Background
1. The Applicants (GD & RD) hold a home insurance policy with the Financial
Services Provider (FSP) that was incepted on 4 April 2011. During this
period, the building a „retreat residence‟ in Captain Creek Queensland was
insured up to a sum of $290,000 and contents for $59,000. Claims were
subject to an excess of $600.
2. On 30 March 2012, GD lodged a claim for damage to their building and
contents from water inundation. The nominated date of loss was either 21 or
22 March 2012. The following description was noted by the FSP on its
system:
“We have returned to our property and when we opened the house it was
completely inundated with rainwater that has come in from the back door.
There is a lot of debris in the yard and we have been told by neighbours a
storm came through on 21/03 at 11.15pm. The whole house has been water
damaged, we have tiling which is saturated. There are marks on the wall. The
furniture and cupboards throughout the house has been affected by water.”
3. Following an investigation into the loss, the FSP denied the majority of the
damage on the basis it was due to “flood” as defined by the policy. The FSP
has accepted damages up to 50mm to the undercover work area and offered
$1,100 in full and final settlement.
4. The Applicants have disputed the FSP‟s decision as they m aintain that all of
the damage was due to stormwater runoff.
5. The Applicants had legal representation; reference to the Applicants
throughout this Determination includes both those parties.
Summary of Applicants ’ position
6. The Applicants have provided substantive submissions on the relevant
issues. For the sake of brevity, the Panel will briefly summaris e these as the
relevant arguments will be considered at greater length when providing
reasons for decision .
Determination
Case No: 295285 Determination Page 2 of 12
7. The Applicants have disputed that the damage was caused by flood and
have relied on the following in this regard:
a. On or around 11pm on Wednesday 21 March 2012, rainfall of up to
300mm fell in the vicinity of the property. In support of this, the
Applicants have provided statutory declarations from CP, CJS and GD.
GD‟s statutory declaration sets out her recollection of a conversation
she had with JS. In addition, the Applicants have also provided articles
from Gladstone News and the ABC News to corroborate this significant
amount of rainfall, as well as a map of the rainfall recorded by the
Bureau of Meteorology for certain pockets.
b. Clear water inundated the home up to a level of 400 to 500mm. GD has
provided evidence of grass clippings lining the back screen door which
indicates the water flowed in a north westerly direction given the door
faces south west.
c. There are two water tanks attached to the house, both on the western
side. The tank to the rear of the property feeds into the other tank via a
connecting pipe. A pipe attached to the tank closest to the rear
entrance usually points away from the house. However, this was
pointing towards the house when they visited the property after the
inundation. The water discharging from this pipe would have
contributed to the inundation given both tanks were f ull and the motor
to the tank‟s water pump had malfunctioned .
d. The property site has poor drainage. This was corroborated by a
company that tested the soil on 28 April 2008 for the purpose of
evaluating and defining a suitable on-site sewerage treatment and
disposal system for the house.
8. In regards to the FSP‟s reliance on the hydrology evidence, the Applicants
have provided the following arguments to refute this:
The hydrologist only attended the site for 12 minutes and spent the
majority of her time inside the house. On at least two occasions, the
hydrologist was invited to review the whole site but declined. Although
the hydrologist, in a supplementary report, stated she spent at least 20
minutes at the property, this would still be insufficient to proper ly
investigate the source of the water inundation given the property is
approximately 40 acres in size.
The report relied on rainfall records located approximately 18km from
the property. This is not indicative of the rainfall at the property,
particularly given the local residents‟ evidence obtained by GD.
The hydrologist identified an unnamed tributary towards the western
side of the property. This description is incorrect as such a tributary
does not exist. Instead, it is a man made drain situated at the northwest
of the property for the purpose of catching runoff from the road.
Accordingly, water that comes from this area of the property does not
fall within the policy definition of “flood”.
Case No: 295285 Determination Page 3 of 12
The hydrologist provided a conclusion that the damage was caused by
“flood” even though recorded water levels for Captain Creek and this
alleged unnamed tributary were not available.
