Home / Financial Firm (Unknown - Insurer) / Determination 292003
Determination 292003
Denial of claim - replacement of entire roof
Summary
The Applicant's motor mechanical business claimed for storm and hail damage and sought replacement of its whole roof, estimated at $47,000. AFCA found the corrugated roof was in poor condition from wear and maintenance, so the FSP was entitled to limit the repair to the hail-damaged skylight sheeting, though the FSP had erred in delay.
The insurer must show an exclusion applies with expert evidence, and the builder's report established the corrugated roof damage was from rust and pre-existing conditions rather than the insured storm event.
Issues
- Claim denial primary · not upheld
“I determine the FSP was entitled to deny the Applicant's claim for replacement of the entire roof.”
- Delay secondary · upheld
“The FSP has apologised for the delay in processing the claim and admits it erred in not providing a timely and expedited outcome.”
Subjects and remedies
natural disastersmall businessno remedy
Text of the determination
Case No: 292003 Determination Page 1 of 5
Case number: 292003
General Insurance - Small Business/Farm Insurance - Commercial Property -
FSP Decision – claim amount
28 March 2013
Background
1. The Applicant is insured under a motor trade insurance policy with the
Financial Services Provider (FSP) that commenced on 18 October 2011 to
cover his motor mechanical business. The policy provided cover for loss or
damage caused by specified events to insured property and was arranged
through the Applicant’s insurance broker.
2. A claim was lodged under the policy on 4 January 2012 as insured property
had been damaged as a result of the storm event that occurred on 25
December 2011. The FSP appointed a builder to attend the property and
report on the extent of damage.
3. It was noted the roof consisted of corrugated roof sheeting which was in poor
condition and alsynite roof sheeting (skylights). The alsynite roof sheeting
had been punctured by hailstones and temporary repairs were done with the
holes being patched over. Business contents had also suffered water
damage due to rain leaking inside the premises.
4. The FSP has accepted the claim for water damage to business contents and
hail damage to the alsynite roof sheeting. However the Applicant is seeking
replacement of the entire roof which the FSP has rejected.
5. The FSP advised it will cash settle the cost of repairs to the alsynite roof
sheeting. It has paid the Applicant for his loss of business contents.
6. The Applicant has referred this matter to the Service seeking indemnity
under the policy for the replacement of the entire roof which has been
quoted at approximately $47,000.
Summary of Applicant’s position
7. The Applicant says prior to the storm event he had no problems with water
entering the premises. He says holes were punched in the skylights due to
the extraordinary size of force of the hailstones.
Determination
Case No: 292003 Determination Page 2 of 5
8. He says the FSP made him an offer to replace the skylights but will not
replace the rest of the roof citing it is in poor condition. He says he was not
aware of the roof’s condition.
9. The A pplicant also stated he was dissatisfied by the FSP’s handling of his
claim.
Summary of FSP’s position
10. The FSP says it apologises for the delays in the service the Applicant has
received while processing the claim. It admits it has erred in not providing
the Applicant with a timely and expedited outcome. Nevertheless, it submits
the Applicant has not been prejudiced by its actions.
11. The FSP says there is no dispute regarding the settlement of the contents of
the Applicant’s business. It has paid the Applica nt in full on final settlement
of the damaged equipment in the building.
12. The FSP says the issue in dispute is the Applicant requesting replacement of
the roof which it says has not been caused by the claimed event but was
result of damage excluded under the terms and conditions of the policy.
13. It says it has relied on its builder’s report to conclude there has been no
storm damage caused to the iron roof and guttering but rather water entry
was due to its age, rusting, dislodging and debris build-up.
14. The FSP says it is clear there is evidence of long-term wear and tear, lack of
maintenance, seepage, inherent structural defects and a failure to perform
adequate maintenance. It submits the policy is clear in excluding cover
under all sections of the policy for any damage, loss or liability caused by,
arising from or involving these causes.
15. The FSP relies on the following policy provisions:
“ When We May Refuse A Claim
We may refuse to pay a claim, or may reduce the amount we pay you, if:
…
(d) you do not at all times take all reasonable care as we require you to do
under “Taking Care” on page xv;
...
(h) you are in breach of any other conditions of your policy.
...
Other conditions
…
2) Taking care
You must:
…
Case No: 292003 Determination Page 3 of 5
keep all property well maintained; and
What we cover
...
7. wind or water (including snow, sleet, how and tsunami).
