Home / Financial Firm (Unknown - Insurer) / Determination 294251
Determination 294251
Denial of claim - earth movement and flood exclusions; settlement amount
Summary
The applicants' home was affected by stormwater and flood in January 2011 and the FSP offered $22,000 to settle a claim for $29,863.68 in repairs. AFCA found most damage was caused by earth movement, excluded under the policy, and determined the FSP's liability was limited to the $22,000 offer, plus interest.
Where concurrent causes include an excluded cause, the exclusion is dominant under the Wayne Tank principle, and only the insured stormwater damage was payable.
Issues
- Claim denial primary · not upheld
“the Panel is persuaded that the other building damage was caused by earth movement... the policy excludes damage caused by flood and damage caused by earth movement.”
- Claim amount dispute secondary · not upheld
“the Panel is of the opinion the FSP's offer of $22,000 is fair and reasonable and represents the FSP's liability for the claim.”
Subjects and remedies
home or building damagenatural disasterpay claimpay interest
Text of the determination
Case No: 294251 Determination Page 1 of 7
Case number: 294251
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim
10 January 2012
Background
1. On about 14 January 2011 the Applicants‟ property was inundated by water
following several days of heavy rainfall in the area.
2. A claim under the Applicants ‟ personal insurance policy for damage caused
by storm water to the building was accepted by the Financial Services
Provider (FSP). The FSP appointed an engineer to establish the extent of
damage c aused by the stormwater. Based on the engineer‟s report the FSP
offered settlement of the claim by cash payment in the sum of $22,000 to the
Applicants.
3. The Applicants refused the FSP‟s offer and contend the offer will not restore
the home to the condition it was in prior to the loss.
Summary of Applicants ’ position
4. The FSP acknowledged the damage to their home was caused by
stormwater. It offered to monitor the home for damage over a 12-18 month
period, then make cosmetic repairs to the north east corner of the house.
The FSP also said it would return the home to its pre-loss condition.
5. Cosmetic repairs will not repair the damage. The chimney has cracked and
is leaning which in turn has cracked a nd moved the cement veranda. This
has opened up the corner of the spouting. The chimney has also pulled the
hearth away from the floorboards. Door frames have moved and there are
cracks in the walls. There has been some stump movement which has
contributed to the plaster cracking.
6. None of this damage was evident prior to the event.
7. The amount they have been offered will not repair the property to its pre
„event‟ condition.
Determination
Case No: 294251 Determination Page 2 of 7
Summary of FSP’s position
8. The stormwater did not directly cause the cracking since the house was
raised by stumps to a level of about 500mm and water only inundated the
property above floor level to 150mm. It did however cause the house to shift
over a period of time resulting in movement related damage.
9. The FSP relies substantially on an engineer‟s report “F” which concluded the
event did not cause the damage to the house or to the external concrete
veranda.
10. Engineer “M” concluded the damage was not structurally significant.
11. The damage is excluded under the policy for the following reasons:
the damage was caused by earth movement or subsidence and/or
was caused by structural defect, faulty design or faulty workmanship
and/or
has at least two proximate causes one of which is excluded under the
terms of the policy.
12. Where damage is caused by two or more proximate causes and one of
those causes is excluded from the policy an insurer is not liable for whole of
the loss. Wayne Tank and Pump Co Ltd v Employers Liability Insurance
Corp Ltd [1974] QB 57 (the Wayne Tank principle).
13. At its highest the building distress was caused by earth movement with a
small contribution from flooding. Engineer F stated the flooding would not
have contributed significantly to the building distress but may have made a
small contribution.
14. Even if it could be demonstrated the distress also had a cause covered by
the policy, the Wayne Tank principle means that the whole of the loss is
excluded.
15. Even accepting stormwater was a proximate cause of damage to the
footings it is not possible to separate out the damage caused by stormwater
from flood water.
16. The property is located only a short distance from the river and the
inundation reached 650mm above ground level which could not have been
comprised of stormwater only.
17. The Applicants have not provided hydrological evidence to contest this
argument.
18. The FSP relies on the following policy terms:
“ Words with special meaning
“Flood” means the inundation of normally dry land by water escaping, or
being released fro, the normal confines of a reservoir, natural watercourse or
lake, (whether or not they have been altered or modified). Flood also includes
Case No: 294251 Determination Page 3 of 7
water discharge from any sewerage or waste water systems due to pressure
induced by flood water,
...
What you are not insured for
Under Section A - Home Cover we will not pay for;
...