The hydrologist cites a Queensland Police Service Facebook entry
page as evidence that Captain Creek flooded near the property.
However, no corroboration was provided of this post and upon the
Applicants‟ enquiry with the police directly, they were unable to provide
a copy.
The hydrologist did not account for the fact that there is a 2%
downward slope between the undercover work area and the house. As
the hydrologist accepted stormwater inundation occurred to the
undercover work area, then it is reasonable to accept that this could
have also inundated the house given the downward slope and the fact
the property is approximately only 100mm above the ground .
Captain Creek has never flooded at the subject property during their
ownership, which has spanned 23 years.
9. Given all of this, the Applicants therefore seek to be indemnified for the
damages sustained.
Summary of FSP’s position
10. The FSP has relied on two reports from a hydrologist to substantiate its
position. The first report investigated the source of the water inundation and
the second addressed the Applicants‟ initial submissions disputing its claim
decision.
11. Accordingly, based on these reports and the following policy provisions, the
FSP maintains it is entitled to deny the Applicants‟ claim :
“ Words with special meanings …
“flood” means the inundation of normally dry land by water that has escaped
or has been released from the normal confines of any natural watercourse,
lake or lagoon whether or not altered or modified or of any reservoir, canal or
dam.
[Note: This policy does not cover loss, liability, injury or damage caused
by or arising from flood to buildings and/or contents]
…
Insured events we will pay …
9. Storm, rainwater or run-off …
We will not pay for loss or damage:
a. caused by:
flood, or
flood water combined with run-off and/or rainwater;
Case No: 295285 Determination Page 4 of 12
“ flood ” means the inundation of normally dry land by water that
has escaped or been released from the normal confines of any
natural watercourse, lake or lagoon whether or not altered or
modified or of any reservoir, canal or dam.
…
When we will not pay a claim under your policy …
2. Unless we state differently in your policy, we will not pay for:
a. flood as defined on page 5.”
Issue
12. Whether the FSP is entitled to deny the Applicants‟ claim on the basis it was
due to “flood”.
Reasons for decision
13. Due to the nature of the dispute, the parties have been informed that the
matter has been referred to the Panel for Determination in line with the
Operational Guidelines to FOS‟s Terms of Reference. This dispute has not
been the subject of a FOS Recommendation and has proceeded directly to
Determination.
14. This decision has been made by a Panel co nsisting of an Ombudsman, a
representative with extensive experience in the insurance industry and a
representative with extensive experience in consumer claims.
15. The onus is on the Applicants to establish, on the balance of probabilities,
that they suffered a loss caused by a risk insured against (in this case, the
main insured event being claimed under is storm, rainwater or run-off). Once
this has been established on the face of the facts, the onus shifts to the FSP
to show, on the balance of probabilities, the claim falls within an exclusion of
the contract of insurance
16. There is no dispute that there was a storm and heavy rain fell within the
vicinity of the Applicants‟ property. Although the parties dispute the extent of
the rainfall, the fact there was heavy rain is evident. In addition, the FSP has
accepted a portion of the Applicants‟ loss as being caused by this insured
event.
17. Given this, the Panel accepts that the Applicants have established a prima
facie claim. The onus therefore reverts to the FSP to establish that the cause
of that portion of the loss not accepted by it falls within an exclusion clause,
namely flood. In this regard, the FSP has relied on two hydrology reports
authored by the one hydrologist.
18. The first report was dated 24 May 2012 and contained the following:
Case No: 295285 Determination Page 5 of 12
The property is a single storey residential building on a concrete slab. It
contains an undercover work area also on a concrete slab. Both
concrete slabs are approximately at ground level with the floor level of
the house being approximately 100mm above the level of the concrete
slab. The house was inundated to approximately 400mm above the
floor level.
The following version of events was provided by the Applicants:
They were not at the property. They arrived 10 days after its
inundation.
Upon arriving at the property, they observed tide marks.
A neighbour to the north stated that water was flowing in a
south-westerly direction, and drained away quickly.
A number of pipes which were stacked on the western side of
the property had been moved up against the eastern fence of
the property.
The water was clean inside the house.
