Home / Financial Firm (Unknown - Insurer) / Determination 293004
Determination 293004
Building claim after February 2012 flood declined as pre-existing defects, wear and tear and failure to maintain
Summary
The applicant's home was flooded to 500mm in February 2012 and the FSP declined the building claim as pre-existing defects, wear and tear and failure to maintain. AFCA found the FSP liable to indemnify the building damage caused by the flood, requiring expert scoping of the damage and interest from the date of the IDR decision.
The FSP bore the onus of establishing the defect and maintenance exclusions, and on the balance of probabilities its engineering evidence did not displace the evidence that the flood caused the damage.
Issues
- Claim denial primary · upheld
“Panel considers the home was more likely than not damaged by the floods and finds the FSP has not established the defect or maintenance exclusions apply.”
- Inadequate claim investigation secondary · upheld
“Panel places limited weight on the FSP's engineering report, which was not based on reliable soil samples and was not physically inspected by the adopting engineer.”
Subjects and remedies
home or building damagenatural disasterpay claimpay interest
Text of the determination
Case No: 293004 Determination Page 1 of 12
Case number: 293004
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim
08 April 2013
Background
1. The Applicant held a Home and Contents policy of insurance with the
Financial Services Provider (FSP). The policy covered the home building up
to $231,000 and the contents up to $105,000 subject to a $500 excess.
2. On or about 4 February 2012 the Applicant‟s insured property in Augathella
Queensland was flooded to just under the floor level.
3. The FSP made payment of the contents items damaged by the flood but
declined the building claim on the basis that the structure was not damaged
by flood but suffered pre-existing defects, wear and tear and deterioration
which is a policy exclusion.
4. The Applicant disputes the declinature and states the building was damaged
by flood.
Summary of Applicant’s position
5. The Applicant has enclosed a copy of a site classification report for the soil
at the property. The Panel notes the bore hole 1 and 2 both indicate “SM”
silty sand at a depth of 00-1800mm and then coarse sand at a depth of
1800-4000mm. The classification of SM indicates that the soil is slightly to a
moderately reactive clay or silt site. This means that the ground will vary
slightly to moderately due to moisture changes.
6. The Applicant has enclosed his Statutory Declaration declared on 18
September 2012 which provided the following relevant information:
The Applicant bought the property from his parents ; his father was a
licensed builder for 40 years.
The Applicant has experience with carpentry and building. He works as
a project manager overseeing the construction of new dwellings.
The house was in good condition when purchased although some
renovations continued. The Applicant was unaware of faults or defects
apart from a cracked bearer which was held in place by a temporary
Determination
Case No: 293004 Determination Page 2 of 12
stump. Neither the Applicant nor his father considered the replacement
of the stump or bearer as urgent.
Prior to the flood the house was functioning, regularly maintained and
in good condition. The Applicant conducted any maintenance that the
house, built in the 1930s, required. At the time of taking out insurance
with the FSP all renovations were completed. The FSP was further
aware of the age of the home.
The FSP‟s inspector “F” from engineering company “J” was
accompanied by the Applicant personally during the entire visit at the
site. The Applicant states that F was unable to operate his laser level
without assistance and further F did not take any soil test from the
property during the visit on 17 March 2012.
The Applicant disputes the photographs taken by F as evidence of pre-
existing defects and notes the following:
i. Page 2 – this bearer was there before the flood but had fallen out
after the flood.
ii. Page 3 top photo – this is the same missing bearer – note the
paint flaking is cosmetic only
iii. Page 4 top photo – lean is of piers not bearers and was not like
that before the flood
iv. Page 4 bottom photo – pier inside external pier has sunk causing
external wall to be pushed out and was not like that before the
flood.
v. Page 6 bottom photos – this is a non-load bearing wall.
vi. Page 7 top photo – beam under stress due to lateral movement
and was not like that before the flood.
vii. Page 7 bottom photo – also a non-load bearing wall
viii. Page 8 top photo – wall sheeting not cut to slope (see 30mm gap
where floor falls away) and wall sheeting buckling under stress
which it was not before the flood.
ix. Page 9 top photo – this was not like this before the flood
x. Page 9 bottom photo – there was no grout between the broken
tiles as it has been vacuumed up – there was grout there before
the flood – see in the left of the photo where the tiles are not
broken.
xi. Page 10 bottom photo – this is an internal shot of the now missing
bearer which was not missing before the flood.
