Text of the determination
Case No: 294076 Determination Page 1 of 16
Case number: 294076
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Claim Amount - Dispute Over Extent of Damage and Settlement of Claim
28 May 2013
Background
1. The Applicants held a home and contents policy with the Financial Services
Provider (FSP) from 21 August 2009. The policy provided building cover for
$459,800 and contents cover for $54,600.
2. On or around 12 January 2011, the Applicants‟ home was inundated through
the lower level as a result of the flood events that affected significant parts of
Queensland.
3. The FSP accepted the claim and cash settled the Applicants for the
estimated cost of repairs of the home, replacement of their contents and for
temporary accommodation costs (the latter two were settled up to the policy
limits).
4. A dispute subsequently arose over the extent of the damage to the home,
whether it required underpinning as a result of ground movement at the
property after the flood and other minor repairs.
Summary of Applicants ’ position
5. The Applicants say that the integrity of the home‟s foundations was affected
by the flood and this required underpinning of the footings to ensure that the
home was properly repaired.
6. The settlement paid for the building repairs was insufficient and not properly
quantified by the FSP.
7. The flood inundated the lower floor of the home to a depth of 1.6m. This
immersion included the downstairs doors, windows and frames and means
that they require replacement, particularly as members of the family have
allergies and are affected by exposure to these items.
8. Some other aspects of the original claim have since been resolved between
the parties.
Determination
Case No: 294076 Determination Page 2 of 16
Summary of FSP’s position
9. The FSP says that there is no persuasive evidence that the home required
underpinning as a result of the flood.
10. It has fairly settled the Applicants for the building, contents and
accommodation costs and met all other aspects of the claim as raised. The
Applicants have supplied no credible evidence that the settlement offered to
repair the home was insufficient.
11. There is no damage to the doors, windows or frames that requires their
replacement and the FSP has paid a settlement for a fair and reasonable
sum to attend to the cleaning of the relevant items.
12. The FSP relies on the following policy provisions:
Pages 119-122 of the Product Disclosure Statement (PDS)
“ What you are not covered for
...
What is not covered under any part of your policy
We do not cover loss or damage:
...
Erosion or subsidence
Caused by or as a result of erosion, vibration, subsidence, landslip, landslide,
mudslide, collapse, shrinkage or any other earth movement
but we will cover
subsidence damage to your home if it is caused by:
...
- these insured events...
insured event 1 (storm and flood)
...
Failing to take care of the home or contents
Caused by, or as a result of, your failure to:
- take reasonable care of your home and contents
- keep the home and contents in good condition and well maintained
- fix faults and defects as soon as you become aware of them.
...”
Case No: 294076 Determination Page 3 of 16
Page 134 of the PDS
“ How we settle your claim
If we agree to pay a claim for loss... we will decide if we will:
- repair damage new for old or
- replace home or contents new for old or
- pay you what it would cost us to repair or replace home or contents new for
old...
We will not:
- ...
- fix a fault that existed before the loss or damage occurred.”
Issues
13. Whether the FSP is liable for any further payment/extension of cover to the
Applicants for their loss.
14. Whether the claim has otherwise been satisfactorily resolved.
Reasons for decision
15. The Panel is satisfied that a full exchange of the relevant information has
taken place between the respective parties and that each party has had the
opportunity of addressing any issues raised.
16. As advised to the parties, FOS has considered it appropriate to refer this
dispute directly to a Panel in accordance with the Operational Guidelines to
the FOS Terms of Reference. This is because of the potential amount of the
claim and the issues to be considered. This dispute has not been the subject
of a FOS Recommendation and has proceeded directly to Determination.
17. This decision has been made by a Panel consisting of an Ombudsman, an
insurance industry representative appointed by the Financial Ombudsma n
Service Board, and a consumer representative appointed by the Financial
Ombudsman Service Board.
18. It is not in dispute that the Applicants‟ overall loss occurred as a result of an
insured event, noting that the policy provides cover for flooding. The dispute
is whether some aspects of the damage claimed by the Applicants were
caused by the flood or not.
