Home / Financial Firm (Unknown - Insurer) / Determination 291858
Determination 291858
Denial of flood and flash flood damage claim under policy exclusion
Summary
The applicants' Tennyson home was inundated in January 2011 and the FSP declined the claim as flood. AFCA found the policy clearly disclosed the flood exclusion and flash flood limits, no detriment was shown from an alleged representation about part payment, and the water arrived outside the flash flood window.
Section 35 of the Insurance Contracts Act was met by the PDS and certificate, and the flash flood cover required inundation within 24 hours of the heavy rain, which was not established.
Issues
- Claim denial primary · not upheld
“The inundation occurred after 9.00am on 12 January 2011, outside the 24-hour flash flood window, so the flood exclusion applies.”
- Failure to disclose secondary · not upheld
“Panel satisfied the FSP clearly informed the applicants of the flood exclusion and flash flood limits under section 35.”
- Misleading conduct secondary · not upheld
“Even if an assessor said half the claim would be paid, no detriment or prejudice was shown.”
Subjects and remedies
disabilitynatural disasterno remedy
Text of the determination
Case No: 291858 Determination Page 1 of 10
Case number: 291858
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim-Exclusion/ condition
21 January 2013
Background
1. The Applicants‟ home (located in Tennyson, Queensland) and contents were
insured with the Financial Services Provider (FSP) under a home building
and contents insurance policy.
2. Their property was damaged as a result of water inundation in January 2011
following severe weather events.
3. A claim was lodged with the FSP who declined liability on the basis the
damage was caused by flood which the policy excluded.
4. The Applicants maintain they are entitled to indemnity because:
The FSP has not complied with Section 35 of the Insurance Contracts
Act, 1984 (the Act);
The FSP had made representations to the effect that their claim was
covered; and
Their loss was caused by events covered by the policy in any event.
Summary of Applicant’s position
5. The Applicants are represented. For convenience, the expression
“Applicants” will jointly re fer to them and their representative.
6. The FSP did not comply with Section 35 of the Act because:
The female Applicant (AH) “does not recall” receiving a PDS when she
made the initial premium payment.
AH is dyslexic, making it difficult for her to understand written material.
AH “does not recall” any discussion relating to the flood exclusion at
policy inception.
The policy definitions of “flood” and “flash flood and storm runoff” were
overlapping, contradictory and confusing.
Determination
Case No: 291858 Determination Page 2 of 10
The definition of “flood” is so wide that it fails to clearly inform the
relevant exclusion.
The layout and structure of the PDS is “offensive to good insurance
practice”, “overly technical, elliptical and confusing”, “not… internally
consistent” and is “an affront to the spirit and letter” of Section 35 of the
Act.
7. The FSP informed the male Applicant (WH) that half of their claim would be
paid on 17 January 2011.
8. Their home and contents were damaged by stormwater runoff and/or flash
flood because:
The Bureau of Meteorology (BOM) had issued warnings of heavy rains
and flash flooding shortly before 9.00am on 11 January 2011.
The Brisbane area was affected by numerous lightning strikes between
11.00pm on 10 January 2011 and 11.00pm on 11 January 2011.
There were winds with speeds of 52km/h and 43km/h on 10 and 11
January 2011 respectively.
Their home was inundated at about 4.00pm on 11 January 2011, within
24 hours of rainfall that occurred on the morning of 11 January 2011.
The rains that fell over the Wivenhoe Dam on the morning of 11
January 2011 led the dam operators to adopt a W4 release strategy,
which was ultimately the main cause of the flooding downstream.
9. The FSP‟s hydrology evidence is unreliable because:
It has been based on a “desk top review” instead of an inspection of the
property.
It fails to contemplate events that occurred specific to their property.
It failed to assess/analyse if the home was first inundated by
stormwater run-off and/or flash flood.
10. The Applicants‟ evidence as to the events that transpired is as fo llows:
Their yard is approximately 3 feet (900mm) lower than the road and
slopes down, with a stormwater drain situated underneath.
Their home is raised 3 feet from the ground.
Their next door neighbours installed a gutter in an attempt to drain
water back into their (the neighbour‟s) garden. Instead, it caused more
water to flow into the Applicants‟ yard.
WH was at home on 11 January 2011 and evacuated between 5.30pm
and 6.00pm.
Water had already entered the garage and began to inundate the home
through the floorboards at about 4.00pm on 11 January 2011.
Case No: 291858 Determination Page 3 of 10
WH believes that most of the items in the garage were already
damaged when he evacuated.
The home was inundated by another 12 to 16 inches (300-400mm) of
water when the water peaked “later that night”.
WH believes the home was not inundated by flood water because he
was still able to cross Pamphlett Bridge when he evacuated.
11. They should be awarded the maximum amount allowable for legal costs.
12. They should be paid interest on the amount payable to them by the FSP.
13. The Applicants refer to Section 35 of the Act.
Summary of FSP’s position
14. It had clearly informed the Applicants of the limitations with respect to flood,
flash flood and stormwater run-off because:
They were sent the PDS, certificate of insurance and renewal notices.