The assessor addressed the contents but not the structural issues.
7. The Applicant has enclosed a letter from “T” a building consul tant. T states
that the Applicant has been employed for the last two years as a supervisor
on a housing project. The duties of the Applicant require a good general
knowledge of the building industry.
Case No: 293004 Determination Page 3 of 12
8. The Applicant has enclosed statutory declaration of “M” a property valuer
declared on 24 September 2012. The Panel notes the following from this
document:
M is a qualified valuer.
M wrote a letter dated 25 May 2012 and confirms he inspected the
insured property on 20 March 2010. In that letter he described the
improvements as in a „reasonable condition for their age‟.
The inspection was conducted in relation to a mortgage and for security
purposes report to the mortgagee.
The use of the word „improvements‟ refers to the home building. The
word „reasonable‟ is u sed to reflect the age of the property. M would
never describe the improvements as higher than „reasonable‟ unless it
had been completely renovated to the extent of it being a new building.
At the time of inspection he was aware that further renovations were
being done.
9. The Applicant has enclosed a statutory declaration from “W” who is a
general handyman and the father of the Applicant‟s partner. W provides the
following information:
The home was relatively old but well maintained by the Applicant.
The Applicant has extensive building experience and he has fixed
things in the home as required.
Since the flood in January 2012, there was a lot of moisture in the
ground. As a result W‟s own home stumps have sunk.
W notes significant damage has occurred to the insured property which
did not exist prior such as uneven floors.
10. The Applicant has enclosed a Statutory Declaration from “TK” who is a friend
of the Applicant. The following information was provided:
TK visited the property prior to the flood and after the flood.
Prior to the flood TK does not recall any part of the property that was
not maintained. The house appeared straight and the doors closed
easily.
After the flood the house is uneven, doors do not close properly, walls
are cracked and coming away from the floor.
11. The Applicant has enclosed Statutory Declaration from “GS” who is a friend
of the Applicant and a justice of peace. The following information was
provided:
GS has attended the insured property every 1-2 months prior to the
flood.
The Applicant and his father often worked on the house together. The
Applicant was always working on bits and pieces to maintain it.
Case No: 293004 Determination Page 4 of 12
GS considered the property to be well maintained and in good repair
considering its age.
12. The Applicant has enclosed Statutory Declara tion from “AM” which provides
the following information:
AM attended the property to perform maintenance on the electrical
connection to the house prior to the flood event in January 2012. The
switchboard in the kitchen was accessed using a ladder and AM notes
the floor was even.
AM attended the property after the flood event in January 2012 to
repair a fault to their television. At this time he noticed the damage
caused by the flood and that the floor was uneven as his ladder would
not rest on it evenly.
13. The Applicant has enclosed a tax invoice in the sum of $186.45 for electrical
work dated 18 October 2012. The invoice notes that the work conducted at
the insured property including testing of all electrical circuits in the house
after a report of electrical shocking to an inhabitant of the property. Testing
found the following two faults:
(a) Tin cladding had cut through a light circuit cable, circuit was repaired
and some cable was replaced.
(b) Power circuit cable running around the „chook shed‟ was found to be
squashed against the floor by metal conduit. The circuit was isolated
and disconnected.
14. A doctor‟s report dated 8 November 2012 confirmed that an electrical shock
had been suffered by an inhabitant of the insured property on 17 October
2012.
15. The Applicant notes the PDS exclusion relied on states the exclusion only
applies to “defects etc that the insured knew about (or reasonably should
have known about)”. The Applicant states that he was not aware of any
alleged pre-existing defects. A reasonable person in the circumstances
would have been in the same position as the Applicant.
