Home / Financial Firm (Unknown - Insurer) / Determination 294892
Determination 294892
Partial denial of burst pipe claim under ground movement exclusion
Summary
The Applicants claimed $61,313 for burst pipe damage to their home and the FSP paid $8,503 for the damage it accepted as caused by the leak and denied the rest as ground movement. AFCA preferred the FSP's expert evidence and found the remaining damage was excluded.
The remaining damage was caused by ground movement, which the policy excludes, and the settlement discharged the FSP's liability for the leak damage.
Subjects and remedies
home or building damageno remedy
Text of the determination
Case No: 294892 Determination Page 1 of 8
Case number: 294892
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of Claim - Exclusion/Condition
14 March 2013
Background
1. The Applicants held a home building and contents insurance policy with the
Financial Services Provider (FSP) from 21 June 2006. The policy was
current at the time of the loss.
2. The Applicants lodged a claim with the FSP on 27 September 2010 for
damage sustained to the property (doors warped, tiles lifted and damage to
steps) as result of a burst pipe at the insured premises.
3. The FSP accepted parts of the claim directly related to the burst pipe and
denied the remaining parts of the claim on the grounds that the damage was
a result of shrinkage, settlement and subsidence which are e xcluded under
the policy.
4. The Applicants expect the FSP accept the full claim amounting to $61,313.
Summary of Applicants ’ position
5. The Applicants believe the entire damage sustained to the property was
caused by the burst pipe.
6. They rely on the findings of their expert engineer T and expect the FSP to
honour the full claim.
Summary of FSP’s position
7. The FSP relies on its expert engineer H‟s findings that the remaining
damage sustained to the property, which is in dispute, was caused by events
excluded under the policy.
8. It maintains denial of these parts of the claim and relies on the following
policy provisions contained in its Product Disclosure Statement (PDS):
“ What we do not cover – general exclusions
Determination
Case No: 294892 Determination Page 2 of 8
You are not covered under any section of your policy for damage, loss, cost or
legal liability that is caused by, arises from or involves:
...
Ground movement
erosion, vibration, subsidence, landslip, landslide, mudslide, collapse,
shrinkage or any other earth movement, but we will cover landslide or
subsidence that is specifically covered under the following insured events:
• „Storm‟;
• „Flood‟ (but only if you have cover for insured event „Flood‟);
• „Earthquake and Tsunami‟;
• „Explosion‟.”
Issue
9. Whether the FSP is entitled to deny liability for the remaining parts of the
Applicants‟ claim.
Reasons for decision
10. Due to the nature of this dispute, FOS has considered it appropriate to
expedite the dispute in accordance with the Operational Guidelines to the
FOS Terms of Reference. This dispute has not been the subject of a FOS
Recommendation and has proceeded directly to Determination.
11. This decision has been made by a Panel consisting of an Ombudsman, an
insurance representative appointed by the Financial Ombudsman Service
Board, and a consumer representative appointed by the Financial
Ombudsman Service Board.
12. The Panel is satisfied that a full exchange of information has taken place
between the parties and that each party has had the opportunity to address
any issues raised.
13. There is no dispute the dama ge sustained to the Applicants‟ property falls
within the general cover of the policy. The issue remains whether the entire
damage to the property was caused by the burst pipe.
14. The Applicants have not raised any issue in relation to receipt of the policy
documents and the Panel is satisfied in these circumstances, the FSP has
met its obligations in clearly informing the Applicants of the terms and
conditions of the policy.
15. The onus of proof rests on the Applicants to establish that, on the balance of
probabilities, they have suffered a loss caused by an insured risk. Once the
Applicants have established that the loss was caused by a risk insured under
Case No: 294892 Determination Page 3 of 8
the policy, the onus then shifts to the FSP to show that, on the balance of
probabilities, the loss falls within an exclusion clause in the policy.
16. The Applicants lodged a claim on 27 September 2010. The report notes that
a copper pipe which the Applicants state had been leaking under the house
for quite a while had been repaired by a plumber that day but that damage
had been caused by the leak.
17. The Applicants rang two days later by saying they were mailing in a copy of
the plumber‟s bill.
18. Subsequent to the lodgement of the claim, the FSP appointed a builder and
an engineer H to investigate the cause of the loss and to assess the claim.