2 Loss or damage to your property caused by:
a. Flood, ...
b. earth movement, vibration, erosion, landslide or subsidence
(exc ept when caused by earthquake).”
Issue
19. Whether the FSP‟s offer of $22,000 to settle the claim is fair in all the
circumstances.
Reasons for decision
20. Due to the complex nature of this dispute, FOS has considered it appropriate
to expedite the dispute in accordance with the Operational Guidelines to the
FOS Terms of Reference. The dispute has not been the subject of a FOS
Recommendation and has proceeded direct to Determination.
21. The decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in the insurance industry and a
representative with extensive experience in consumer claims .
22. There has been an exchange of material between the parties. Each party
therefore is aware of the issues and has had the opportunity to respond.
23. Prior to arriving at a determination the Panel has read and considered all the
material submitted by the parties.
24. The Panel has been provided with a number of expert's reports. As the
documents have been exchanged it is not proposed to repeat the detail in
full in this determination. However, the Panel will refer to those elements of
the reports which are relevant.
25. Structural engineer M - inspection report dated 8 June 2011
Drainage waters accumulated around and under floors over a three day
period of incessant heavy rain in early January 2011.
Wetting of ground under the house and parts of the lower floor framing
timbers resulted in movement of the building frames and damaged to
attached fittings.
Case No: 294251 Determination Page 4 of 7
Minor cracking of internal plaster linings and loss of tiles from the
splash backs with the bathroom and movement of floors relative to
hearths of both fire places are consistent with swelling of reactive clays
common in the area combined with movements due to swelling of the
subfloor timber frames with moisture uptake.
Failure of the ceiling plaster on the western side of the living room is
due to excessive roof water overtopping the eaves guttering entering
the ceiling space.
Sections of the gutters along the eastern and western sides require
replacement due to failure of fixings due to the amount of heavy rain
over short periods.
26. Engineer F - report dated 3 October 2011
The report provided a scope of works for reinstatement works required
to reinstate the house to condition it was in prior to the storm/flood
event.
The reports recommended appointment of a surveyor to carry out
building movement surveys which were expected to take 12 to 24
months for the soil moisture to stabilise.
The report listed the following internal cosmetic repairs:
Repair wall and ceiling cracks
Repair distressed ceiling cornices.
Repair cracking/ movement in window and door frames.
Repair gap between chimney and timber floor.
Check correct operation of all doors.
Repair affected areas to match existing.
27. By letter dated 12 October 2011 the FSP informed the Applicants that as the
damage was due to earth movement the claim was not accepted. However,
the letter went on to state that the property suffered internal damage as a
result of internal water inundation and that it would cover the following:
Sanding and resealing the tongue and groove flooring in the rear of the
house.
Reinstate the MDF skirting boards in the rear of the house.
28. Engineer F - report dated 14 February 2012
The actual extent of the inundation caused by stormwater runoff was
not known. An assumption was made for the maximum depth of
stormwater to have reached below the underside of the timber floor
members.
Rainfall data confirmed about 180mm of rain fell in Charlton between
10 and 14 January 2011. The highest dally rainfall was 84mm on 14
January 2011.
Case No: 294251 Determination Page 5 of 7
The owner advised that a large volume of water flowed into the subfloor
of the house and was concerned it may have caused movement of the
foundations.
The flood water did not inundate the house internally.
The event did not cause the damage to the house or eternal concrete
veranda. It was possible the event contributed slightly to the distress in
the NE corner of the house (kitchen). The distress in this area
appeared to be the most recent distress.
Damage to the concrete veranda predated the event and the event did
not contribute to the damage.
29. The Applicants submitted a contractor‟s quotation dated 20 January 2012 in
the sum of $29,863.68 to rectify damage to the kitchen, hallway, veranda
and chimney.
30. By letter dated 15 March 2012 the FSP ‟s loss adjuster offered the Applicants
$20,000 towards the cost of repairs. The Applicants refused the offer and by
letter dated 19 June 2012 the loss adjuster increased the offer to $22,000.
Summary
31. When making a claim under an insurance policy the responsibility rests with
the policyholder to establish on the balance of probabilities that the loss
claimed falls within the cover provided by the policy. An FSP seeking to rely
on a clause in the policy to deny the claim has the burden of establishing on
the balance of probabilities that the terms of the relevant clause apply to
defeat the claim.
Source of inundation
32. In circumstances where more than one concurrent cause has been
established as responsible for damage and one concurrent cause is covered
by the policy and the other is excluded, it is established law that the clause
excluding the cover is dominant and the claim fails (Wayne Tank principle).