16. The valuer has confirmed the property was in reasonable condition and what
he means by this. Further, the electrician that came out to test the old wiring
is evidence of maintenance. The Applicant has obtained two builder‟s
quotations which state that the damage to the house is the result of flood
water and makes no reference to the maintenance issues or defects
responsible for the damage.
17. The Applicant has multiple statutory declarations from witnesses regarding
the condition of the property before and after the floods. The Applicant
clarifies that the renovations referred to included re -levelling the house,
including raising and lowering the house off the stumps. It is the Applicant ‟s
contention that the levelling could not be satisfactorily completed without
being inspected and deemed up to standard.
Case No: 293004 Determination Page 5 of 12
18. The Applicant‟s own renovations were cosmetic rather than structural in
nature. The Applicant has been maintaining the older property as required by
the policy.
19. To clarify the FSP‟s queries regarding the electrical work, AM was
completing works to a television aerial cable which is located in the ceiling
cavity. The further electricians‟ and doctor‟s reports are evidence of the fact
the house has shifted and the damage is now posing a risk to the Applicant.
20. The Applicant disputes J‟s report for the reasons stated in the Statutory
Declaration declared by him and also on the basis that no soil test was
actually conducted by F on the property. The Applicant contends that his soil
tests should be preferred as there is no known method to complete a visual
identification of soil type. The soil is more reactive than the A class reported
by J.
21. The Applicant submits that the FSP has not discharged its obligation of
demonstrating that any applicable exclusion applies on the basis of failure to
maintain or a pre-existing defect the Applicant should reasonably have been
aware.
Summary of FSP’s position
22. The FSP has enclosed an assessment report which confirms that the
property was inundated to a level of 500mm. The floodwaters did not reach
floor level. Further, the Applicant advised the damage to the building was
caused by floodwater. Specifically, that a timber bearer was washed out by
the force of the flood water and that the timber stumps at the rear of the
dwelling have shifted, causing the building to drop, damaging the external
cladding and door frame. The floodwaters inundated the property for a
number of days.
23. The FSP has enclosed a builder‟s opinion regarding the damage to the
property from “AS”. The Panel notes the following from this document:
Due to water pooling under the home the house has moved.
The stumps are all different heights throughout the house.
The bearers and joints are different heights and may need replacing
due to damage, given the age of the house it may not comply with
building standards.
There is major structural damage and it may not be economical to
repair the property.
24. The FSP has enclosed a quotation from builder “SB” from which the Panel
notes the following:
The force of the flood waters has moved this house significantly on its
foundations, to the point where some bearers are no longer sitting on
stumps. The bearer on the south side has fallen off.
Case No: 293004 Determination Page 6 of 12
The movement has caused significant damage inside the house.
The house has dropped in one corner causing the roof rafters to split.
The flooring is bouncy and unstable.
The house is at least 60 years old and is unrepairable.
25. The FSP relies on a report by F of the engineering company J. The Panel
notes the following from this document:
The report consists of a number of photographs noting issues and
stating „pre - existing problem‟ next to it. For example “complete length of
bearer missing: pre- existing problem”.
The laser survey determined there was significant movement or
settlement in the timber stumps, this movement was outside of the
tolerances prescribed in the Australian Standards. The floor was found
to fall from the front of the house towards the middle of the house by
165mm then further back in the floor down to 225mm before rising back
up again to the rear of the house where it was 130mm lower than the
front of the house. This is considered structurally significant.
A soil sample indicated that the soil in the area was primarily a silty
sand loam. These soils are classified as a granular soil.
The movement on site depends not only on the reactivity of the clay,
but also the depth and distribution of the clay in the soil profile as well
as the changes in moisture content.
Flooding can have a significant effect on the moisture content of the
soil and result in fast changes to the volume of the soil. Onsite test
indicates the soil is a combination of mainly sandy loams.
In granular soil, water seepage can increase soil density and settlement
occurs as a result. During a flood event the inundation of water to the
underfloor areas of a dwelling can help to wash the finer particles down
deeper resulting in settlement of the piers.
