Text of the determination
Case No: 294771 Determination Page 1 of 8
Case number: 294771
General Insurance - Domestic Insurance - Home Building - Service - Service
quality
8 October 2013
Background
1. The Applicant’s home is insured under a Home and Contents insurance
policy issued by the Financial Services Provider (FSP).
2. On 3 January 2012 the Applicant lodged a claim under the policy for damage
to timber flooring caused as a result of water leaking from a freezer unit and
a refrigerator following a power cut.
3. The FSP accepted liability for the claim and authorised rectification of the
damage. Rectification work involved sanding the entire top level of the home,
which included the affected flooring. The initial sanding was considered to be
sub standard and the floors were re-sanded. The result of the second
sanding was unsatisfactory and the floors were sanded a third time on this
occasion by the Applicant’s preferred contractor .
4. The Applicant maintained that the life of the floorboards had been adversely
compromised by the two additional sandings and sought compensation.
Alternatively the Applicant requires replacement of the affected floorboards.
5. The offers and counter offers made by the FSP and the Applicant have not
resolved the dispute.
6. The dispute was considered by a Case Manager of the Service who issued a
Recommendation. In that Recommendation, the Case Manager determined
the dispute in favour of the Applicant and recommended that the FSP sand
and polish the affected areas and that the FSP pay the Applicant a sum
equal to the cost of replacing the floorboard having a depth of 3.8mm.
7. The Recommendation was not accepted by the Applicant. Pursuant to
clause 8.5c of the Terms of Reference of the Service, the Applicant requests
that the dispute proceed to Determination.
Determination
Case No: 294771 Determination Page 2 of 8
Summary of Applicant’s p osition
8. The Applicant has provided a number of submissions with respect to this
matter and the full details of the Applicant’s position is set out within those
submissions.
9. The Applicant maintains that as a result of poor workmanship on the part of
the FSP’s appointed agent , his timber floorboards had to be sanded two
additional times and that this has reduced the life span of the floorboards.
10. Further, the Applicant challenges the basis on which the FSP selected the
method of rectification of the problem, saying that it was based upon the
cheapest option rather than a duty of care to the customer.
11. The Applicant also says that contrary to the FSP’s assertion that the flooring
repairs completed to date satisfied the policy coverage to return his property
to its previous position prior to the insured event, the fact that the boards
were sanded on two additional occasions and that as a result the boards
have been sanded to a depth greater than necessary, the Applicant has not
been returned to his previous position, prior to the insured event.
12. In addition, the Applicant challenges the Recommendation to the affect that
only one timber board requires replacement, when the entire floor was
subject to the three sandings, two of which should not have been necessary.
13. Finally, the Applicant maintains that the repair process has meant that he
has had to relocate his family three times because of the delay in the work
which has had significant impact upon himself and his family.
Summary of FSP’ s position
14. The FSP maintains that the Applicant’s own expert clearly an d ambiguously
confirms the actual areas that have been affected and to what extent they
have been affected.
15. The FSP says that the Applicant ’s expert makes recommendations on how
to rectify the existing issue and does not suggest at any point that the floor
should be replaced.
16. The FSP says that the Applicant even directly recommends the re-sanding of
the floor to correct the issue, noting that the particularly thin floorboards may
be subject to splintering later on if re-sanded.
Issue
17. What are the obligations the FSP has to the Applicant under the terms of the
policy.
Case No: 294771 Determination Page 3 of 8
Reasons for Decision
18. I have reviewed all the material provided by the parties and the reports
included within their respective submissions.
19. The Recommendation of the Case Manager has not been accepted by the
Applicant and as such, this matter will proceed to Determination in
accordance of the Terms of Reference of the Service
“ 8.5 Process for deciding Disputes
Unless paragraph 8.6 applies, the process for deciding a Dispute is as
follows:
...
c) If, within 30 days of receiving the Recommendation, either:
(i) the Financial Services Provider does not accept the
Recommendation in relation to the Dispute; or
(ii) either party requests FOS to proceed from a Recommendation
to a Determination,
FOS will proceed to a Determination by either an Ombudsman or by a
FOS Panel (as the Chief Ombudsman or his or her delegate decides is
appropriate). Before the Determination is made, the parties will be
given a reasonable opportunity to make submission, and provide any
further information, in response to the Recommendation.”
20. Subsequent to the Case Manager’s Recommendat ion, the Applicant has
lodged further submissions by way of emails of the 13 and 17 August 2013
and the 4 September 2013.
