Determination 292210

Adequacy of cash settlement for cyclone damage and additional kitchen repairs claimed

FirmFinancial Firm (Unknown - Insurer)
Decided2013-07-26
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$14,189
Non-financial loss—
Amount claimed$16,825
SourceAFCA PDF

Summary

The applicants disputed the FSP's cash settlement for Cyclone Yasi damage to their home and contents and sought an additional $16,825 for kitchen repairs. AFCA ordered the FSP to pay $14,189.09 plus interest, based on the JL scope of works, after deducting a duplicated antenna payment, and rejected the kitchen claim.

Having settled on one contractor's costing, the FSP acted unfairly by switching to a lower quote, but the kitchen damage arose from water entering through the unrepaired roof, which the applicants failed to repair with prompt, reasonable steps under the policy.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 292210 Determination Page 1 of 10 Case number: 292210 General Insurance - Domestic Insurance - Home Building - FSP Decision - Claim amount 16 July 2013 Background 1. The Applicants held a home insurance policy with the Financial Services Provider (FSP) for their residential premises. The relevant period of insurance operated for twelve months beginning from 15 October 2010. During this period, the building was insured up to a sum of $253,600 and contents for $93,800. Claims were subject to a $100 excess. 2. On 3 February 2011, the Applicants lodged a claim for damage resulting from Cyclone Yasi. The FSP, after assessing the claim, opted to cash settle the Applicants by way of the following payments: Item Amount Food loss $ 150.00 Cleaning cost, make safe cost & TV antenna $1,492.18 Buildings - window replacement $ 286.00 Buildings claim - based on JL scope of works $82,387.51 Bulk of contents claim $19,356.00 Contents - dressing table $ 1,779.00 Contents - curtains $ 5,002.00 Buildings - electrical including kitchen appliances and 2 air conditioning units $ 8,978.97 3. The Applicants have disputed the FSP‟s decision. In particular, they maintain JL‟s scope of works were incomplete and have highlighted additional repairs required for the kitchen in the sum of $16,825. 4. Both parties have provided extensive submissions on the matter. For the sake of brevity and conciseness, the Panel will only briefly summarise same. Summary of Applicants ’ position 5. The Applicants have submitted the following in substantiating their position: Determination Case No: 292210 Determination Page 2 of 10  Much of the damage sustained arose due to the inadequate repairs conducted by the FSP following Cyclone Larry on 20 March 2006. This inadequacy was highlighted by the fact the roof sustained additional damage as a result of Cyclone Yasi.  They are not in a position to articulate the amount in dispute. Instead, they simply do not accept JL‟s scope of works. Their position is corroborated by the fact the engineer engaged by the FSP (RDR from S) to provide a comprehensive scope of works , omitted to identify the extent of kitchen repairs necessary. In this regard, they rely on a quotation and report provided by CS in seeking an additional amount of $16,825.  The cash settlement of $82,387.51 was provided by the FSP without any warning. In particular, they were not consulted about the scope of works nor did they agree to it.  The quote they obtained from TCB for $170,343.75 (being a local builder), was generated after their frustrations with the FSP during the claim. Further, this quote was completed after a three hour assessment. 6. Based on the above, the Applicants maintain the cash amounts paid by the FSP are insufficient and are seeking to be properly indemnified for their claim. Summary of FSP’s position 7. The FSP has relied on the scope of works completed by JL and S to substantiate its position that the amounts paid are fair and consistent with its policy obligations. These amounts included any alleged defective roof repairs from Cyclone Larry and the kitchen repairs now subject to this dispute. 8. Accordingly, the FSP maintains it has discharged its liability towards the Applicants with respect to this claim. Issue 9. Whether the FSP‟s settlement is fair and in accordance with its obligations under the policy. Reasons for decision 10. As advised to the parties, due to the nature of the dispute, the matter has been referred to a Panel for Determination in line with the Operational Guidelines to the Service‟s Terms of Reference. This dispute has not been Case No: 292210 Determination Page 3 of 10 the subject of a FOS Recommendation and has proceeded directly to Determination. 11. This decision has been made by a Panel consisting of an Ombudsman, a representative with extensive experience in the insurance industry and a representative with extensive experience in consumer claims. 