It was concluded that the evidence reveals that the bulk of the
movement has been pre-existing and is the result of poor foundation
integrity which was not the result of the flood inundation. There is little
evidence of clay in the soil, it can be ascertained that the existing
stumps were not sufficiently embedded into natural ground so as to
minimise settlement of lateral movement.
The construction materials show signs of considerable ageing and
weathering due to exposure in places. The cosmetic damage to the
interior of the dwelling is more a result of poor foundational integrity,
inferior construction, poor building materials, and a long -term lack of
maintenance. The present damage to the building cannot be directly
related to recent flood events.
26. The FSP has provided a letter dated 25 May 2012 from M which states the
following:
Case No: 293004 Determination Page 7 of 12
“I confirm at the date of that inspection that improvements appeared to be in a
reasonable condition for their age and there was no obvious visual evidence
of flood damag e.”
27. The FSP has enclosed a Statutory Declaration made by the Applicant‟s
father “IM” from which the Panel notes the following: IM has 40 years
experience in the building trade.
At the time of purchasing the property IM carried out a thorough
inspection and noted that the house was not entirely level but the
structure was solid. IM rectified the defects with the Applicant. IM re-
levelled the property, installed new walls, doors, new kitchen, new
carpet and repainted the interior.
IM was not aware of any existing weaknesses in the structure and
notes the stumps were hardwood embedded one metre in the ground.
After the initial renovation, work was performed in 2008/2009.
A new toilet cistern was installed and this caused the bearer
underneath to crack. A temporary stump was placed under the bearer
but it was not urgent to replace same. IM lost his sight so did not
replace the temporary stump prior to the sale to the Applicant.
Prior to the sale the walls were intact, there were no gaps between
walls and the windows were in good working order.
Renovations were ongoing at the time the property was sold.
28. The FSP has enclosed email dated 31 August 2012 from J which states the
following:
“ The soil test undertaken is a simple site soil test. It is not a full geotech test
nor is it intended to be represented as such. The test involves the removal of
the surface soil – such as top soil under grass etc to examine the base type of
soil that is present. In this instance there was little to no top soil around the
dwelling and the simple site test found that the soil was granular and of a
sandy loam in nature. We did not undertake a full test or sample soil test
1.5km from the dwelling.
This soil is typical for soils in Augathella and in particular homes that were
affected by the flood.
...
The report from [J] are often signed off on behalf of the company by myself
after reviewing the report.”
29. The FSP has enclosed invoice dated 8 May 2010 for the test out home and
repair to “GPOs, Lts, and fan controller” and the removal of old unused
cabling.
30. The FSP has enclosed a report dated 22 October 2012 from J from which
the Panel notes the report explains the manner in which laser levels are
taken. Further, that F undertook the laser level readings and operated the
laser level himself. F reports that there was no assistance required or given
by the owner of the property during the taking of the laser levels. In addition
Case No: 293004 Determination Page 8 of 12
to this, F has a 20 year career in the building industry and had 3 months
training by J.
31. The FSP states that the PDS provides cover for insured events subject to
relevant exclusions. In particular, the FSP relies on the wear and tear and
failure to maintain the property exclusion and pre-existing defects.
32. The FSP relies on the report from J to demonstrate that the cause of
damage to the property was not flood but rather pre-existing defects, wear
and tear and failure to maintain. J is an appropriately qualified expert
engineer who has adopted F‟ s findings. F also has sufficient qualifications to
undertake an inspection. Further, the FSP notes the assessor‟s photographs
of the property are evidence of the pre-existing condition of the home.
33. The FSP has alleged that the renovations allowed for pre-existing defects by
cutting the metal and wall sheeting to suit the existing sloping of the relevant
areas of the home building. The FSP relies on page 7- 8 of J‟s report for
same. The cracking to the tiles pre-dates the insured event due to the
observed grout erosion and tile chipping at the margins of the cracking. The
cracking was caused by insufficient foundation support underneath the home
building.
34. The quotation by AS confirms that the house may not comply with building
standards and that the report does not address pre-existing defects.