21. The FSP has responded to the Applicant’s further submissions by way of an
email of the 2 September 2013.
22. I have considered all of the material as part of this Determination.
23. I am satisfied that as a result of an insured event under the policy, the
Applicant was entitled to coverage under the policy and the FSP made effort
to attend to the loss and damage within the terms of the policy.
24. Unfortunately, the first two efforts by the FSP’s nominated agent to solve the
problems, have not been successful.
25. Whilst I note that the Applicant challenges the FSP’s approach to
determining which way they will resolve this dispute, I also note that the
terms of the policy detail how the FSP is entitled to settle any particular
claim.
26. The relevant policy terms provide as follows:
“ 8.4 How we settle your claim
...
Case No: 294771 Determination Page 4 of 8
Repairing or replacing
When we agree to pay your claim for loss or damage
We may choose to pay
the reasonable cost of repair, or
the reasonable cost of replacement to new condition with property of the
same size and specifications or with items as near as original as is
currently possible.
a cash amount. If we agree to pay cash, we will pay the amount it would
reasonably cost to repair or replace the property. Where a building is not
being replaced, the amount we will pay will be less a reasonable
deduction for depreciation due to wear and tear and age of the property.”
27. Unfortunately and within their correspondence to the Applicant of the 14
August 2012, the FSP has not assisted the situation because rather than
directly quoting the policy provisions as detailed above, the FSP has said
“ the flooring repairs completed to date satisfy the policy coverage to return
your property to its previous position prior to the insured event.”
28. Whilst the statement in the correspondence of 14 August 2012 may be
accurate from a general legal point of view, it is not a precise statement of
the policy coverage and therefore, potentially will lead to confusion, as it has
done in this particular case.
29. I am satisfied that the FSP’s obligation, once having chosen to indemnify the
Applicant for the original loss , is to return the Applicant’s property to its
previous position, prior to the insured event.
30. In this regard, I note from the report provided by the FSP’s expert, “ C ” , that
they estimated a total of 1.6mm of the floorboard had been removed due to
the additional sanding.
31. I accept the Applicant’s argument , that at the very least, he has suffered a
loss of 1.6mm of the floorboards.
32. Having made that finding, it is necessary for me to consider a number of
matters;
What, if any, compensation is the Applicant entitled to for the loss of
1.6mm, in the height of the Applicant’s floorboards.
Whether there is any other loss or damage which must be rectified
under the terms of the policy and what if any obligations does the FSP
have in that regard.
33. In order to make a decision regarding these issues, it is necessary to
consider the expert reports which have been submitted.
Case No: 294771 Determination Page 5 of 8
34. I intend to confine myself to the expert reports, rather than various
interpretations of those reports or alternate views that have not been
supported by appropriate written expert confirmation.
35. The FSP has provided a report from Building Services Company, C, dated
13 August 2012. The following points are relevant from that report:
The process of sanding the floor prior to resealing is designed to
remove the original sealants only. During this process, very little of the
actual timber floorboard is lost due to sanding.
Based on the above information, C estimated a total of 1.6mm of the
floorboard has been removed due to the additional sanding.
The nature of the hardwood tongue and groove timber boards once
laid, is that when the tongue is fitted into the adjoining groove, it offers
continuous spanned support over the entire length of the boards. This
allows the board to remain structurally sound after numerous sandings
which reduces the overall thickness of the board.
It is C’s experience and opinion that the additional sanding of the floor
has not reduced the usable lifespan of the floorboards. If the normal
recommended maintenance and cleaning of the floorboards is carried
out, a light sand should be completed and resealing can occur every 5
to 6 years.
36. I have difficulty reconciling a number of the matters raised within this report.
37. On the one hand, C estimates that a total of 1.6mm of the floorboard has
been removed due to the additional sanding. However, on the other hand, C
concludes that the usable lifespan of the floorboards has not been reduced.
38. Given that there is only a certain distance between the top of the board and
the tongue and groove and given C’s estimate of 1.6mm of the board being
removed, this would suggest that the remaining board is reduced.
39. I note that C says that the process of sanding is designed to remove the
original sealants only, but clearly this was not achieved in the two sandings,
because C concedes that 1.6mm of the floorboard was removed, during the
course of the additional sanding.
40. The Applicant has provided a report from a timber consultant, “ FC ” and the
report is dated the 24 June 2013.
41. Whilst the report is comprehensive, I am not satisfied that it is complete and
in fact, it does appear to leave a number of questions unanswered.