There was no damage to the roof of the property.
Recorded hourly rainfall was obtained from Oysters Creek at Rapleys
rainfall station, which is located approximately 15.5km south of the
property. A total of 200mm of rainfall was recorded on 21 March 2012
and 29mm of rainfall on 22 March 2012. No significant rainfall was
recorded after about 0200 hours on 22 March 2012. The peak hourly
rainfall was recorded in the hour to 0000 hours on 22 March 2012. For
durations between 30 minutes and 3 hours, the recorded rainfalls had
an average recurrence interval (ARI) of 20-50 years.
Captain Creek drains through the property from north to south and joins
Oyster Creek approximately 5.3km downstream of the property. An
unnamed tributary to Captain Creek drains from west to east on the
property and joins Captain Creek approximately 1.3km downstream.
Captain Creek and the unnamed tributary have defined beds and banks
and would be considered watercourses. Recorded water levels for
Captain Creek and the unnamed tributary are unavailable. Instead,
recorded water levels for Oysters Creek were obtained from Rapleys
gauge, which is located approximately 18km downstream of the
property. The peak water level of Oyster Creek occurred at 0700 hours
on 22 March 2012. As the gauge is downstream of the property, the
peak level in Captain Creek would have occurred earlier than 0700
hours.
19. Based on the above, the hydrologist provided the following findings:
a. The house and undercover work area of the property were inundated to
their maximum depth by floodwater overflowing from Captain Creek
and/or the unnamed tributary. It is not possible to determine which
watercourse overflowed first. Debris marks on the fences and the back
door show clear evidence of the path of the floodwater.
Case No: 295285 Determination Page 6 of 12
b. The area around the house and undercover work area drain poorly
because it is topographically flat. Given the high rainfall depths, it is
possible that local rainwater runoff would have ponded in the yard to a
considerable depth.
c. It is not known whether stormwater ponded to a depth sufficient enough
to inundate the house and work area above floor level prior to the
arrival of Captain Creek or tributary flood water. Given the work area
floor levels are at near or ground level, it cannot be discounted that
some pre-inundation occurred. If it did, the depth above floor level of
the work area would not have reached more than 50mm.
d. The house floor level is approximately 100mm above ground level. It is
unlikely that stormwater ponded to a depth greater than 100mm to
inundate the house.
20. The hydrologist‟s second report addressed a number of the Applicants‟
submissions. In particular, the hydrologist stated the following:
The arranged time of the inspection was noon on 18 May 2012.
However, she attended the property 10 minutes earlier. In addition,
time stamps of photographs show the earliest photograph was taken at
11.59 and the last at 12.19. As such, she spent a minimum of 20
minutes at the property but likely more than this given she did not
immediately begin to take photographs upon her arrival.
The Applicants did not offer to take her on a tour around the property.
Captain Creek flows in a north-west to south-east direction. The
unnamed tributary flows in a west to east direction across the property
itself and continues in a south-east direction. The movement of the
pipes is consistent with the direction of flooding from either of these
watercourses. Additionally, debris built up behind a truck also confirms
the direction of the flow to be south-east.
The absence of data for Captain Creek or the unnamed tributary does
not preclude the fact that a flood occurred. As water level information is
available for Oyster Creek and Captain Creek is a tributary to it, then it
is appropriate to rely on the data obtained from Rapleys gauge.
The Queensland Police Service Facebook page posted the following at
1315 hours on 21 March 2012:
“Agnes Water Police advised that Captains Creek cros sing on Round Hill
Road is flooded and impassable.”
The Captain Creek crossing of Round Hill Road is 4km downstream of
the property and 1.3km upstream of the confluence of Oyster Creek.
Oyster Creek at Rapleys rainfall station is approximately 18kms
downstream as measured along the centre of the watercourse. There is
no mountain ridge between the property and Oyster Creek despite the
Applicants‟ submissions to the contrary.