Similarly SB provides a quotation/report which ignores the general condition
of the home building but does not address pre-existing defects. Given this,
the quotations/reports should be given less evidentiary weight tha n the
FSP‟s expert reports.
35. The valuer does not state what improvements were inspected or which
improvements were reasonable for their age. M‟s evidence should not be
given much evidential weight. Further, if FOS decides to give weight to this
evidence the FSP notes there has apparently been a change or deterioration
in the condition of the home between March 2010 and March 2012. This is
demonstrative of a failure to take reasonable care of the building and keep it
maintained. Even if the house was in a reasonable condition for its age, it
does not follow that the house was not in need of maintenance at the time of
inspection of subsequently. This is particularly given this was not the
purpose of M‟s inspection.
36. The statement by IM is a description of several improvements to the home
which suggests it was in a state of degradation at the time. IM also indicates
the renovations were not completed prior to the sale of the home. The FSP
further contends that the replacement of the stump/bearer as non-urgent is
concerning. Additionally, IM lacks objectivity in relation to being an
independent expert in building or structural matters.
37. There is no evidence the soil report was taken at or in close proximity to the
Applicant‟s home. In any event the FSP states that ev en if the soil test was
taken at the insured property the conclusions do not vary markedly from J‟s
report which concludes the soil was „silty sand loam‟.
Case No: 293004 Determination Page 9 of 12
38. T‟s report does not adequately explain the Applicant‟s qualifications,
experience or ability in dealing with the building works.
39. The FSP is critical of the bulk of witness statements as vague and of little
assistance to the dispute. Further, the witnesses all confirm the Applicant
was widely known to be undertaking maintenance works since his purchase.
40. The fact that the Applicant has some expertise suggests that he ought
reasonably to be aware of the issues with the home. Further, the Applicant
cannot rely on Section 46 of the Act to suggest he was not aware of the
defects in the home.
Issue
41. Whether the FSP was entitled to decline the Applicant‟s claim for the building
damage.
Reasons for decision
42. There has been an exchange of material between each party and the Panel
is satisfied each party has had an opportunity to reply to the issues raised.
43. The Panel has read each party‟s submissions and materials and will only
refer to the relevant submissions and materials raised.
44. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in insurance i ndustry matters and a
representative with extensive experience in consumer claims.
45. The Panel notes the policy exclusion wording is as follows:
“What you are not covered for
...
Defect, structural fault or design fault
Caused by defect, structural fault or design fault that you knew about (or
should reasonable have known about) and did not fix before the loss or
damage occurred (e.g. if there are signs that a defect previously caused
damage, we will not pay a later claim for further damage from this defect).
Failing to take care of the home or contents
Caused by, or as a result of, your failure to:
i. Take reasonable care of your home and contents
ii. Keep the home an contents in good condition and well maintained
iii. - fix faults and defects as soon as you become aware of them”
46. First, the Panel does not accept Section 46 of the Act applies in this instance
as the policy wording states that the defect has to be known about or
reasonably known about prior to the damage. This goes beyond Section 46
Case No: 293004 Determination Page 10 of 12
of the Act and accordingly Section 46 of the Act does not need to be referred
to in consideration of this dispute.
47. Second there is no dispute the policy covers flood damage subject to the
exclusions outlined above.
48. The Panel has reviewed J‟s report and notes the following issues :
A number of assertions are made regarding pre -existing defects which
are not supported by observational evidence or an explanation of why
these must be pre-existing defects rather than caused by flood
damage.
F inspected the property but does not hold engineering qualifications.
Whilst this does not invalidate the report as F holds other relevant
qualifications, the Panel cannot accept that this is an engineer‟s opinion
regardless of its adoption by another engineer. The engineer adopting
the report has not physically inspected the property so it is unknown if
he would have noted additional items or other issues had he done so.
Accordingly, the Panel place limited evidential weight on the adoption
of F‟s report.
F did not take reliable soil samples at the property but makes a number
of comment regarding the soil; in comparison the Applicant has taken a
series of bore hole samples at varying depths. The classification of the
soil is therefore slightly to moderately reactive in nature.
