Home / Financial Firm (Unknown - Insurer) / Determination 293988

Determination 293988

Storm damage claim: stumps/footings claim declined; slow claim handling

FirmFinancial Firm (Unknown - Insurer)
Decided2013-05-23
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss$1,000
Amount claimed—
SourceAFCA PDF

Summary

The complainant's home was damaged in a 2011 storm and tornado, and the FSP declined further cover for the stumps/footings. AFCA found the stumps damage was not caused by the insured event but ordered $1,000 for poor claim handling and delay.

The insured must prove on the balance of probabilities that the loss was caused by a covered event, and the stumps damage was attributed to deterioration rather than the storm.

Issues

Subjects and remedies

home or building damagenatural disasterpay non financial loss

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 293988 Determination Page 1 of 11 Case number: 293988 General Insurance - Domestic Insurance - Home Building - Service - Delay in Complaint Handling - Dispute Over Repairs 20 March 2013 Background 1. The Applicant held a home and contents insurance policy with the Financial Services Provider (FSP) from approximately 2001. The policy provided building cover for $121,500 and contents cover for $80,000. 2. On 9 November 2011, the Applicant’s home was damaged during a storm and tornado event and a claim was lodged. 3. The FSP accepted the claim and provided indemnity for numerous repairs at the home. In all, the Applicant was indemnified for about $60,000. The Applicant was dissatisfied with some aspects of the work, the time taken to complete the work and the extent of work done. 4. Whilst the FSP believes that she has been indemnified to the extent required under the policy, the Applicant considers that the FSP should repair or replace the footings of the property which were moved and/or damaged in the insured event and provide compensation for the poor handling of the claim. Summary of Applicant’s p osition 5. The Applicant says that the FSP has left her without a safe home to live in and she and her children do not have suitable alternate accommodation. 6. She relies upon an expert report confirming that the severity of the tornado was sufficient to affect the footings of the property and contends that these footings should be repaired or replaced by the FSP. 7. There are other aspects of the home that have not been repaired to a suitable quality or extent and the Applicant seeks compensation for the FSP’s poor handling of the claim. Determination Case No: 293988 Determination Page 2 of 11 Summary of FSP’ s position 8. The FSP says that it has indemnified the Applicant to the extent required of it under the policy. 9. Some repairs in relation to the downpipes and guttering remain in dispute but this was private work arranged by the Applicant with contractors used by the FSP and is not covered under the policy. 10. The Applicant has supplied no evidence to prove the alleged poor claims handling, her difficult personal circumstances or any other reasons which might warrant an award of compensation. 11. The FSP relies on the following policy provisions: Pages 15-17 of the Product Disclosure Statement (PDS) “ WHAT YOU ARE COVERED FOR Storm If your home or contents suffer loss or damage caused by a violent wind, cyclone or tornado thunderstorm or hail which may be accompanied by rain ... or a sudden, excessive run-off of water as a direct result of a storm ... ... we will ...  rebuild or repair that part of your home that was damaged ... however ...  we will NOT cover loss or damage caused by storm to retaining walls, or when water enters through an opening that was not created by the storm.” ... Water – leaking or escaping If your home or contents suffer loss or damage caused by water leaking or escaping from ... ... we will under building insurance  rebuild or repair that part of your home that was damaged however  we will NOT cover loss or damage caused by water leaking or escaping from a o shower recess or shower base Case No: 293988 Determination Page 3 of 11 o stormwater channel or canal o stormwater pipe off the site  we will NOT repair or replace the item that the water leaked or escaped from  we will NOT pay to locate the cause of damage unless we have agreed to the costs beforehand.” Page 35 of the PDS “ What you are not covered for – general exclusions we will NOT cover  loss, damage, injury or death that occurs as a result of ... wear, tear, rust, corrosion, deterioration or erosion subsidence or landslide unless it happens immediately following an earthquake or explosion ...  accidental damage, unless you have paid the additional premium for this cover  ...  mechanical, structural or electrical failure of an it em...” Page 62 of the PDS Settling claims – under buildings If we agree to cover the claim under buildings insurance we will  repair or rebuild that part of your home which sustained loss or damage, or  pay you the cost to repair or rebuild it, whichever is smaller o if we choose to pay you the cost to repair or rebuild your home, we will pay the builder directly unless we tell you otherwise...” Page 66 of the PDS “ Things that may put your claim or cover at risk ... We may refuse a claim, cancel your Policy, or do both if you  ...  do not maintain your home in good repair and condition. This means that your home must be watertight, structurally sound, secure and well maintained...” Case No: 293988 Determination Page 4 of 11 Issues 12. Whether the Applicant’s claim has been handled appropriately by the FSP. 13. Whether there are any aspects of the claim which remain outstanding. 14. Whether an award of compensation is appropriate. Reasons for Recommendation 15. I am satisfied that a full exchange of the relevant information has taken place between the respective parties and that each party has had the opportunity of addressing any issues raised. 16. As advised to the parties, FOS has considered it appropriate to expedite the dispute in accordance with the Operational Guidelines to the FOS Terms of Reference. This is because of the potential amount of the claim and the issues to be considered. