Home / Financial Firm (Unknown - Insurer) / Determination 294131

Determination 294131

Flood exclusion relied on to decline stormwater inundation claim at Charlton

FirmFinancial Firm (Unknown - Insurer)
Decided2013-02-13
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed$18,500
SourceAFCA PDF

Summary

The elderly applicants claimed for extensive damage to their Charlton home from January 2011 flooding, which the FSP declined as flood, an excluded event. The Panel found that stormwater inundated the property before river floodwaters arrived and ordered indemnity for building damage up to 150mm above ground, excluding the stumps, with interest on final settlement.

Water from a flood plain that is not a natural watercourse is stormwater, so the initial inundation is covered up to 150mm, but the applicants did not prove that stormwater alone damaged the stumps.

Issues

Subjects and remedies

elderly or capacityhome or building damagenatural disasterpay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 294131 Determination Page 1 of 12 Case number: 294131 General Insurance - Domestic Insurance - Home Building - FSP Decision – Flood - Denial of claim 10 January 2013 Background 1. The Applicants held a Home Building Insurance Policy with the Financial Services Provider (FSP). 2. The insured property in Charlton, Victoria sustained extensive damage arising from the significant weather events experienced in Charlton in January 2011. 3. The FSP rejected their claim on the basis the loss was caused by the excluded event „flood‟. 4. The Applicants remain dissatisfied with the FSP‟s decision and are seeking full payment of their claim. Summary of Applicants ’ position 5. The Applicants in disputing the FSP‟s decision to decline the claim have sought the assistance of legal representatives “M”. In the interest of brevity both the Applicants and M will be referred to as the “the Applicants” for the purpose of this determination. 6. The Applicants maintain:  The initial damage to the property was due to stormwater run-off inundation arising from the significant rainfall in the area over the period 10 January – 14 January 2011.  The Applicants maintain that they are elderly and were evacuated from their home prior to the inundation event occurring; therefore they are not in a position to advise when the water began to inundate the property.  The Applicants‟ daughter (supported by a statutory declaration) refutes the assessor‟s (KB of loss adjusters‟ C) report that he was advised by the Applicants that water entered their home above floor level at 7.00pm on 14 January 2011. She maintains that she was present at the time KB spoke to the Applicants and the information disclosed was that Determination Case No: 294131 Determination Page 2 of 12 the home was unoccupied and that the neighbour‟s home was waist deep in water at 7.00pm.  The Applicants rely upon the evidence made available by their preferred consultant „PM‟ in his hydrology report dated November 2011. They submit that the initial inundation of the property occurred from water escaping the stormwater drain in close vicinity to the property. Further, the Applicants dispute the FSP‟s reference to the drain as being a watercourse/channel and maintain that it cannot be classified as anything other than a stormwater drain.  The Applicants do not dispute the Avoca River subsequently broke its banks. However, they maintain that the initial inundation of the property was due to stormwater run-off prior to the arrival of floodwaters.  The FSP bears the onus to establish the application of the exclusion it seeks to rely upon in declining the claim, which they do not believe it has successfully established through its submissions to the Service.  The reports, including loss adjusters C and hydrologists‟ “F” commissioned by the FSP, are not sufficiently specific to the Applicants‟ circumstances. Further, t he loss assessor KB may not be adequately qualified to provide an opinion on the cause for the water damage.  The concrete stumps were washed out by the force of the water. The house requires 92 stumps to be replaced and raised to meet new council regulations at a cost of $18,500. This is in addition to extensive damage inside their home.  The Applicants are seeking indemnity for their complete loss arising from stormwater inundation of their home which is covered under the policy. Summary of FSP’s position 7. The FSP maintains:  The policy is a “Defined Events” contract of insurance which includes „Storm and rainwater‟ as one of the listed defined events. However, it excludes from cover under all sections loss arising from the event flood.  The time of inundation (7.00pm on 14 January) provided to the loss adjusters earlier in the claim should be preferred as this would be the most dependable, at least to the extent that it represents the most contemporaneous recorded version of the event, provided only some 14 days after the event.  