Denial of storm and flood damage claim; subsidence exclusion and 72-hour condition
Text of the determination
Case No: 292127 Determination Page 1 of 10
Case number: 292127
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim – flood – storm – subsidence
8 February 2013
Background
1. The Applicants hold an Accidental Damage Home policy with the Financial
Services Provider (FSP). The policy covers the building up to $220,000 and
contents up to $60,800.
2. On 2 March 2011, the Applicants lodged a claim for damage arising from
water inundation under the insured property which occurred on 14 January
2011. Damage was later viewed to the property in the form of cracking in the
bathroom.
3. The FSP reviewed the claim and declined same on the basis that the
subsidence was excluded under the policy terms and conditions.
4. The Applicants dispute the declinature and state the subsidence
commenced within 72 hours of the storm inundation which is covered by the
policy.
Summary of Applicants' position
5. The Applicants have a rain gauge in the backyard of their property. On 8
December 2010 the Applicants recorded 64mm of rain and on 11 January
2011 they recorded 123mm of rain. On both occasions the rain ran under the
house however the second event was much worse.
6. The property is in Horsham which has reactive soil. The Applicants do not
consider 72 hours sufficient time to view actual visible movement.
7. The Applicants note the FSP‟s engineer never inspected under the house or
took soil tests. The inspection took place 3-4 months after the water
inundation. Further soil testing undertaken by the FSP occurred 16 months
after the event and no soil samples were taken from underneath the home
despite the ability to access same.
Determination
Case No: 292127 Determination Page 2 of 10
8. The Applicants had installed a greywater pit and pump as well as purchasing
two rainwater tanks (4,000 gallons) to keep lawns and garden well watered
through the drought years. Accordingly, soil samples taken from this area
would provide artificial results due to the watering of the lawn.
9. The tree which was removed from the property did not have roots under the
house as it was not a well established tree.
10. There are no leaking pipes and the hot water system is not leaking.
11. The damage was directly caused by water laying underneath the home and
there was no evidence of cracks/damage prior to the event. In particular
there is damage to the bathroom which is over a low point in the ground
surface. No other area has moved like the bathroom.
Summary of FSP’s position
12. The FSP relies on the following policy terms and conditions:
“We will cover your buildi ngs or contents for loss or damage as a result of
landslide or subsidence.
We will only do this if the loss or damage occurs within 72 hours of
...
- A storm, including rainwater or wind...
...
Exclusions to your cover
Any cover we provide is subject to the following exclusions
We will NOT cover any loss or damage as a result of, or caused by
- Settling, shrinkage or any movement of earth
...
- Roots from trees, plants, shrubs or grass
...
- Landslide or subsidence, unless
o We agree to cover the incident as described under „Landslide or
subsidence‟”
13. The FSP has enclosed the assessor report dated 14 March 2011 from which
I note the following:
On 8 December 2010 the Horsham area experienced torrential rainfall.
The stormwater drains overflowed and water inundated the backyard,
subsequently flowing under the stumped dwelling.
On 12 January 2011 more torrential rains were received and again the
backyard was inundated and water flowed under the dwelling.
Case No: 292127 Determination Page 3 of 10
The assessor has reviewed the rainfall data from the Bureau of
Meteorology and notes that Horsham did not record rainfall on 8
December 2011 but Hamilton recorded 84.8mm on this date. The
Bureau of Meteorology also recorded 101.4mm of rain in the Horsham
area on 12 January 2011. The assessor further notes its office is
dealing with a number of similar claims arising from this event.
The assessor notes the Applicants‟ proximity to the Wimmera River and
confirms there is no report of the river having flooded on the dates in
question.
After the events the flooring has gone out of level in several locations
with localised cracking of wall plaster in the bathroom and bedroom.
The shower base has cracked and wall linings have bowed. Further the
windows and doors throughout the dwelling are binding.
The Horsham area is founded on highly reactive soil and is subject to
extremes of drying and swelling.
The area has been in drought conditions for the past 10 years and the
assessor recommended an Engineer be appointed.
Pictures attached to the report indicate the brick paving around the
perimeter of the dwelling has become detached and appears to have
dropped.
14. The FSP relies on a plumbing invoice which confirms no leaks were found at
the property. Further, the waste drains were found to be “ok”.
15. The FSP relies on an engineering report dated 21 June 2011 from “H”. I note
the following from this report:
The residence is a single story, faux brick over weatherboard clad
residence with a corrugated iron roof. The residence rests on red gum
stumps and has been owned by the insured for 11 years.