42. In this respect, the report says that most edges of the floorboards were tight
together but there were some gaps. Further, most floorboards were flat
Case No: 294771 Determination Page 6 of 8
although there was some cupping. And finally, in some instances there was
some difference in height between the edges of the adjacent floorboards.
43. Unfortunately, the author of the report does not definitively say what causes
these apparent anomalies. However, on each occasion the author refers to
the anomaly occurring within the kitchen or near the fridge.
44. In those circumstances, I think it is reasonable to assume that the anomalies
referred to arise from the original water leaking event and the sanding efforts
were an effort to rectify any problems.
45. Further, within the report from FC, there is reference to the fact that shortly
after the second additional sanding, the home owner’s had noticed that
some floorboards had cupped, however, the cupping had not noticeably
changed in around 10 months, leading up to FC’s inspection.
46. FC explains that when the floorboards had been sanded to remove the
cupping, there was still a difference in moisture content between the top and
bottom surfaces and that since there had been no change in around 10
months, the floors were now in a position to be sanded flat and recoated,
with a minimal risk of cupping.
47. The most significant point I take from the report of FC, is that nowhere does
the consultant suggest that the floorboards need to be replaced. Indeed, the
consultant suggests that sanding and re-coating would remove any cupping
and any slight difference in height between the edges of the floorboards. To
this can be added FC’s recommendation, that the gaps between floorboards
can be removed with appropriate filler.
48. In my view, there is no expert report to support the Applicant’s request for
the floor boards to be replaced and I do not think the FSP should be required
to replace the floorboards.
49. Unfortunately, FC does not say what area of floorboards should be re-
sanded and re-coated.
50. FC says that he inspected the floors in the kitchen, lounge/dining room and
the formal lounge/dining room.
51. The more noticeable gaps were noted in the kitchen, next to the fridge. A few
floorboards in the kitchen next to the microwave oven were slightly chipped.
There were also some instances of a slight difference in height between the
edges of adjacent floorboards and the area that appeared to be more
noticeably affected was in the kitchen, in front of the island bench.
52. The Applicant says that following the insured event, the rectification work
involved sanding the entire top level. The FSP does not dispute this, but FC
does not say if it is necessary to re-sand and re-coat the entire top level.
53. However, given that the original rectification involved the entire top level and
with a view to achieving consistency over the whole area of the floor, I am
Case No: 294771 Determination Page 7 of 8
satisfied that the re-sanding and re-coating should be of the entire top level
of the home.
54. On the other hand, I am not satisfied that the evidence presented supports a
position that the FSP should do more than arrange for the refilling of the
gaps in the area of the original damage, not the entire top level.
55. Consistent with the report of FC, I determine that the FSP is to arrange for a
suitably qualified flooring expert to attend the Applicant’s home , with a view
to preparing a scope of works which includes re-sanding and re-sealing of
the entire top level floor of the home, together with the application of
appropriate filler, to remove any gaps within the floorboards in the area of
the original damage.
56. Upon receipt of the scope of works, the FSP is to cash settle the Applicant
for the amount contained within the scope of works and given that it will be a
current scope of works, I am not satisfied that it is appropriate that any
allowance for interest, should be made on that amount.
57. In addition, I am satisfied that as a result of the additional sanding which has
taken place following the original attempt to rectify any problem arising from
the water leak, that the potential life of the floorboards has been reduced.
58. In this regard and unfortunately, FC has not provided a definitive statement
in respect to this concern.
59. The conclusion of FC is that “...the edge of the floorboard may be weakened
and become splintery.”
60. On the other hand, C claims that in their experience, the additional sanding
of the floor has not reduced the useable lifespan of the floorboards.
However, as I have said, this does not appear to be consistent with the
earlier statement, to the effect that 1.6mm of the floorboard, has been
removed due to additional sanding.
61. Having considered both reports and the submissions of the parties, I am
satisfied that it is fair in the all the circumstances to pay the Applicant an
additional sum of $3,000, in addition to the amount applicable to the scope of
works referred to above.
62. I determine that the payment of the above mentioned amounts is subject to
the Applicant’s acceptance of this Determination .
Determination
63. I determine that the FSP is to arrange for a current scope of works in
accordance with paragraph 55 above and that the FSP is to cash settle the
Applicant for the amount detailed in the scope of works.
64. I determine that it is not appropriate that interest is payable in this matter.
Case No: 294771 Determination Page 8 of 8
65. Finally, I determine that the FSP is to pay the Applicant the sum of $3,000,
as a result of the loss arising from the additional sanding.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.