PM‟s report provides the Avoca River reached major flood levels at 5.15pm on 14 January 2011, which further confirms inundation occurring at around 7.00pm would be due to floodwater. Case No: 294131 Determination Page 3 of 12  F concluded that all rainfall in the area ceased by 8.00am on 14 January 2011, therefore inundation of the property later in the day was not the result of direct rainfall.  F‟s hydrology report specifically addresses the cause of water inundation at the insured property. An analysis of the local catchment area, rainfall durations, rainfall volumes and intensity levels in the area concludes that levels of stormwater runoff experienced in January 2011 were likely to have been experienced at the insured property at least every two years.  In line with the available information and the policy, the FSP maintains the culvert type drain in the vicinity of the Applicants‟ property is properly characterised as a stormwater channel. Water which has escaped or overflowed from, been unable to enter, or has been prevented from entering the stormwater channel is floodwater, independent of any contribution from the Avoca River (the River).  So, in line with the Applicants‟ submission that the water responsible for the inundation of their property came from this stormwater channel, the FSP is entitled to decline indemnity for the loss or damage on the basis it was due to the event flood, which is specifically excluded from cover.  The floor level of the home is built at a significantly higher level (approximately 700-800mm) than surrounding ground levels, with the surrounding ground levels appearing to be higher than street level.  The FSP does not accept that there is any evidence available to establish, on the balance of probabilities, that the insured building was inundated by stormwater run-off prior to the arrival of floodwaters directly from the River.  The FSP maintains that KB does hold adequate qualifications to provide his opinion in respect to the cause of the water damage.  In the event, it is accepted that stormwater did pool, overflow or couldn‟t escape through the stormwater drainage system, this would have mixed with floodwaters and trigger the “Wayne Tank Principle”. 8. The FSP relies on the following policy provisions: ““ Home Building Insurance Policy What we cover – insured events You are covered for damage or loss to your home building occurring during the period of cover and caused by the following events: Yes Storm and rainwater including stormwater runoff from areas surrounding the site, or water escaping from any water main, drain, pipe, street gutter, guttering or surface. No Damage or loss caused by flood . Flood means the inundation or covering of normally dry land by water which: Case No: 294131 Determination Page 4 of 12 escapes or overflows from, or cannot enter, because it is full or has overflowed, or is prevented from entering, because other water has already escaped or been released from it, the normal confines of any watercourse or lake, including any that may have been modified by human intervention, or reservoir, canal, dam or stormwater channel. … What we do not cover – general exclusions You are not covered under any section of the policy for damage, loss, cost or liability caused by or arising from or involving: flood, …” Issues 9. Whether damage to the Applicants‟ property was caused by flood water as defined by the policy. 10. Whether the FSP was entitled to decline indemnity to the Applicants under the policy. Reasons for decision 11. As advised to the parties, FOS has considered it appropriate to refer this dispute direct to the Panel in accordance with the Operational Guidelines to the FOS Terms of Reference. This is because of the complex nature of the issues. This dispute has not been the subject of a FOS Recomme ndation and has proceeded directly to Determination. 12. The decision has been made by a Panel consisting of an Ombudsman, a representative with extensive experience in insurance matters and a representative with extensive experience in consumer claims. 13. There has been an exchange of material between the parties. Each party therefore is aware of the issues and has had the opportunity to comment. 14. Prior to arriving at a determination the Panel has read and considered all the material submitted by the parties to FOS. 15. The Panel is satisfied the parties do not dispute the following:  The Applicants held an active home building insurance policy with the FSP at the time of loss. Case No: 294131 Determination Page 5 of 12  The FSP provided and the Applicants received the relevant policy documentation including the Product Disclosure Statement (PDS) and Certificate of Insurance.  The insured property suffered extensive damage due to water inundation arising from the significant weather events experienced in the area during January 2011.  