Home / Financial Firm (Unknown - Insurer) / Determination 293077
Determination 293077
Denial of flood damage claim for home inundation on 2 March 2010
Summary
The applicant's home was inundated in the 2010 Roma floods and the FSP denied the building and contents claim as flood, which the policy excludes. AFCA found the water that entered the home was floodwater from a creek overflow, so the FSP was entitled to deny the claim.
Site-specific hydrology, the home's elevation and the timing of the inundation show the water was flood from Bungil Creek, which the policy excludes.
Subjects and remedies
home or building damagenatural disasterno remedy
Text of the determination
Case No: 293077 Determination Page 1 of 8
Case number: 293077
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Flood - Denial of claim
8 May 2013
Background
1. The Applicant held a home building and contents insurance policy with the
Financial Services Provider (FSP).
2. In March 2010, the Applicant‟s property in Roma, Queensland was
inundated by water following severe weather events.
3. The FSP assessed the claim and refused liability on the basis the loss was
caused by flood, which is an exclusion under the policy.
4. The Applicant disputes the decision on the basis that the FSP‟s hydrology
evidence was incorrect and her home was inundated by stormwater runoff.
5. The FSP maintains that the loss is an excluded event.
6. The Applicant has legal representation; for ease of reference, the term
Applicant throughout this Determination refers to both those parties.
Summary of Applicant ’s position
7. The Applicant says the home was inundated above floor level at 9:30am on
2 March 2010. She acknowledges the timing given to the FSP‟s hydrologist
was slightly different, but after checking her telephone records she has been
able to clarify the times by the phone calls she made at the time.
8. The time of 11:15am given to the hydrologist was also the time muddy water
came into the property.
9. The Applicant provides a number of Statutory Declarations from witnesses to
support her submission the inundation occurred around 9:30am.
10. The Applicant provides photographic evidence in support of her submission
that there were two separate inundation events on 2 March 2010.
11. The FSP‟s hydrologist (W) initially provided reports with no site specific
information. W‟s various hydrology reports lack detail as to how and when
Determination
Case No: 293077 Determination Page 2 of 8
the event occurred and nominate varying times as to the highest rainfall and
the times Bungil Creek broke its banks.
12. W also states that some properties could have been inundated by
stormwater runoff before the flood.
13. The loss adjustor who assessed the home did the majority of the
assessments on the street for a number of insurers. Some of those claims
were paid and others were not. The Applicant questions how such different
decisions can occur in such a small area.
14. An eyewitness has stated he saw local stormwater breaking out from
Macartey Gully at around 5:00am on 2 March 2010, well before water broke
from the banks of Bungil Creek.
15. The Applicant believes her loss stands at around $148,000, for building and
$40,000, for contents. She also seeks costs associated with handling the
dispute.
Summary of FSP’s position
16. The FSP says the hydrology evidence establishes the loss was caused by
flood and as flood is an exclusion under the policy, the loss is excluded.
17. The Applicant originally reported more than once that the inundation of the
home occurred at 11:15am on 2 March 2010; however, now the Applicant
claims the inundation occurred two hours earlier. The FSP submits the
Applicant‟s revised timing cannot be reasonably believed.
18. The FSP says that the photographs provided do not show the time and there
is no evidence the photographs were taken at the times submitted. The
photographs fail to establish the Applicant‟s revised version of events and
the water in the photographs is largely dirty, despite the Applicant‟s
comments to the contrary.
19. Further, one photograph reportedly taken at 9:30am, shows the water level
in B Court had not risen to the level of any of the houses and water had not
inundated land visible at the far end of the intersection in the Applicant‟s
street.
20. However, even if the inundation occurred at 9:30am as submitted, this would
still have been floodwater given the peak rainfall occurred around 5:00am.
21. The FSP provides evidence that the Applicant was told the policy did not
cover flood when the policy was purchased. The policy inception call
transcript reveals the Applicant was aware that the policy did not cover flood
and that she stated she could review that matter later.
22. The floor level of the insured property is 300mm above the street and could
not have been inundated with stormwater runoff prior to the flood. This is
Case No: 293077 Determination Page 3 of 8
further supported by the fact the inundation did not occur before 9:30am (at
the very earliest), some hours after the peak rainfall.
23. Its hydrology expert (W) has responded to the allegations its reports lack
detail. W notes a number of issues with the hydrology reports on which the
Appl icant relies (E‟s reports). Further, E‟s reports are not site specific and
therefore do not consider all the relevant facts.
24. Even if the water came from Macartey Gully, as E submits, W has advised
this is a watercourse and therefore the water would still be considered
floodwater.
25. The FSP relies on the following policy provisions:
“ General Exclusions of this Insurance
The insurance we offer to you under the policy provides cover for certain
events. There will be situations where the policy provides no cover at all.
