Determination 293392

Flood exclusion - claim refused

FirmFinancial Firm (Unknown - Insurer)
Decided2013-05-28
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed$36,326
SourceAFCA PDF

Summary

The complainants' Roma home was inundated in March 2010 and the FSP refused the claim as flood. AFCA found the FSP had not proved the first peak of water was flood water, and ordered it to cover damage up to 200mm above floor level with interest, quantum to be agreed.

The FSP bears the onus of showing the exclusion applies, and its hydrology evidence on the watercourse status and floor height did not discharge that onus for the first peak.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interestreassess claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 293392 Determination Page 1 of 9 Case number: 293392 General Insurance - Domestic Insurance - Home Building - FSP Decision – Flood - Denial of claim 10 May 2013 Background 1. The Applicants held a home building and contents insurance policy with the Financial Services Provider (FSP). 2. In March 2010, the Applicants‟ property in Roma, Queensland was inundated by water following severe weather events. 3. The FSP assessed the claim and refused liability on the basis the loss was caused by flood, which is an exclusion under the policy. 4. The Applicants disputed the decision on the basis that the FSP‟s hydrology evidence was incorrect and their home was inundated by stormwater runoff. 5. The FSP maintains that the loss is an excluded event. Summary of Applicant s’ position 6. The Applicants say the home was inundated above floor level at 9:30am on 2 March 2010. They provide statements in support of their submission. 7. The FSP‟s hydrologist (W) initially provided reports with no site specific information. W‟s various hydrology reports lack detail as to how and when the event occurred and nominate varying times as to the highest rainfall and the times Bungil Creek broke its banks. 8. Further, in its site specific report of 2 September 2011, W states their home is approximately 1m above the street. To the best of their knowledge no one has attended to measure the height of the home from the road. 9. Further, they do not agree w ith the hydrologist‟s opinion that Macartey Gully is a watercourse. There is also a lot made of the fact the peak rainfall occurred at 5:00am on 2 March 2010; however, there was still significant rain until 8:00am. 10. W also acknowledges that local stormwater runoff may have affected some properties in the area. Determination Case No: 293392 Determination Page 2 of 9 11. An eyewitness has stated he saw local stormwater breaking out from Macartey Gully at around 5:00am on 2 March 2010, well before water broke from the banks of Bungil Creek. 12. The Applicants seek to be reimbursed for the costs incurred in repairing the property, replacing contents, accommodation and legal costs, in the amount of $36,325.53, being less than the original $72,380.48 claimed. Summary of FSP’s position 13. The FSP says the expert evidence establishes the loss was caused by flood and that this is an excluded event under the terms and conditions of the policy. 14. The floor level of the insured property is 1m above the street and could not have been inundated with stormwater runoff prior to the flood. This is further supported by the fact the inundation did not occur before 8:30am, some hours after the peak rainfall. 15. Its hydrology expert (W) has responded to the allegations its reports lack detail. W notes a number of issues with the hydrology reports on which the Applicants rely (E). Further, E‟s reports are not site specific and therefore do not consider all the relevant facts. 16. Even if the water came from Macartey Gully, as E submits, W has advised this is a watercourse and therefore the water would still be considered floodwater. 17. The FSP relies on the following policy provisions: “ Words with special meaning … “Flood” means the inundation of normally dry land by water escaping or being released from the normal confines of a reservoir, natural watercourse or lake (whether or not they have been altered or modified). Flood also includes water discharge from any sewerage or waste water system due to pressure induced by Flood water. … Sections 1 & 2 Building & Contents Cover … Accidental Damage Cover We will pay for Accidental Loss of or Damage to your Building or Contents at the Address other than the Occurrences or items referred to in “What you are not insured for”. … What you are not insured for Under Section A – Home Cover we will not pay for: Case No: 293392 Determination Page 3 of 9 … 2. loss of or damage to your property caused by: a. Flood, the action of water from the sea, high sea water, tidal action or Tsunami;” Issues 18. Whether the loss was caused by flood, as defined by the terms and conditions of the policy? 19. Whether the FSP is entitled to refuse liability under the terms and conditions of the policy? Reasons for decision 20. As advised to the parties, the Financial Ombudsman Service has considered it appropriate to elevate the dispute in accordance with the Operational Guidelines to the Terms of Reference. This is because of the potential amount of the claim and the issues to be considered. This dispute has not been the subject of a Recommendation and has proceeded directly to Determination. 