12. This dispute has been the subject of a protracted history. Both parties have referred to a number of incidents or issues during the course of this claim (and the Cyclone Larry event) in their submissions. However, when considering the information in detail, the Panel accepts the substance of the dispute revolves around the FSP‟s cash settlements of the claim. In particular, whether the amounts paid were sufficient to indemnify the Applicants for the claim and in accordance with the FSP‟s policy obligations. 13. Accordingly, it is this substantive issue the Panel shall deal with. 14. The Panel notes both parties have provided information in support of this issue, which it shall now consider. Scope of Works (excluding the kitchen) Evidence and Additional Background 15. The FSP initially engaged JL to compile a scope of works. This was completed on 12 May 2011. Based on this, JL estimated the cost of repairs to be $82,387.51 and a cash payment was sent by the FSP to the Applicants shortly after (on or about 6 June 2011). 16. The Applicants, having been dissatisfied with the fact this was done without any consultation and also concerned by the amount offered, engaged TCB to provide a quote and scope of works. TCB did so and arrived at a total of $170,343.75. 17. It was following this that the FSP engaged company S. RDR from S provided a report dated 11 October 2011, as well as a scope of works for the claimable repairs. The report contained the following of relevance: “‟Uplift‟ to sections of the roof frame can sometimes occur as the result of the strong wind experienced during the cyclone. It results in the separation of some of the building components, mainly in the roof area of the building. However, the normal shrinkage of the timber can sometimes also result in a separation gap between the building components. This shrinkage can be confused with „uplift‟. A common area for the shrinkage of timber to be confused with „uplift‟ caused by strong wind, is at the junction of the roof batten and roof rafter. Common areas of „uplift‟ to occur are:  At the junction of the bottom edge of the roof batten and the top edge of the rafter.  At the junction of the roof rafter and top edge of the wall top plate. Case No: 292210 Determination Page 4 of 10 At the time of compiling the Scope of Works for the repair to the Cyclone Yasi damage, I carried out an inspection of the roof timbers from inside the roof void. I did not observe any evidence of separation at the junction of the bottom edge of the roof batten and top side of the roof rafter. I did not observe any evidence of separation at the junction of the roof rafters and top plate of the wall frame. NOTE: I was unable to inspect the entire area of the roof void batten to truss connection due to the sarking. The sarking has been affected by the broken tiles tearing the sarking and strong winds caused by Cyclone Yasi. In order to replace the sarking the roof tiles and battens will need to be removed. The Insured also directed me to the kitchen and advised water entered the kitchen through the range hood and walls of the western elevation of the kitchen. I observed swelling to the pot drawers located under the cooktop. The rest of the kitchen carcass, doors and drawers were not adversely affected by water. As the kitchen is a 2-pac finish colour matching should be possible. The vinyl flooring which runs through the kitchen, meals, lounge and hallway has been affected by water. The vinyl runs under the kitchen cupboards, however, if the kick rails are removed the flooring can be removed and replaced whilst leaving the kitchen in situ.” 18. S then proceeded to provide a fairly extensive scope of works with a total amount of $61,831.18 allowed. 19. Following a number of discussions and additional payments being made, the FSP re-engaged JL to assess the property. JL did so and submitted a variation of the scope of works, estimating an additional cost of $24,367.59 may be required. 20. The FSP noted that it omitted to provide JL with S's scope of works as well as a list of items it had already cash settled the Applicants for, upon receiving relevant receipts. As a result, JL‟s variation a ccidentally included items that were already settled. This is corroborated by the following examples:  Air conditioner – Paid as part of the electrical items in payment of $8,978.98.  Fencing $1,369.35 – Including in S‟s scope of works .  Light $488 - Paid as part of the electrical items in payment of $8,978.98.  Joinery ($2,500 & $1,000) – Identified in S‟s scope of works.  Painting and plastering totalling $6,531 – Identified in S‟s scope of works.  