Determination 293212

Quality and matching of replacement ground floor boards after water damage

FirmFinancial Firm (Unknown - Insurer)
Decided2013-05-02
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded$24,542
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

After water damage the FSP replaced the ground floor boards with milled timber instead of the recycled boards the Applicant wanted to match the upper floor. AFCA found the FSP had not met its policy obligation to match the original materials and directed it to have the entire ground floor re-laid with recycled boards, or alternatively cash settle $24,542.

The policy requires the insurer to try to match repair materials with the original materials or the nearest equivalent, and the insurer had not shown it could not source suitable recycled boards.

Issues

Subjects and remedies

home or building damagepay claimrepair or rectify

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 293212 Determination Page 1 of 6 Case number: 293212 General Insurance - Domestic Insurance - Home Building - Service - Service Quality 30 April 2013 Background 1. The Applicant held a home building insurance policy with the Financial Services Provider (FSP) from 7 November 2008 and the policy was current at the time of the loss. 2. The Applicant lodged a claim with the FSP for damage sustained to the property as a result of rainwater leaking into the property. 3. The FSP accepted the Applicant’s claim and organised for th e replacement of the entire floor boards on the ground floor as its attempt to repair the water damaged floor boards had failed. 4. The Applicant is unhappy with the replacement (floor boards) and she expects the FSP to re-lay the entire ground floor with recycled floor boards. Summary of Applicant’s position 5. The Applicant says she requested the FSP ’s appointed builder to replace the damaged floor boards with boards similar to the original recycled floor boards, so that upper and ground floors would have a unified appearance. 6. The FSP's builder was aware of her travel details and due to a two to three weeks delay of the scheduled works due to the unavailability of the material, she left to attend a conference in the USA and was not present at the time when the replacement works were carried out. 7. The Applicant says the replacement works carried out by the FSP’s builder is of poor standard and the correct floor boards had not been used. The builder had used milled timber rather than recycled floor boards as requested by her. 8. The Applicant is very unhappy with the current appearance of the flooring and says it would decrease the value of her property. Determination Case No: 293212 Determination Page 2 of 6 9. She also says the recycled floor boards are available from various retailers and that when she replaced them approximately 12 years ago, she had carefully chosen each floor board to match the existing flooring. 10. The Applicant says that there are approximately twelve to thirteen floor boards (re- laid by the FSP’s builder) which have sustained damage and she sees no point in the FSP’s expert assessing the flooring as suggested by the FSP, as she believes the entire floor needs to be re-laid. 11. The Applicant expects the FSP to re-lay the flooring with recycled floor boards including sanding and polishing in accordance with the quotes (prepared by “ R ” – floor specialist) submitted by her. Summary of FSP’s position 12. The FSP says the Applicant’s floorboards have been replaced to an acceptable select grade industry standard, according to an Acc redited Inspector (expert) and si nce t imber is a natural product containing natural variations, and no two pieces of timber are the same , it cannot guarantee to replace damaged areas with an exact replacement if it is not available. 13. In the absence of an identical replacement, it has endeavoured to source the nearest equivalent available to the original materials in accordance with the policy entitlement. 14. The FSP is willing to replace the two floor boards which have sustained damage since the replacement and the further works recommended by its expert and the engineer. 15. It is also willing to appoint its expert to reassess the flooring if the Applicant believes the flooring had sustained further damage since his last inspection. 16. The FSP is not willing to relay the entire ground floor and relies on the following policy provisions: “ How we settle a buildings claim 1. We will decide how we will settle your claim If you buildings suffer loss or damage, we will decide whether to … pay you the cost to repair or rebuild that part of our buildings that suffered loss or damage. If we do, we will … try to match any material used to repair your buildings with the original materials or nearest equivalent available to the original materials.” Case No: 293212 Determination Page 3 of 6 Issue 17. Whether the FSP is required to re-lay the entire ground floor with recycled timber boards. Reasons for decision 18. Due to the nature of this dispute, FOS has considered it appropriate to expedite the dispute in accordance with the Operational Guidelines to the FOS Terms of Reference. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 19. I am satisfied that a full exchange of information has taken place between the parties and that each party has had the opportunity to address any issues raised. 20. I consider the FOS Terms of Reference relevant to this dispute are: “ 8.2 Dispute resolution criteria Subject to paragraph 8.1, when deciding a Dispute and whether a remedy should be provided in accordance with paragraph 9, FOS will do what in its opinion is fair in all the circumstances, having regard to each of the following: a) legal principles; b) applicable industry codes or guidance as to practice; c) good industry practice; and d) previous relevant decisions of FOS or a Predecessor Scheme (although FOS will not be bound by these).” 21. The Applicant has not raised any issues regarding receipt of the policy documents and in the circumstances I am satisfied the FSP has fulfilled its obligations in informing her of the terms and conditions of the policy. 22. There is no dispute the Applicant's claim falls within the general cover of the policy. The issue that remains, is whether the replacement flooring organised by the FSP meets the terms and conditions of the policy. 23. I note the Applicant is of the firm view that the FSP's replacement flooring has not brought her property to its pre-loss condition as the replacement floor boards were milled timber, meaning large pieces of wood taken from a demolition site and milled into floor boards. 24. The Applicant says the original damaged floor boards were recycled floor boards and they also matched the upper level floor. The standard and appearance of the re-lai d flooring by the FSP’s builder is poor and the floor boards have sustained further damage since it was re-laid. 25. In response to t he Applicant’s concerns, the FSP appointed an expert to assess the re-laid floor boards and his report is below: “ 3.0 HISTORY OF THE FLOOR RELATING TO THE PROBLEM Case No: 293212 Determination Page 4 of 6 ... It is said that following the refurbishment, the flooring crowned (also known as reverse cupping) and it was agreed to remove and replace the entire floor area. It is said that the [Applicant] requested the replacement flooring be recycled timber instead of new timber. Following completion of the work, it is said the home owner has questioned the quality of the timber used in the flooring indicating that recycled floorboards were requested and not remachined timber. ... 