19. The builder was unable to ascertain the cause of the loss and suggested that
further investigation was required.
20. H attended and its report dated 23 November 2010 states:
“ It was indicated that a hissing noise was heard recently and investigations
into this noise found that a burst water pipe occurred underneath the house. It
was indicated that delays occurred in having the pipe repaired and the leak
was occurring for approximately one to two days before it was repaired. It
should be noted that the water was turned off during this time and only turned
on when needed…”
CONCLUSIONS
The cracking and movement of the interior and external walls are typical of
problems that occur due to differential settlement of the footings. Differential
settlement can occur of the footings due to seasonal changes in moisture
content of the foundation material.
Over recent years the Melbourne area has experienced drought conditions
which have resulted in extremes occurring in the seasonal changes in the
moisture content of the foundation material. In particular, the past winters and
the last summer experienced long periods without rain. This can result in
extremes occurring in the seasonal changes in moisture content of the
foundation material and an increase in the differential settlement of footings
support by foundation material.
The cracking in the external brickwork showed weathered edges which would
indicate that the cracking has been occurring for some time. It should also be
noted that the water from the leaking pipe did not extend up to these areas of
the house.
Therefore, in our opinion, the cracking in the external brickwork has resulted
due to seasonal changes in moisture content of the foundation material and
these problems are not related to the leak in the water pipe.
Cracking and movement was evident to large areas of the house. It should be
noted that the leak in the water pipe only effected a small area along the
south side of the house in the central area near the bathroom area.
Some of the cracking showed weathered edges which would indicate that the
cracking has been occurring for some time, particularly the floor tiles. In our
opinion, the cracking of the floor tiles has been occurring for some time and is
not related to the leak in the water pipe.
Case No: 294892 Determination Page 4 of 8
Case No: 294892 Determination Page 5 of 8
Therefore, in our opinion, the cracking and movement evident to the interior
plaster walls and floor tiles and binding doors has resulted due to the following
factors.
Seasonal changes in the moisture content of the foundation material
due to the recent drought.
The cracking and movement evident around the bathroom, bedroom,
passageway area could be contributed to the leak in the water pipe.”
21. H‟s report stated internal, external and sub -floor inspections were made. It
was also accompanied by photographs and a site plan with reference to the
damaged areas.
22. Based on this report, the FSP accepted the Applicants‟ claim for the damage
sustained to the bathroom, bedroom and passageway.
23. However, the Applicants were not satisfied with this outcome and appointed
an independent engineer T to reassess the cause of the loss.
24. T‟s report dated 18 July 2011 states:
“We conclude that the movem ent, damage and house subsidence which have
occurred at [Applicants‟ address] , and, was the result of soil moisture that
related to foundation movements. Such movements may be expected to occur
on all Highly Reactive Clays or Class H soil sites due to some or all of the
following factors:-
i. Natural Seasonal and Climatic variations/conditions. (Very Limited in
this case)
ii. Over watering of gardens. (Not Applicable in this case)
iii. Broken pipe work or similar. (Applicable in this case)
iv. The presence of trees and/or vegetation in close proximity to the
building. (Not Applicable in this case)
v. Poor ground surface drainage which allows water to pond in the
vicinity of the building. (N/A in this case)
The two major cracks which were in the external brickwork and interior walls
occurred due to differential settlement of the footings which was caused by
the burst pipe.
Subfloor space leakage rarely affects the structural integrity of the house.
Stumps and footings have been eroded by the exiting leak from the burst
pipe. It is required an urgent re-levelling of the existing stumps that include re-
stumping 22 of existing stumps (400mmtx400mmx600mm deep) and backing
to the rest of existing stumps. Also, the works include underpinning 7 of
existing pins at 2000mm deep minimum. These works must be under
qualified engineering supervision.
Therefore, we advised that the cracks and movements were evident in the
interior plaster walls, ceilings, doors, and floor tiles. Those cracks and
movements were due to the leak in the water pipe.
Case No: 294892 Determination Page 6 of 8
The above mentioned structural defects in this report are only due to the
leaking of the burst pipe and they are not related at all to a faulty of the
workmanship, settling, shrinkage and/or expansion
...
Finally, we recommend that the house needs repair of all areas that are
contributed to the leaks in the water pipe” (sic)
25. T‟s report also stated a visual inspection was carried out which included
structure and envelope that was exposed or readily accessible. It is not clear
from the foregoing whether a sub-floor inspection was made. There were no
photographs accompanying the report to support the described damage.