The house has never been re-levelled by the current owner but some
minor adjustments have been made around the front door.
The land is flat with a slight fall to the south and has poor surface
drainage. The kerb and channel in the street slightly undulates
suggesting a history of ground movement in the area and ponds of
water. The land underneath the house is not hollow which limits the
amount of water that would pond for an extended term under the
house. The subfloor area is dry and has fair perimeter ventilation with
small vents provided to the faux brick cladding.
The front and rear yards are well grassed and have been maintained in
excellent condition. There is an existing medium sized tree in the front
yard, in front of the kitchen and lounge room area, approximately 7m
from the house. The engineer notes that another medium to large tree
was removed 10 years ago.
Case No: 292127 Determination Page 4 of 10
The engineer notes that the previous 12 months received good rainfall,
including numerous heavy rainfall events causing water inundation
under and around houses. The moisture content of the soils has
recovered significantly.
The engineer understands that there was extensive rainfall in the
Horsham area which caused water to run under the house in the north
east corner; with the water currently extending under much of the
house. Further, there was fairly rapid movement occurring over a
several week period, causing doors to stick, lami-panel to bulge on one
wall of the shower, and plasterboard lining to crack in the bathroom.
The main problem with cracking appears to be in the bathroom area
and the faux brick rear wall adjacent to the bathroom.
The house displays obvious movement throughout most rooms, with
the lack of cracking throughout these other areas of the house
suggesting a history of long term movement in the house. The
movement is consistent with the type of movement that occurs to the
style of house in the Horsham area, which has extremely reactive clays
that can be subject to significant movement following wetting and
drying cycles.
A distortion survey shows there is evidence of significant subsidence
movement across the front of the house, but particularly along the east
wall of bedroom 1 where over 70mm of subsidence movement has
occurred. H did not believe that the cause of subsidence arose from the
recent water inundation.
There is evidence of soil swelling across the rear wall of the house,
primarily around the bathroom, toilet and laundry area, where up to
30mm of heave movement appears to have occurred. However, this
could be the floor level returning to the original pre-drought levels as
the moisture regime of the underlying soils recovers from its previous
drier state. This area of the house may have recovered quicker than the
other areas because the slope of the land would tend to direct water
run-off towards the house, rather than away from the house as could
occur across the front of the house.
The most likely cause of cracking to the internal linings of the bathroom
area is recovery movement as the footings resume their pre-drought
levels, with the bathroom being relined when the footings were in a
subsided state.
The majority of the current movement in this house, particularly along
the east side of the house is clearly long term soil subsidence
movement, caused by the extended drought and nearby vegetation.
Over the next few years the house is likely to experience further
cracking.
H believed the cracking to the faux brick cladding has probably been
ongoing for some time.
Case No: 292127 Determination Page 5 of 10
H summarised as follows:
“The house has suffered significant long term movement as a result of general
soil drying, particularly across the east portion of the house. However recent
cracking and movement from heavy rainfall has only been evident in the
bathroom area and generally across the rear of the house. This recent
movement is consistent with soil moisture recovery of the underlying clays,
resulting in footings recovering to pre-drought levels. As the internal linings to
the bathroom and kitchen were replaced when the underlying soils were dry
and subsided, cracking has occurred as a result of this recovery movement.”
16. The FSP relies on a further email dated 14 December 2011 from H. I note
the following from this email:
The damage to the home has resulted from the underlying soil moisture
gradually recovering to pre-drought levels. This is causing damage to
the house because internal linings to the bathroom area were replaced
when the soil was dry and the footings subsided. The footings are now
gradually moving back to pre-drought levels and cracking would be
expected to occur.
The engineer notes that the soil drying occurred to several meters
depth in the Horsham area and it could take several years for the soil
moisture to reach this depth and recovery to occur.
The damage has not occurred over a 72 hour period. The recovery
movement commenced during the first rainfalls after the drought and is
likely to be ongoing. It is possible that some minor initial movement
may have commenced when the property was inundated with water.
However, if this did occur, it would have occurred irrespective of the
water inundation.
The bathroom floor was levelled and wall linings replaced when
footings were in a subsided state. Accordingly, the current movement
was always going to occur following the breaking of the drought.
17. The FSP relies on a further email dated 7 March 2012 from H. I note the
following from this email:
The damage to the property occurred over a several week period
following the rainfall. This is consistent with soil moisture recovery
movement as a soil swell is a return to pre-drought moisture levels.
If the damage had been caused solely by the water inundation, you
would almost certainly have caused subsidence movement due to soil
bearing failure underneath the stumps (sic). The levels clearly indicate
that this has not happened in the bathroom area, the worst area of
recent cracking which has experienced heave or swelling movement.