21. The decision has been made by a Panel of three Decision Makers, including an Ombudsman and Decision Makers with experience in the insurance industry and consumer rights. 22. On 17 April 2013, the Panel Chair Ombudsman attended on site where he met with the female Applicant and a representative of the FSP. The policy 23. The Panel has reviewed the terms and conditions of the Product Disclosure Statement (PDS) containing the details of cover. 24. The Panel is satisfied the policy covers accidental loss but specifically excludes loss caused by flood, broadly defined as water escaping a watercourse (such as a creek or river) or wastewater system. Whether the loss was caused by flood, as defined by the terms and conditions of the policy? 25. The Applicants says the FSP‟s hydrology evidence lacks detail and fails to establish the loss was caused by flood. They advise that as far as they are aware no one has measured the height of the home from the street to establish the floor level is 1m high, as report ed by the FSP‟s hydr ologist. 26. The FSP says the expert evidence establishes the loss was caused by flood and is therefore excluded under the policy. Case No: 293392 Determination Page 4 of 9 27. The Panel has reviewed the various hydrology reports provided. The FSP‟s hydrologist (W) and the hydrologist upon which the Applicants rely (E), have provided various comments on the rainfall and flooding from Bungil Creek. E states that W has not taken all available data into account while W states that E includes rainfall data for areas outside the relevant catchment area and therefore E‟s conclusions are misleading as to the nature of the event. 28. W provided a site specific hydrology report dated 2 September 2011. It provides the following relevant information:  W says that E‟s report fails to appreciate the difference between floodwater and stormwater. E concludes local stormwater including overflows from Macartey Gully was the primary cause of the flooding of the property. W says that Macartey Gully is a watercourse and therefore overflow from Macartey Gully would be floodwater.  While the exact time that Bungil Creek broke its banks is not known, it would have been north of Roma town (via the low section of Macartey Gully) sometime before 8:00am on 2 March 2010.  In E‟s report, witness „NT‟ reportedly noticed flow breaking out of Macartey Gully at approximately 5:00am on 2 March 2010.  During the December 2010 flood event in Roma, the evidence indicates that Bungil Creek reached the overflow paths to the east and west of the insured property before the gauge height of 6.5m was reached. This indicates that Bungil Creek would have broken out to the north of Roma around 7:00am on 2 March 2010.  E has not nominated a time of inundation and in its comments it fails to acknowledge that most homes in the area are raised above ground.  The available evidence for the insured address suggests the home is raised around 1m above the street. Information from local residents in various other flood investigations reveals that areas of the street were underwater by 7:30am on 2 March 2010 and homes on the street were inundated after 8:30am.  It is likely the Applicants‟ home was inundated above floor level sometime after 8:30am on 2 March 2010.  The peak rainfall at Roma occurred around 5:00am on 2 March 2010 and peak stormwater runoff would have occurred between 6:00am and 7:00am on 2 March 2010, before the insured property was inundated above floor level.  The report concludes that: “….based on information now to hand, during the 2 March 2010 flood event, overflows from Macartey Gully appear to have commenced around 0500 hours and overflows from Bungil Creek appear to have commenced sometime around 0700 hours. This is prior to the time water was observed to inundate parts of Edna Street and at least 1.5 hours prior to the conservatively assumed time (0830 hours) of initial above floor level Case No: 293392 Determination Page 5 of 9 inundation at the subject property and more than 1.5 hours after stormwater inundation in the vicinity of the subject property would have peaked. All available data and information, including recorded rainfall and water level data, local resident observations, flood mapping and detailed modelling of stormwater runoff, indicate that the subject property was initially inundated above floor level by floodwaters overflowing from Bungil Creek.” 29. The Panel notes that the FSP has not submitted evidence to support W‟s opinion that Macartey Gully is a watercourse. The Panel is satisfied that simply giving the geographic area the title of „Gully‟ does not of itself, make it a watercourse. 30. The Panel has also reviewed the case of Gartner v Kidman [1962] HCA 27 and notes the following:  The case held there was a difference between natural and artificial watercourses as well as the natural flow of surface water.  The Court relied on the case of Lyons v Winter (1899) 25 VLR which held that to constitute a watercourse, there must be a stream of water flowing in a defined channel or between something in the nature of banks.  