F‟s report relies on the type of soil and what would have occurred to the
foundations during flood. However, F has not clarified whether his
opinion would alter on the basis of the bore hole samples. Accordingly,
it is unknown whether F would have altered his opinion of the effect of
the flood on the property had he been aware of the soil type.
49. There is no evidence to contradict the Applicant‟s statement that the flood
water had exerted substantial pressure on the foundations – sufficient to
wash away a bearer. F reports this occurred due to a pre-existing issue but
he has not provided any data on why the flood could not have washed the
bearer away. A hydrologist‟s opinion in this regard may have been of
assistance.
50. The Panel notes that several statutory declarations have been provided
regarding the state of the property pre-flood and post-flood. Given the
number of witnesses, including a justice of peace, the Panel does not share
the FSP‟s view that these witnesses‟ evidence should be given minimal
weight. These individuals are entitled to provide their own opinion regarding
the fact the floor was level, the doors closed and the property was well
maintained prior to the flood. The Panel does not consider the statements
regarding maintenance should lead to an inference that the property was in
poor condition. Rather, it would appear that the Applicant was pro-active in
improving and maintaining the property as required by the policy wording.
There is no evidence from the witnesses that the property was receiving
ongoing structural renovations or maintenance. The witnesses have all
indicated that the condition to the house pre and post flood is markedly
Case No: 293004 Determination Page 11 of 12
different in the floor level, doors and walls which would suggest some
structural movement has occurred.
51. The FSP has further indicated that the building quotations/quotes cannot be
relied upon because they did not address pre -existing defects. The reports
state quite clearly that it was both these builders‟ opinions that the property
was damaged by flood. It is unclear why the builders in providing this opinion
would go on to address the purported pre-existing defects. This is
particularly when at least one, if not both reports, pre- date J‟s report. The
Panel has noted the comment regarding building standards ; however it
considers this statement quite vague. It is unclear whether this refers to the
fact the home is quite old and the construction generally is unlikely to accord
with current building standards or the recent works do not accord with
building standards. There is insufficient evidence on this point for the Panel
to draw a firm conclusion.
52. The Panel is puzzled by the allegation that M‟s valuation report is
demonstrative of a complete degradation of the home within 2 years. There
is no evidence to support this and several witness statements to the
contrary. Further, if the home had been in poor condition it would be M‟s
responsibility to note this in his valuation as it would indicate the value of the
chattel may be less than the consideration/mortgage.
53. The Panel accepts that the evidence of the Applicant and IM is not strictly
independent and will weigh their evidence accordingly.
54. In essence, the Panel has before it two builders‟ opinions, multiple witness
statements on the pre and post flood condition, a valuer‟s opinion, an
el ectrician‟s opinion and the Applicant‟s own opinion. In contrast the Panel
has J‟s report with the noted concerns regarding same.
55. The Panel considers that on the balance of probabilities the home was
damaged by the floods. The Panel is not satisfied that the FSP has
established on the balance of probabilities the application of the relevant
exclusions within the policy apply in this case. Unfortunately, there is
insufficient evidence before the Panel to determine the extent of damage
caused to the building by the floodwater. It is apparent that the house has
moved on its foundations, but given the level of inundation was to 500mm,
which was below the level of the floor, damage above that level is unclear.
56. The FSP is to appoint appropriately qualified experts to provide a scope of
works in respect of the extent of damage caused by inundation to 500mm
above the ground, including the damage to the foundations and any resultant
damage to the home above the level of the floodwater.
57. Should it elect to cash settle the claims, it is required to pay i nterest on any
such component.
Case No: 293004 Determination Page 12 of 12
Determination
58. On the basis of the available information the Panel determines the FSP is
liable to indemnify the Applicant for building damage as a result of the flood.
59. The FSP is to pay interest in accordance with Section 57 of the Act from 26
July 2012 being the date of the FSP‟s Internal Dispute Resolution decision to
deny the claim, to date of payment of the claim.