Home / Financial Firm (Unknown - Insurer) / Determination 294266
Determination 294266
Structural damage claim from bath overflow declined
Summary
The applicant claimed structural damage to his home from a May 2005 bath overflow, which the FSP declined as caused by long-term foundation movement. AFCA found the applicant had not established on the balance of probabilities that the damage arose from an insured event.
The insured bears the onus of proving loss from an insured event, and the weight of engineering evidence showed the structural damage was ongoing and unrelated to the 2005 overflow.
Subjects and remedies
home or building damageno remedy
Text of the determination
Case No: 294266 Determination Page 1 of 6
Case number: 294266
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim
29 April 2013
Background
1. The Applicant held a home insurance policy with the FSP commencing on 30
September 2004 that insured the home building for the sum of $155,600 and
contents for the sum of $28,100 with a nil excess.
2. On or about 18 May 2005, the Applicant contacted the FSP to lodge a claim
for damage to their property that occurred on or about 18 May 2005 with the
F SP recording the following: “water damage to carpet and floors from
overflow”. According to the Applicant, the house was damaged when his
youngest son‟s bath overflowed for a number of hours. Later that night he
heard a loud bang with the house shuddering and observed tracks around
the kitchen, lounge and in the bricks of the house.
3. The FSP accepted liability with respect to damage to carpets and floors but
following investigation of the claim determined that the structural damage
sustained was not consistent with the overflow of the bath.
4. The FSP declined the Applicant‟s claim with respect to the structural damage
based on an engineer‟s report to the effect that the damage was due to long
term foundation movement.
5. On or about 13 July 2012, the Applicant again contacted the FSP with
respect to the worsening cracking of the Applicant‟s home. Following
investigation of the additional cracking, the FSP received an engineer‟s
report to the effect that the damages were not related to the bath overflow of
2005 and maintained the decline of the claim.
6. The Applicant has disputed the FSP‟s decision and maintains the damage
sustained on or about 18 May 2005 has led to structural damage to the
property.
Determination
Case No: 294266 Determination Page 2 of 6
Summary of Applicant’s position
7. On 18 May, 2005, the Applica nt‟s son allowed the bath to overflow for a few
hours. That same night the Applicant heard a „loud bang‟ and describes the
house shuddering, cracks forming in the kitchen, lounge, bricks at ground
level and the bedroom doors not opening properly and latches not lining up.
The garage also formed big cracks in the floor.
8. The emergency overflow draining plate had been covered up with new floor
tiles and the water pipe to release the overflow bath water to the outside
brickwork had been totally removed.
9. The Applicant relies upon a report from RK an architect/builder following
inspection of the property on 22 July 2005 to support his claim. The report
concluded that based on the visible telltale defects through the residence
recent occurrence, it is reasonable to interpret that the overflowing bathwater
had been the primary catalyst that caused the damage and adversely
affected the amenity of the dwelling.
10. The Applicant also provided an email from JJ, a retired plumber of 52 years
standing. This email is dated 8 March 2013 and follows a request by the
Applicant for an opinion from JJ as to the damage to his home. JJ formed a
view that the cracking and subsidence to the garage and laundry area could
have been caused by water under the slab and it may have been caused by
an overflowing bath as the floor had no dry floor waste in it. He did not
believe the damage was due to tree roots as the floor had subsided and not
been pushed up.
11. The Applicant has advised that since the original plan, he has put in a 3,000
litre rainwater tank due to the lack of rain in the area. Water is allowed to
discharge on to the ground.
12. Insofar as trees and vegetation at the front of the property, the Applicant
denies the FSP‟s allegation and maintains a large tree at the front has been
significantly pruned and is to be removed.
Summary of FSP’s position
13. The relevant policy terms and conditions are:
The Member submits the policy clearly excludes any type of earth movement
within its terms and conditions:
We do NOT cover loss or damage caused by or as a result of erosion,
vibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage
or any other earth movement but we will cover the following Insured
Events and Optional covers:
✓ Explosion (Insured Event 2)
Case No: 294266 Determination Page 3 of 6
✓ Earthquake (Insured Event 5)
✓ Bursting, leaking, discharging or overflowing (Insured Event 7)
✓ Flash flood and rainwater run-off (Insured Event 6(b))
✓ Flood (if you have chosen and are covered by Option 3)
✓ items insured under Personal effects (if you have chosen and are
covered by Option 2).”
14. The FSP relied upon an engineering report from L dated 7 July 2005 in
which he formed the opinion that the building had not been damaged
structurally as a result of the bath overflowing. L considered the defects
nominated by the Applicant to be pre-existing and not related to or caused
by the effects of the bath overflowing.
15. The FSP obtained a second report dated 29 November 2005 in response to
the Applicant‟s report from RK. L maintains that the main floor‟s slab had
been cast on fill and this had been settling over a long period of time. In the
event that the soil was saturated, L commented that the drying of clay takes
some time and is never instantaneous. He did not accept that there would be
any significant shrinkage of the clay under the slab within the period of two
weeks as claimed by the Applicant. He maintains the damage was due to
long term settlement of a poorly compacted film material which could well
cause the subsidence and damage which occurred. He did not consider the
damage to be recent.
16. More recently the FSP obtained an engineer‟s report from C dated 22
September 2012.
17. C noted that the Applicant advised that there had been no new damage to
the residence since 2005 although the cracks had since enlarged. Following
inspection of the internal and external areas of the property, C noted that
minor cracking was evident to various sections of the concrete with evidence
of previous repairs.