The policy excludes from cover loss or damage arising from flood however does provide indemnity for damage arising from stormwater/rainwater inundation. 16. As there has been an exchange of material between the parties each having had the opportunity to comment it is not intended to recite all details of the various hydrological reports in this determination. In the interest of brevity only details found relevant in providing this determination have been summarised below as follows: C’s Loss Assessment Report dated 17 February 2011  An inspection was undertaken on 28 January 2011.  The property is 1.5km from the Avoca River, with the policy limited to building cover only.  There was no clear indication as to the time of inundation as the Applicants were elderly and their daughters were not present.  Areas to the rear of the home were found to be damaged i.e. fencing and this would indicate that the water flow came from the rear of the property.  There was evidence of severe damage to the building with peak inundation levels within the home noted at around 0.7m. The dwelling is on stumps with the floor level approximately 600mm above ground level.  The Applicants confirmed inundation of the home occurred at 7.00pm on 14 January.  There may well have been contributing factors in respect to the flooding of the property however from C‟s inspection of the premises it would be impossible to separate these factors. PM’s Charlton Floods - January 2011 dated 3 November 2011  The town of Charlton experienced heavy rainfall between 10 January- 14 January, with extensive flooding in the area from the Avoca River from 14 January onwards.  Total rainfall over this period was recorded at 168.6mm with 66.2mm falling between 9.00am on 13 January and 9.00am on 14 January.  The highest intensity rainfall recorded was 15mm/hr between 7.00am- 8.00am on 13 January. There was no rainfall recorded after 8.00am on 14 January. Case No: 294131 Determination Page 6 of 12  Although rainfall intensity is reported on an hourly basis, PM maintains that the rainfall periods at Charlton were highly conce ntrated in short duration bursts e.g. 10 to 12 minute intervals. Accordingly, if calculated on this basis it would represent 20-50 year ARI rainfall events as opposed to 1-2 year ARI events (based on hourly intervals).  Accordingly, overflow from local drainage systems and culverts was highly likely as these systems are only designed to cope with 2-5 year ARI rainfall events.  Time of overflow would have to correspond closely with the timing of the intense rainfall periods and based on this the first stormwater drainage overflow event would have occurred at around 7.00am on 13 January.  There are two possible sources of rainwater run-off in Charlton, run-off which does not enter the stormwater drainage system and second run- off from surrounding rural areas.  All rainfall that fell on 13 January and 14 January would have become saturated overland flow and followed natural drainage lines into Charlton. This would have led to the inundation of Charlton on these dates prior to the arrival of floodwaters from the Avoca River.  Floodwaters from the Avoca River would be of high sediment loads (muddy/mucky) and would not be clear. Clear water inundation would support that prior to the arrival of floodwaters from the Avoca River there was water sourced from local stormwater.  Depending on the exact locations of the properties, they will have begun to have been inundated from floodwater sometime on the afternoon or early evening 14 January. Any inundation before this time would be from runoff particularly corresponding to times when heavy rainfall were occurring (13 January and early morning 14 January).  Evidence in respect of water inundation of properties which occurred particularly before 5.00pm on 14 January should be taken into account. PM’s additional report dated March 2012  Site visit (Charlton) undertaken on 2 -3 March 2012, with interviews also carried out with the homeowners.  A survey revealed that the stormwater drainage system empties directly into the Avoca River close to the Calder Highway Bridge. The implication of this being as river levels rose in the Avoca River the stormwater outlet would have been inundated with river water. This would result in the drains being backfilled to capacity preventing stormwater on the surface from draining away.  A survey revealed that the upper height of the stormwater outlet pipe is 4.6m (relative to the river height records). This water level was reached early in the morning on 13 January [2011]. From this point on the stormwater drainage system in Charlton would not be able to drain away freely. Stormwater accumulation therefore becomes an issue in Charlton from mid-morning on 13 January. Case No: 294131 Determination Page 7 of 12  Survey reveals that the eastern side of Charlton has a significant depression and occupies lower land than the western side of Charlton. The town slopes towards the north i.e. Armstrong Street is 35cm higher at the junction with Donald Street compared to High Street side, and Wilson Street is 45cm higher at the junction with Watson Street compared to High Street end.  