33. The Panel had gained considerable experience in disputes involving
inundation of homes in Charlton by water in January 2011 and has visited
the area on several occasions.
34. In the Panel‟s experience many homes in the area were initially inundated by
stormwater runoff before water which overtopped the Avoca River mixed
with the surface runoff rainwater. Accordingly inundation occurring in these
circumstances is the result of consecutive events.
35. When this occurs damage caused by the initial inundation from stormwater
runoff falls within the cover provided by the policy. A combination of water
from the Avoca River and surface runoff rainwater is considered flood water.
When the policy excludes damage by flood, then damage arising from
combined runoff and river water is not covered.
Case No: 294251 Determination Page 6 of 7
36. No hydrological evidence has been provided to determine the source of the
water which inundated the Applicants‟ property.
37. According to the evidence rain fell between about the 10 and 14 January
2011. The Panel is aware water overtopped the Avoca River in Charlton at
about 5.15 pm. The Applicants advised FOS their property is located about
8/9 kilometres east of Charlton and is some distance from the Avoca River.
The Applicants also advised FOS the water reached the level of their
veranda at about 5.00pm. Given the delay in river water reaching outer
areas of Charlton, it is reasonable to conclude any water from the Avoca
River would not have influenced the water on the Applicants ‟ property until
sometime after 6.00pm.
38. Further according to engineer M water had accumulated under the house
over a three day period.
39. In the absence of any acceptable evidence to the contrary the Panel accepts
on balance tha t surface runoff rainwater initially inundated the Applicants‟
property prior to the arrival of flood water and as such contributed to any
damage arising from the presence of water on the property.
Expert evidence
40. The evidence has established to the Panel‟s satisfaction that damage to the
interior ceiling of the living room and eave gutters was due to the ingress of
stormwater from the roof when the eave gutters were unable to cope with the
intense rainfall. (M report 8/6/11).
41. The Panel notes the FSP accepted the cost of sanding the flooring and
replacing the skirting boards in the rear of the home.
42. The Panel is persuaded that the other building damage was caused by earth
movement. The report by F dated 14 February 2012 following a floor level
survey observed heave up to about + 60mm was occurring in the NE section
of the kitchen. There was a fall of about 20mm to 60mm towards the central
region of the house. F considered this movement was common for a stump
footing system and was caused by long term drying of the sub floor soils.
43. F further reported the location and pattern of the pre-existing and recent wall
cracks was typical of distress caused by differential foundation movement in
the type of soil on which the building was founded.
44. F considered the flooding of the sub floor space had not contributed
significantly to the building distress. He did however consider it was possible
it made a small contribution to the NE corner of the house.
45. F went on to state that the dislodged (wedge shaped) concrete veranda
confirmed that earth movement had been occurring for a prolonged period of
time prior to the January inundation. In relation to the chimney he stated one
cycle of a possible slight wetting and drying of the chimney footings due to
Case No: 294251 Determination Page 7 of 7
the water ingress would not cause any significant permanent deformations of
the chimney footings.
46. The policy excludes damage caused by flood and damage caused by earth
movement.
47. Unfortunately, for the Applicants the evidence does not support a finding that
all the damage claimed by them was caused by the initial inundation of the
home on 14 January. In the Panel‟s opinion the evidence leads to the
conclusion the majority of damage claimed was caused by earth movement
with only a marginal impact caused by the initial inundation from surface
runoff rainwater with that restricted to the north-eastern corner (kitchen) of
the home
48. Based on the evidence, the Panel concludes the Applicants are entitled to
payment for the cost of repairing the ceiling in the living room and eave
gutters to the eastern and western sides of the home, and a contribution to
the cost of the kitchen damage. According to engineer F damage to the
kitchen consisted of plasterboard wall cracking in five locations (see 4.0 and
diagram).
49. The scope of works obtained by the Applicants involves substantial remedial
works including installation of new flooring in the kitchen, removal of flooring
in the hallway, replace stumps, repair cracking in walls and cornices, and
rectification of the chimney and concrete paving. This work was quoted in
the sum of $29,863.68.
50. Given the scope includes both insured damage and uninsured damage, the
Panel is of the opinion the FSP‟s offer of $22,000 is fair and reasonable and
represents the FSP‟s liability for the claim.
Determination
51. For these reasons the Panel determines the FSP‟s liability for the claim is
limited to $22,000.
52. The FSP is to pay interest on this sum in accordance with Section 57 of the
Insurance Contracts Act 1984 from 15 March 2012 being the date on which
the FSP offered partial settlement of the claim until the date of payment.