Home / Financial Firm (Unknown - Insurer) / Determination 291942

Determination 291942

Denial of home and contents flood claim; extent of flash flood cover

FirmFinancial Firm (Unknown - Insurer)
Decided2013-01-07
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicant's Paddington home and contents were inundated in January 2011 and the FSP declined the claim as flood. AFCA found the loss was caused by flash flood within the policy, requiring indemnity to 200mm above floor level subject to limits and a scope of works, and refused legal costs.

The heavy rainfall within 24 hours was the proximate cause of the inundation, so the flash flood cover applies subject to its monetary limits, and the policy was clearly communicated under section 35 of the Insurance Contracts Act 1984.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interestreassess claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 291942 Determination Page 1 of 10 Case number: 291942 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of claim-Exclusion/ condition14 November 2012 5 December 2012 Background 1. The Applicant’s home (located in Paddington, Queensland) and contents were insured with the Financial Services Provider (FSP) under a home building and contents insurance policy. 2. His property was damaged as a result of water inundation in January 2011 following severe weather events. 3. A claim was lodged with the FSP who declined liability on the basis the damage was caused by flood which the policy excluded. 4. The Applicant maintains he is entitled to indemnity because:  The FSP has not complied with Section 35 of the Insurance Contracts Act, 1984 (the Act); and  His loss was caused by events covered by the policy in any event. Summary of Applicant’s position 5. The Applicant is represented. For convenience, the expression “Applicant” will jointly refer to him and his representative. 6. The FSP did not comply with Section 35 of the Act because:  The FSP has not shown that a copy of its PDS was sent to him before he took out the policy.  The policy definitions of “flood” and “flash flood and storm runoff” were overlapping, contradictory and confusing.  The definition of “flood” is so wide that it fails to clearly inform the relevant exclusion.  The layout and structure of the PDS is “offensive to good insurance practice”, “overly technical, elliptical and confusing”, “not… internally consistent” and is “an affront to the spirit and letter” of Section 35 of the Act. Determination Case No: 291942 Determination Page 2 of 10 7. His home and contents were damaged by stormwater runoff and/or flash flood because:  The Bureau of Meteorology (BOM) had issued warnings of heavy rains and flash flooding shortly before 9.00am on 11 January 2011.  The Brisbane area was affected by numerous lightning strikes between 11.00pm on 10 January 2011 and 11.00pm on 11 January 2011.  There were winds with speeds of 52km/h and 43km/h on 10 and 11 January 2011 respectively.  His home was inundated at 11.00am on 11 January 2011, within 24 hours of rainfall that occurred on the morning of 11 January 2011.  The rains that fell over the Wivenhoe Dam on the morning of 11 January 2011 led the dam operators to adopt a W4 release strategy, which was ultimately the main cause of the flooding downstream. 8. The FSP’s hydrology evidence is unreliable because:  It has been based on a “desk top review” instead of an inspection of the property.  It fails to contemplate events that occurred specific to his property.  It failed to assess/analyse if the home was first inundated by stormwater run-off and/or flash flood. 9. He should be awarded the maximum amount allowable for legal costs. 10. The Applicant refers to Section 35 of the Act. Summary of FSP’s position 11. It had clearly informed the Applicant of the limitations with respect to flood, flash flood and stormwater run-off because:  He was sent the PDS, certificate of insurance and renewal notices.  The PDS clearly sets out that: i. Flood damage was not covered by the policy and that cover for such damage was available as an option. ii. The FSP would only cover “flash flood”, which is a specific form of flood. iii. Cover for damage arising from a “flash flood” was monetarily limited.  The suggestion that the flood definition is “too broad” ha s nothing to do with its obligations under Section 35 of the Act. Section 35 of the Act does not restrict insurers from setting out the scope of its cover. It only obliges insurers to inform policyholders of the terms of cover.  The format and structure of its PDS is clear and well indexed. Case No: 291942 Determination Page 3 of 10  The certificate of insurance also clearly sets out that the policy does not cover flood damage.  FOS has previously determined that its policy documentation satisfies its obligation to clearly inform policyholders of the terms of cover (Determination 239722). 12. The Applicant’s property was not damaged by flash flood or stormwater run - off, but by flood (as defined in the policy) because:  Its hydrological evidence shows that the proximate cause of the loss was the rains which fell in the Wivenhoe Dam catchment from 9 January 2011 or earlier. Releases from the dam caused the Brisbane and Bremer River levels to rise and subsequently inundate the Applicant ’s residence. The Applicant’s property was therefore damaged by rain which fell more than 24 hours earlier.  His property was damaged before the W4 releases had “substantial impact”.  The terrain around the Applicant’s home does not indicate that it was particularly vulnerable to stormwater run-off.  