The Court further noted the case of Cooper v The Corporation of Sydeney (1853) 1 Legge 756 which distinguished between a regular stream between banks and the occasional overflow of a swamp.  The Court further considered with some approval the American case of Barkley v Wilcox (1881) 86 NY 140 which stated “Depressions in the soil to which the surface water from adjacent lads naturally finds its way and is discharged into some natural outlet are not thereby made watercourses.” 31. W has not presented any evidence by way of details of the flow of water, whether there is a defined channel, or whether there are any banks. 32. Given the absence of evidence presented by W, the Panel is not satisfied that the FSP has sufficiently established that Macartey Gully is a watercourse. 33. The Applicants submit that W‟s reports offer varying times that Bungil Creek broke its banks and the times of the peak rainfall, making its conclusions unreliable. 34. In reviewing the comments from E and the responses from W, the Panel accepts that the exact time that Bungil Creek broke its banks has not been established; however, it would appear the peak rainfall in the area occurred in the hours before the Applicants says the property was inundated. 35. The Applicants have provided statements in relation to the events that unfolded on 2 March 2010. Case No: 293392 Determination Page 6 of 9 36. The male Applicant states he received a call at 5:30am from his brother asking him to assist with deliveries that morning as the normal person could not assist due to the water in the area. He went home around 6:30 – 7:00am and water was over the road and up to the bottom of the driveway. Friends helped move furniture in the home and he drove his wife and children to higher ground around 9:00am. He tried to find some sandbags on the way home but his friend called from the insured property at 9:30am to advise there was no need to get sandbags as water was already in the house. A neighbour had been putting sticks in the driveway to mark the water heights and these indicated there had been an initial peak and a second peak. 37. The female Applicant states she called her sister in law at 7:31am on 2 March 2010 to see if she needed her business premises sandbagged. At 7:57am she called her sister in law back to say she could not help as the insured property was at risk of inundation. Her husband drove her and their child to her auntie‟s house around 9:00am. She returned to the insured property at midday on 3 March 2010 and the cleanup was already in progress. 38. The FSP‟s first assessment of the propert y states the following: “From our enquiries we learned the water began to encroach over residential and commercial properties at around 10:00am on 2 March 2010 and by 12:00pm the water had inundated those properties situated throughout the Northern and Eas tern sides of town.” 39. W says that any stormwater runoff inundation would have peaked between 6:00am and 7:00am on 2 March 2010, shortly after the peak rainfall. 40. W says that the home would have been inundated to above floor level sometime after 8:30am. The Applicants say the home was inundated above floor level around 9:30am. 41. The Panel has very recently reviewed a dispute (293075) on the same street as the Applicants‟ home for the same event. The other home is a few houses away on the same side of the street. 42. In that case, W stated that property would have been inundated sometime after 10:30am on 2 March 2010. It is noted that the other propert y‟s floor level was estimated to be only 300 - 500mm above the street (as opposed to the Applicants‟ home which is estimated by W to be more than 1m above the street level). 43. The Panel notes that the Applicants‟ property is reportedly at least 500mm higher than the property only a few numbers away on the same street, yet W states the insured property would have been inundated above floor level after 8:30am, but the other property would have been inundated after 10:30am. 44. In reviewing this issue the Panel notes that W says the ground level of the Applicants‟ property is approximately 299m AHD and the ground level of the other property is approximately 300m AHD. Noting the Applicants‟ floor level Case No: 293392 Determination Page 7 of 9 is estimated to be 1m higher than the street and the other property is estimated to be 300 – 500mm higher than the street, there is an element of doubt as to the comparisons between the two properties. 45. The figures nominated for the street levels and above floor levels are all estimates only and may not reflect the actual heights accurately. The estimation is not assisted by the fact that it appears W did not attend on site. 46. Further, the Applicants have questioned W‟s report that the floor level of the home is 1m higher than the street level. 47. The Panel has the benefit of the Panel Chair Ombudsman‟s onsite observations of the Applicants‟ home and topography in the immediate area. 48. The Panel Chair Ombudsman disagrees strongly with W‟s view that the Applicants‟ floor level was more than 1m above the street level; the Panel Chair Ombudsman observed the floor to be only about 500mm above the street level. 