Kitchen electrical $4,000 - Paid as part of the electrical items in payment of $8,978.98. Case No: 292210 Determination Page 5 of 10 Consideration of the Evidence 21. Although the Applicants have disputed the scope of works, the Panel notes the only evidence they have provided in support (excluding the kitchen works, which shall be considered later) is the quotation from TCB. This quotation though, on the face of it, is excessive given the quotations provided by JL and S (through RDR). In particular JL‟s estimates, which includes the variation and is significantly higher than S, is almost $70,000 lower than TCB. 22. Th e Panel notes the FSP‟s cash settlement appears to be relying on a mixture of the amounts quoted by S and JL. For instance, its initial cash settlement was based on the scope of works and costing allowed for by JL, dated 12 May 2011. However, following the Applicants‟ disputation of this and the FSP‟s engagement of S, the FSP then proceeded to rely on its initial cash settlement even though S‟s scope of works identified additional items that were omitted in JL‟s scope of works. 23. The rationale provided by th e FSP is that as S‟s costing included all additional items and was more than $20,000 less than allowed by JL, then the amount paid was fair and reasonable. 24. There is, however, minimal explanation behind the fairly significant variation between JL and S. JL‟ s costing, including its initial scope of works and the subsequent variation, totalled $106,755.10. Subtracting the electrical items already paid for by the FSP and included in JL‟s variation (which totalled $8,488 according to the FSP‟s response dated 29 January 2013) and which were not included in S‟s scope of works, results in the following amounts allowed by JL and S for the same amount of works:  JL - $98,267.10  S - $61,831.18 25. The significant variation between two of the FSP‟s preferred contractors is not explained. In particular, the Panel notes one of the Applicants‟ consistent concerns has been about the contractors to be used and the quality of repairs. Accordingly, on the face of it, the variation between the two contractors would raise concern. 26. In addition, the Panel notes the FSP exercised its discretion under the policy to cash settle the Applicants relying on the cost of repairs quoted by JL. It appeared JL arrived at the figure working in conjunction with a company CC who, according to the Applicants, visited the property twice to set out the scope of works. In particular, these processes were followed in an environment where the Applicants expressed grave reservations early in the claim about using the FSP‟s preferred contractors and were conce rned about the quality of repairs. Accordingly, it is reasonable to expect that CC took this into consideration when calculating the costs in conjunction with JL. 27. It is unclear if S provided as much appreciation for the situation or for the fact the Applicants' property was not in an urban area. Case No: 292210 Determination Page 6 of 10 28. The Panel is therefore concerned by the FSP varying its position by choosing to rely on S‟s costing , when it initially exercised its discretion to cash settle the Applicants' claim , based on JL‟s estimated cost to repair the damage. This concern is exacerbated by the variation in the two quotes and the lack of explanation in their difference. 29. In the Panel's opinion, having regard to the FSP‟s obligation to act with utmost good faith and good industry practice, the Panel considers it was fair in all the circumstances that when the FSP decided to cash settle the Applicants‟ claim based on JL‟s estimated cost of repairs, that it should have consistently maintained its position. In particular, the Panel does not consider it would be consistent with good industry practice for an insurer to initially attempt to settle an insured‟s claim based on one contractor‟s quote and then seek to rely on a significantly lower quote in circumstances when the insured‟s concerns about the initial scope of works being incomplete, appear to have been substantiated. 30. Given this, the Panel therefore believes it would have been fair in all the circumstances that the FSP cash settle the Applicants for the costing allowed for by JL. In this regard, having deducted the electrical items already paid for by the FSP, this leaves a balance of $15,879.59 owing , when relying on JL‟s figures. 31. The Panel confirms that in these circumstances, it has preferred JL‟s quotation over the Applicants‟ TCB, as JL‟s figures have been broken down by the relevant items in the scope of works. In particular, as TCB‟s quotation is substantively greater than both JL and S, the Panel is not prepared to accept same in the absence of any breakdown or substantiation of the quotation. 