What we exclude
…
Loss or damage :
…
caused by water entering the premises as a result of structural defect,
faulty design or faulty workmanship;
caused by water seeping circulating from outside the premises; or
caused by wear and tear, but does not apply in respect of loss or damage
resulting from wear and tear. ”
Issue
16. Whether the FSP was entitled to deny the Applicant’s request for
replacement of the entire roof.
Reasons for decision
17. FOS has considered it is appropriate to expedite the dispute in accordance
with clause 8.6 of the FOS Terms of Reference. This is because of the issue
in dispute. This dispute has not been the subject of a FOS Recommendation
and has proceeded directly to Determination.
18. There has been an exchange of material between the parties. It therefore is
not intended to recite details of the information in this Determination except
where considered relevant.
19. The onus of proof is on the Applicant to establish, on the balance of
probabilities, that he has suffered a loss caused by a risk insured against.
Once the Applicant has established that the loss was prima facie caused by
a risk insured against, the onus of proof shifts to the FSP to show that, on
the balance of probabilities, the claim falls within an exclusion clause in the
contract of insurance.
20. The FSP accepted the Applicant ’s claim for the water damaged contents as
a result of water leaking into the premises during the storm event.
21. The FSP accepted hail damage to alsynite roof sheeting caused by the
storm. It says corrugated roof sheeting was in poor condition. I note the
FSP’s submission and its reference to the causes of the damage as being
excluded under all sections of the policy.
Case No: 292003 Determination Page 4 of 5
22. I do not accept this as being the case. The insured e vents covered by the
policy have specific exclusions which are set out as “what we exclude” and
are not a catch-all for all insured events. If the FSP intends to have
exclusions to be applied on all sections of the policy then it needs to make
this clearer.
23. Further, if the FSP wishes to rely upon an exclusion then it should have
appropriate expert evidence to support the application of exclusions to the
circumstances of the claim. I think it has done so in this matter.
24. The FSP relies on a builder’s report which contains photographs of the roof
showing its condition. The corrugated roof sheeting is extensively rusted
which has allowed water to leak through. There is no evidence of claim
related damage to the corrugated roof sheeting and guttering.
25. The builder noted deficiencies with the roof that related to maintenance and
pre-existing conditions including rust and the roof being at the end of its
serviceable life.
26. The Applicant says the quote he received was for a complete roof
replacement. He says that if this is what is necessary to repair the damage
caused by the event than that needs to be done.
27. However, the Applicant has not provided any evidence to refute the findings
of the FSP’s builder o r evidence to show the corrugated iron sheeting and
guttering has suffered storm damage.
28. After an analysis of the material presented, I am not satisfied the Applicant
has presented a case that establishes that damage to the corrugated roof
sheets has been caused by an insured event. I accept the FSP was entitled
to limit the repairs of the roof to the damaged alsynite roof sheets.
29. I note the FSP has apologised for the delay in processing the claim and that
it has erred in not providing the Applicant with a timely and expedited
outcome. The FSP says the Applicant has not been prejudiced by its actions.
30. According to the chronology provided in the FSP submission, which has not
been disputed by the Applicant, the Applicant’s broker was advised on 7
March that the FSP was not accepting a complete roof replacement but only
going to pay the cost of repairs to the hail damaged alsynite sheeting.
31. It was indicated that arrangements were to be made with the builder to
attend to the replacement of the alsynite sheeting but this was unable to be
effected as the corrugated roof sheeting needed to be replaced, due to its
poor condition, prior to any replacement of the alsynite sheeting.
32. Because of this the FSP advised on 17 April 2012 that it would cash settle
for the cost to replace the alsynite sheeting.
33. Although it took several months for this matter to be reviewed through the
FSP’s internal dispute resolution processes the Applicant was well aware in
March 2012 the FSP was not going to replace his roof.
Case No: 292003 Determination Page 5 of 5
34. The Applicant has not shown how he has been prejudiced by this delay other
than to say that his employees had to work under a leaking roof. I noted
make safe repairs were attended to on the alsynite sheeting and if water was
leaking into the premises it was due to the corrugated roof’s poor condition.
35. I sympathise with the Applicant’s sense of injustice. The damage for which
the FSP is obliged to pay is a very modest proportion of the entire damage.
But on the material supplied (the Applicant has not offered a contrary
opinion) the remainder of the roof was in such poor condition that the FSP is
entitled to deny liability for that part of the damage.
Determination
36. On the basis of the available information I determine the FSP was entitled to
deny the A pplicant’s claim for replacement of the entire roof.
37. The Applicant has indicated that if the FSP is not responsible to cover his
claim then it should be covered by his insurance broker. If the Applicant
believes his insurance broker is liable he will need to lodge a dispute with his
insurance broker and go through the appropriate dispute process.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.