Rainfall at around the time the home was first inundated was insufficient to cause stormwater inundation. 13. Even if the proximate cause was flash flood (which it denies) a proximate cause was also the rain that fell from 9 January 2011, which is excluded. As such, the whole loss is excluded on the basis of the Wayne Tank principle. 14. It is not required to pay interest on the Applicant’s claim (if payable) because it had not acted unreasonably for purposes of Section 57 of the Act. In any case, it is entitled to a reduction on the interest payable to account for delays that were not its fault. 15. The FSP relies on the following policy provisions contained in its PDS: “ Words / terms with special meanings Word / term Meaning … Flood Rising water which enters your home as a result of it running off or overflowing from any origin or cause. This policy does not cover flood unless we have agreed and it is shown on your certificate of insurance Flash flood and stormwater run - off A sudden flood caused by heavy rain that fell no more than 24 hours pri or to the flash flood or stormwater run - off. … Storm A violent disturbance of the atmosphere associated with strong winds including a cyclone, lightning, heavy rain, hail or snow Case No: 291942 Determination Page 4 of 10 but not continuous bad weather by itself. … Insured events you are covered for Damage caused by the weather …. What is covered What is not covered Storm … … Flash flood and stormwater run-off A sudden flood caused by heavy rain that fell no more than 24 hours prior to the flash flood or stormwater run - off Loss or damage caused:  by flood; … … Your home … The most we will pay for home claims What is covered What is not covered … Flash flood and stormwater run-off We will pay up to 50% of your home sum insured or $25,000, whichever is higher. … Your contents … The most we will pay for contents claims What is covered What is not covered … Flash flood and stormwater run-off We will pay up to 50% of your contents sum insured or $25,000, whichever is higher. ” Case No: 291942 Determination Page 5 of 10 16. The FSP refers to Sections 35, 57 and 69 of the Act. Issues 17. Whether the Applicant was clearly informed of the limitations with respect to flood damage and damage arising from stormwater runoff and flash flood. 18. Whether the Applicant’s loss was caused by rain or storm water runoff, flash flood and/or flood (as defined in the policy). 19. Whether the Applicant is entitled to legal costs. 20. Whether the FSP is required to pay interest and if so, is it entitled to a reduction in the amount payable. Reasons for decision Preliminaries 21. Due to the nature and complexity of the dispute, it has been directly referred to the Panel for Determination in accordance with the Operational Guidelines to the Financial Ombudsman Service’s (FOS) Terms of Reference. 22. The Panel consists of an Ombudsman, a representative with extensive experience in the insurance industry and a representative with extensive experience in consumer claims. 23. The Panel is satisfied that the material has been exchanged and the parties have had the opportunity to respond to the issues raised. 24. The Applicant is legally represented and the various statutory provisions referred to by the parties have been set out in their respective submissions. For the sake of brevity, the Panel will not repeat these provisions here. Lack of awareness of policy limitations 25. The Applicant bases his claim of being unaware of the policy limitations with respect to flood, flash flood and stormwater run-off on two grounds, namely:  The FSP provided no evidence that a PDS was sent to him before he took out the policy.  The policy provisions in the PDS were unclear and confusing for a number of reasons outlined in his submissions. Provision of a PDS 26. The Applicant’s claim to being entitled to indemnity because the PDS was provided to him after the policy was incepted is untenable. Case No: 291942 Determination Page 6 of 10 27. Although a PDS may have been provided after the policy was incepted (and even if it occurred more than 14 days after inception), the Panel has previously determined that, pursuant to Section 69(3) of the Act, policyholders are taken to have been clearly informed of the relevant policy terms for purposes of a loss that occurs after the policy documentation has been provided. 28. In the circumstances, the Panel is satisfied on the evidence that a PDS was sent to the Applicant. Policy provisions unclear and confusing 29. Turning to his suggestion that the policy provisions were unclear and confusing, FOS has previously reviewed the FSP’s PDS and policy documentation (which were no different to the ones the Applicant received) and is satisfied that:  They were clearly indexed;  The monetary caps for damage caused by flash flood and stormwater run-off have been clearly set out; and  The flood exclusion is not only clearly defined within the policy, but referenced in the Certificate of Insurance (COI) forwarded to the Applicant. 30. A fair reading of Section 35(2) of the Insurance contracts Act 1984 requires that the relevant exclusions and limitations be in clear and unambiguous language and in a manner that a person of average education and intelligence would have little difficulty in finding and understanding should they choose to read the policy. 31. Having carefully reviewed the policy, the Panel is satisfied that if the Applicant had read the policy and COI the Applicant would have had little difficulty in finding and understanding the nature and extent of the exclusions and limitations. 