32. With respect to the Applicants disputing the extent of the scope of works (excluding the kitchen for the moment), the Panel is not satisfied they have established their argument. In this regard, the Panel relies on the fact that both JL and S have provided extensive scope of works which are consistent and appear reasonable and plausible. 33. Although the Panel acknowledges JL provided a variation of approximately $24,367.59, the Panel does not accept that this infers a total new scope of works is required. As stated, JL acknowledged these works were additional to those previously allowed. In addition, the total amount of works necessary has been corroborated by S and not disputed by any other contractor. Further, there is no evidence to refute that the amounts allowed for by JL are not fair and reasonable. 34. Accordingly, the FSP is entitled to rely on JL‟s costing in settling the Applicants‟ claim. Additional Kitchen Repairs 35. The Applicants have relied upon a quotation provided by CK dated 10 July 2012, in substantiating its position that an additional amount of $16,825 is Case No: 292210 Determination Page 7 of 10 required for the kitchen. In particular, the Applicants have provided a report from CK dated 13 April 2013, that stated the following: “It is obvious that water has flowed through the ceili ng and rangehood right through to the floor underneath the kitchen causing the benchtop to sink and separate. The benchtop had to be lifted to the correct level and reinforced under with wood then all joins resealed in particular the corner where the bench top, glass splashback and wall oven tower meet.” 36. The FSP responded to this by relying upon the following: a. A photograph included in S‟s report of the kitchen (following RDR‟s inspection) noting there was no evidence of sinking. b. At no stage throughout the claims process was any sinking identified or reported by any assessor, builder or consultant that inspected the property. c. A conversation the FSP had with RDR where the latter noted this was never drawn to her attention despite having spent 3 hours inspecting the property. 37. The Applicants, in their submissions dated 10 January 2013 and 6 May 2013, indicated these works were specifically identified to RDR but deliberately omitted due to its expense. 38. The Panel is not prepared to accept the Applicants‟ allegation in this regard, in the absence of any clear and cogent evidence. The photographs included in S‟s report do not corroborate the Applicants‟ position. Furthermore, the motivation provided by the Applicants, behind such an allegation, is implausible. That is, the Panel does not accept it is plausible the FSP would deliberately omit works required for the kitchen, but allow a significant amount of works for the balance of the claim. 39. The Applicants provided photographs to support their position, in an email dated 21 June 2013. The Panel notes this email was not exchanged with the FSP for the following reasons:  This dispute has become significantly protracted and prolonged.  It was clearly desirable that a resolution option, by way of Determination, be provided as expeditiously as possible.  The information provided by the Applicants did not assist their position and/or prejudice the FSP‟s case for the reasons to follow. 40. In that email, the Applicants provided a number of photographs showing the damage to the kitchen bench top. This, they submit, was damage caused by Cyclone Yasi; they then asserted that they had patched up their roof and stopped the water leaks two days after the cyclone and that the water damage had occurred in the two days prior to them patching the roof. 41. The Panel is not prepared to accept the Applicants' position. JL‟s scope of works allowed $25,573.10 for the roofing with the work described as follows: Case No: 292210 Determination Page 8 of 10 “Remove all existing tiles. Install around house, install new battens, lay new heavy duty sarking, install new roof tiles, clean all existing gutters, and provide form 15 on completion of works.” 42. It is evident that the roof required extensive repairs which, in the Panel‟s view, could not be ameliorated by a simple patching. In particular the Panel notes the Applicants, in their submissions dated 6 May 2013, stated they did not conduct the necessary repairs until 12 months ago, meaning these were completed on or around May 2012. 43. Accordingly, the roof therefore remained in an unrepaired state for 15 months following Cyclone Yasi and almost 12 months after the Applicants received the necessary funds to repair the roof pursuant to the cash settlement paid on 6 June 2011. Given this significant period of time that had elapsed and the extensive roof repairs required as identified by S, JL and TCB, the Panel accepts there was scope for additional water damage to have occurred whilst the roof remained unrepaired. 