Home / Financial Firm (Unknown - Insurer) / Determination 293630

Determination 293630

Claim declined for foundation movement and water inundation damage

FirmFinancial Firm (Unknown - Insurer)
Decided2013-06-28
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicants claimed for subsidence-type damage to their house after heavy rain and for water entry through the roof and guttering. AFCA accepted the FSP exclusion for soil movement but found the roof and guttering water damage and garage contents were covered, with interest payable.

Soil movement is excluded under the policy, but roof tile dislodgement and guttering backflow are storm and rainwater damage without any proven unreasonable failure to maintain.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 293630 Determination Page 1 of 9 Case number: 293630 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of claim 14 May 2013 Background 1. The Applicants hold a Home Building and Contents Insurance policy with the Financial Services Provider (FSP). 2. There are two claims relating to the inundation of the property. The Applicants withdrew the first claim from 2010 and proceeded with the claim arising from heavy rainfall on 11-12 January 2011. The Applicants lodged a claim for damage caused by water inundation arising from the January 2011 weather event. 3. The FSP has declined the claim on the basis the damage arises from the excluded event of earth movement. 4. The Applicants dispute the declinature and seek indemnity for the damage. Summary of Applicants ’ position 5. The Applicants have enclosed report dated 5 April 2011 and quotation from “K”. The report contains the following:  The roof was found to be in good condition but there has been considerable movement in the rest of the property.  There is extensive damage internally due to water damage both coming through the roof and water causing movement.  The roof will need minor repairs around two entry points. Parts of the lead flashings need repair or replacing and some minor repairs or fixing down of ridge tiles is needed.  The whole house is required to be jacked up and sub-floor rebuilt. 6. The Applicants have enclosed an engineering report dated 2 November 2012 from “D”. The Panel notes the following from this report:  The house is a single-storey fibre cement board clad building with a metal tile roof. The internal walls appear to be plasterboard lined timber studs. A timber floor is supported by what appears to be 100x100 Determination Case No: 293630 Determination Page 2 of 9 timber stumps. The sunroom at the north-east corner of the building has a concrete floor.  Heavy rain in December 2010 and January 2011 caused serious flooding under the whole house which took months to dissipate. The stormwater mainly came from higher elevated areas to the north and west and could not drain away due to the already flooded areas to the south and east. Sometime after the floor levels started to show variations with associated wall and ceiling damage.  The most serious damage is around the north east corner of the sunroom and along the northern and western walls of the lounge. Some eaves damage is also evident.  Surface drainage away from the house is generally poor and there are trees/bushes located in close proximity to the building.  The floor levels over the entire house demonstrate a maximum elevation difference of 110 which is a significant reading. The low point of 220 is near the north east corners of the laundry to relatively high points of 325-330 along the western walls of bedrooms 3 and 4. The most dominant pattern is the north eastern corner of the laundry room plus part of the kitchen. This pattern is characteristic of soil shrinkage. Another pattern is the high points along the western wall of bedroom 3 and 4. This pattern covers these rooms plus bedroom 2, the bathroom, WC and northwest portion of the kitchen. This pattern is characteristic of soil swelling. The pattern in the lounge and bedroom 1 is also characteristic of soil swelling.  The soil sample indicated the property was founded on soil classified as extremely reactive. The soil is relatively uniform highly reactive sandy clay which is quite normal for this area. Tree roots to 5mm in diameter were found in the bore-log but there were no other unusual features.  D concluded the following information: i. The fact there are no significant fill materials in the area and the age of the building would rule out settlement as the likely cause of footing movement for this residence. ii. The footings are not appropriate for the soil type and accordingly will move to a greater degree than properly designed footings. iii. D notes the floor level would originally have been 280-290. This means that levels below are probably due to soil shrinkage if the ground is hard, bearing failure if the ground is soft and/or stump deterioration. Levels above these readings could only be due to soil swelling. iv. The allowable bearing pressure for stumps should not be less than 100kPa. The results of the reading showed that less than 100kPa existed to a depth of 900 around midway along the eastern wall for the lounge. This location is associated with high Case No: 293630 Determination Page 3 of 9 floor levels indicating that soil swelling rather than bearing capacity is probably the main cause of footing movement. v. Reactive movement is probably a significant factor in