Determination 294076

Flood damage - underpinning claim denied and cash settlement amount disputed

FirmFinancial Firm (Unknown - Insurer)
Decided2013-06-04
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded—
Non-financial loss—
Amount claimed$89,500
SourceAFCA PDF

Summary

Owners of a home damaged in the 2011 Queensland floods disputed the insurer's refusal to pay for underpinning and the adequacy of a cash settlement for building repairs. AFCA found the underpinning was flood-related and ordered indemnity, interest and a costed scope of works.

The flood inundation affected the foundations, so underpinning was a direct consequence of the insured flood event, and the insurer must transparently cost its cash settlement.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interestprovide documentsreassess claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 294076 Determination Page 1 of 16 Case number: 294076 General Insurance - Domestic Insurance - Home Building - FSP Decision - Claim Amount - Dispute Over Extent of Damage and Settlement of Claim 28 May 2013 Background 1. The Applicants held a home and contents policy with the Financial Services Provider (FSP) from 21 August 2009. The policy provided building cover for $459,800 and contents cover for $54,600. 2. On or around 12 January 2011, the Applicants‟ home was inundated through the lower level as a result of the flood events that affected significant parts of Queensland. 3. The FSP accepted the claim and cash settled the Applicants for the estimated cost of repairs of the home, replacement of their contents and for temporary accommodation costs (the latter two were settled up to the policy limits). 4. A dispute subsequently arose over the extent of the damage to the home, whether it required underpinning as a result of ground movement at the property after the flood and other minor repairs. Summary of Applicants ’ position 5. The Applicants say that the integrity of the home‟s foundations was affected by the flood and this required underpinning of the footings to ensure that the home was properly repaired. 6. The settlement paid for the building repairs was insufficient and not properly quantified by the FSP. 7. The flood inundated the lower floor of the home to a depth of 1.6m. This immersion included the downstairs doors, windows and frames and means that they require replacement, particularly as members of the family have allergies and are affected by exposure to these items. 8. Some other aspects of the original claim have since been resolved between the parties. Determination Case No: 294076 Determination Page 2 of 16 Summary of FSP’s position 9. The FSP says that there is no persuasive evidence that the home required underpinning as a result of the flood. 10. It has fairly settled the Applicants for the building, contents and accommodation costs and met all other aspects of the claim as raised. The Applicants have supplied no credible evidence that the settlement offered to repair the home was insufficient. 11. There is no damage to the doors, windows or frames that requires their replacement and the FSP has paid a settlement for a fair and reasonable sum to attend to the cleaning of the relevant items. 12. The FSP relies on the following policy provisions: Pages 119-122 of the Product Disclosure Statement (PDS) “ What you are not covered for ... What is not covered under any part of your policy We do not cover loss or damage: ... Erosion or subsidence Caused by or as a result of erosion, vibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage or any other earth movement but we will cover subsidence damage to your home if it is caused by: ... - these insured events...  insured event 1 (storm and flood) ... Failing to take care of the home or contents Caused by, or as a result of, your failure to: - take reasonable care of your home and contents - keep the home and contents in good condition and well maintained - fix faults and defects as soon as you become aware of them. ...” Case No: 294076 Determination Page 3 of 16 Page 134 of the PDS “ How we settle your claim If we agree to pay a claim for loss... we will decide if we will: - repair damage new for old or - replace home or contents new for old or - pay you what it would cost us to repair or replace home or contents new for old... We will not: - ... - fix a fault that existed before the loss or damage occurred.” Issues 13. Whether the FSP is liable for any further payment/extension of cover to the Applicants for their loss. 14. Whether the claim has otherwise been satisfactorily resolved. Reasons for decision 15. The Panel is satisfied that a full exchange of the relevant information has taken place between the respective parties and that each party has had the opportunity of addressing any issues raised. 16. As advised to the parties, FOS has considered it appropriate to refer this dispute directly to a Panel in accordance with the Operational Guidelines to the FOS Terms of Reference. This is because of the potential amount of the claim and the issues to be considered. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 17. This decision has been made by a Panel consisting of an Ombudsman, an insurance industry representative appointed by the Financial Ombudsma n Service Board, and a consumer representative appointed by the Financial Ombudsman Service Board. 