The PDS clearly sets out that:
i. Flood damage was not covered by the policy and that cover for
such damage was available as an option.
ii. The FSP would only cover “flash flood”, which is a specific form of
flood.
iii. Cover for damage arising from a “flash flood” was monetarily
limited.
The suggestion that the flood definition is “too broad” has nothing to do
with its obligations under Section 35 of the Act. Section 35 of the Act
does not restrict insurers from setting out the scope of its cover. It only
obliges insurers to inform policyholders of the terms of cover.
The format and structure of its PDS is clear and well indexed.
The certificate of insurance also clearly sets out that the policy does not
cover flood damage.
FOS has previously determined that its policy documentation satisfies
its obligation to clearly inform policyholders of the terms of cover
(Determination 239722).
15. The Applicants‟ property was not damaged by flash flood or stormwater run -
off, but by flood (as defined in the policy) because:
Its hydrological evidence shows that the proximate cause of the loss
was the rains which fell in the Wivenhoe Dam catchment from 9
January 2011 or earlier. Releases from the dam caused the Brisbane
and Bremer River levels to rise and subsequently inundate the
Applicant s‟ residence. The Applicants ‟ property was therefore damaged
by rain which fell more than 24 hours earlier.
Case No: 291858 Determination Page 4 of 10
Their property was damaged after 8.00am on 12 January 2011, that is
– more than 24 hours after 4.00am to 8.00am 11 January 2011 rains.
The terrain around the Applicant‟s home does not indicate that it was
particularly vulnerable to stormwater run-off.
Rainfall at around the time the home was first inundated was
insufficient to cause stormwater inundation.
16. Even if the proximate cause was flash flood (which it denies) a proximate
cause was also the rain that fell from 9 January 2011, which is excluded. As
such, the whole loss is excluded on the basis of the Wayne Tank principle.
17. WH‟s recollection that the initial inundation occurred a t about 4.00pm on 11
January 2011 is likely erroneous because:
The hydrological information is more consistent with a view that the
inundation was likely to have occurred at about 4.00pm on 12 January
2011.
There was no rainfall in the Applicants‟ area in the hour prior to 4.00pm
on 11 January 2011.
WH contacted the FSP at about 7.03am on 12 January 2011, saying
that he was “moving my house out at the moment”, being a reference to
him moving items ahead of the impending flood.
18. It is not required to pay inte rest on the Applicants‟ claim (if payable) because
it had not acted unreasonably for purposes of Section 57 of the Act. In any
case, it is entitled to a reduction on the interest payable to account for delays
that were not its fault.
19. The FSP relies on the following policy provisions contained in its PDS:
“ Words / terms with special meanings
Word / term Meaning
…
Flood Rising water which enters your home as a result of it running off
or overflowing from any origin or cause.
This policy does not cover flood unless we have agreed and it
is shown on your certificate of insurance
Flash flood and
stormwater run - off
A sudden flood caused by heavy rain that fell no more than 24
hours prior to the flash flood or stormwater run - off.
…
Storm A violent disturbance of the atmosphere associated with strong
winds including a cyclone, lightning, heavy rain, hail or snow
but not continuous bad weather by itself.
…
Case No: 291858 Determination Page 5 of 10
Insured events you are covered for
Damage caused by the weather ….
What is covered Wh at is not covered
Storm …
…
Flash flood and
stormwater run-off
A sudden flood caused by
heavy rain that fell no
more than 24 hours prior
to the flash flood or
stormwater run - off
Loss or damage caused:
by flood;
…
…
Your home
…
The most we will pay for home claims
What is covered What is not covered
…
Flash flood and stormwater
run-off
We will pay up to 50% of your
home sum insured or $25,000,
whichever is higher.
…
Your contents
…
The most we will pay for contents claims
What is covered What is not covered
…
Flash flood and stormwater
run-off
We will pay up to 50% of your
contents sum insured or
$25,000, whichever is higher. ”
20. The FSP refers to Sections 35, 57 and 69 of the Act.
Case No: 291858 Determination Page 6 of 10
Issues
21. Whether the FSP made a representation that the Applicants would be
covered for half of their loss.
22. Whether the Applicants were clearly informed of the limitations with respect
to flood damage and damage arising from stormwater runoff and flash flood.
23. Whether the Applicants‟ loss was caused by rain or storm water runoff, flash
flood and/or flood (as defined in the policy).
24. Whether the Applicants are entitled to legal costs.
25. Whether the FSP is required to pay interest and if so, is it entitled to a
reduction in the amount payable.
Reasons for decision
Preliminaries
26. Due to the nature and complexity of the dispute, it has been directly referred
to the Panel for Determination in accordance with the Operational Guidelines
to the Financial Ombudsman Service‟s (FOS) Terms of Reference.
27. The Panel consists of an Ombudsman, a representative with extensive
experience in the insurance industry and a representative with extensive
experience in consumer claims.
28. The Panel is satisfied that the material has been exchanged and the parties
have had the opportunity to respond to the issues raised.