floor movement in the building. The contour patterns covering bedrooms, lounge, bathroom and part of the kitchen are characteristic of soil swelling caused by a moisture source(s) and support the claim of flood waters from the north and west inundating the area under the building. vi. Whilst there are trees and bushes around the building closer than recommended, the only one that could be causing problems is the 5m high native tree to the east of the north east corner of the house. The readings indicate this site has far deeper soil moisture conditions than usual and it is quite probable that the other trees and bushes are obtaining sufficient moisture from this deep source and have not caused serious problems to the building in the past. 7. The Applicants state that prior to the flooding there was no cracked plaster within the home. 8. The packing that was performed near the front door of the house was done post flooding and was necessary to enable the front door of the property to be locked. 9. There are no trees which caused any damage to the property prior to the subject flooding. 10. The FSP‟s engineer „F‟ did not take any levels in conjunction with the inspection. Further, there was no inspection performed underneath the house by F when the report was prepared. 11. The Applicants submit that the FSP had K inspect and perform an evaluation in connection with the claim. They are „astounded‟ the FSP denies same. 12. The Applicants contend that a significant amount of water inundated the property including a shed at the rear of the property which contained items such as power tools. The Applicants dispute the roots made anything sink and submit that roots push items up. 13. The Applicants note they claimed in 2010 but with the advent of the January 2011 flood which damaged the property further they cancelled the original claim. 14. The Applicants seek indemnification in respect of their loss resulting from the weather event. Summary of FSP’s position 15. The FSP relies on the following policy terms and conditions: Case No: 293630 Determination Page 4 of 9 “Storm and rainwater including stormwater runoff from areas surrounding the site, or water escaping from any water main, drain, pipe, street gutter, guttering or surface. Storm means a violent wind (including a cyclone or tornado), thunderstorm or a heavy fall of rain, snow or hail. ... What we do not cover – general exclusions You are not covered under any section of the policy for damage, loss, costs or liability caused by or arising from or involving: ... Soil movement or settlement ... The actions of t rees, plants or their roots” 16. The FSP has enclosed expert report dated 31 August 2010 from “C” entitled „external assessment‟ from which the Panel notes the following:  C found water overflowing from the front concealed gutter.  The slab is not moving but the wall between the stumps and slab in the laundry is moving. 17. The FSP has enclosed a report dated 17 November 2010 from engineer “F” from which the Panel notes the following:  The Applicants informed F that around November 2009 the Council performed road works. After the road works, the stormwater drain caused water to „back up‟ during heavy rainfall events which occurred around Easter 2010. The Applicants undertook plumbing works.  Re-blocking and re-levelling of the home was undertaken 2 years previously.  The sub-floor space below the house flooded around Easter 2010 during a heavy rainfall event. The water entered below the laundry as a result of water backing up from the stormwater drain. F contacted the plumber and confirmed the stormwater drain had been backing up.  Floor measurements indicated a variation of -62mm to +26mm for an arbitrary datum of 0mm.  The sunroom and laundry fall to the east by 60mm and 32mm respectively. It was noted by F that there was a 6m high tree in the adjoining eastern property. F believed the main cause of continued movement in the laundry and sunroom was due to trees in the adjoining eastern property.  F considers the re-levelling of the laundry during any re-blocking was limited by the construction of the sun-room, because re-levelling of the laundry could not be carried out without also re-levelling the sun-room. However, the amount of distress in the sun-room and laundry is no greater than the rest of the home. Case No: 293630 Determination Page 5 of 9  The house movements have generally been caused by differential changes in the soil moisture content of the expected highly reactive soils at the site. The area of Horsham is based on highly reactive soils.  F opined that the flooding event had not caused or contributed to the current out of levels of the laundry floor beca use: i. Water entry into the sub-floor space would cause heave, not settlements to occur. ii. If water entering the sub-floor space during a rainfall event had caused some heave to occur, the clay would be expected to swell and then settle following drying out. This single cycle of wetting and drying would be expected to have either a very minimal or zero effect on floor levels. iii. F believes the volume of water entering the sub -floor space during one heavy rainfall event would not be sufficient to cause saturation and bearing failure of the clay founding soils. 18. The FSP has enclosed report dated 5 April 2011from building consultant “J” from which the Panel notes the following:  There has been considerable movement throughout the whole house.  