32. In the circumstances, the FSP has met its obligation to clearly inform, pursuant to Section 35 of the Act. Proximate cause of damage 33. The Applicant says his home was first inundated at about 11.00am on 11 January 2011 (see his solicitor’s 20 July 2011 letter). 34. Although acknowledging that he had considered the solicitor’s 20 July 2011 letter, the FSP’s hydrologist curiously states: “…if the house on the Subject Property were to have been inundated by stormwater or other local run-off on 11 January 2011 it would have been inundated during or immediately after the most intense burst of rainfall (i.e. between 10.00am and midday on 11 January 2011). However, I do not Case No: 291942 Determination Page 7 of 10 understand the Applicant to have claimed that the house on the Subject Property as inundated at this time.” 35. Having carefully reviewed the material exchanged and noting that there is an absence of evidence regarding the impact of stormwater runoff to the house, the Panel is satisfied on the balance of probabilities that given the rainfall in the local area, the topography of the local area and the height of the Applicant’s home above the ground, the house is unlikely to have been impacted by stormwater runoff. 36. The Panel considers that the home is more likely to have been impacted by flood. The Panel notes that flood is an excluded event under the policy, save that the policy does provide coverage for a certain type of flood, that is flash flood. 37. In order for the Applicant ’ s to be entitled to cover for flash flood, the following elements must be established:  there was a sudden flood;  there was a heavy rain that occurred within 24 hours prior to that flood;  the sudden flood was caused by that heavy rain. 38. FOS has determined in other disputes, following consideration of all material exchanged, that the heavy rainfall commencing around 4.00am on 11 January 2011 was a proximate or effective cause of the inundation of the properties downstream from the Wivenhoe Dam. 39. Although each dispute is determined on its me rits and in this dispute, detailed further submissions have been made by the parties, in particular by the FSP, the Panel is not satisfied that the evidence substantially changes the position adopted in earlier Determinations. 40. The evidence supports the view that a substantial portion of the flooding downstream of the Wivenhoe Dam is attributable to the particularly intense rainfall over the dam that commenced at approximately 4.00am on 11 January 2011. This rainfall event caused a sharp rise in the dam’s l evel; ultimately leading the dam’s operating engineers to move from a W3 release strategy (which had been working well up to then) and to adopt a W4 release strategy from 8.00am on 11 January 2011. 41. The Panel is satisfied having considered all of the evidence presented and in particular the further submissions and hydrology reports provided by the FSP that it was the heavy rainfall commencing at approximately 4.00am on 11 January 2011 that was the proximate, effective or dominant cause of the inundation of t he Applicant’s property. 42. The FSP’s hydrology indicates that rising Brisbane River water levels was likely to have caused an inundation of the Applicant’s residence to a height of about 200mm above floor level by 4.00am on 12 January 2011. This is within the relevant 24 hour period with the commencement of the heavy rainfall so as to attract cover under the flash flood provisions of the policy. Case No: 291942 Determination Page 8 of 10 43. In this regard, the Panel has taken particular note of SC’s statement of 18 September 2012 that “by approximately 2 .25am on 12 January 2011, the Brisbane River reached a level of RL 4.2m AHD which would have been sufficient to begin to inundate the house on the subject property.” 44. In addition there appears to be no evidence that SC conducted a site visit of the property . SC’s comment (no apparent storage areas) is not consistent with the aerial images provided which appears to indicate the sheds at the rear of the property. 45. Coverage under the policy in respect of flash flood is limited to 50% of the home sum insured or $25,000 whichever is higher and 50% of the contents sum insured or $25,000 whichever is higher. In this dispute, the policy provided home sum insured of $720,000 and contents sum insured of $175,000. Accordingly, under the terms of the policy for flash flood, the liability of the FSP would be limited to a maximum amount of $360,000 for the home sum insured and $87,500 for the contents insured. 46. The FSP has provided a site report from its assessors. The assessors have placed a total reserve on the loss at $175,000; comprising reserves of $105,000 and $70,000 for the home and contents respectively. The report does not clearly identify how these sums were calculated but it appears plain that the monetary limits applicable to the Applicant would be sufficient to cover his loss (assuming the reserves are accurate). 47. It is evident that an inundation to a height of 200mm above floor level of the house, though the property, would lead to some loss of contents and damage to the home, but the available information is insufficient for the Panel to form a definite view as to the extent of the loss. 48. In the circumstances, the Panel considers it reasonable in the circumstances that the FSP be given the opportunity of completing a thorough scope of works to identify the actual loss sustained as a result of inundation throughout the property to a level of 200mm in the house. 