Other rainfall stations located in the vicinity of the property only contain
totals for a 24 hour period up to 9.00am the following day. A
Case No: 295285 Determination Page 7 of 12
comparison with these and Rapleys station indicates that the highest
total for 21 March 2012 was recorded by Rapleys. This did not exceed
270mm over a 7 day period. There is nothing to corroborate the
Applicants‟ allegation that there was a 340 -350mm rainfall event
recorded in a 45 minute period. If such an event occurred, it would
have been greater than a 1 in 100 year ARI event.
Any stormwater collected from the roof and discharged through the
overflow pipe would not have been sufficient to inundate the property
given the small catchment area of the roof and the house floor level
being above ground level by 100mm.
21. After carefully considering all of the available evidence, including the
substantive evidence the Applicants have provided in support of their
position, the Panel considers there are a number of gaps in the hydrology
evidence.
22. Firstly, and most significantly, the rainfall data the hydrologist has relied on
does not, of itself, provide persuasive evidence that this was the type of
rainfall the Applicants‟ property was subject to. Although the gauge relied
upon was the closest one available to the Applicants‟ property and contained
hourly data, this was still approximately 15.5km away, a fairly significant
distance.
23. In the Panel‟s opinion, there is scope for there to be a discrepancy between
the levels recorded at Rapleys compared to that actually experienced on the
site and its immediate surroundings. For instance the rainfall gauge at
Euleilah Creek, which is located 23km south-east of the property, recorded
174mm of rainfall on 22 March 2012. This is 26mm less than the daily
amount recorded at Rapleys even though the distance between the two is
arguably half compared to the distance between R apleys and the Applicants‟
property. Although Euleilah Creek station would have begun recording
rainfall at 0900 hours, there was minimal rainfall recorded at Rapleys
between 0000 and 0900 hours on 21 March 2012 so the comparison is
appropriate.
24. In addition to this, the Applicants have provided two statutory declarations
from neighbours (CP and CJS) regarding their recollection of rainfall events.
CP stated the following:
“I was asleep in my bed and was woken approx. 11pm by very heavy rain on
the roof and windows of my house and the sound of extremely strong winds.
The heavy rain and strong winds continued for a couple of hours, then passed
by. On daylight we found damage to trees and gardens from the destructive
winds. Due to the large amount of rainwater in a short time, I found some of
our out-door belongings at the front of our property, caused by the run- off.”
25. CJS in particular provided the following description which the Panel
considers to be substantive:
“On the evening of the 21 st March a storm delivered unprecedented amounts
of water to our immediate area. It came down so hard and fast that for the first
time since we moved here 10 years ago there was deep water flowing down
Case No: 295285 Determination Page 8 of 12
our entire property like a river. Its force was such that it made holes in
otherwise sound roofs - all sheds and the house leaked under the sheer
volume of water coming down. Daylight revealed rainfall measurements over
300mm (more accurate was not possible due to gauge overflowing and some
rain being horizontal).”
26. GD provided a statutory declaration setting out her recollection of a
conversation she had with JS regarding the events during late evening and
early morning of 21 and 22 March 2012 respectively. This contained the
following of relevance:
“She stated that it had r ained lightly for a couple of hours before the bulk of
the rain, remnants of the cyclone tropical low dumped a whole hour from
11pm to 12 midnight of heavy rain.”
27. CJS‟s evidence is particularly relevant as she provided reference to
measuring rainfall of 300mm around the relevant time. The hydrologist does
not appear to have been privy to this statutory declaration although in her
second report, she did take into consideration the Applicants‟ argument that
locals‟ evidence is that 340 -350mm of rain fell in 45 minutes. However, the
hydrologist appears to have dismissed this because it is not corroborated by
nearby rainfall stations and such an amount of rainfall would be a rare event
given it is greater than a 1 in 100 year ARI event.
28. The Panel is not persuad ed by the hydrologist‟s evidence in this regard. The
nearest rainfall station to the property was 15.5km away. Based on the
Panel‟s experience in dealing with these types of disputes and on common
knowledge, rainfall measured 15.5km away is not necessarily indicative of
the amount of rainfall affecting a property‟s catchment. This is also
corroborated by the discrepancies in rainfall recorded in the various stations
referred to by the hydrologist.