18. It is not in dispute that the Applicants‟ overall loss occurred as a result of an insured event, noting that the policy provides cover for flooding. The dispute is whether some aspects of the damage claimed by the Applicants were caused by the flood or not. 19. Since the lodgement of the claim, the FSP has provided indemnity to the Applicants to the extent of $162,193 for the building damage, $55,677 for the contents damage and $45,980 for temporary accommodation, primarily through cash settlements. Some other minor payments have also been made since the matter was referred to the Service. The contents and the Case No: 294076 Determination Page 4 of 16 temporary accommodation settlement amounts are equal to or exceeding the level of total cover provided under the policy. 20. Since the initial settlement of the claim, the Applicants have had their home inspected and contend that there are a number of issues outstanding. Some of these have since been resolved between the parties, prior to this Determination. 21. Included in the resolved issues are the claim for the fencing (dropped by the Applicants) and the cleaning of mud and debris at the property (for which the FSP provided a cash settlement of $1,000 which was accepted by the Applicants). 22. With respect to the remaining issues, the Panel shall consider each in turn. Underpinning of the property 23. After the initial cash settlement for the building damage was provided in or around December 2011, the Applicants sought builders to attend to the required work at their home. 24. “IC” was retained by the Applicants to provide a scope of works for the property, after several other builders had provided quotes that exceeded the cash settlement offer provided by the FSP. 25. IC became concerned over the structural integrity of the concrete slab and evidence of movement under the ground. It formed the opinion that structural underpinning of the property would be necessary prior to any repairs being conducted in relation to the flood damage. 26. The Applicants reported these findings and their concerns for the repair of the property to the FSP in January 2012. 27. No allowance for structural underpinning had been made in the cash settlement paid to the Applicants, which was based on the scope of works prepared for the FSP by “BL”. To further consider the issues raised by the Applicants, BL retained a structural engineer, “ME”, to prepare a report for the FSP‟s consideration. 28. Over the course of the next 15 months, ME produced four reports in relation to the Applicants‟ home and the damage observed. In the first report of 6 May 2011, ME observed that:  they were retained to inspect the external slab and the walls surrounding the pool to consider if there had been structural damage;  the slab has “a number of shrinkage cracks”, which are normal and the result of “long term shrinkage in the concrete”. The slab had “not been affected by the flood event”; Case No: 294076 Determination Page 5 of 16  the rear wall of the pool was “sound”, although pavers around the pool had “a number of areas where the pavers have separated”;  none of the observed damage was a consequence of or caused by the flood event. 29. BL subsequently notified the FSP of more reports from the Applicants of cracking through the concrete at their home on 4 August 2011. Specifically, the FSP‟s file note of the discussion with BL revealed that the claims officer was informed that: “... there are new cracks appearing and the slab may need to be repaired...” 30. In isolation, this comment may be read to imply that BL was of the view that the slab may need to be repaired as well. This is not expanded on in any of the reports provided. 31. BL requested that an engineer be retained to inspect the property and ME was again asked to inspect the damage. ME‟s subsequent report, dated 1 August 2011 (prior to the conversation with the FSP from BL), revealed that there had been a slight widening of some of the cracks observed during the first inspection and some “slight heaving” of the slab. ME further observed: “The cracks in the slab were origi nally caused by concrete shrinkage, a normal phenomenon resulting from the loss of moisture that accompanies “curing” of the concrete.” 32. ME also considered that the surrounding soil was “reactive”, in that it swells after periods when it is subject to moisture ingress and shrinks when it dries out: “Since the flood event the soil around the edges of the slab has dried while the soil under the centre has remained relatively wet. This has caused the observed heaving and widening of the shrinkage cracks.” 33. ME co ncluded that as the soil returned to normal, the “heaving” of the slab should diminish. 34. Based on the two reports from ME, the FSP concluded that there was no evidence that the soil/slab movement was related to the flood event and it asked BL to proceed with a repair quote for the purposes of cash settling the Applicants‟ claim. 