regardless of any action between the Applicants and their
council, the Applicants have chosen to approach this Service with regard to
their dispute with the FSP and accordingly, I must confine my considerations
of this matter solely to the FSP and its policy.
28. Therefore, after considering all of the information before me, on balance, it
appears the damage did not become evident until approximately 13 months
after the claimed event. I accept the FSP‟s policy is clear in stating that
whilst it will cover loss or damage caused by soil movement arising from
storm and rainwater, it will only do so when the damage becomes evident
within 72 hours of the claimed event.
29. Accordingly, I accept the Applicants claim against the FSP, fails against the
relevant exclusions from cover.
Determination
30. On the basis of the available information I determine the FSP is entitled to
decline the claim.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.