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 17. There is an onus on an insured to establish on the balance of probabilities that a claim fits the definition of an insured event. This is known as a prima facie claim. Should this onus be discharged, it is then the responsibility of the insurer to establish the application of any exclusion on which it relies to deny the claim. 18. To be entitled to cover from the FSP, the onus therefore rests with the Applicant to establish that her loss fits within the scope of what is covered by the FSP’s policy. 19. The policy provides cover for a series of defined events as outlined in the PDS. It does not provide blanket cover for all types of loss. 20. Whilst the FSP concedes that an insured event occurred and has attended to the repair (or cash settlement in some instances) for a significant portion of observed damage at the home, it considers that some aspects of the damage were not consistent with the insured event or were otherwise excluded by the policy. 21. I accept that the Applicant is in a difficult position as a result of her loss, noting that she has dependent children and her submission that the state of her home renders it unsuitable for habitation at the moment. 22. To establish if further work is required by the FSP, I must be satisfied that the work is necessary as a result of damage caused by the insured event. 23. To establish if compensation is appropriate, I must be satisfied that the FSP has failed to handle the matter in an appropriate fashion and/or that the Applicant is eligible pursuant to clause 9.3 of the Terms of Reference. Case No: 293988 Determination Page 5 of 11 24. The Applicant considers that her home, which is a former church and approximately 135 years old, was damaged in a severe storm event. This is not in dispute, although the parties differ over the extent of the damage which was caused by this event. Footings/stumps and the flue 25. Principally, the further dispute relates to the movement of the stumps/footings and the resultant insecurity of the home structure. The Applicant considers that this was as a result of the insured event, and/or as a result of the footings exposure to the elements after a trench was dug on the property, left insufficiently filled and allowed rainwater to flow and pool under the home for several months. 26. As of 29 January 2012, “water began penetrating through & around the firebox flue” which had not been repaired. This was used as a source of heat and a stove at the property. 27. In support of her concerns, the Applicant relies upon an expert report from CW, which relevantly provides: “... the gusts [from the storm/tornado event] could well have moved the house forward as spot levels indicate movement towards the north. There is no doubt that the house needs restumping, and that water ingress could well have exacerbated the deterioration of the stumps. The movement of the house has caused the ceiling plaster to become loose, and we would strongly recommend spending as little time inside as possible as plaster could break away and drop without notice. We also noticed that the spouting at the front left-hand side has a negative grade and is allowing water to flow over the top and directly under the house. This will be further eroding the stumps and would be the cause of that corner sinking more rapidly than the rest of the home.” 28. I accept that this report is not unequivocal about the cause of the damage and leaves it open to interpretation as to whether the stumps were moved by the storm, noting that it “could well” have been the cause. CW clarifies that the home needs restumping but this is not in dispute. 29. In response to this, the FSP retained a structural engineer, BM, to visit the site and to report on the damage. BM noted in his report of 4 August 2012 that: the severity of the tornado caused “several sheets of iron [to be] removed from the roof” and together with the heavy rain there was damage to the internal ceiling and wall linings; the Applicant had expressed concerns that during the remedial works to repair the damage, no stormwater pipes were present and this caused structural movement throughout the building; Case No: 293988 Determination Page 6 of 11 two different sized stumps were used for the home and “appear to be second hand”. BM suggested that they might have been former fence posts; due to the general fall of the land, any surface water on the south side of the property will flow across the ground beneath the home as there are no “cut - off drains constructed to divert water away from the house”; there is also “inadequate protection of the foundation soils along the south wall from significant moisture variation”; the drainage on the northern side of the home was adequate; at the time of inspection, the soil on the southern side of the home was moist but it was drier on the northern side; there were damp areas underneath the floor and one of the bearers under the floor was broken and not providing adequate support to the home; some of the stumps were in “very poor condition” and required replacement as they had decomposed. Other stumps were in good condition; BM could not identify why some of the stumps were decomposed and others were in a good condition; since the tornado/storm event, the Applicant had noticed some movement within the home. BM did not consider that this was related to the absence of stormwater pipes but due to the poor condition of the “timber stumps, broken beare r and poor site maintenance along the southern side of the dwelling”. 30. Photographs supplied with the report showed some of the decomposed stumps and the broken bearer joint. 31. The Applicant considers that there was ample evidence of the movement of the home after the storm and that she pointed this out to the repairer, PP, who attended the property on 10 November 2011. She contends that the FSP should have investigated the problem at the time and not when the engineer rendered his report some eight months later. 