Those situations are set out in the policy wording and in some cases in your
policy schedule. The following is a list of some of the general exclusions of the
policy:
…
flood.
…
Words that have Special Meanings
…
Flood means the covering of land that is not normally under water by:
(a) water that overflows or escapes from a naturally occurring or man made
inland watercourse (such as a river, creek, canal or storm water channel)
or a water pool (such as a lake, pond or dam), whether it is in its original
state or has been modified; or
(b) water released from a dam whether it be accidentally released or
intentionally released to control, mitigate , regulate, or otherwise respond
to excess water; or
(c) water that cannot drain or run off as a result of water that is overflowing or
escaping from an inland watercourse or water pool preventing the escape
of water.
…
Section 2A – Your Home: What is Covered
…
What we will pay for
We will cover you for accidental loss or damage to your home occurring
during the period of insurance.
…
Section 2F – Exclusions
These Exclusions apply to all sections of the policy.
Case No: 293077 Determination Page 4 of 8
We will not pay for any accidental loss, damage, injury or liability for,
occurring from or arising out of:
…
21. flood.”
Issues
26. Whether the loss was caused by flood, as defined by the terms and
conditions of the policy?
27. Whether the FSP is entitled to refuse liability under the terms and conditions
of the policy?
Reasons for decision
28. As advised to the parties, the Financial Ombudsman Service has considered
it appropriate to elevate the dispute in accordance with the Operational
Guidelines to the Terms of Reference. This is because of the potential
amount of the claim and the issues to be considered. This dispute has not
been the subject of a Recommendation and has proceeded directly to
Determination.
29. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in insurance industry matters and a
representative with extensive experience in consumer claims.
30. On 17 April 2013, the Panel Chair Ombudsman attended on site where he
met with the Applicant and a representative of the FSP.
The policy
31. The Panel has reviewed the terms and conditions of the Product Disclosure
Statement (PDS), containing the details of cover.
32. The Panel is satisfied the policy covers accidental loss but specifically
excludes loss caused by flood, broadly defined as water escaping a
watercourse (such as a creek or river).
33. The Applicant stated in her submission that she was not aware of the flood
exclusion. However, the FSP provided information from the policy inception
call that indicates the Applicant was told the policy excludes flood and she
said that she would take the policy anyway and “suss out what else was
available” in respect of flood cover.
34. The Applicant has acknowledged this on review of the information and the
allegation in respect of „failure to clearly inform,‟ is no longer part of this
dispute.
Case No: 293077 Determination Page 5 of 8
35. Accordingly, the Panel is satisfied the FSP did clearly inform the Applicant of
the flood exclusion and may rely on the terms and conditions of cover.
Whether the loss was caused by flood, as defined by the terms and conditions
of the policy?
36. The Applicant says the FSP‟s hydrology evidence lacks detail and fails to
establish the loss was caused by flood.
37. The FSP says the expert evidence establishes the loss was caused by flood
and is therefore excluded under the policy.
38. The Panel has reviewed the various general hydrology reports provided. The
FSP‟s hydrologist (W) and the hydrologist upon w hich the Applicant relies
(E) have provided various comments on the rainfall and flooding of Bungil
Creek. E states that W has not taken all available data into account while W
states that E includes rainfall data for areas outside the relevant catchment
a rea and therefore E‟s conclusions are misleading as to the nature of the
event.
39. The Applicant submits that W‟s reports offer varying times that Bungil Creek
broke its banks and the times of the peak rainfall, making its conclusions
unreliable.
40. In reviewing the comments from E and the responses from W, the Panel
accepts that the exact time that Bungil Creek broke its banks has not been
established; however, it appears not in dispute that the peak rainfall in the
area occurred several hours before the Applicant says the property was
inundated.
41. W provided a site specific hydrology report dated 9 April 2010. It provides
the following relevant information:
The insured building is built on a slab and was inundated to a level of
400mm above floor level.
The property is on the corner of a street and crescent and appears to be
“well drained” with the floor levels of the house and garage/office being
approximately 300mm above the street level.
The Applicant‟s version of events is that water began to inundate the y ard
around 9:15am on 2 March 2010 and water rose to inundate the home
above floor level at around 11:15am. The Applicant left the property at
1:00pm and at this time the water was knee deep.
The peak rainfall in the area occurred at around 5:00am on 2 March 2010
and the stormwater runoff should have drained away within 10 to 20 minutes
of the peak rainfall; however, water did not inundate the home above floor
level until over six hours later.
CONCLUSIONS
“Based on our site inspection and an assessment of available data for the
subject site, it is concluded that the inundation of the house and
Case No: 293077 Determination Page 6 of 8
garage/office at the subject property above floor level was caused by water
overflowing from Bungil Creek.”