26. T‟s report did however quote from a plumber‟s invoice and report dated
27/09/2010 which it had examined. The report stated water to a depth of
50mm approximately was under the house and that mud had prevented the
immediate repair of the leaking pipe. The plumber recorded when he later
repaired the pipe, the area under the bathroom was still wet.
27. T also reported some 600 litres of water, almost double normal water usage
was recorded for the period July 2010 to November 2010 and it remained
under the dwelling “ between 2-3 months approximately under the house
before the plumber repaired the leak ing pipe” (Panel emphasis). This
statement is somewhat in conflict however with the engineer‟s earlier
description which states “… the leak in the water pipe at the area of the
bathroom for more than a month (Panel emphasis) ”.
28. Upon receipt of T‟s findings, the FSP referred same to H for further
comments and its response dated 19 August 2011 is below:
“ Conclusions
It is not clear whether the engineer actually inspected the sub floor area as no
mention is made of an inspection of this area.
It should be noted that our site inspection was carried out soon after the pipe
was repaired and the areas of dampness were evident as indicated on our
sketch plan. In our opinion, the whole of the sub floor area was not flooded
with water as would appear to be indicated by the engineer.
The engineer refers to two major cracks. In our opinion, these are not major
cracks and are very minor cracks. Refer to Photo 2 of our original report which
is typical of the size of cracking to the brick work. Photo 1 has been added to
this letter and shows the size of the crack to the north wall.
The engineer refers to stumps and footings being eroded by the existing leak
from the burst pipe. When our office inspected the sub floor area there was no
evidence of any eroding of the foundation material from around the stumps
and it should be noted that the leak in the water pipe was a spray leak and not
a full leak. Therefore only a small area of the sub-floor was damp.
Therefore, we are not clear why the engineer refers to re-stumping and
underpinning works to be carried out.
Case No: 294892 Determination Page 7 of 8
Underpinning was carried out of the house some time ago and normally once
underpinning has been carried out no further works are required.
The engineer makes a general statement that the structural defects in this
report are all related to leaking of the burst pipe.
In our opinion, the dampness underneath the house was only to a small area
and did not affect the whole of the house.
Mention is also made that the damage is severe for structural, aesthetic and
re-sale problem. In our opinion, the leaking pipe has not compromised the
structural integrity of the whole house and has only affected the area indicated
in our report.
Therefore, we are still of the same opinion, as reached in our original report
and our conclusions have not changed even though an engineer's report for
the owner has been forwarded to our office”
29. The Panel has carefully reviewed the evidence submitted by the parties and
notes that H's investigations into the cause of the loss was closer to the date
of the loss when compared to the date of investigation by T.
30. T‟s findings appear to be general in nature concluding that most of t he
damage sustained to the property was related to the burst pipe.
31. The Panel notes T refers to two major cracks in the external brickwork but
fails to locate the cracks or their size category. In H‟s evidence two external
cracks were identified by location. H described them as very minor and not
needing repairer and argued they were weathered (thus long standing). On
the basis that the cracks referred to in each report are the same cracks, the
Panel concludes the available photographs support H‟s view.
32. Importantly, the Panel notes that the Applicants have not presented
evidence to refute the comments of H, in its report dated 19 August 2011 on
T‟s findings
33. The available evidence records the Applicants called the FSP on 16
November 2011 to advise more information would be obtained from their
engineer however a follow up call on 30 December 2011 elicited that no
further report would be forthcoming.
34. In the absence of any further expert evidence from the Applicants, the Panel
is persuaded by H‟s findings.
35. Accordingly, the Panel is satisfied on the balance of probabilities that the
damage caused by the burst pipe was limited to the bathroom, bedroom and
passage way and that the remaining parts of the damage to the property was
caused by ground movement which is excluded under the policy.
36. In the circumstance the Panel concludes the settlement made by the FSP in
the amount of $8,503 to indemnify the Applicants for the damage caused by
the leaking pipe has discharged the FSP from any further liability under the
policy for damage arising from the leak.
Case No: 294892 Determination Page 8 of 8
Determination
37. On the basis of the available information, the Panel determines the FSP was
entitled to deny liability for the Applicants‟ additional claim.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.