19. Since the lodgement of the claim, the FSP has provided indemnity to the
Applicants to the extent of $162,193 for the building damage, $55,677 for the
contents damage and $45,980 for temporary accommodation, primarily
through cash settlements. Some other minor payments have also been
made since the matter was referred to the Service. The contents and the
Case No: 294076 Determination Page 4 of 16
temporary accommodation settlement amounts are equal to or exceeding
the level of total cover provided under the policy.
20. Since the initial settlement of the claim, the Applicants have had their home
inspected and contend that there are a number of issues outstanding. Some
of these have since been resolved between the parties, prior to this
Determination.
21. Included in the resolved issues are the claim for the fencing (dropped by the
Applicants) and the cleaning of mud and debris at the property (for which the
FSP provided a cash settlement of $1,000 which was accepted by the
Applicants).
22. With respect to the remaining issues, the Panel shall consider each in turn.
Underpinning of the property
23. After the initial cash settlement for the building damage was provided in or
around December 2011, the Applicants sought builders to attend to the
required work at their home.
24. “IC” was retained by the Applicants to provide a scope of works for the
property, after several other builders had provided quotes that exceeded the
cash settlement offer provided by the FSP.
25. IC became concerned over the structural integrity of the concrete slab and
evidence of movement under the ground. It formed the opinion that structural
underpinning of the property would be necessary prior to any repairs being
conducted in relation to the flood damage.
26. The Applicants reported these findings and their concerns for the repair of
the property to the FSP in January 2012.
27. No allowance for structural underpinning had been made in the cash
settlement paid to the Applicants, which was based on the scope of works
prepared for the FSP by “BL”. To further consider the issues raised by the
Applicants, BL retained a structural engineer, “ME”, to prepare a report for
the FSP‟s consideration.
28. Over the course of the next 15 months, ME produced four reports in relation
to the Applicants‟ home and the damage observed. In the first report of 6
May 2011, ME observed that:
they were retained to inspect the external slab and the walls
surrounding the pool to consider if there had been structural damage;
the slab has “a number of shrinkage cracks”, which are normal and the
result of “long term shrinkage in the concrete”. The slab had “not been
affected by the flood event”;
Case No: 294076 Determination Page 5 of 16
the rear wall of the pool was “sound”, although pavers around the pool
had “a number of areas where the pavers have separated”;
none of the observed damage was a consequence of or caused by the
flood event.
29. BL subsequently notified the FSP of more reports from the Applicants of
cracking through the concrete at their home on 4 August 2011. Specifically,
the FSP‟s file note of the discussion with BL revealed that the claims officer
was informed that:
“... there are new cracks appearing and the slab may need to be repaired...”
30. In isolation, this comment may be read to imply that BL was of the view that
the slab may need to be repaired as well. This is not expanded on in any of
the reports provided.
31. BL requested that an engineer be retained to inspect the property and ME
was again asked to inspect the damage. ME‟s subsequent report, dated 1
August 2011 (prior to the conversation with the FSP from BL), revealed that
there had been a slight widening of some of the cracks observed during the
first inspection and some “slight heaving” of the slab. ME further observed:
“The cracks in the slab were origi nally caused by concrete shrinkage, a
normal phenomenon resulting from the loss of moisture that accompanies
“curing” of the concrete.”
32. ME also considered that the surrounding soil was “reactive”, in that it swells
after periods when it is subject to moisture ingress and shrinks when it dries
out:
“Since the flood event the soil around the edges of the slab has dried while
the soil under the centre has remained relatively wet. This has caused the
observed heaving and widening of the shrinkage cracks.”
33. ME co ncluded that as the soil returned to normal, the “heaving” of the slab
should diminish.
34. Based on the two reports from ME, the FSP concluded that there was no
evidence that the soil/slab movement was related to the flood event and it
asked BL to proceed with a repair quote for the purposes of cash settling the
Applicants‟ claim.
35. The Applicants later obtained various expert reports and provided a
submission from their solicitor (at the time) to attest to the damage caused
by the slab instability and movement. Included in this was an assessment of
the soil composition from geotechnical engineer “AU”, a quote for the
underpinning works and a scope of works for the building and plans from IC.