7.0 FACTORS CONSIDERED TO BE CONTRIBUTING TO THE PROBLEM ARE ... Whilst the expansion of the flooring in one section of the installation is clearly a concern, the main issue contributing to the [Applicant’s] dissatisfaction relates to appearance expectations. Whilst the noted imperfections are considered commercially acceptable it is considered that more attention to detailed filling would have reduced the visual impact of the imperfection and the propensity for the rejection by the [Applicant]. 8.0 CONCLUSIONS ... The purpose of this report is to assess the standard of recycled timber used in the production of the subject floor and to consider causation of distortion in a section of the installation. The evidence propounded in this report indicates that the standard of material used in the execution of the works meets industry standards for product and grade. The distortion in the flooring adjacent to the store room is considered to be temporary and most likely related to residual moisture from the original water damage incident. Due to the damage caused by the expansion of the boards, 1 or 2 boards may need to be replaced which will generate the need to re-sand the floor. In such a strategy, it is recommended that consideration be given to detailed filling of surface imperfections which will improve the aesthetic appreciation of the floor and contribute to amelioration of the [Applicant] concerns. ” 26. The FSP also appointed a civil and structural engineer “ M ” who states: “To repair we would recommend that skirting is removed and timber edges trimmed. The central boards can then be removed and replaced with sanding and sealing as per the [expert] report. In general the sanding did not look particularly well done, nor did the sealing as there is significant splashing to skirtings and kitchen kick boards to which tape and good preparation would have avoided” 27. The Applicant appointed R to assess the flooring and his findings are as follows: “ After visiting your house and inspecting your floor ... Case No: 293212 Determination Page 5 of 6 As you also pointed out, you do not have continuity from your original floor. The new recycled floor does also have allot of boards that have cracks in them. To remove your floor without going to the expense of going through the kitchen, I propose that we cut around it and bead (trim) the gap afterwards. Also with pulling up your floor more then likely the battens with come up with the flooring, I have attached a separate quote for the battens if this eventuates. (sic) 28. I have carefully reviewed the material presented by the Applicant and the FSP and I accept that the FSP has replaced the flooring with the nearest equivalent and the floor boards are of industry accepted standards. However, it appears the re-laying work by its builder was poor as highlighted by the expert and M. 29. The fact remains the policy assures the Applicant that the FSP would try to match any material used to repair the building with the original materials. 30. I am of the view that the main issue that rests here is not about the quality of the replacement boards used by the FSP’s builder. 31. There is no evidence presented by the FSP that it was not unable to source the recycled floor boards similar to the original floor boards nor that it contacted the Applicant regarding this issue and sought her views on this matter before it decided to choose the nearest equivalent. 32. The Applicant says that she was assured by FSP’ s builder that best replacement would be sourced and she had no knowledge that he meant “milled timber” and not “recycled floor boards”. 33. I note that the FSP’s expert in his report acknowledges the reason why the Applicant had rejected the floor boards was because the related flooring was re-machined timber and not recycled floor boards. However, the focus of his report from thereon revolves around the standard of material used, current issues and remedial work to improve the aesthetic appearance of the FSP’ s builder’s works. 34. The FSP does not address the issues whether the FSP’s builder at any time look for the recycled floor boards, whether he was unsuccessful and whether he sought advice from the FSP as to what his next step should be. 35. The Applicant says that she can provide a number of contacts for retailers who are specialised in supplying recycled floor boards and she is happy to choose the boards herself. She will then allow R to complete the re-laying of the entire flooring. The sanding and polishing could then be completed by THD. 36. Based on the above, I am not satisfied the FSP has met its policy conditions in that it tried to match the original material as there is no evidence that it was unable to source the recycled floor boards. Case No: 293212 Determination Page 6 of 6 37. It appears the FSP’s builder had chosen the best replacement available in the market rather than attempting to source floor boards similar to the original boards. 38. Therefore, I am satisfied that on the balance of probabilities, the FSP has not met its policy conditions and that it should replace the entire ground floor with recycled timber floor boards. 39. The Applicant has recently provided quotes (dated 22 and 23 April 2013) from C, who is able to attend to the repair and reinstallation works including sanding and polishing of the flooring and supplier RTC who would supply the recycled floor boards. 40. She says that she prefers that one company, C, attends to all the repairs and reinstallation and I am satisfied that this is a reasonable request. I note the FSP has not made any comme nts in relation to the Applicant’s request and the quotes from C and RTC. 41. I accept that the FSP is entitled to choose to appoint its own builder to complete this work. Nevertheless, considering the history of this dispute and the Applicant’s willingness to carefully choose the floor boards herself (to match the existing flooring), I am satisfied that it is fair in all the circumstances that the FSP appoints C and RTC to complete the works and the Applicant be given the opportunity to select the recycled floor boards. 42. Alternatively, the FSP could cash settle the Applicant for the following: Repair and reinstallation works by C - $18,650; and Purchase of floor boards from RTC - $5,892 43. I am satisfied the FSP cannot be held responsible by the Applicant for any further issues arising from the repair works completed by C or the floor boards chosen by the Applicant from RTC. Determination 44. On the basis of the available information, I determine the FSP should appoint C to re-lay the entire ground floor with recycled floor boards from RTC or it should cash settle the Applicant $24,542.00 as the full and final settlement of the claim.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.