This movement has not occurred over a 72 hour period but usually
takes at least a week or more, usually longer.
Case No: 292127 Determination Page 6 of 10
18. The FSP has enclosed a further engineering report from “D” from which I
note the following:
There is a maximum elevation difference of 120 over the entire house
which is a significant reading.
There are two clear pattern covers through the whole house area. One
pattern radiates from the low point along the outside wall of the
bathroom which covers the bathroom and then extends further out into
the house itself. The other pattern extends from along the western side
of the house and also covers a fair potion of the floor area.
The site classification is extremely reactive with deep soil moisture
changes.
The relatively uniform shape of the floor contours indicates the slow
steady volumetric changes have probably taken place under this
building. In addition, as bearing failure and settlement have been ruled
out as the probable cause of footing problems it means that reactive
movement is most likely the major cause of the problems associated
with this building, that is, when damp or moist soil conditions cause a
swelling reaction in the soils and/or dry soil conditions cause a
shrinking reaction in the soils.
The problems associated with footing movement and building damage
to this house could be from a number of possible sources including
poor surface drainage away from the structure, tree root influence, hot
water service safety valve overflow and/or leaking or broken water
supply or drain pipes.
19. The FSP has enclosed an email from the Applicant which provides the
following information:
72 hours was not enough time for the damage to occur.
There was no movement of the bathroom before the rain event.
The water was “like a river running under the house”
The winter had been quite wet and there was no movement.
The Applicant knows a neighbour who claimed for the same event
which was paid by the same FSP.
20. The FSP relies on the expert reports to submit the Applicants‟ property was
not damaged by subsidence occurring within 72 hours of a storm. The
evidence shows that the Applicants‟ pro perty is situated on soil which has
been dehydrated by 12 years of drought and the action of tree roots. When
the drought finished the soils started to rehydrate and expand differentially
causing cracking to the Applicants‟ property as parts of the buildin g moved.
The evidence demonstrates that the Applicants‟ property was not damaged
as a direct result of a storm as asserted by the Applicants.
21. Further, the FSP contends that the expert evidence indicates damage to the
Applicants‟ property did not occur with in 72 hours of a storm. The Applicants
Case No: 292127 Determination Page 7 of 10
have also noted two separate rain events in a month caused the damage
and agreed the damage did not occur within 72 hours.
Issues
22. Whether the FSP was entitled to decline the Applicants‟ claim for damage.
Reasons for decision
23. There has been an exchange of material between each party and I am
satisfied each party has had an opportunity to reply to the issues raised.
24. I have read each party‟s submissions and materials and will only refer to the
relevant submissions and materials raised.
25. Due to the nature of the dispute, FOS has considered it appropriate to
expedite the dispute in accordance with the Operational Guidelines to the
FOS Terms of Reference. Thus, this dispute has not been the subject of a
FOS Recommendation and has proceeded directly to Determination. The
parties have been previously advised that a Determination will be issued in
this case.
26. The parties do not dispute the following:
The Applicants had a valid Accidental Damage policy covering the
relevant period of loss/damage.
The locale of the insured property received heavy rainfall on 8
December 2010 and 11 January 2011.
The Applicants recorded 123mm in his backyard rainfall gauge and the
Bureau of Meteorology supports a high rainfall in the area.
The Applicants did not have cracking to the bathroom prior to the event.
The Applicants did not view cracking or other physical damage within
72 hours of the storm events.
27. I have reviewed the expert evidence and prefer that of H, which appears to
have the benefit of t he plumber‟s report noting there were no leaks. Both
experts appear to agree that the soil around the property is highly reactive.
28. H has confirmed the last 12 months received good rainfall. Interestingly, the
Applicant states there was no prior cracking despite this rainfall.
29. The Applicants reported to H that there was “ fairly rapid movement occurring
over a several week period, causing doors to stick, lami-panel to bulge on
one wall of the shower, and plasterboard lining to crack in the bathroom .”
Case No: 292127 Determination Page 8 of 10
30. I note that H appears to treat the Eastern wall of the home and the bathroom
as separate areas. I ndeed the earth movement described as „subsidence‟
does appear to be different in these areas, 70mm as opposed to 30mm.
31. When discussing the Eastern wall, H opines that the cause of subsidence
was not from the recent water inundation. In contrast he notes the area
around the rear wall, bathroom, toilet and laundry area could be the floor
level returning to the original pre-drought levels.