36. AU tested three areas of soil at the property, two samples were taken from
the front of the home and one from the western side of the property. AU
recalled that he had worked in this area in the 1980‟s and remembered the
Applicants‟ home being present then, suggesting that it had stood for at least
Case No: 294076 Determination Page 6 of 16
30 years. The front area of the home was underlain with rock (identified in
tests one and two), with the western side having a silty sand which can
become “compressible when wet”. No testing was done at the rear of the
property.
37. The quote detailing the scope of works for underpinning the property and
correcting the existing problems was for $89,500.
38. In response to this, the FSP (through BL) retained ME to perform a third
inspection of the property and to consider the further information provided.
39. ME‟s third report, dated 18 May 2012 , involved a different engineer. He
concluded on this occasion that:
there was no evidence of cracking in the brickwork, observed damage
to the soffits or signs of movement around the windows or doors;
there were large bamboo plants near the lounge and dining room;
some of the pavers near the pool had become loose;
the observed cracks from the first two visits did not appear to have
changed;
there had been a slight “heaving” of the slab as identified in the last
inspection;
some loose and cracked tiles were observed in the ensuite on the
ground floor, as well as a “hairline gap” between intersecting walls and
some gaps in the cornices;
based on the report from AU, this engineer from ME‟s firm considered
the soil at the property to be “moderately reactive”;
the cause of the cracks in the slab was attributed to “concrete
shrinkage”.
40. This report concluded that the plants on the property may have “potential
ongoing damaging effects” to the property and considered:
“In our opinion the observed movements of the re sidence are within what
would be expected given the reactive soil and location of vegetation.
Furthermore, the slope of the slab is within normal serviceability limits and no
evidence of any foundation failure has been detected during any of our
inspections. We believe that the new damage to the plasterboard linings has
occurred due to the swelling and shrinkage of the timber frame that has
occurred to the immersed areas of the stud framing.”
41. In the Panel‟s view, an observation that the timber frame of the home has
been affected (and caused movement in the property) as a result of being
immersed in water, suggests that this damage was flood related. The FSP,
however, maintained its position that the submitted underpinning costs were
Case No: 294076 Determination Page 7 of 16
not required as a result of any insured event damage and rejected the
Applicants‟ claim for the underpinning costs.
42. The Applicants obtained a report from IC dated 17 July 2012 to better
express the problems identified at the property. IC noted:
the water from the flood event cause d “soil to consolidate, and also
wash away causing the house to subside”;
the timber frame was in “good condition”, although it was
recommended that it be cleaned and sanitised prior to any work being
done;
pavers have cracked in the vicinity of the swimming pool but not the
pool itself. There is no evidence of a leak but further movement is
expected;
most of the cracking and general movement of the home was a
“consequence of consolidation and settlement of the dwelling‟s
founding soils which is directly related to the. flood event”;
“distortions” to the footings had been noted that were not within
accepted tolerance levels;
“underpinning of the rear of the house is highly recommended in order
to reinstate the dwelling to its original condition”;
other homes inundated in the area inspected by IC had been “subject
to the same amount and type of movement” as the Applicants‟ home,
suggesting it was a consequence of the inundation;
IC was at a loss to understand how ME conceded that the movement of
the pavers in the vicinity of the swimming pool was consistent with the
flood event but not the movement of the house foundations;
the soil tests confirm that the fill overlaying the silty sand on the
property is alluvium. This is a loose, unconsolidated soil and in
con junction with the silty sand would likely have experienced “severe
consolidation” as a result of the flood event;
the differential movement was more noticeable at the rear than at the
front of the Applicants‟ property, possibly because the inundation laste d
longer in this area;
because of the floodwater contamination of the property, proper
cleaning and drying methods would have to be engaged to repair the
home;
the “most likely cause” of the damage to the footings at the property
was the differential movement of the foundation soils. This was a direct
consequence of the flood event.
Case No: 294076 Determination Page 8 of 16
43. The FSP objected to the suggestion that “other homes” had suffered from
similar movement issues and considered that this was not evidence of any
value. The Panel accepts that reliance on anecdotal evidence of this type
must be viewed in context. It is not necessarily persuasive but should not be
disregarded altogether.