32. She is further of the view that the observed damage could easily have been caused by the tornado, noting that BM considered that the damage to the bearer (in particular) might have occurred anywhere from the time of the inspection up to two years prior to this. 33. The Applicant considers that such a timeframe fits in with the storm/tornado event and therefore, on balance, it could well have been the likely cause. Case No: 293988 Determination Page 7 of 11 34. The FSP’s repairer had identified a leak through two of the sheets of iron roofing near the flue. The Applicant says that no such leak occurred prior to the tornado and had never been identified in any previous inspection. The area in question was located above the floor level where the broken bearer joint was located and “noticeable movement has occurred”. 35. The Applicant cited several instances of work done at the property (such as the failure to arrange a drainage trench whilst downpipes were absent and trench digging by WA which allowed water to pool under the property) but these were events that o ccurred after the loss. As it is the Applicant’s contention that the stumps/footings were damaged in the tornado, these incidents should not have any bearing on this (except perhaps for exacerbation of the problem). 36. There is no direct evidence to suggest that the damage caused to the stumps was a direct result of the tornado and/or the storm. It is clear from the report compiled by BM and through the attached photographs that the condition of the home in general was not ideal prior to the insured event and the condition of some of the footings/stumps did not appear to be of an acceptable standard. 37. The Applicant’s expert, CB, identified that “water ingress could well have exacerbated the deterioration of the stumps” and I accept that this may be true but exacerbating the condition is not the same as causing it. 38. Whilst I accept that the home was damaged by the tornado, I am not persuaded by the evidence before me that the damage caused to the stumps was inflicted by this event. 39. The photographs indicate signs of advanced wear and tear and deterioration. The break of the bearer joint may well have occurred as a result of the storm (though there is no direct evidence of this) but its advanced state of deterioration suggests that it failed due to the ravages of time and not the result of a single definable event. 40. The purpose of insurance is to provide cover in circumstances listed under the policy and limited to a definable event. I cannot accept on the provided material that the tornado/storm was responsible for the damage caused, noting the advanced state of the deterioration visible. 41. Ultimately, the responsibility for proof rests with the Applicant to establish that the stumps and/or the flue were damaged in the storm, not simply that they might have been. It is a burden that I do not believe has been discharged in this instance. 42. I understand that the photographs provided were taken about nine months after the event and that continuous exposure to the elements may have affected the appearance of the stumps over this time. However, there is still no compelling evidence to believe that the stumps collapsed as a result of the insured event. Case No: 293988 Determination Page 8 of 11 Other damage 43. The Applicant has been dissatisfied with the failure of the FSP’s nominated repairer, SB, to satisfactorily attend to work at the property, including the installation of downpipes (which were not connected to the water tank). 44. The Applicant alleges that the roof was left leaking by SB and the FSP’s other contractors and was not completely finished until 11 October 2012, nearly a year after the storm event. 45. After her entitlement to temporary accommodation had expired, the Applicant says she returned to her home and found that the work undertaken by SB had not been completed. She learnt that the “downpipes were installed and not connected to the charged water system to the rainwater tank, our sole water supply”. 46. Heavy rain had been forecast and the Applicant was “forced to use old gutters to direct water away from the foundations and scaffolding as best I could” 47. As a result of SB’s failure to attend to a trench for the pipe and downpipes, soil “pushed up against my water pump box, which then flooded and I was forced to buy a new pump at the cost of $550”. SB refused to reimburse her for this. 48. The Applicant also alleges that whilst work was still to be completed, with the roof leaking and repairs still outstanding, SB issued a compliance certificate attesting to the completion of the job. The Applicant made complaints to SB, PP and the FSP and the relevant work was not completed until 27 March 2012 (but remained unsatisfactory until October). 49. The FSP says that this work on the gutters undertaken by SB was privately arranged with the Applicant and not part of the actual claim. The FSP considers that it is not responsible for work done on a private basis. 50. This situation is a difficult one and far from ideal. Where a contractor is engaged by an insurer but subsequently retained by an insured for independent work, the lines of responsibility are blurred. 51. The Applicant does not deny that she retained SB to conduct private work for her. It is admitted that she was seeking to renovate the home at the time of the tornado. 52. The scope of works prepared by PP notes that it was required to obtain a “roof plumbing compliance certificate” as part of its responsibilities but otherwise does not detail any repairs involving the plumbing. The FSP has since confirmed that it did not authorise or attend to any of the work for the downpipes or the guttering and that this was done as a result of a private arrangement with the Applicant. 53. The Applicant is of the view that compliance could not occur unless the downpipes and guttering was all connected but I agree with the FSP that Case No: 293988 Determination Page 9 of 11 there is no evidence that these items were damaged in the insured event and therefore no responsibility for the FSP to ensure that they were repaired. The FSP’s duty is to reinstate the home to the condition it was in prior to the incident (as near as it is practicable to do so). It is not to ensure that the home is repaired to a better condition or that all repairs undertaken at the site (and not relevant to the specific claim) are completed and satisfactory. 