The study at the rear (north east corner) has been built on a slab which has sunk due to water from recent storm.  There is extensive damage internally due to water damage coming through the roof and water causing movement.  The roof needs minor repairs around two penetrations in the roof. Part of the lead flashings need repair or replacing and some minor repairs or fixing down of ridge tiles is required. J considered these maintenance issues.  The study area will need to be jack hammered up and the subfloor rebuilt. 19. The FSP has enclosed an assessor report dated 11 May 2011 from which the Panel notes the following:  The Applicants advised that the guttering around the property could not handle the water volume and has backed up into the property.  The assessor listed the cause of damage as storm.  The assessor opined that water inundated the property and appears to have moved the timber stumps and the ho use appears to have sunken in places. 20. The FSP has enclosed report dated 24 August 2011 by “F” from which the Panel notes the following:  The rainfall at the time of the damage was as follows: i. 12 January 2011: 101.4mm ii. 14 January 2011: 42.4mm Case No: 293630 Determination Page 6 of 9 iii. 19 February 2011: 22.8mm iv. 28 February 2011: 42.6mm  The cracking to the plaster throughout the home is relatively new and the crack locations/orientations are indicative of either a net uplift for the living room, bedroom or bathroom or alternatively settlement to the area.  Some of the timber bearers are in contact with the subfloor soil and some of the stumps in the location of the living room have been repacked.  The soil beneath the home appeared to be in a desiccated state. F believed this to be due to drought from 2006-2010 and the trees/shrubs around the home.  F listed the following issues as causing distress to the home: i. Drying soil leading to differential settlement of isolated stumps. ii. The repacking of settled stumps and the setting of the stump level to a higher than original datum level. iii. Clay soils will swell on wetting and this can cause movement in wet weather conditions. iv. Any difference in height between adjacent stumps will cause curvature of bearers and/or joists which will translate through to walls and floor surfaces above.  Uplift exerts strains on internal and external walls as well as the floor covering, resulting in cracking, particularly to doors and window openings. Had the packing been adjusted to take into account seasonal wetting then any uplift would likely have been uniform and cracking less likely. 21. The FSP has enclosed a report dated 18 January 2013 from F. The Panel notes the following from this report:  F has reviewed D‟s report and notes that in general the reports agree.  F maintains however that the damage would not have occurred from a one-off flood event. The silty clay material identified at the subject site is of medium to high plasticity with a low permeability rate. Based on the reactivity of the clay and its consistency, it is Fs experience that the water would not ingress to depths that would cause significant foundation movement from a one-off storm flooding event.  This type of silty clay generally forms a barrier and the water from the storm flooding sits on top of it until it evaporates or flows away. It takes a significant volume of water over a prolonged period of time (usually months) from a leaking pipe or poor drainage to inundate the area and create differential movement. 22. The FSP has acknowledged that J engaged K to provide a scope o f works but this does not bind the FSP to K‟s scope of works if it determines the Case No: 293630 Determination Page 7 of 9 claim is not one for acceptance. Further, whilst K‟s scope of works was initially authorised the Applicants had not established they suffered a prejudice. However, F‟s opinion should be preferred over J‟s opinion. 23. The FSP decided to consolidate the 2010 and 2011 claims as they appeared to be connected with one another. 24. The FSP submits that the Applicants must demonstrate that the damage claimed is the result of a covered event under the policy. The policy provides specific event cover which does include storm and rainwater. However, the policy also excludes damage or loss caused by soil movement or settlement and the actions of trees, plants and their roots. 25. Alternatively, the FSP submits that if FOS determines an insured event caused the damage that there are two events responsible for the damage to the insured property. One event is covered and one event is not covered and accordingly the Wayne Tank principle applies to defeat the whole of the claim. 26. The FSP contends the expert reports support its position that the cause of the damage is an excluded event. 27. The FSP disputes the Applicants‟ submissions that there was no previous cracking to the property and relies on the photographs attached to the 2010 expert reports which show cracking. Further, one of the experts clearly records the property was re-blocked 2 years prior to the 2010 event. Accordingly, the FPS contends that there is no deterioration to the property as a result of the storm event. 28. There is no evidence to support the Applicants‟ submission that the trees had no impact on the property. Issue 29. Whether the FSP was entitled to decline the Applicants‟ claim for water inundation. Reasons for decision 30. There has been an exchange of material between each party and the Panel is satisfied each party has had an opportunity to reply to the issues raised. 