42. The Applicant states that the inundation actually occurred around 9:30am on
2 March 2010. She notes her earlier version given to the assessor and
hydrologist was incorrect and this only came to her attention when she
reviewed her telephone records, which revealed that the calls she had made
to alert people to the unfolding events were made earlier than she had
thought.
43. The Applicant provides a number of Statutory Declarations in support of her
submission:
„JH‟ (the Applicant‟s father) states that he took his wife to the hairdresser less
than 1km away at 10:00am on 2 March 2010 and soon after his return home,
the Applicant called to say there was a foot of water in the home. He
estimates this call was at 10:30am.
„BP‟ (the Applicant‟s neighbour) states that soon after 9:00am on 2 March
2010 she visited the Applicant‟s home. There is a photograph showing her at
the Applicant‟s property after 9:00am with water already rising above the
street gutter.
„MH‟ & „MH‟ (res idents on the same street) state water entered their property
at 9:30am on 2 March 2010.
44. The FSP says the Applicant‟s revised timing cannot be relied upon, noting
she gave the same version that water entered the home at 11:15am to the
assessor, the hydrolo gist and also in her „Brief for Decision‟ to the FSP‟s IDR
department.
45. The FSP says the comments cannot reasonably be interpreted as meaning
that the muddy floodwater entered the home at 11:15am, but that other
water was already in the home.
46. This issue is problematic for the Panel; it is unusual for the same version to
be given several times to various parties and then later changed by a
significant period. However, the Applicant states she was not aware of the
time and only came to understand the actual timings after reviewing her
telephone records.
47. In any case, the FSP says the loss would have been caused by flood even if
the inundation occurred at 9:30am on 2 March 2010, noting the peak rainfall
occurred around 5:00am, well before the revised time of inundation.
48. The Panel has recently been dealing with two other disputes for the same
event on the street where the Applicant lives.
49. In those disputes, the inundations reportedly occurred at 9:30am also. One
of the homes is only two houses from the insured‟s address, although is
estimated by the hydrologist to be up to 1m above the street (as opposed to
only 300mm in the Applicant‟s case).
Case No: 293077 Determination Page 7 of 8
50. The Panel has the benefit of the Panel Chair Ombudsman‟s on site
observations of the topography applicable to the Applica nt‟s home. In this
regard, the Panel Chair Ombudsman observed that the land adjacent to (E)
Street is significantly built up, so that the floor level of the home is at least
600mm to 1m above E Street. This is substantially higher than the
hydrologist‟s es timate of 300mm.
51. Further, the Applicant‟s daughter confirmed that at 9.20am on 2 March 2010,
when she arrived at the home, the water was lapping at the base of the
driveway in B Court. The Panel notes that the daughter‟s statement is
confirmed by the photograph alleged to have been taken at 9.24am on 2
March 2010. The Panel also notes that the water was still 300mm – 400mm
below the floor level of the home at that time.
52. Importantly, the Panel also notes that the area of E Street to the north of the
property is lower than the area of B Court to the east of the property.
53. The result is that water is likely to flow out of B Court and into and down E
Street before rising up into the Applicant‟s property.
54. The Panel has determined a number of disputes in the town of Roma and is
aware of the evidence supporting the view that properties were impacted by
two peaks of water.
55. The Panel has in other disputes, determined the first peak of water as
stormwater runoff and the second peak as flood water from the break out of
the Bungil Creek to the north of Roma.
56. The Panel is satisfied that the impact of each peak of water upon an
individual property will depend upon the location of each property, the
particular topography of the site itself and the evidence concerning the time
the property was inundated.
57. Having carefully considered all of the evidence and in particular the
photograph allegedly taken at 9.24am on 2 March 2010, the Panel
concludes that on the balance of probabilities, and particularly given the
height of this individual property above the adjoining streets, the home itself
was not inundated until a later time than 9.30am.
58. Given the estimates of the time that the Bungil Creek overflowed its banks to
the north of the town and the time that the peak rainfall in the area ceased
(5.00am), the Panel is satisfied that the water that inundated the home itself
is likely to have been flood water from the Bungil Creek rather than
stormwater runoff.
59. The Panel‟s conclusion in this regard is based upon the height of the home
above (E) Street, the time that rainfall in the area ceased and the likely
timing of the inundation of the home itself.
Case No: 293077 Determination Page 8 of 8
60. The Panel accepts that given the water that inundated the Applicant‟s home
was, on the balance of probabilities flood water, the FSP is entitled to deny
the Applicant‟s claim.
61. The Panel is conscious of the fact that it has made several Determinations
for properties in the same street and that the outcome of those
Determinations are not exactly the same.
62. However, the Panel is obliged to consider the individual circumstances and
specific evidence applicable to each property.
63. Additionally, the Panel has had the benefit of the Panel Chair Ombudsman‟s
on site observations, which has greatly assisted the Panel‟s consideration of
each matter.
Determination
64. The FSP is not required to indemnify the Applicant for her loss.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.