29. Accordingly, the Panel considers it was incumbent on both the FSP and the
hydrologist to take into account the local residents‟ evidence regarding the
rainfall they observed. In particular, if CJS‟s evidence is to be accepted (and
there is nothing to indicate her evidence is incorrect), then it is possible
approximately 300mm fell within an hour.
30. The Panel notes that the hydrologist substantively relied upon the peak
hourly rainfall being 78mm/hr when concluding that stormwater runoff did not
inundate the house . Accordingly, it is open to presume that if the hydrolo gist
had accepted that 300mm rainfall had fallen, being more than 4 times the
amount and having an ARI of over 100 years, that this would have likely
significantly affected her conclusion regarding this substantive issue .
31. Even if the Panel was to adopt a conservative approach and reduce this
figure to 200mm per hour, the point would still be evident given this is almost
3 times the amount considered by the hydrologist and the ARI event would
still be greater than 1 in 100 years.
32. Accordingly, based on the issue of the rainfall alone, the Panel considers
there is a substantive basis to conclude that the FSP is unable to establish,
Case No: 295285 Determination Page 9 of 12
on the balance of probabilities that the damage caused to the house was
solely by flood. At the least, it is reasonable for the Panel to conclude that
the initial inundation was caused by stormwater runoff based on the rainfall
recorded by CJS, which was not accounted for by the hydrologist.
33. However, other factors lend additional support to the conclusion that the FSP
is unable to discharge its onus to establish the cause of loss is flood.
34. The hydrologist has provided minimal evidence of the land‟s topographical
features. For instance, she has not commented on the height of the property
in terms of Australian Height Datum and measured this in comparison with
the likely level of Captain Creek to determine at what point and in what
manner the creek (or the unnamed tributary) overtopped its banks. Instead, it
appears the hydrologist has based her conclusion of flood predominantly on
the presence of debris on the south-eastern fence.
35. Although debris is generally a factor in considering whether water which
inundated a property falls within the definition of “flood”, it is not itself
conclusive, particularly if it is not corroborated by any objective evidence,
such as measured watercourse levels or eyewitness evidence. In particular,
when considering that there was a significant rainfall event as corroborated
both by eyewitnesses and media reports, and neither party disputes that the
property has poor drainage, it is open to presume that the build up of this
significant rainfall event could have resulted in the accumulation of debris.
36. Further, the Panel is satisfied there was a 2% fall in the land between the
undercover work area and the property. This is based on the soil report
provided by the Applicants and not refuted by the FSP. However, it is
unclear whether this fall was accounted for at all by the hydrologist.
37. For instance, the hydrologist concluded that up to 50mm of stormwater
inundation could have occurred to the contents in the undercover work area
but the house could not have been inundated because the floor level is
100mm above the ground.
38. However, the report does not account for the 2% fall. Accordingly, it is
unclear whether this slight fall would have reversed the hydrologist‟s opinion.
39. Also , it is unclear based on the evidence , whether Captain Creek did escape
its confines. For instance, there is no eyewitness evidence of the creek
breaching its banks. Most of the witnesses ref er to runoff and heavy rain.
Although it is possible the water they observed could have originated from a
“flood”, their evidence alone does not automatically lead to this inference
given the fact they did not actually observe the water from the creek
brea king its banks and there was a significant rainfall event occurring .
40. The newspaper articles provided by the Applicants do not assist the FSP in
this regard. Although they refer to “flash flooding”, this term is often
associated with the accumulation of significant amount of water due to
intense periods of rainfall. Accordingly, the reference to “flash flood” does not
Case No: 295285 Determination Page 10 of 12
provide persuasive evidence that water from Captain Creek overflowed its
banks or escaped its confines.
41. Although the hydrologist referred to a Facebook posting of the Queensland
Police to corroborate this phenomenon, she has not provided a copy. The
Applicants attempted to obtain this from the Queensland Police but were
unsuccessful. The FSP, who carries this evidentiary onus, omitted to do so.