54. It appears that the FSP was either not aware or only marginally aware of the extent of extra work to be done by SB. There is no evidence before me to suggest that the delays encountered after 27 March 2012 were related to repairs arising out of the subject incident. I accept, based on the evidence that has been supplied, that this extra work was not done with the FSP’s authorisation and that it was not part of the claim. 55. Whilst it is entirely possible that SB has not repaired the relevant areas to an acceptable standard and/or that it did not do so quickly enough, the repairs were not conducted within the scope of the claim and therefore do not fall within the ambit of the Service’s (or the FSP’s) consideration. 56. Any ongoing concerns between the Applicant and SB will need to be addressed between these parties. Compensation and handling of the claim 57. The Applicant says that she has bee n severely disadvantaged by the FSP’s handling of the matter. She has been unable to live in the home as she considers it unsafe and has been dependent on the assistance of others for somewhere to stay. 58. This problem has had a distinct effect on her life and that of her children as they have been dependent on others to provide them with shelter and assistance through this period. 59. The Applicant says that the FSP has “consistently failed” to see to her needs, fulfil the terms of the insurance contract or to return telephone calls and/or meet deadlines. It is apparent that she has been unhappy with the FSP’s approach to the matter and this has been exacerbated by the situation with her children not having a permanent home. 60. In lieu of all the problems she has encountered in relation to the claim, the Applicant contends that the FSP should indemnify her for the various costs she has incurred throughout this period, including living expenses, moving expenses, inconvenience, storage and other items. 61. The FSP provided cover to the Applicant for temporary accommodation whilst repairs were conducted at the home but this was only for eight weeks and upon returning, the home was still surrounded by scaffolding, work remained unfinished and the investigation of the movement of the building had not been undertaken. Case No: 293988 Determination Page 10 of 11 62. Whilst the FSP’s repairer issued a compliance certificate for completion on 10 February 2012, the FSP does not dispute that the actual repairs related to the claim were not complete until about 27 March 2012, noting that a leak in the roof remained unrepaired until this time. 63. The Service does not have the power to grant entitlements not provided for under the terms of the insurance contact. The FSP’s policy does provide scope for alternate accommodation on the basis that the Applicant is unable to live in the home, although I have already indicated my satisfaction that the ongoing problems with the home have not been linked with damage arising from the claim. 64. Certainly, the Applicant might have had a claim under the policy up until 27 March 2012 and it appears that she received cover for the period up until she returned to the home in February. 65. There is no evidence of incurred costs for alternate accommodation and in my view there should be no cover under the policy as the remaining problems which continued after March 2012 were either not caused by the loss or did not directly involve the FSP. 66. Notwithstanding this, I am certainly of the view that the FSP has not handled the matter as well as it might have and it is not unfair to say that the tardy adherence to deadlines has had a detrimental effect on the Applicant. 67. In full knowledge of the Applicant’s circumstances, the FSP has been slow to investigate the cause of the loss and the ongoing problems with the property. 68. Further to this, the FSP failed to provide its last submission on the matter until prompted by the Service and held the matter up unnecessarily despite being in full knowledge of the Applicant’s situation . 69. The FSP is of the view that there is no evidence of the Applicant’s hardship or any reason under the Terms of Reference why compensation should apply. 70. I am of a different view. Whilst I concede that the FSP had grounds to deny the claim for the damage to the stumps and was at least not solely responsible for the problems with SB, it is apparent that the Applicant raised issues regarding the stumps and the possible impact of the tornado during the first inspection on 10 November 2011. 71. The issue could and should have been investigated immediately and a decision issued promptly regarding the denial of the claim. 72. The problem was not properly investigated by the FSP until August the next year and this, combined with the delays encountered with the submission to this office and the knowledg e of the Applicant’s predicament has been unfair on her and certainly served to cause her an “unusual degree or extent of physical inconvenience”. There was certainly an excessive time taken to Case No: 293988 Determination Page 11 of 11 resolve the situation and subsequent interference with the App licant’s enjoyment or peace of mind. 73. As provided for under the Terms of Reference and in consideration of the hardship suffered by the Applicant, I am of the view that the amount of $1,000 should be paid by the FSP to compensate her for her hardship in relation to the handling of the claim. Determination 74. On the basis of the available information, I determine that the FSP is not obliged to provide further indemnity to the Applicant in relation to the claim. 75. Based on the handling of the matter, the inconvenience for the Applicant and the time taken to resolve the claim, I am of the view that the FSP should compensate the Applicant with a payment for $1,000, pursuant to clause 9.3 of the Terms of Reference to the Service.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.