Scope of fire repairs versus full rebuild and temporary accommodation

FirmFinancial Firm (Unknown - Insurer)
Decided2012-12-05
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

After a fire, the insurer authorised repair of the ground floor and rebuild of the first floor, while the insured sought full demolition and rebuild and further temporary accommodation payments. The Panel accepted the expert evidence that the slab was sound and found no further accommodation was payable.

The Panel accepted the insurer's expert evidence that the fire did not compromise the suspended slab, so the insurer's liability was limited to repair under the policy terms and the accommodation benefit cap had been exceeded.

Issues

Subjects and remedies

home or building damageno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 295108 Determination Page 1 of 9 Case number: 295108 General Insurance - Domestic Insurance - Home Building - Fire - FSP Decision - Claim amount - Scope of works 05 December 2012 Background 1. The Applicant held a home building and contents insurance policy with the Financial Services Provider (FSP) which was in place at the time of the loss. 2. On 14 April 2011, the Applicant lodged a claim for damage to her home and contents caused by a fire which occurred on 13 April 2011. 3. The FSP accepted the claim and paid for the contents portion of the claim based on the contents sum insured. However, an issue arose regarding the settlement of the building portion of the claim. The FSP offered to demolish and rebuild the first floor only and repair the rest of the building. 4. The Applicant disagrees with this decision and argues the suspended concrete slab to the first floor has been structurally compromised and the building requires complete demolition and rebuilding. Summary of Applicant’ s position 5. Her house was severely damaged in a fire. She disputes the FSP’s decision to rebuild the first floor only thereby keeping the ground floor structure, including the first floor suspended slab. 6. The building should be completely demolished and rebuilt as the structure has been compromised by the effects of excessive heat and exposure to the elements, particularly after the first floor was demolished in December 2011. 7. She is financially stressed as her business and source of income was home based. Despite this, the FSP has said it will not pay the rent for accommodation after September 2012 which would leave her and her children with nowhere to live. 8. Upon consulting with many builders and engineers, her main concerns are the structural integrity of the suspended slab and mould and spores growing from besser blocks which may still retain water due to exposure to the elements. Determination Case No: 295108 Determination Page 2 of 9 9. The property should be completely rebuilt and the rent for her temporary accommodation paid for in full. Summary of FSP’s position 10. The FSP’s loss assessor inspected the damage and recommended emergency accommodation, which the FSP authorised. He also instructed a building/engineering services company to inspect the property and provide a scope of works on the repairs needed. 11. Following receipt of the building/engineering c ompany’s report, the assessor instructed an engineering company to report on the structural integrity of the concrete slab to the downstairs area and a scope of works for the reconstruction of the first floor. 12. The loss assessor advised that demolition of the first floor was required to ascertain the integrity of the building. Once this process was completed, the assessor and the engineer re- assessed the property’s structural integrity. 13. The engineer confirmed that the first floor’s suspended concrete slab is structurally sound. To support its position, it engaged a geotechnical expert to test the integrity of this concrete slab. The geotechnical engineer confirmed the strength of the concrete slab had not been degraded by the fire. On that basis repairs were authorised in accordance with builder D’s quotation. 14. Although the Applicant disagrees with the experts’ opinions and argues the suspended concrete slab should be demolished and the property rebuilt, she has not provided any independent expert evidence to s upport this position. 15. Upon consultation with the engineer about the arguments raised by the Applicant, the engineer maintained its position that the structural integrity of the suspended concrete slab was not compromised. 16. As to the temporary accommodation, the FSP notes that the policy provides a benefit for alternative accommodation for up to 12 months. The policy also says that the maximum amount payable is up to 10% of the buildings sum insured. In this case, the maximum payable benefit would be $29,500. 17. Notwithstanding this, based on the time it would take for the builder to finalise repair works, the FSP offered five months of rent more than the policy entitlement. 18. It says it will not pay any accommodation cost beyond 21 September 2012, considering part of the delays in finalising the repairs are due to the Applicant not accepting the scope of works. 19. The FSP relies on the following policy provisions within the policy wording: “ Buildings cover Case No: 295108 Determination Page 3 of 9 What buildings we protect We will cover residential buildings located at the insured property address listed on your Schedule, their fixtures and fittings and any structural improvements at your home ... How much we will pay When you take out buildings cover, based upon the information you give us when taking out this Policy, we automatically calculate the replacement value of your buildings at today’s price. This is called the sum insured and is listed on your Schedule. If your buildings are damaged or are a total loss, the amount we will pay will be the total amount required to repair or rebuild your home to the condition it was in just before the loss or damage occurred, but not better, and this will not be limited to the sum insured. ... When your buildings are protected (continued) Event Fire or explosion Loss or damage as a result of a fire or an explosion. ... Additional buildings benefits [Product name] includes a range of additional buildings benefits which are automatically included in your Policy when you obtain buildings cover. The amount we will pay is in addition to the sum insured. ... Additional Benefits We will cover Alternative temporary accommodation (including for pets) Costs of alternative accommodation for up to 12 