44. In particular, given neither JL nor S identified the extent of repairs necessary to the kitchen that the Applicants now claim to have arisen due to a Cyclone Yasi (despite their extensive inspections and scope of works), the Panel accepts it is more likely, based on the available evidence, that the required repairs appears to have arisen due to additional water leakage as a result of the roof‟s unrepaired state. 45. This is corroborated by the Applicants‟ own position , stating the damage was caused by water leaking from the roof, through the ceiling and to the floorboards. It is also supported by CK's report. Although the Applicants submit this was related to the events in February 2011, the Panel does not accept the evidence supports them in this regard. 46. Instead, the evidence is consistent with additional water leakages occurring subsequent to Cy clone Yasi and likely subsequent to RDR‟s inspection on 26 September 2011. This is based on the following:  The repairs conducted to the roof after Cyclone Yasi were fairly minimal when compared with the extensive works articulated by JL and S.  The required roof repairs remained outstanding for 8 months following RDR‟s inspection (despite the Applicants being in receipt of the funds to conduct same at the time).  The relevant period of time included another tropical summer, which was likely to include significant rainfall events. 47. Given this, the Panel is not satisfied that the additional costs being sought by the Applicants are associated with the damage caused by Cyclone Yasi. Instead, based on the information made available, the evidence supports the fact the damage is more consistent with water penetrating the home due to the roof‟s unrepaired state. 48. In this regard, the Panel notes the FSP relies on the following policy provisions: Case No: 292210 Determination Page 9 of 10 “ Your responsibilities when you are making a claim When you make a claim you must meet a number of responsibilities. You must  ...  take safe and reasonable steps to prevent any further loss, damage or liability occurring. ... If you do not meet your responsibilities If you do not meet your responsibilities, we may refuse or reduce a claim, cancel your policy, or do both.” 49. Based on the information available, the Panel accepts this provision applies given the following:  The Applicants were in receipt of the necessary funds to repair the roof on or about 6 June 2011.  The repairs remained untended for almost 12 months after being in receipt of the funds.  There was no evidence the kitchen had sustained the additional damage now being claimed for when inspected by either S or JL. In particular, RDR specifically referred to this area in her report and found no evidence of same.  The description of the damage is consistent with water penetrating the roof, which is likely due to its unrepaired state given the extensive damage identified.  It is unlikely any patching provided would last 15 months, particularly when such a period of time included a tropical summer.  There was no reasonable explanation provided as to why the repairs to the roof were not conducted earlier. 50. Accordingly, the Panel is satisfied the FSP is entitled to rely on the policy provision above, to deny payment for any additional damage to the kitchen, now being sought by the Applicants. Concluding Remarks 51. The Panel has allowed an additional $15,879.59 to be paid to the Applicants based on JL‟s estimated cost of repairs. Ho wever, the Panel also notes that the Applicants received payment in duplicate for a TV antenna. In particular, the FSP reimbursed the Applicants for the actual cost of replacing the antenna ($420) and then inadvertently paid $1,690.50 toward this cost purs uant to JL‟s first scope of works. 52. In the Panel‟s opinion, it is fair in all the circumstances that such duplication be deducted from any amount payable to the Applicants. Accordingly, the amount owing to the Applicants is $14,189.09. Case No: 292210 Determination Page 10 of 10 Determination 53. On the basis of the available information, the Panel determines the FSP pay the sum of $14,189.09 to the Applicants in full and final settlement of this dispute. 54. The FSP is to pay interest on the settlement amount, at the rate specified by the Insurance Contracts Act, 1984, from 6 June 2011 to the date of payment of the settlement amount. 55. In the event the Applicants accept this Determination, this amount should be paid within 21 days of the FSP being notified of its acceptance unless it requires a binding release to be signed first. In the event the FSP requires a binding release to be signed, it should:  Ensure a release is sent to the Applicants within 14 days of being notified of the Applicants‟ acceptance of the Determination; and  Pay the above amount within 14 days after it has received an appropriately signed release.