35. The Applicants later obtained various expert reports and provided a submission from their solicitor (at the time) to attest to the damage caused by the slab instability and movement. Included in this was an assessment of the soil composition from geotechnical engineer “AU”, a quote for the underpinning works and a scope of works for the building and plans from IC. 36. AU tested three areas of soil at the property, two samples were taken from the front of the home and one from the western side of the property. AU recalled that he had worked in this area in the 1980‟s and remembered the Applicants‟ home being present then, suggesting that it had stood for at least Case No: 294076 Determination Page 6 of 16 30 years. The front area of the home was underlain with rock (identified in tests one and two), with the western side having a silty sand which can become “compressible when wet”. No testing was done at the rear of the property. 37. The quote detailing the scope of works for underpinning the property and correcting the existing problems was for $89,500. 38. In response to this, the FSP (through BL) retained ME to perform a third inspection of the property and to consider the further information provided. 39. ME‟s third report, dated 18 May 2012 , involved a different engineer. He concluded on this occasion that:  there was no evidence of cracking in the brickwork, observed damage to the soffits or signs of movement around the windows or doors;  there were large bamboo plants near the lounge and dining room;  some of the pavers near the pool had become loose;  the observed cracks from the first two visits did not appear to have changed;  there had been a slight “heaving” of the slab as identified in the last inspection;  some loose and cracked tiles were observed in the ensuite on the ground floor, as well as a “hairline gap” between intersecting walls and some gaps in the cornices;  based on the report from AU, this engineer from ME‟s firm considered the soil at the property to be “moderately reactive”;  the cause of the cracks in the slab was attributed to “concrete shrinkage”. 40. This report concluded that the plants on the property may have “potential ongoing damaging effects” to the property and considered: “In our opinion the observed movements of the re sidence are within what would be expected given the reactive soil and location of vegetation. Furthermore, the slope of the slab is within normal serviceability limits and no evidence of any foundation failure has been detected during any of our inspections. We believe that the new damage to the plasterboard linings has occurred due to the swelling and shrinkage of the timber frame that has occurred to the immersed areas of the stud framing.” 41. In the Panel‟s view, an observation that the timber frame of the home has been affected (and caused movement in the property) as a result of being immersed in water, suggests that this damage was flood related. The FSP, however, maintained its position that the submitted underpinning costs were Case No: 294076 Determination Page 7 of 16 not required as a result of any insured event damage and rejected the Applicants‟ claim for the underpinning costs. 42. The Applicants obtained a report from IC dated 17 July 2012 to better express the problems identified at the property. IC noted:  the water from the flood event cause d “soil to consolidate, and also wash away causing the house to subside”;  the timber frame was in “good condition”, although it was recommended that it be cleaned and sanitised prior to any work being done;  pavers have cracked in the vicinity of the swimming pool but not the pool itself. There is no evidence of a leak but further movement is expected;  most of the cracking and general movement of the home was a “consequence of consolidation and settlement of the dwelling‟s founding soils which is directly related to the. flood event”;  “distortions” to the footings had been noted that were not within accepted tolerance levels;  “underpinning of the rear of the house is highly recommended in order to reinstate the dwelling to its original condition”;  other homes inundated in the area inspected by IC had been “subject to the same amount and type of movement” as the Applicants‟ home, suggesting it was a consequence of the inundation;  IC was at a loss to understand how ME conceded that the movement of the pavers in the vicinity of the swimming pool was consistent with the flood event but not the movement of the house foundations;  the soil tests confirm that the fill overlaying the silty sand on the property is alluvium. This is a loose, unconsolidated soil and in con junction with the silty sand would likely have experienced “severe consolidation” as a result of the flood event;  the differential movement was more noticeable at the rear than at the front of the Applicants‟ property, possibly because the inundation laste d longer in this area;  because of the floodwater contamination of the property, proper cleaning and drying methods would have to be engaged to repair the home;  the “most likely cause” of the damage to the footings at the property was the differential movement of the foundation soils. This was a direct consequence of the flood event. Case No: 294076 Determination Page 8 of 16 43. The FSP objected to the suggestion that “other homes” had suffered from similar movement issues and considered that this was not evidence of any value. The Panel accepts that reliance on anecdotal evidence of this type must be viewed in context. It is not necessarily persuasive but should not be disregarded altogether. 