49. The FSP is requested to obtain the scope of works immediately upon the Applicant’s acceptance of the Determination and the parties are requested to work cooperatively to then determine the extent of the loss. If the parties are unable to reach agreement as to the extent of the loss, further submissions may be made and the Service will make a determination on the actual loss sustained. 50. Insofar as the FSP has made payment of a compassionate sum to the Applicant, FOS does not have jurisdiction to deal with this payment but acknowledges that the FSP, given the terms on which the compassionate payment was made, may be entitled to deduct this payment from any settlement sum. Case No: 291942 Determination Page 9 of 10 Legal Costs 51. The Applicant has requested that FOS award the maximum amount of legal costs. FOS’s Terms of Reference do allow for the awarding of legal costs pursuant to clause 9.4 of the Terms of Reference. 52. The Applicant is represented by a community legal centre. It is commonly understood that community legal centres do not charge their clients for their legal services although there are exceptions to this. 53. For instance, the Panel is aware that legislation does allow for pro bono schemes such as Legal Aid and Community Legal Services (if acting under a Legal Aid Grant) to seek an award for costs. The case of Desmond Francis Lewis and Telstra Corporation Limited [1995] AATA 94 is also authority that a Community Legal Service may seek its costs in limited circumstances. This case indicated that the legal service in question was able to do so because it reserved the right to recover costs from the Applicant. 54. There is no evidence of any such agreement between the representative and the Applicant. 55. Further, although legislation may allow pro bono schemes to seek an award for costs, the Panel’s ability to provide such an award is not founded in statute. Instead, the sole basis it can provide such an award is pursua nt to clause 9.4 of the Terms of Reference which states: “FOS may decide that the Financial Services Provider contribute to the legal or other professional costs or travel costs incurred by the Applicant in the course of the Dispute.” (Panel emphasis) 56. As is evident, this provision is only enlivened if the Applicant has incurred the legal costs. It does not entitle a third party to seek its costs for advocating a dispute on behalf of the Applicant from the FSP. 57. As there is no evidence that the solicitors have any entitlement to recover its costs from the Applicant, the Panel has no jurisdiction to award legal costs in these circumstances. Interest 58. The FSP has argued that interest is only payable from the date from which it was unreasonable to withhold payment. The FSP maintains that it is entitled to a reasonable period to investigate and determine its position, and given the complex nature of the flood disputes, the delays are not unreasonable. Further complex situations require substantial periods of time fo r independent bodies such as the Queensland Flood Commission of Inquiry and FOS, to make conclusions on the issues in dispute. 59. The FSP maintains that it did not act unreasonably in this dispute and therefore interest is not payable. Alternatively if some period of interest is to be awarded, it should be reduced to account for the substantial delays through the course of the process which were not the FSP’s fault. Case No: 291942 Determination Page 10 of 10 60. Section 57 of the Act requires interest be paid when it becomes “unreasonable for the insurer to have withheld payment”. An examination of relevant case law indicates that most probably, interest will be awarded from either when an insurer first emphatically denied liability or disputed a matter, or from when in the normal course of events the claim should have been paid if liability had not been disputed. 61. The Panel accepts that the FSP was entitled to withhold payment of the settlement monies until such time as it had properly investigated the dispute and made its decision as to liability. 62. The FSP made its original decision to deny the claim after receiving relevant assessment reports, hydrology reports and other information. The FSP was aware of the terms of its policy and aware of the relevant provisions under which liability might arise and chose to deny the claim having reviewed those relevant provisions and the evidence available to it. 63. At that point the FSP has made its decision on the claim and it is appropriate that from that time interest be paid unless it can be established that the Applicant had withheld information from the FSP that would have led to an alteration of its decision. 64. Accordingly, it is appropriate that the FSP in this dispute pay interest from the day upon which the FSP determined to deny liability of the Applicant’s claim, until payment of the claim. Determination 65. In light of the above analysis, the Panel determines that the FSP is required to indemnify the Applicant for loss or damage caused by the inundation of the property to a level of 200mm above the floor level of the house, through the property, subject to the applicable policy limits for the flash flood. 66. In the event the FSP elects to settle any portion of the claim in cash, it is required to pay interest on such amount at the statutory rate from 11 May 2011, the date it first declined the claim, until the claim is settled.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.