44. In response to this further information from the Applicants and more
specifically to assess the possible mould related damage to the home, the
FSP arranged a re-inspection of the property by assessor RL to review the
areas of concern highlighted by the Applicants. RL attended the property on
9 August 2012 and reported:
the home had still not been repaired since the event and “mud and
debris [was] everywhere” within the home;
the upper level of the home was not directly affected by the flood,
although “extensive mould damage” was present;
the presence of mould was “clearly a result of the damage to the
lower level of the home and a result of the flooding”;
the holdup concerning the ongoing dispute and the subsequent
inability of the Applicants to proceed with repairs had been directly
responsible for the mould problems;
there “has clearly been movement to the home” and damage
associated with this movement. This damage includes “[c]racking to
tiles and walls in the bathrooms, the cracking of the slab and
movement in the paving on the lower level” and the movement was
directly responsible for issues in the upstairs ensuite;
if the mould extended to inside the walls, the wall lining may need to
be stripped;
whilst acknowledging that it was not the purpose of his visit, the
assessor confirmed that the “cracking to the building” was definitely
present and that this had resulted in “damage to the home from
movement”. He could not confirm how soon after the insured event
this had occurred.
45. The “RL” report is frank and forthright about areas of damage he considers
that the FSP should respond to. On face value it lends considerable weight
to the evidence from IC and the position of the Applicants that the home‟s
base foundations were affected by the inundation event, even though RL
does not express this opinion directly.
46. The FSP relayed a copy of the IC report to its structural engineer, ME to
review same. ME supplied a fourth report in relation to the issues raised,
dated 23 August 2012. This report revealed:
Case No: 294076 Determination Page 9 of 16
there is no evidence or basis for the conclusion that the damage was
attributable to the flood event;
the “moderately reactive” soil surrounding the property and the effects
of normal seasonal changes better explains the observed movements
of the home than the flood explanation;
the cracks to the internal and external walls described by IC were not
photographed for the purposes of the report or observed by ME when
its inspection of the home took place. The hairline cracks that were
observed were consistent with “thermal expansion or seasonal
movement from changes in soil moisture cont ent”;
the movement of the slab observed was, in the view of ME, within
“acceptable tolerances” and should be classified as very slight to slight
only;
ME had also observed other homes in the area which required
underpinning as a result of damage but these homes showed much
more definitive signs of damage than that observed at the Applicants‟
property;
the movement of the pavers was due to the thin layer of sand located
underneath and not the “deeper material” located underground;
the damage is “not consiste nt with severe consolidation of the founding
soils, and is more consistent with movements in the structure as a
result of the reactivity of the soil;
there was “no evidence of damage caused by foundation movement in
the residence and the observed movements ... are entirely consistent
with the reactivity of the soil...”
47. The observation of ME that cracks in the home from possible “seasonal
movement from changes in soil moisture content” proffered for some of the
observed cracking in the home might also (and perhaps better) be explained
by the flood event. If the soil surrounding the property was to be susceptible
to changes in moisture content and weather conditions, the Panel is of the
view that a significant event such as a flood should have a more obvious
im pact than simple “seasonal” changes.
48. A wealth of evidence has been submitted by the respective parties. Clearly
the two main experts (IC and ME) differ strongly on the role of the flood
inundation in the further damage to the home and more specifically the effect
it might have had on the structural integrity of the home.
49. The FSP‟s assessor RL‟s views postulated that the home had sustained
what he considered to be significant damage and this is at odds with the
general views of ME who appeared to have viewed the damage as
„seasonal‟ and, on the whole, relatively minor. Regardless of the extent of
Case No: 294076 Determination Page 10 of 16
damage, ME and the FSP are adamant that there is no link between it and
the flood event.
50. To reconcile the differences in opinion, the Applicants sought to have a
meeting with the experts present at the property to fully work through the
issues in dispute and properly discuss the possible causes of the damage.
The Applicants‟ expert, IC, was amenable to this suggestion but the FSP
refused.
51. Since the matter has been referred to the Service, the Case Manager
contacted the FSP to again suggest that such an inspection might be
beneficial but this was again rejected by the FSP. This is particularly of
concern given the lack of data in the reports from ME as to levels taken,
uniformity of movement, nature of vegetation etc.