44. In response to this further information from the Applicants and more specifically to assess the possible mould related damage to the home, the FSP arranged a re-inspection of the property by assessor RL to review the areas of concern highlighted by the Applicants. RL attended the property on 9 August 2012 and reported:  the home had still not been repaired since the event and “mud and debris [was] everywhere” within the home;  the upper level of the home was not directly affected by the flood, although “extensive mould damage” was present;  the presence of mould was “clearly a result of the damage to the lower level of the home and a result of the flooding”;  the holdup concerning the ongoing dispute and the subsequent inability of the Applicants to proceed with repairs had been directly responsible for the mould problems;  there “has clearly been movement to the home” and damage associated with this movement. This damage includes “[c]racking to tiles and walls in the bathrooms, the cracking of the slab and movement in the paving on the lower level” and the movement was directly responsible for issues in the upstairs ensuite;  if the mould extended to inside the walls, the wall lining may need to be stripped;  whilst acknowledging that it was not the purpose of his visit, the assessor confirmed that the “cracking to the building” was definitely present and that this had resulted in “damage to the home from movement”. He could not confirm how soon after the insured event this had occurred. 45. The “RL” report is frank and forthright about areas of damage he considers that the FSP should respond to. On face value it lends considerable weight to the evidence from IC and the position of the Applicants that the home‟s base foundations were affected by the inundation event, even though RL does not express this opinion directly. 46. The FSP relayed a copy of the IC report to its structural engineer, ME to review same. ME supplied a fourth report in relation to the issues raised, dated 23 August 2012. This report revealed: Case No: 294076 Determination Page 9 of 16  there is no evidence or basis for the conclusion that the damage was attributable to the flood event;  the “moderately reactive” soil surrounding the property and the effects of normal seasonal changes better explains the observed movements of the home than the flood explanation;  the cracks to the internal and external walls described by IC were not photographed for the purposes of the report or observed by ME when its inspection of the home took place. The hairline cracks that were observed were consistent with “thermal expansion or seasonal movement from changes in soil moisture cont ent”;  the movement of the slab observed was, in the view of ME, within “acceptable tolerances” and should be classified as very slight to slight only;  ME had also observed other homes in the area which required underpinning as a result of damage but these homes showed much more definitive signs of damage than that observed at the Applicants‟ property;  the movement of the pavers was due to the thin layer of sand located underneath and not the “deeper material” located underground;  the damage is “not consiste nt with severe consolidation of the founding soils, and is more consistent with movements in the structure as a result of the reactivity of the soil;  there was “no evidence of damage caused by foundation movement in the residence and the observed movements ... are entirely consistent with the reactivity of the soil...” 47. The observation of ME that cracks in the home from possible “seasonal movement from changes in soil moisture content” proffered for some of the observed cracking in the home might also (and perhaps better) be explained by the flood event. If the soil surrounding the property was to be susceptible to changes in moisture content and weather conditions, the Panel is of the view that a significant event such as a flood should have a more obvious im pact than simple “seasonal” changes. 48. A wealth of evidence has been submitted by the respective parties. Clearly the two main experts (IC and ME) differ strongly on the role of the flood inundation in the further damage to the home and more specifically the effect it might have had on the structural integrity of the home. 49. The FSP‟s assessor RL‟s views postulated that the home had sustained what he considered to be significant damage and this is at odds with the general views of ME who appeared to have viewed the damage as „seasonal‟ and, on the whole, relatively minor. Regardless of the extent of Case No: 294076 Determination Page 10 of 16 damage, ME and the FSP are adamant that there is no link between it and the flood event. 50. To reconcile the differences in opinion, the Applicants sought to have a meeting with the experts present at the property to fully work through the issues in dispute and properly discuss the possible causes of the damage. The Applicants‟ expert, IC, was amenable to this suggestion but the FSP refused. 