32. H states in correspondence subsequent to the report that the damage to the
property occurred over a several week period following the rainfall. This is
consistent with soil moisture recovery movement as soil swell is a return to
pre-drought moisture levels. However, he then goes on to state that if the
damage had been caused solely by water inundation, that subsidence
movement would be expected due to soil bearing failure underneath the
stumps. The levels clearly indicate that this has not happened in the
bathroom area, the worst area of recent cracking which has experienced
heave or swelling movement. This movement has not occurred over a 72
hour period but usually takes at least a week or more, usually longer.
33. The evidence essentially indicates that H believes the da mage at the
property was generally covered b y moisture recovery in the soil over a
period of time. However, he does indicate that there may have been some
minor initial movement which commenced when the property was inundated
with water.
34. The evidence before me in relation to the Eastern wall of the home is that
the damage is the result of subsidence and was not impacted by the water
inundation. Any damage to the Eastern wall would therefore fall outside the
policy cover as the damage caused by subsidence has not occurred within a
72 hour period as a result of storm.
35. The evidence on the bathroom, rear wall, toilet and laundry, however, does
not indicate subsidence. Rather, the expert has stated the cracking damage
viewed is in fact the result of upheave. That is, the water caused the soil to
expand which in turn affected the footings and caused the visible cracking
damage.
36. The evidence in this regard does not suggest subsidence which is rather a
settling of the soil. The expert has made it clear that the issue with the soil
under the bathroom region is due to the reaction with water. This has been
described as „upheave‟ which is the opposite of subsidence which settles
downward. Accordingly, I consider that upheave would not fall within the
scope of the limited cover provided for subsidence. This , however, does not
preclude it from falling within the general cover of the policy.
37. The expert has acknowledged that the inundation was capable of causing
the upheave viewed in the bathroom area and that this change would have
occurred quickly after the inundation. I note that the Applicant and H both
state there was some rainfall in the 12 months leading up to the heavy
Case No: 292127 Determination Page 9 of 10
inundation event. However, it is not until these extreme weather events that
the upheave around the bathroom occurs.
38. I accept on the balance of probabilities that upheave or expansion of soil
was the result of the storm events in December 2010 and January 2011.
39. The policy covers the event of storm, rainwater or wind. However, the
damage must occur from one incident. The evidence provided by the
Applicants in their submissions is more limited than that provided to the
expert. The expert, H, records the problems with the property occurring
shortly after the rainfall which would tend to suggest that it occurred after the
extremely heavy rainfall of 14 January 2011. Given this, I accept the damage
arose from this heavy rainfall event.
40. A review of the exclusions indicates that the policy does not cover any loss
or damage as a result of or caused by earth movement. I must therefore
consider whether the proximate cause of the loss is the soil upheave or the
heavy rainfall.
41. I am satisfied that it is incorrect to look at the most immediate cause when
considering the proximate cause of damage instead, one look s to the “quality
of the connection between [the] cause and the injury”. The correct test for
proximate cause is that it should be the “active, efficient cause that sets in
motion a train of events without intervention of any independent force”.
42. A review of the issues suggest that the soil upheave has not occurred
independently. Further, the property damage occurred temporally proximate
to the heavy rainfall.
43. I cannot accept that the soil upheave should be considered an independently
occurring consecutive or concurrent cause of loss to the rainfall. This is
because the soil upheave is a result of the rainfall and is a result conditional
on this event. It is doubtful that the damage viewed would have occurred but
for this heavy rainfall given the wet weather experienced in the 12 months
leading up to this event.
44. The exclusion has therefore not been made out because it is not damage
which is the result of or caused by earth movement in and of itself. The
damage has arisen due to the water inundation which then resulted in the
volumetric changes to the soil and subsequent cracking to the home under
the bathroom area. This is different to the eastern wall where the inundation
has not caused such an issue as the damage arises from subsidence.
45. I further note it is the policy‟s clear intention to cover damage arising from
storm water inundation. Accordingly, the commercial intention should extend
to damage caused by stormwater which results in soil upheave rather than
soil movement acting naturally and gradually without any single causal
event.
Case No: 292127 Determination Page 10 of 10
Determination
46. On the basis of the available information I determine the FSP is liable to
make payment for the soil upheave damage to the bathroom, rear wall, toilet
and laundry. The FSP however shall not be liable for damage to other areas
of the home which arises from subsidence unrelated to the inundation such
as the Eastern wall.
47. Should the FSP elect to cash settle any part of the claim the FSP shall pay
interest on that part, in accordance with the Insurance Contracts Act 1984 ,
from the date of denial of the claim, to the date of settlement.