18. He considered the drainage system was defective in preventing water
ingress permeating the soils causing the soils to react by swelling and
shrinking due to the variance in moisture. The situation was worsening with
the presence of a number of defective/broken down pipes which dispersed
stormwater directly onto the ground, a view he supported by photographs
and the presence of a number of tall trees and vegetation on the insured‟s
and neighbouring property.
19. Although conceding he did not have a geotechnical report, C considered that
the foundation soil under the building was of a reactive nature with soil
underneath the footings having the potential to shrink and swell under
varying moisture conditions. He concluded that the damage observed
following the inspections appeared as a result of foundation settlement.
Although a number of factors could locally influence the foundation ‟ s
Case No: 294266 Determination Page 4 of 6
settlement at various locations throughout the property, C concluded that the
underlying cause of the foundation settlement is related to the presence of
reactive soils with high potential to shrink/swell under varying moisture
conditions. In addition to the primary cause, C considered other external
factors influence the soil moisture conditions including:
inadequate compaction of film material;
ineffective external drainage;
absence of controlled joints (for the garage).
20. C considered it would be very difficult for the water from an overflow bath to
find a path to reach the foundation of the residence and cause the damage
sustained. He considered the damages sustained to the insured residence to
be unrelated to the event of overflowed bath in 2005.
Issue
21. Whether the FSP was entitled to decline the Applicant‟s claim for structural
damage.
Reasons for decision
22. There has been an exchange of material between each party, and I am
satisfied each party has had an opportunity to reply to the issues raised.
23. Due to the nature of the dispute, the FOS has considered it appropriate to
expedite the dispute in accordance with the Operational Guidelines to the
FOS Terms of Reference. Thus, this dispute has not been the subject of a
FOS Recommendation and has proceeded directly to Determination. The
parties have been previously advised that a Determination will be issued in
this case.
24. It is an accepted principle of insurance law that the onus rests with an
insured to prove, upon the balance of probabilities, that they have sustained
a loss caused by an event insured for under the policy in force at the date of
loss [ Regina Fur Co. Ltd v Bossom (1957) 2 Lloyd’s Rep 466]
25. There is no dispute that the Applicant‟s property was damaged due to water
overflowing from the bath. Under the terms of the policy, the policy covers as
an insured event, the bursting, leaking, discharging or overflowing of water
or liq uids at an insured address from “.... baths, sinks, toilets or basin”. The
FSP acknowledges that an insured event occurred and in fact accepted
liability with respect to the repair of the carpets and some of the internal
damage. The issue in this dispute is whether the Applicant can establish a
prima facie claim under the terms of the policy with respect to the insured
event leading to the foundation damage.
Case No: 294266 Determination Page 5 of 6
26. I have had the opportunity of reviewing the various reports provided. Whilst
RK maintains there were cracks in the concrete slab (albeit hairline cracks),
L notes that at the time of inspection, they did not record the presence of
cracks of any significance.
27. Significantly, RK considered that the ground under the slab had softened
and failed and that the foundation material was able to dry out within two
weeks causing the shrinkage of the soils. The combined bearing failure and
shrinkage caused the problems according to RK. L on the other hand
maintains the drying of clay takes some time and is never insta ntaneous and
did not accept that the significant shrinkage of the clay under the slab could
take place over a two week period.
28. I note from the initial report of L of 7 July 2005, that they formed the view that
the cracks in the brickwork and generally thro ughout the internal linings of
the house were attributable to seasonal movements of the footing
inadequate to withstand the current prolonged dry subs urface conditions
being experienced in South East Queensland. There is no comment as to
whether they observed dampness in the subfloor area or whether it had
dried out by the time of the inspection.
29. The more recent information exchanged is from JJ, the retired plumber. JJ
states that the damage may have been caused by an overflowing bath on
the floor above as it had no dry floor waste in it. Such a statement is not
particularly conclusive in relation to the connection between the bathwater
overflowing and the foundation settlement.
30. C‟s report was provided sometime after the initial event. C‟s report however
is most detailed. C reports on observing cracking that had reappeared at the
same locations of previous repairs suggesting that the cracking and
settlement of the property had been ongoing. C also referred to the defective
drainage system and broken down pipes as being a further source of
possible water inundation. Significantly C considered that water from an
overflowed bath would have difficulty reaching the foundation of the property.
C also considered the trees and vegetation on both the Applicant and
neighbouring properties would affect the moisture count of the soils. C also
considered the inadequate compaction of the fill material and the absence of
controlled joints in the garage as being responsible for damage.
31. I have considered the evidence as a whole in this matter. In my view the
weight of the evidence supports the findings of the FSP‟s engineers that
most likely the structural damage to the Applicant‟s property was continuing
and cannot be related to the event of 18 May 2005. Whilst I am satisfied
there is structural damage to the property, I am not satisfied that the
evidence presented by the Applicant when considered alongside the
evidence presented by the FSP is sufficient to establish on the balance of
probabilities that the damage sustained to the property was due to the
claimed event of 18 May 2005. In the circumstances I am not satisfied that
the Applicant has met the onus of proof to establish on the balance of
probabilities that the damage arose as a result of an insured event under the
terms of the policy.
Case No: 294266 Determination Page 6 of 6
Determination
32. On the basis of the available information I determine the FSP was entitled to
decline the Applicant‟s claim for structural damage.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.