51. Since the matter has been referred to the Service, the Case Manager contacted the FSP to again suggest that such an inspection might be beneficial but this was again rejected by the FSP. This is particularly of concern given the lack of data in the reports from ME as to levels taken, uniformity of movement, nature of vegetation etc. 52. In view of the inconsistencies in the information provided, the Panel Chair Ombudsman conducted a site inspection of the property on 16 May 2013. Present was the female Applicant, her engineer (IC), and th e FSP‟s representatives. The FSP‟s engineer was not present. 53. During the course of the inspection, the Applicants advised that despite the cash settlement to clean the doors, windows and screens at the property in October 2012 and having had the cleaners and builders attend to this, they had not been able to properly clean the screens. The screens are a Crimsafe screen and according to the Applicants and the engineer who was present, these screens have gaps in them that allow the mud to accumulate. The mud from the floods is not then able to be cleaned out of the screens without the screens being dismantled. To dismantle the screens and then reinstate would be more expensive than the replacement of the screens. The Applicants are concerned as to the hygiene a nd diseases associated with having the mud through the screens, given that the flood inundation included sewerage. 54. The current information does not allow the Panel to determine whether the screens can in fact be properly cleaned, but it was agreed by the FSP during the site inspection, that they would arrange for a senior assessor and possibly a representative from the screen manufacturer to reassess the damage. It was also agreed between the parties that they will attempt to resolve this issue. 55. The Panel Chair Ombudsman had the opportunity during the site inspection of discussing issues directly with the engineer (IC) present. The engineer described how given the slope of the land, and its proximity to the river, that as a result of the flood there would ha ve been some differential settling of the soils under the slab. This led to a uniform deflection of the slab to a point where the slab required underpinning. The IC report of 17 July 2012 clearly identified the nature of the differential movement, the distortions found, and makes that recommendation of the need for further underpinning. 56. The Applicants had in fact completed the underpinning of the property. The engineer IC had supervised this with the actual underpinning being Case No: 294076 Determination Page 11 of 16 performed by RL. The engineer explained that during the course of the underpinning they were very careful to avoid additional cracking but some cracking appeared during and after the levelling process with some major cracking through the chimney. There was also some cracking of the tiles in the upper section of the house. The engineer believed this was due to the movement of the house. 57. Insofar as the impact of vegetation is concerned, the engineer described that this would be minimal. He considered the foundations at 800mm deep, would not have been impacted by the vegetation. Further, the vegetation, if it did have an impact on the property, would not have led to a uniform deflection occurring. The uniform deflection of the slab was consistent with the impact of the flood. The engineer also described the type of vegetation. At the front and side of the property where the uniform movement occurred, there was a palm bush which was described as a deep single rooted bush that would not impact on the slab. This had been removed as part of the recent underpinning. Other similar bushes had also been removed. There was nothing to suggest that the vegetation was a cause of the movement. 58. The engineer also referred to the movement of the footings of the retaining wall. He said this had clearly moved a nd that process had been identified; IC then explained that as part of the repair of the slab, the repair of the retaining wall had also been encompassed. 59. Based on the information elicited during the site inspection and the material presented, the Panel is not convinced that the evidence of ME is persuasive, as to the likely causes being variously listed as the: presence of trees in relation to the property, normal soil movement, seasonal factors, curing of the slab or other issues. 60. Whilst such factors may have been present and may influence the movement at the property to an extent, none explain why the home appears to have stood without any such issues for the best part of 30 years. 61. In particular, the Panel considers it most unlikely that a slab that had been in place for 30 years would still be subject to “curing”, which is typical of a recently laid slab. 62. The Panel finds the information provided by ME is unreliable. The Panel prefers the information provided by IC and in particular is impressed by the detail of the information provided in his report. 