42. In addition to this, there is no objective evidence regarding the likely levels of
Captain Creek. As acknowledged by the hydrologist, there are no measuring
stations proximate to the Applicants‟ property. The closest is at Rapleys
station which measures t he level of Oyster Creek. Although the hydrologist
has used this station to postulate the likelihood of Captain Creek overflowing
given it is a tributary of Oyster Creek, it is unclear how accurate such a
reconstruction could be when the hydrologist does n ot appear to have
considered the following :
The catchment size and topography of the site. For instance, she has
not explained what level the creek reached and why this would have
resulted in it breaking its banks.
The level of rainfall recorded for the pr operty's catchment. In this
regard, the hydrologist‟s evidence is substantively reliant on one station
which, for reasons already expressed, the Panel does not consider
persuasive .
Eyewitness evidence of the rainfall or the levels of water in Captain
Creek.
43. Finally, although not significant, the direction of overflow rainwater from the
roof‟s catchment to the property does not appear to be properly accounted
for by the hydrologist. Although the Panel accepts the hydrologist‟s
conclusion that the roof‟s li mited catchment would alone not have resulted in
sufficient runoff to inundate the property, the hydrologist did not appear to
account for its contribution with the runoff that had already accumulated at
the site.
44. For instance, the hydrologist accepted tha t 50mm above ground level could
have accumulated on the site. Given this, it is unclear whether the rainwater
being discharged from the roof in conjunction with this accumulation of water
could have inundated the house.
45. Accordingly, after careful consideration of all of the evidence, the Panel
cannot be satisfied, on the balance of probabilities that the FSP is able to
establish the damage to the Applicants‟ property was caused by “flood”. This
is principally based on the substantive gaps in the hydrologist ‟s evidence.
46. Instead, the Panel accepts that there is a reasonable basis to accept that the
damage was caused by stormwater runoff given the following:
The significant rainfall that the property was likely subjected to as
corroborated by eyewitnesses and news reports.
Case No: 295285 Determination Page 11 of 12
The fact the site has poor drainage, is relatively flat and has a tendency
to pool and accumulate stormwater.
The slight downward fall of the land between the undercover work area
and the house, the former which has been accepted to have been
inundated by stormwater to a certain extent.
The fact that even based on the limited information the hydrologist
accounted for, in particular the rainfall she presumed affected the
property‟s catchment, she could not dismiss the possibility that
stormwater runoff inundated the property although she considered it
unlikely based on the data relied upon.
47. Accordingly, with respect to the damage sustained to the house (including
both the building and contents) the Panel accepts the Applicants should be
fully indemnified.
48. The Panel notes the Applicants have provided a number of quotations in
support of the quantum sought. However, no assessment has been made by
the FSP and the Panel has insufficient evidence to determine whether the
amounts quoted are fair and r easonable . The Panel notes from the
assessor‟s report the assessor observed water level marks on interior and
exterior walls at approximately 0.5m. Inundation to that level would cause
considerable loss of contents and building damage.
49. Given this, the Panel urges the parties to work co-operatively to reach an
agreed settlement outcome with respect to the Applicants‟ loss.
50. In regards to the damage of the contents in the undercover work area, the
Panel accepts that the FSP‟s liability is limited to the amount offered, namely
$1,100 ($1,000 plus GST), given the following policy provision:
“We will pay:
a. for loss or damage caused by theft, storm, rainwater or run-off, up to a
total amount of:
$500 for bicycles, and
$1,000 for all other contents.”
51. The Applicants do not appear to have disputed this settlement.
Determination
52. On the basis of the available information the Panel determines that the FSP
is to indemnify the Applicants for the damage sustained to the property
pursuant to the terms of the policy.
53. Insofar as the FSP is to cash settle any aspect of the Applicants‟ claim, the
FSP is to pay interest from 4 June 2012 (being the date of rejection of the
claim) to date of payment of the claim, in accordance with Section 57 of the
Act. Interest however is not payable on the $1,100 amount offered by the
Case No: 295285 Determination Page 12 of 12
FSP for the contents damaged in the undercover work area given it
attempted to pay this amount to the Applicants .