Therefore, water moves through the town (high to low) until it is impeded by the train tracks that run parallel to Davies Street. Both topographical survey and new modelling indicate that property in the east of Charlton, especially those close to High Street were inundated by locally accumulating stormwater which followed a drainage line independent of any watercourses close to Charlton.  The witness accounts provide varied evidence in respect to the arrival of sediment laden water flows associated with the rapid rise in water levels. The likely explanation for this is that inundation from the river (in the afternoon of 14 January) was widespread, with water levels rising accordingly. However, the complete mixing of the two water bodies had not yet occurred in the central and high parts of town.  The mixing of clear water and muddy water was a gradual process and it is likely that it took some time for water sourced directly from the river to flow across the whole town and mix with locally sourced stormwater.  In this situation flooding in some houses was therefore controlled by the rise in the river level but the actual water at the site was stormwater.  Major flood level for Charlton is 7.5m at the gauging station near the bridge over the Avoca River, which was reached at 5.15pm on 14 January. It is possible that other parts of the riverbank to the south and west of Charlton had low points which allowed water to leave the river and inundate parts of the town somewhat earlier than 6.00pm. Flood modelling indicates earlier overtopping of the river played a part in inundating the west and southwest of Charlton. F’s Flood and Stormwater Investigation Report March 2011  Charlton has a history of flooding.  Catchment area to Avoca River is 274,945 hectares to Charlton Township. Since the river is narrow and shallow, a significant catchment to the river is likely to cause frequent flooding within the area.  Hourly rainfall data indicates the maximum rainfall recorded was 15mm/hr which corresponds to a 1 in 2 year ARI rainfall event.  The town is reasonably flat with a fall of 0.1% across town north to south.  Site inspections were undertaken on 16 and 17 February in the presence of homeowners. There were minor inconsistencies observed regarding the time and date of inundations. Almost all advised water started inundating dwellings between 3.00pm-6.00pm on 14 January. Case No: 294131 Determination Page 8 of 12  The level of water continued rising and most of the owners departed their properties about 8.00pm on 14 January.  The last rainfall recorded in the area ceased at 8.00am on 14 January and therefore the rising water level was not due to direct rainfall.  Inspection of the insured property was undertaken in the absence of the Applicants. Significant damage to the insured building was observed with inundation up to 300mm above floor level and the floor level was noted to be approximately 700-800mm above surrounding ground levels.  In the absence of rainfall up to twelve hours prior to inundation, it would not be possible for the run-off to flood the property by a depth of one meter.  Minor run-off would have been taken by the table drain at the front of the property itself and would not have overflowed.  The consultant formed the opinion that the inundation of the property was due to floodwaters from the Avoca River which breached upstream. F’ Supplemen tary Comments in letter dated 25 October 2012  F considered PM‟s reports of November 2011 and March 2012.  An assessment of the photographic evidence shows that a waterway exists as a discernible channel commencing just east of Menzies Street. It runs in a generally northern direction crossing Watson Street, the end of Fanning Street and crossing High Street and Davies Street to connect with the Avoca River about 900m north of High Street.  The waterway corresponds to a natural minor depression and appears to have been modified or formed at some time in the past.  Table drains and gutters, which carry urban stormwater along the sides of intersecting streets, connect to this channel.  Rainfall ceased in the area by 8.00am on 14 January, with water levels noted to rise rapidly between 5.00pm-6.00pm.  The local catchment to the eastern waterway is estimated to be 2-3km long and 1km wide. Peak flow in the town area around High Street from this catchment would be expected to occur in around 1-3 hours after peak rainfall i.e. before noon. While reports exist of clear water late in the afternoon it is probable that this was ponded local water which was pushed north by floodwaters flowing over the banks of the Avoca River upstream of town.  