52. In view of the inconsistencies in the information provided, the Panel Chair
Ombudsman conducted a site inspection of the property on 16 May 2013.
Present was the female Applicant, her engineer (IC), and th e FSP‟s
representatives. The FSP‟s engineer was not present.
53. During the course of the inspection, the Applicants advised that despite the
cash settlement to clean the doors, windows and screens at the property in
October 2012 and having had the cleaners and builders attend to this, they
had not been able to properly clean the screens. The screens are a Crimsafe
screen and according to the Applicants and the engineer who was present,
these screens have gaps in them that allow the mud to accumulate. The
mud from the floods is not then able to be cleaned out of the screens without
the screens being dismantled. To dismantle the screens and then reinstate
would be more expensive than the replacement of the screens. The
Applicants are concerned as to the hygiene a nd diseases associated with
having the mud through the screens, given that the flood inundation included
sewerage.
54. The current information does not allow the Panel to determine whether the
screens can in fact be properly cleaned, but it was agreed by the FSP during
the site inspection, that they would arrange for a senior assessor and
possibly a representative from the screen manufacturer to reassess the
damage. It was also agreed between the parties that they will attempt to
resolve this issue.
55. The Panel Chair Ombudsman had the opportunity during the site inspection
of discussing issues directly with the engineer (IC) present. The engineer
described how given the slope of the land, and its proximity to the river, that
as a result of the flood there would ha ve been some differential settling of
the soils under the slab. This led to a uniform deflection of the slab to a point
where the slab required underpinning. The IC report of 17 July 2012 clearly
identified the nature of the differential movement, the distortions found, and
makes that recommendation of the need for further underpinning.
56. The Applicants had in fact completed the underpinning of the property. The
engineer IC had supervised this with the actual underpinning being
Case No: 294076 Determination Page 11 of 16
performed by RL. The engineer explained that during the course of the
underpinning they were very careful to avoid additional cracking but some
cracking appeared during and after the levelling process with some major
cracking through the chimney. There was also some cracking of the tiles in
the upper section of the house. The engineer believed this was due to the
movement of the house.
57. Insofar as the impact of vegetation is concerned, the engineer described that
this would be minimal. He considered the foundations at 800mm deep,
would not have been impacted by the vegetation. Further, the vegetation, if it
did have an impact on the property, would not have led to a uniform
deflection occurring. The uniform deflection of the slab was consistent with
the impact of the flood. The engineer also described the type of vegetation.
At the front and side of the property where the uniform movement occurred,
there was a palm bush which was described as a deep single rooted bush
that would not impact on the slab. This had been removed as part of the
recent underpinning. Other similar bushes had also been removed. There
was nothing to suggest that the vegetation was a cause of the movement.
58. The engineer also referred to the movement of the footings of the retaining
wall. He said this had clearly moved a nd that process had been identified; IC
then explained that as part of the repair of the slab, the repair of the retaining
wall had also been encompassed.
59. Based on the information elicited during the site inspection and the material
presented, the Panel is not convinced that the evidence of ME is persuasive,
as to the likely causes being variously listed as the: presence of trees in
relation to the property, normal soil movement, seasonal factors, curing of
the slab or other issues.
60. Whilst such factors may have been present and may influence the
movement at the property to an extent, none explain why the home appears
to have stood without any such issues for the best part of 30 years.
61. In particular, the Panel considers it most unlikely that a slab that had been in
place for 30 years would still be subject to “curing”, which is typical of a
recently laid slab.
62. The Panel finds the information provided by ME is unreliable. The Panel
prefers the information provided by IC and in particular is impressed by the
detail of the information provided in his report.
63. Having considered the information it is the Panel‟s view that the inundation
of flood water did have an effect on the integrity of the land a nd that this has
influenced the movement of the concrete slab at the property. This in turn
has meant that cracks have emerged in the home as a result of the
additional stresses placed upon it.
64. As a result, the Panel accepts that the property required underpinning, prior
to any work being conducted to repair damages caused by the flooding.
Case No: 294076 Determination Page 12 of 16
More specifically, the Panel is of the view that the underpinning became
necessary as a direct result of the flooding of the property.