31. The Panel has read each party‟s submissions and materials and will only refer to the relevant submissions and materials raised. 32. This decision has been made by a Panel consisting of an Ombudsman, a representative with extensive experience in insurance industry matters and a representative with extensive experience in consumer claims. Case No: 293630 Determination Page 8 of 9 33. The Panel notes that most of the material focuses on the foundational movement, however the Applicants have raised water inundation through the roof/guttering and the loss of contents kept in the garage. Accordingly, the Panel notes there are three discrete areas of damage which will be dealt with separately below. Foundational movement and resulting damage 34. The Panel notes that the experts D and F generally agree that the foundation movement has been caused by soil movement. 35. There is some disagreement regarding whether the soil is exhibiting a subsidence or a swelling affect. D believes that the heavy rainfall has created an upheave impact to the western wall of bedroom 3 and 4, bedrooms 1 and 2, the lounge-room, the bathroom, WC and north-west portion of the kitchen. F disagrees that the storm event could have caused the upheave in the soil and opines that there are serious subsidence issues occurring. 36. The Panel notes that regardless of whether the storm did in fact create an upheave effect, that the storm cover is still subject to the general exclusions. In particular, the exclusion states the Applicants are not covered under any section of the policy for damage, loss, cost or liability caused by or arising from or involving soil movement. 37. The Panel accepts the evidence of both D and F that soil movement either by the mechanism of subsidence or upheave has caused damage. However, the claim for damage involves soil movement which is specifically excluded. This is regardless of whether the storm may have increased the soil volume and caused upheave, as the damage arising from this still involves soil movement and is accordingly excluded. 38. Given this, the Panel finds the Applicants claim for damage arising from soil movement/foundational movement is excluded by the policy. Water inundation via roof and/or guttering 39. The Panel notes the following additional policy terms: “You are not covered under any section of the policy for damage, loss, cost or liability caused by or arising from or involving: An unreasonable failure to properly maintain or repair y our building;” 40. It was noted in a number of expert reports, in particular J‟s report, that the roof had two areas in which water had entered the property through the roof. There are further statements from the FSP‟s expert C and the assessor that the guttering may have back flowed. 41. The evidence regarding the roof is that the lead flashing needs repair or replacing and some minor repairs of fixing down of dislodged ridge tile caps is required. J states that these are maintenance issues but does not explain the basis of his conclusion that these are maintenance issues. This is Case No: 293630 Determination Page 9 of 9 particularly given the high rainfall and apparently high wind gusts of 52- 76km/hr from 10 January 2011 to 14 January 2011. It is noted that these wind gusts, according to the Bureau of Meteorology Beaufort scale, are capable of causing dislodgment of roof tiles. 42. There is no evidence that the failure of the roof tiles arises out of an unreasonable failure by the Applicants to properly maintain or repair the building, which would be required to demonstrate the exclusion relating to „a failure to maintain‟ applies. Given this, the Panel sees no reason to exclude the loss or damage arising from the water entry through the roof. 43. There is no evidence that the guttering is defective and the polic y clearly covers damage arising from storm and rainwater run-off from guttering. Accordingly, the Panel considers any damage by the backflow of guttering into the property should be covered by the policy. Loss of Contents from the garage 44. The Applicants have stated that the water inundated the garage and as a result contents such as power tools were lost. In is unclear whether the Applicants lodged a claim for these items. 45. The Panel notes that in any event, the policy does cover stormwater run-off inundating a building and damaging the contents contained within that building. 46. Accordingly, should the Applicants wish to add the contents loss to their current claim then they are entitled to do so. Determination 47. On the basis of the available information the Panel determines the FSP was entitled to decline the Applicants‟ claim for damage arising from soil and/or foundation movement. However, the FSP was not entitled to decline damage arising from water inundation through the roof or the guttering system. Further, the Applicants are entitled to add any loss of garage contents to the claim. 48. The Panel further determines that the FSP is to pay interest in accordance with Section 57 of the Act from 7 January 2012 being the date of the FSP‟s Internal Dispute Resolution decision to deny the claim, to date of payment of the claim.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.