months if your buildings suffer loss or damage and you are unable to live in your home as a result. The loss or damage must occur as a result of an event we have agreed to cover. We will pay:  up to an amount that is equal to the weekly rental value of your buildings before the event occurred, and  the reasonable costs of alternative accommodation for your pets. The maximum amount we will pay is up to 10% of the buildings sum insured, as shown in your Schedule. Claims Howe we settle a buildings claim We will decide how we will settle your claim. Case No: 295108 Determination Page 4 of 9 If your buildings suffer damage, we will decide whether your buildings are repairable or a total loss. ... What happens if we decide to repair your buildings If we decide to repair your building(s), we will:  only repair the part or parts of your buildings that actually sustained damage, including damaged portions of fixed coverings to walls, floors and ceilings, in the rooms, halls or passages where the damage occurred, to a condition as close as possible to when new, but not better  try to match any material used to repair your buildings with the original materials or nearest equivalent available to the original materials  ensure the repairs to your buildings comply with government and local authority bylaws  allow you to choose your own repairer or tradesperson, or we can help you to find one; we may decide not to accept your chosen repairer if the quote and credentials are not acceptable  deal directly with the repairer or tradesperson concerning payment. Note: If repairs do not start within six months of the acceptance of your claim, we may not pay any increase in costs caused by your delay.” Issues 20. Whether the FSP is entitled to limit its liability for the claim to the repair and partial rebuilt of the building. 21. Whether the Applicant is entitled to further payments for alternative temporary accommodation under the policy. Reasons for decision 22. As advised to the parties, due to the nature of the dispute and the amount claimed, the Financial Ombudsman Service (FOS) has considered it appropriate to expedite the dispute to Determination by the Panel in accordance with the Operational Guidelines to the FOS Terms of Reference. 23. The Panel consists of an Ombudsman, a representative with extensive experience in the insurance industry and a representative with extensive experience in consumer claims. 24. The Panel is satisfied that a full exchange of information has taken place between the parties and each party has had the opportunity to address the issues raised. 25. There is no dispute between the parties that the property was fire damaged and the FSP is liable for the loss as well as for paying temporary accommodation costs. Case No: 295108 Determination Page 5 of 9 26. The Panel notes there had been other issues regarding settlement of the contents portion of the claim and the reconnection of water and electricity to the property. The Panel understands that these matters are no longer in dispute and therefore they shall not be addressed in this Determination. 27. The Panel will now address each of the issues in dispute. Whether the FSP is entitled to limit its liability for the claim to the repair and partial rebuilt of the building 28. The Applicant says the structural integrity of the suspended concrete slab to the first floor has been compromised as a result of exposure to intense heat during the fire and the elements in the months subsequent to the fire. She argues that because of this the building should be completely demolished and rebuilt. 29. To support her position, the Applicant has compiled online information and provided comments showing how the integrity of the suspended concrete slab can be compromised by different factors. The compiled information says in summary:  After the fire, the entire house should have been sealed immediately or at least covered with a tarpaulin to protect it from the elements, in particular from water which can cause the slab to fail.  The effects of water and salt combined can cause flaking and spalling of a concrete slab.  The Bureau of Meteorology rainfall data shows there was a considerable amount of rain during the months the slab has been exposed to the elements. The house is also situated close to the sea and it would have been affected by salt in the air.  The exposed slab had a film of white powder between the wet and dry areas.  The concrete slab may be affected by rising damp, which could also compromise the steel reinforcement. The initial signs of this is softening plaster, bubbling render and peeling paint as well as musky smells and visible mould.  The suspended slab and metal reinforcement were engulfed in flames and then water laden when firemen were hosing the property. Then it was affected by rain for over a year.  The underside of the suspended slab was sealed with plastic type paint. This suitably protected the slab from condensation.  Excessive heat, exposure to water and the compromised capillary system and porosity of the slab contributed to the synthetic paint in the ground floor ceiling to form paint bubbles and is now saturated and decaying.  Photographs show visible mould and water running from electrical wiring encased in the suspended slab. Case No: 295108 Determination Page 6 of 9  Water can be poured through the slab and this is a sign of it being structurally inadequate.  The concrete was sanded after the first floor demolition and the spalling looks minimised.  There was minimal small cracking on the slab surface when tiles from previous floor covering were remo ved.  Cracks can contribute to the deterioration of a slab and allow water to enter into the slab, causing further breakage. The slab was not water sealed.  The strength of prestressing steel decreases more rapidly than ordinary reinforcement as the temperature rises.  Water and oxygen entering the concrete slab through the porous surface can cause metal corrosion. This is shown by new cracking. There is a new crack along the length of the besser blocks supporting the cantilever over the carport.  The besser blocks on the base level are partially core-filled. Water will no doubt have filled the vacant spaces affecting the electrical wiring and promoting growth of mould and spores.  There are concerns due to family history of asthma, allergy and lung problems that there will be excessive growth of mould if the building is repaired instead of rebuilt. 