63. Having considered the information it is the Panel‟s view that the inundation of flood water did have an effect on the integrity of the land a nd that this has influenced the movement of the concrete slab at the property. This in turn has meant that cracks have emerged in the home as a result of the additional stresses placed upon it. 64. As a result, the Panel accepts that the property required underpinning, prior to any work being conducted to repair damages caused by the flooding. Case No: 294076 Determination Page 12 of 16 More specifically, the Panel is of the view that the underpinning became necessary as a direct result of the flooding of the property. 65. On this basis, the Panel accepts that the FSP should indemnify the Applicants for the cost of underpinning of the property. Suitability of the cash settlement for the building claim 66. The cash settlement of the Applicants‟ claim for the building damage, being $162,193, was based on a scope of works prepared by BL on behalf of the FSP. 67. The actual costing of this scope of works was not revealed as the FSP claimed it was commercially sensitive information. The Applicants supplied two comparison quotes which suggested the relevant work required would cost more than $200,000. 68. It is the Applicants‟ contention that the original scope of works provided by the FSP was insufficient and not properly costed (or at least not proven to be so, due to the FSP‟s refusal to provide a cost breakdown of the quot e). 69. By contrast, the FSP claims that the Applicants have failed to prove that the quote from BL is in any way inadequate and therefore it is entitled to rely upon same for settlement of the claim. 70. No argument has been made by the FSP to suggest that the Applicants are estopped from revisiting the merits of the quote based on their acceptance of the settlement offer. 71. The Panel is of the view that whilst the scope of works prepared by BL may be genuine and reasonable, the Applicants have been disadvantaged by the refusal of the FSP to provide a breakdown of the relevant costs. The Applicants are therefore unable to ascertain how it has been constructed and whether the pricing of the quote is a reasonable reflection of industry rates or whether it was inclusive of all work that may be required at the site. 72. Whilst IC also produced a quote for the Applicants without individual costing breakdown, this was likely with the intention of fitting the work within the scope of a pre-arranged agreed amount between the parties. As it was not the basis of any subsequent settlement, the Panel is less concerned with this. 73. Whilst the FSP has an entitlement, under the policy, to settle claims based on the cost it would incur to attend to the work, it has a duty to be transparent about how such an amount is calculated. It must also ensure that such an offer is realistic as to the actual costs of the job and that the scope of works may be utilised by the Applicants if it chooses to retain the FSP‟s nominated repairer. Case No: 294076 Determination Page 13 of 16 74. The Applicants have provided evidence, through at least two comparative quotes, to suggest that the repair of the building would cost about 20% more than the amount offered by the FSP. In the Panel‟s view, this raises legitimate questions about the viability of the BL quote, even if it is was reasonably priced. 75. During the site inspection, the FSP‟s representatives were asked if they could clarify the costing that led to the cash settlement. The representatives were not able to and no further information has been supplied from the FSP. 76. The Panel notes from the site inspection that the female Applicant advised that she had been unable to complete the repairs within the cost provided, although she admitted to taking the opportunity of completing some improvements. 77. On this basis, the Panel is of the view that a new, properly costed, scope of works should be prepared by BL (or another repairer of the FSP‟s choosing). It remains possible that the original quote might be properly accounted for and, if so, it may be relied upon for settlement by the FSP. 78. If not, any additional amount required to repair the home should be included in a cash settlement to the Applicants for the difference. The relevant builder should also confirm with the Applicants that it is prepared to undertake the work at the quoted price. 79. In the event that the FSP does not wish to provide the detailed costing associated with the scope of work, then the Panel recommends that the parties resolve the full repair costs of the home for the sum of $194,000; being a fair price based on a compromise of the two costed quotations provided by the Applicants and the cash settlement amount offered by the FSP. Mould and pest control 80. The Applicants suggest that the home was subject to extensive mould damage to the upper floor as a result of the inundation of the lower floor. 81. This damage was confirmed by assessor RL during his inspection of the home on 9 August 2012. He considered the presence of mould-related damage extensive and confirmed that it was a by-product of the flood inundation of the home. 82. The FSP subsequently agreed to cover this aspect of the claim and relied upon a quote from “PA” to cash settle the Applicants $4,520.29. The Applicants raised no further objections in respect of this issue and the Panel is therefore satisfied that the settlement was reasonable. 