49. As stated, there is no evidence that the FSP‟s hydrologist attended on site or met with the Applicants. 50. The Panel Chair Ombudsman also observed the floor height of the Applicants‟ home, relative to the street, was significantly, lower than the floor height of the other home, referred to by the FSP‟s hydrologist, W. 51. The Panel has considered a number of disputes in the town of Roma and is aware of the evidence supporting the conclusion that there were two peaks of water on 2 March 2010. 52. The Panel notes that the evidence presented by the Applicants in this dispute, is consistent with that conclusion. 53. Having considered all the available evidence, the Panel is satisfied that the second peak of water was as a result of flood water from the break out point of the Bungil Creek, which is to the north of Roma. 54. The Panel is also satisfied both peaks of water inundated the Applicants‟ property and having reached that conclusion, the issue for the Panel is whether the first peak is properly categorised as stormwater runoff, or flood water? 55. The Panel notes that the policy, applicable to the dispute, is an accidental damage policy and given the loss suffered b y the Applicants was unintended and unexpected, the Applicants have established a prima facie claim. 56. The FSP in seeking to rely upon the policy exclusion of flood, carries the onus to demonstrate that the first peak of water is properly categorised as flood water. 57. The Panel, as stated, is concerned by the evidence presented by the FSP‟s hydrologist W, regarding the respective heights of properties above E Street. Case No: 293392 Determination Page 8 of 9 58. The Panel also notes that in a dispute in respect of another property in E Street, W estimated that the other property was inundated sometime after 10.30am. However, the eye witness evidence of the tenant at the other property was that the other property had been inundated by 9.30am. 59. The Panel notes that the Applicants‟ evidence in this dispute, is consistent with the evidence of the tenant, in the other dispute and significantly, challenges the estimation of W. 60. Further, the Panel notes that in the other dispute involving E Street, W says the inundation occurred after 10.30am, whereas in the current dispute, W estimates that this property, also in E Street, was inundated after 8.30am. 61. Having considered all of the evidence, the Panel is not satisfied that the FSP has discharged its onus to show that the first peak of water was flood water. 62. Conscious of the fact that there is limited evidence to establish the height of the first peak of water, the Panel is satisfied after considering the evidence, that it is fair in all the circumstances to determine that the Applicants‟ property was inundated by the first peak of water, to a level of 200mm above floor level. 63. The Panel is conscious of the fact that it has made several Determinations for properties in the same street and that the outcome of those Determinations are not exactly the same. 64. However, the Panel is obliged to consider the individual circumstances and specific evidence applicable to each property. 65. Additionally, the Panel has had the benefit of the Panel Chair Ombudsman‟s on site observations, which has greatly assisted the Panel‟s consideration of each matter. Quantum 66. The Renewal Schedule of Insurance for the relevant period provides a sum insured of $231,462 for the home building and $30,000 for the contents. 67. The information available to the Panel does not allow it to determine the extent of the loss sustained as a result of the inundation; however, the Panel understands the Applicants have repaired the property since the loss. The Applicants state they would be willing to accept $36,325.53; however, the Applicants have advised the Service that this does not represent the actual loss as they have not replaced some items and did much of the work themselves or through friends. 68. In the absence of any accurate assessment with respect to this, the parties are asked to work together to develop a relevant list of the building damage and to work together to reach agreement as to the cost of repairs and/or replacement of the various building damage and contents as a result of the inundation to the property to a level of 200mm, above the floor level of the home. Case No: 293392 Determination Page 9 of 9 69. In the circumstances the Panel determines the Applicants are not entitled to be reimbursed for legal costs. 70. In the event that the parties are unable to reach agreement, then the parties are invited to make further submissions to the Panel and the Panel will determine the extent of the loss. Determination 71. The FSP is to meet the cost of the building rectification and contents loss caused by inundation to a level of 200mm, above the floor level of the home. 72. Insofar as the FSP is to cash settle the claim, the FSP is to pay interest from 5 November 2010 (the date of the November hydrology report) until payment of the claim, in accordance with Section 57 of the Act.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.