30. Further, the Applicant has also provided reasons as to why the ground floor should be rebuilt. Namely:  The back room has large vertical cracks down the besser blocks mortar.  The tiles are detaching from the floor due to water ingress.  The ceilings are mouldy.  There is extensive water on the floor. 31. The FSP, based on its experts’ reports, contends that the strength and integrity of the suspended concrete slab has not been affected. It says that accordingly, it authorised the repair of the ground floor and the rebuilding the first floor only. 32. To support its position, the FSP appointed the assessor, the engineering services company and the engineer to issue reports. They all agreed that a further report on the structure should be made once debris was cleared out and the first floor was demolished. 33. The only available report after the clearance of debris and demolition of the first floor comes from the engineer. It reports in s ummary the following:  There is extensive damage to the painted textured finish to the ceiling of the ground floor level. It has separated from the reinforced concrete ceiling, possibly due to water penetration through the slab. Case No: 295108 Determination Page 7 of 9  There is a crack in the front upper cantilevered concrete veranda slab. The engineer was unable to determine the extent of the crack but it is unlikely to extend further into the house than the front wall.  The cracked section of the veranda slab should be demolished and replaced with a framed timber deck on new steel posts or braced off the front of the house.  The ground floor elements comprising the concrete masonry walls and concrete slab on ground and footings are in suitable condition for re- use.  The first floor has a reinforced concrete suspended slab 150mm thick, supported on the ground floor concrete masonry walls. The slab cantilevers past the external walls to form the upstairs veranda.  The suspended slab was sound and showed no evidence of fire or heat damage. The geotechnical engineer performed a test of the concrete surface’s strength by using a Schmidt Hammer in 20 test locations.  The results indicate the concrete surface has a compressive strength of at least 32MPa in all test locations. The engineer considers this means the strength of the slab has not been degraded by the fire.  There is a crack to the cantilevered part of the slab. The crack is due to corrosion of the reinforcement in this area. This crack is due to insufficient concrete cover to the reinforcement and is damage unrelated to the fire.  There are a number of cracks in the upper surface of the suspended slab. These cracks are generally 1 – 2mm wide with some spalling. These cracks are pre-existing.  The cracks indicate there is insufficient top reinforcement over ground floor supporting walls and that the slab panels are spanning between supporting walls as simple spans.  However, there is nothing to indicate that the fire event has degraded the structural adequacy of the slab. 34. Having considered the parties’ positi ons and material provided, the Panel notes the following:  The engineer appointed the geotechnical engineer (the report of which is not available) to perform a test on the strength of the slab. It appears that this test is suitable to measure the strength of the slab when there has been potential fire damage.  As noted by the Applicant, there seems to be other factors that may need to be considered such as condensation levels, moisture levels, water saturation and concrete permeability due to exposure to the elements and levels of salt in the air, all of which might cause the structural integrity of the slab to be gradually degraded. Case No: 295108 Determination Page 8 of 9 This is corroborated by the engineer’s findings and the photographs provided. In particular the photographs related to the ground floor ceiling paint which is clearly water damaged.  The engineer says the cracks on the suspended slab are pre-existing or unrelated to the fire, yet it does not develop as to the reasons why it considers this is the case or whether it may be as a result of the post- fire exposure to the elements.  The engineer points out many issues of concern in and related to the concrete slab (damage to ceiling painting, cracking in cantilevered area and throughout slab causing spanning). It concludes however, based on the geotechnical engineer’s opinion that the adequacy of the slab has not been degraded. 35. The Panel notes the points of concern raised, however the available expert evidence before the Panel indicates that the fire has not compromised the structural integrity of the suspended slab. 36. In the absence of any evidence to the contrary, the Panel is satisfied the FSP has established on the expert evidence provided that the suspended slab is sound and strong enough to support the building of walls and roof on top of it. 37. Accordingly, the Panel is satisfied that the FSP is entitled to limit its liability for the claim to the repair of the building according to the builder’s quotation and in compliance with the terms and conditions of the policy. Whether the Applicant is entitled to further payments for alternative temporary accommodation under the policy 38. The Applicant contends that, due to the FSP’s reluctance to authorise the demolition and full rebuilding of the house, she has been forced to live in temporary accommodation. She holds the FSP responsible for this and wants payment of her accommodation in full. 39. The FSP contends that, under the policy, the temporary accommodation benefit extends to up to 10% of the buildings sum insured ($29,500) and up to 12 months if the building suffers a loss or damage that makes it uninhabitable. 40. The FSP notes that it has paid five months beyond the Applicant’s entitlement (12 months) under the policy. 41. Further, the Panel notes, as per the assessor’s fourteenth report dated 8 May 2012, that the payments for temporary accommodation have been up to a total (including the additional five months) of $27,438.60. 42. Based on the available evidence, the Panel is satisfied there are no grounds for further payments of alternative temporary accommodation. Case No: 295108 Determination Page 9 of 9 Determination 43. On the basis of the available information, the Panel determines that:  the FSP is entitled to limit its liability for the claim to the repair of the building under the policy and according to D’s quotation ; and  the Applicant is not entitled to further payments for alternative temporary accommodation under the policy.