Data shows that whilst the Avoca River peak level occurred early on 15 January, the level of the river was actually above 7m from 11.00pm on 13 January. As the ground surface of High Street is approximately 7.1m this shows that little or no water could escape into the river due to the high flood levels for almost the entire day on 14 January. So the Case No: 294131 Determination Page 9 of 12 overflow of the channel in the east of Charlton is likely to have been local stormwater which was unable to escape freely. 17. The Panel notes that the hydrology reports relied on do not consider the impact of the work undertaken at the Charlton-St Arnaud Road on the natural flow of the water from the floodplain to the Avoca River, which, in the Panel‟s view is an import ant consideration. 18. The Ombudsman, Panel member and FOS Case Manager, together with FSP representatives and a number of local residents have visited the area as part of their site inspections. The road has been raised to allow access to the airport during floods. In doing so, it dissects the natural floodplain. Although, a number of pipes/culverts have been positioned under the road they were not sufficient to cope with the overland flow and according to locals the flow is diverted initially east of Armstrong Road and eventually through the town. When the road was dug up by machinery on 15 January 2011, the level of inundation within Charlton started to drop. 19. This information was provided by a number of local residents independently of the Applicants to the Ombudsman and Case Manager in the presence of the FSP representatives. The site visits undertaken by the Panel representatives of the Charlton area and more specifically individual properties (not including the Applicants‟) have assisted the Service in gain ing a greater understanding of the topography and impact of the stormwater runoff in the area prior to the arrival of floodwater from Avoca River. 20. Following these visits to the area by FOS personnel and based on discussion with all parties, the Panel is of the opinion the landscape over which the water flowed from the south and east of the town cannot be regarded as a natural watercourse. Although the area from which the water flowed is designated as “Yeungroon Creek”, that appellation alone cannot be taken as evidence of a watercourse. 21. The following ruling was made by the High Court in Gartner v Kidman [1962] HCA 27: 108 CLR 12 (30 May 1962): “This distinction between watercourse and depression follows the language of Hood J in Lyons v Winter (1899) 25 VLR 464, who in that case held that a depression which took rainwater for about three months of a year fell short of the legal definition of a natural watercourse. To constitute such a watercourse as a matter of law, there must be a stream of water flowing in a defined channel or between something in the nature of banks. The stream may be very small and need not run, nor need the banks be clearly or sharply defined. But there must be a course, marked on earth by visible signs, along which water usually flows in order to constitute a watercourse such as creates riparian rights (1899VLR at p485 (at p16) 22. The landscape to the south and south east of the town does not have evidence of visible banks between which water flows and further, water does not usually flow along this stretch of land, which is only vaguely described by a range of indentations and vegetation. The landscape may best be Case No: 294131 Determination Page 10 of 12 described as a flood plain over which water flows in a direction determined by the rise and fall of the land. 23. This view is further supported by the description given by PM who observed Yeungroon Creek has been infilled with flood deposits over many years. The course of the creek to the south of the town is marked by linear depressions and vegetation. 24. Accordingly the Panel accepts that water which came from the Yeungroon Creek area to the south and south east of the town may not be regarded as water which escaped from the normal confines of a natural watercourse. 25. In the Panel‟s view, stormwater from that flood plain is likely to hav e inundated the Applicants‟ property, including water which would have discharged from the stormwater infrastructure to the west of their property, prior to the arrival of floodwaters from the Avoca River. 26. Given the elevation of the floor level of the Appl icants‟ home (around 600mm above surrounding ground levels) the Panel is satisfied it is unlikely the inundation of the Applicants‟ home above floor level was due to stormwater runoff alone. More likely the initial inundation above floor level and subsequent peak level of inundation was due to a combination of flood and stormwater runoff, which is properly characterised as flood and as such, would be excluded under the policy. 