83. Separate to this damage, is a claim from the Applicants for pest control treatment before the home is rebuilt. This was mooted as necessary due to the fact that the home has been left untouched for some time and the mould growth indicates that moisture is still present from the inundation. Case No: 294076 Determination Page 14 of 16 84. It is well known that homes subject to high levels of moisture may be subject to infestation from termites and the like. On this basis, the Panel accepts that insulating the home against such a problem is a reasonable move. 85. The question is whether such a precautionary measure should be covered by the FSP under the claim, noting that there is no report of infestation at this point. 86. No evidence has been provided as to any previous measures taken on pest control or any precautions after the event, undertaken by the Applicants to protect their property. 87. In the circumstances, whilst the Panel agrees this is a measure that is warran ted, it cannot accept that it‟s a cost for which the FSP must provide indemnity. There is no evidence of an infestation at the property to this point and the policy does not extend cover to protect against losses which have not occurred. Replacement of doors, windows and frames 88. The Applicants sought replacement of the doors, windows and window frames in the lower floor of the property, which were all subject to inundation as a result of the flood event. 89. They contend that their children suffer from allergies and the contaminants from the water still present in these items have made it difficult for the female Applicant to enter the home (which remains unrepaired). 90. No evidence has been provided as to specific allergies or to suggest that the specific items are in any way responsible for any adverse reactions. 91. RL observed in his assessment of 14 August 2012 that the relevant items might need to be replaced, noting that nothing had been done since the claim at the time of assessment. He deferred to another expert to review and comment on this damage. 92. “BB” then i nspected the property at the instruction of the FSP and identified that: “... the window and door security screens show signs of flood water however there is no visible damage to the screens. Upon testing the security screens doors all movable mechanisms are free and working fine. ... The security screen doors have minor flood water marks and will need to be removed, cleaned and reinstated only.” 93. Whilst it is accepted that the female Applicant and her children may have suffered from allergic reactions to something in the home, there is no evidence to suggest it involved the stated items. There is no evidence to suggest that the items are severely damaged or otherwise cannot be salvaged. Case No: 294076 Determination Page 15 of 16 94. BB prepared a quote to attend to the relevant removal and cleaning of certain items for $1,792.56. This was subsequently paid to the Applicants as part of a cash settlement. The Applicants allegedly indicated to BB that they would not accept a clean and repair of the items and that they only sought a replacement of them. 95. The Panel notes, following the site inspection, the parties agreed that the FSP will arrange for a further assessment of the doors, windows, window frames and screens to determine whether the screens can be adequately cleaned and if so the proper method of clea ning, bearing in mind the Applicants ‟ claim to have attempted to clean these screens. 96. The parties are asked to work cooperatively together to resolve this aspect of the dispute. Determination 97. On the basis of the available information, the Panel determines that:  the FSP must indemnify the Applicants for the underpinning of the property and provide an itemised and costed quote for the scope of works prepared by BL. The FSP may engage another repairer to attend to this if it sees fit and should the new scope of work exceed the original quote, the FSP should pay the difference in a cash settlement to the Applicants;  Insofar as the Applicants have already incurred the cost of the underpinning, then subject to proof of the cost incurred, the FSP is to pay the Applicants interest in accordance with Section 57 of the Insurance Contracts Act 1984 on the amount incurred from the date of payment of the relevant invoice to date of payment of the claim. 98. The Panel notes that the FSP has already cash settled the Applicants for the cost to remove the mould at the home and for the cleaning of the downstairs doors, windows and window fittings. Insofar as any additional costs may be incurred with respect to the downstairs doors, windows and fittings, the parties are asked to work together in a cooperative manner to resolve this aspect of the dispute. 99. The Panel determines the FSP is not responsible for the costs of protecting the property against future pest infestation. Case No: 294076 Determination Page 16 of 16 100. Finally, the Panel determines pursuant to paragraph 9.4 of the Terms of Reference that the FSP pay the Applicants an amount of up to $3,000 by way of contribution to the Applicants‟ costs, incurred in supplying the relevant engineering report from IC subject to the Applicants providing proof of the relevant invoice to the FSP.