65. On this basis, the Panel accepts that the FSP should indemnify the
Applicants for the cost of underpinning of the property.
Suitability of the cash settlement for the building claim
66. The cash settlement of the Applicants‟ claim for the building damage, being
$162,193, was based on a scope of works prepared by BL on behalf of the
FSP.
67. The actual costing of this scope of works was not revealed as the FSP
claimed it was commercially sensitive information. The Applicants supplied
two comparison quotes which suggested the relevant work required would
cost more than $200,000.
68. It is the Applicants‟ contention that the original scope of works provided by
the FSP was insufficient and not properly costed (or at least not proven to be
so, due to the FSP‟s refusal to provide a cost breakdown of the quot e).
69. By contrast, the FSP claims that the Applicants have failed to prove that the
quote from BL is in any way inadequate and therefore it is entitled to rely
upon same for settlement of the claim.
70. No argument has been made by the FSP to suggest that the Applicants are
estopped from revisiting the merits of the quote based on their acceptance of
the settlement offer.
71. The Panel is of the view that whilst the scope of works prepared by BL may
be genuine and reasonable, the Applicants have been disadvantaged by the
refusal of the FSP to provide a breakdown of the relevant costs. The
Applicants are therefore unable to ascertain how it has been constructed and
whether the pricing of the quote is a reasonable reflection of industry rates or
whether it was inclusive of all work that may be required at the site.
72. Whilst IC also produced a quote for the Applicants without individual costing
breakdown, this was likely with the intention of fitting the work within the
scope of a pre-arranged agreed amount between the parties. As it was not
the basis of any subsequent settlement, the Panel is less concerned with
this.
73. Whilst the FSP has an entitlement, under the policy, to settle claims based
on the cost it would incur to attend to the work, it has a duty to be
transparent about how such an amount is calculated. It must also ensure
that such an offer is realistic as to the actual costs of the job and that the
scope of works may be utilised by the Applicants if it chooses to retain the
FSP‟s nominated repairer.
Case No: 294076 Determination Page 13 of 16
74. The Applicants have provided evidence, through at least two comparative
quotes, to suggest that the repair of the building would cost about 20% more
than the amount offered by the FSP. In the Panel‟s view, this raises
legitimate questions about the viability of the BL quote, even if it is was
reasonably priced.
75. During the site inspection, the FSP‟s representatives were asked if they
could clarify the costing that led to the cash settlement. The representatives
were not able to and no further information has been supplied from the FSP.
76. The Panel notes from the site inspection that the female Applicant advised
that she had been unable to complete the repairs within the cost provided,
although she admitted to taking the opportunity of completing some
improvements.
77. On this basis, the Panel is of the view that a new, properly costed, scope of
works should be prepared by BL (or another repairer of the FSP‟s choosing).
It remains possible that the original quote might be properly accounted for
and, if so, it may be relied upon for settlement by the FSP.
78. If not, any additional amount required to repair the home should be included
in a cash settlement to the Applicants for the difference. The relevant builder
should also confirm with the Applicants that it is prepared to undertake the
work at the quoted price.
79. In the event that the FSP does not wish to provide the detailed costing
associated with the scope of work, then the Panel recommends that the
parties resolve the full repair costs of the home for the sum of $194,000;
being a fair price based on a compromise of the two costed quotations
provided by the Applicants and the cash settlement amount offered by the
FSP.
Mould and pest control
80. The Applicants suggest that the home was subject to extensive mould
damage to the upper floor as a result of the inundation of the lower floor.
81. This damage was confirmed by assessor RL during his inspection of the
home on 9 August 2012. He considered the presence of mould-related
damage extensive and confirmed that it was a by-product of the flood
inundation of the home.
82. The FSP subsequently agreed to cover this aspect of the claim and relied
upon a quote from “PA” to cash settle the Applicants $4,520.29. The
Applicants raised no further objections in respect of this issue and the Panel
is therefore satisfied that the settlement was reasonable.
83. Separate to this damage, is a claim from the Applicants for pest control
treatment before the home is rebuilt. This was mooted as necessary due to
the fact that the home has been left untouched for some time and the mould
growth indicates that moisture is still present from the inundation.