27. The policy however covers stormwater run-off or water escaping any water main, drain, pipe, street gutter, guttering or surface. In the event of the inundation being due to a combination of stormwater overland flow and water escaping the stormwater drain near the property then the policy will cover the loss. 28. The Panel having considered the evidence in this matter accepts that most likely the initial inundation of the Applicants‟ property i.e. the yard, sheds, and garage would have been due to water escaping the stormwater infrastructure in the vicinity of the property and the stormwater flows from the paddocks to the south and significant stormwater run-off generated east of Charlton St Arnaud Road/Armstrong Street. Although there is no precise calculation of this level of inundation the Panel (having considered a number of properties in close proximity to the Applicants‟ home) considers it fair in the circumstances to assess the initial compensable inundation on their property to a height of 150mm. 29. The Panel determines that the FSP is obliged under the policy to provide indemnity for lo ss or damage arising from “ Storm and rainwater ” including stormwater runoff from areas surrounding the site, or water escaping from any water main, drain, pipe, street gutter, guttering or surface ”. 30. The Panel notes that the Applicants‟ policy provides ind emnity for loss or damage to the insured building(s) only and does not extend to include damage to contents within the home and/or stored within structures built at ground level such as sheds and the garage. Case No: 294131 Determination Page 11 of 12 31. The Panel is mindful of the fact that it has not been provided with sufficient information which would allow it to come to an informed decision as to the extent/degree (monetary) of the FSP‟s liability (if any) under the claim arising from the initial stormwater inundation of the yard, sheds and garage. 32. Accordingly, the Panel urges the parties to act in a cooperative manner to establish the extent of damage if any to the insured property limited to the structures built at ground level and that may have been affected by the initial stormwater inundation. 33. The Panel notes that the assessor‟s report makes reference to extensive damage to contents (uninsured) and extensive damage to building. It also notes “Insured is concerned re damage to stumps of property and specialist inspection would be required in this regard.” 34. The Panel has also been provided with a number of photographs including images of some stumps, noting “The cement stumps were washed out by the force of the water”. However, it has not been provided with any substantiating evidence in this regard which would establish the extent and more specifically the cause for the claimed damage to the concrete stumps. 35. In order to seek indemnity in this respect the onus rests with the Applicants to establish, on the balance of probabilities that the damage to these stumps was due to the stormwater run-off alone prior to the arrival of floodwaters. 36. In the absence of specific substantiating evidence in this regard the Panel has considered the limited evidence available. The evidence indicates that the home sits on stumps at about 600mm higher than the surrounding ground. It is accepted that stormwater runoff of some 150mm height would have passed across the property and likely under the home sometime between 3.00pm and 6.00pm on 14 January 2011. After that time it is likely that floodwater from the Avoca River would have inundated the home to a level of about 1.2m above ground level, such inundation remaining through to its peak on 15 January 2011, and receding sometime thereafter. 37. In the Panel‟s view, a short peri od of runoff to a height of 150mm would have been insufficient to have caused major damage to the stumps in this situation. On the balance of probabilities the depth and force of the floodwater from the river after 6.00pm on 14 January 2011 (and its subsequent retention on site for some 24 hours) is more likely to have caused such significant damage. 38. Given the absence of any evidence in support of their contention, the Applicants have not established that they are entitled to indemnity under the policy for the claimed foundation damage. Determination 39. On the basis of the available information the Panel determines that the FSP is liable under the policy to provide indemnity to the Applicants (within 30 Case No: 294131 Determination Page 12 of 12 days of receiving this determination) for any damage (if any) to the building structures up to a height of 150mm above the level of the surrounding ground through the property, but excluding any damage to the stumps. 40. The FSP is to pay to the Applicants interest at the statutory rate, in line with the Insurance Contracts Act 1984 , upon the final settlement figure agreed between the parties from the date of the decision to deny the claim to final settlement of the claim.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.