Case No: 294076 Determination Page 14 of 16
84. It is well known that homes subject to high levels of moisture may be subject
to infestation from termites and the like. On this basis, the Panel accepts that
insulating the home against such a problem is a reasonable move.
85. The question is whether such a precautionary measure should be covered
by the FSP under the claim, noting that there is no report of infestation at this
point.
86. No evidence has been provided as to any previous measures taken on pest
control or any precautions after the event, undertaken by the Applicants to
protect their property.
87. In the circumstances, whilst the Panel agrees this is a measure that is
warran ted, it cannot accept that it‟s a cost for which the FSP must provide
indemnity. There is no evidence of an infestation at the property to this point
and the policy does not extend cover to protect against losses which have
not occurred.
Replacement of doors, windows and frames
88. The Applicants sought replacement of the doors, windows and window
frames in the lower floor of the property, which were all subject to inundation
as a result of the flood event.
89. They contend that their children suffer from allergies and the contaminants
from the water still present in these items have made it difficult for the female
Applicant to enter the home (which remains unrepaired).
90. No evidence has been provided as to specific allergies or to suggest that the
specific items are in any way responsible for any adverse reactions.
91. RL observed in his assessment of 14 August 2012 that the relevant items
might need to be replaced, noting that nothing had been done since the
claim at the time of assessment. He deferred to another expert to review and
comment on this damage.
92. “BB” then i nspected the property at the instruction of the FSP and identified
that:
“... the window and door security screens show signs of flood water however
there is no visible damage to the screens. Upon testing the security screens
doors all movable mechanisms are free and working fine.
...
The security screen doors have minor flood water marks and will need to be
removed, cleaned and reinstated only.”
93. Whilst it is accepted that the female Applicant and her children may have
suffered from allergic reactions to something in the home, there is no
evidence to suggest it involved the stated items. There is no evidence to
suggest that the items are severely damaged or otherwise cannot be
salvaged.
Case No: 294076 Determination Page 15 of 16
94. BB prepared a quote to attend to the relevant removal and cleaning of
certain items for $1,792.56. This was subsequently paid to the Applicants as
part of a cash settlement. The Applicants allegedly indicated to BB that they
would not accept a clean and repair of the items and that they only sought a
replacement of them.
95. The Panel notes, following the site inspection, the parties agreed that the
FSP will arrange for a further assessment of the doors, windows, window
frames and screens to determine whether the screens can be adequately
cleaned and if so the proper method of clea ning, bearing in mind the
Applicants ‟ claim to have attempted to clean these screens.
96. The parties are asked to work cooperatively together to resolve this aspect
of the dispute.
Determination
97. On the basis of the available information, the Panel determines that:
the FSP must indemnify the Applicants for the underpinning of the
property and provide an itemised and costed quote for the scope of
works prepared by BL. The FSP may engage another repairer to
attend to this if it sees fit and should the new scope of work exceed
the original quote, the FSP should pay the difference in a cash
settlement to the Applicants;
Insofar as the Applicants have already incurred the cost of the
underpinning, then subject to proof of the cost incurred, the FSP is to
pay the Applicants interest in accordance with Section 57 of the
Insurance Contracts Act 1984 on the amount incurred from the date of
payment of the relevant invoice to date of payment of the claim.
98. The Panel notes that the FSP has already cash settled the Applicants for the
cost to remove the mould at the home and for the cleaning of the downstairs
doors, windows and window fittings. Insofar as any additional costs may be
incurred with respect to the downstairs doors, windows and fittings, the
parties are asked to work together in a cooperative manner to resolve this
aspect of the dispute.
99. The Panel determines the FSP is not responsible for the costs of protecting
the property against future pest infestation.
Case No: 294076 Determination Page 16 of 16
100. Finally, the Panel determines pursuant to paragraph 9.4 of the Terms of
Reference that the FSP pay the Applicants an amount of up to $3,000 by
way of contribution to the Applicants‟ costs, incurred in supplying the
relevant engineering report from IC subject to the Applicants providing proof
of the relevant invoice to the FSP.