29. The Applicants are legally represented and the various statutory provisions
referred to by the parties have been set out in their respective submissions.
For the sake of brevity, the Panel will not repeat these provisions here.
Representation that half the claim would be met
30. The FSP has not responded to the Applicants‟ assertion that WH was
informed that half of their loss would be met when WH lodged the claim on
17 January 2011. Neither has it addressed the Applicants‟ assertion that the
FSP‟ s assessor told them they would be paid $60,000 for their building and
$60,000 for their contents.
31. However, even if the Panel were to accept that such a representation was
made either by the FSP or its assessor, there is nothing in the material
exchanged t o suggest that the Applicants‟ have acted to their detriment or
suffered a prejudice as a result of the representation.
Case No: 291858 Determination Page 7 of 10
32. In the absence of any evidence as to the nature or extent of any prejudice
suffered, the Panel has difficulty concluding that an estoppel necessarily
applies in the circumstances of the claim.
Lack of awareness of policy limitations
33. The Applicants base their claim that the FSP failed to comply with Section 35
of the Act on a number of reasons cited in their submissions.
34. The Panel has cons idered the Applicants‟ assertions and notes:
The Applicants have been insured with the FSP for some four years.
They suggest that they “do not recall” receiving a PDS when they paid
their initial premium.
If the PDS had been provided after the policy was incepted (and even if
it occurred more than 14 days after inception), then, pursuant to
Section 69(3) of the Act, policyholders are taken to have been clearly
informed of the relevant policy terms for the purposes of a loss that
occurs after the policy documentation has been provided
All policy terms are generally important and every term has the capacity
to gain prominence depending on the circumstances of a claim being
made. It is not generally reasonable to expect an insurer to run through
every term at policy inception.
There is nothing in the material to suggest that there was a specific
discussion about flood damage or cover at policy inception (so as to
alert the FSP to the need to inform that its policy does not cover such
damage.
The FSP‟s Certifica te of Insurance which was sent to the Applicants at
each year‟s renewal notes “Flood and storm surge – not included ”
That DH may have been dyslexic is does not assist the Applicants in
this instance. There is nothing to suggest that the FSP was aware of
DH ‟s condition. A fair reading of Section 35(2) of the Insurance
contracts Act 1984 requires that the relevant exclusions and limitations
be in clear and unambiguous language and in a manner that a person
of average education and intelligence would have little difficulty in
finding and understanding should they choose to read the policy.
The Panel has previously reviewed the FSP‟s PDS and policy
documentation (which were no different to the ones the Applicant
received) and is satisfied that:
1. They were clearly indexed;
2. The monetary caps for damage caused by flash flood and
stormwater run-off have been clearly set out; and
3. The flood exclusion is not only clearly defined within the policy,
but referenced in the Certificate of Insurance (COI) forwarded to
the Applicant.
Case No: 291858 Determination Page 8 of 10
35. Having carefully reviewed the policy, the Panel is satisfied that if the
Applicants had read the policy they would have been informed of the nature
and extent of the exclusions and limitations, including flood.
36. In the circumstances, the FSP has met its obligation to clearly inform,
pursuant to Section 35 of the Act and is entitled to rely on the terms of its
policy.
Proximate cause of damage
37. The Applicants maintain that their property was first inundated by either
localised runoff or a flash flood at about 4.00pm on 11 January 2011,
although the FSP believes that this could have been 12 January 2011 rather
than 11 January 2011. The Applicants appear to base their belief on the fact
WH was able to cross Pamphlett Bridge when evacuating the property which
he recalled was sometime between 5.30pm and 6.00pm on 11 January
2011.
38. The FSP believes WH may have been mistaken as to his recollection of the
actual day of initial inundation. In this regard, it has provided an audio
recording of a conversation that occurred between MH and the FSP at about
7.03am on 12 January 2011. The recording relevantly indicates that MH had
informed the FSP that he was in the process of evacuating his home at that
time.
“MH: Okay. Well you know if you can get here quickly… with
the flood coming so [the car] will go under
FSP representative: When you say quickly um at this stage it is going to be
a minimum of two hours bef ore we can even think
about doing that.
MH: Sigh… well that will have to do. Um anyway I will give
you my mobile number I’m moving my house out at
the moment .”
[Panel emphasis]
39. This information has been exchanged and there has been no persuasive
rebuttal from the Applicants.
40. Although WH‟s recollection was that he evacuated the property on 11
January 2011, the Panel must consider all of the evidence in this instance.
41. The Panel notes that the policy excludes damage caused by flood, however
it provides limit ed cover for “flash flood” and i n order for the Applicants to be
entitled to this limited cover, the following elements must be established:
there was a sudden flood;
there was a heavy rain that occurred within 24 hours prior to that flood;
the sudden flood was caused by that heavy rain.
Case No: 291858 Determination Page 9 of 10
42. FOS has determined in other disputes, following consideration of all material
exchanged, that the heavy rainfall commencing around 4.00am on 11
January 2011 was a proximate or effective cause of the adoption of the W4
release strategy. The Panel has previously determined that this combined
with the heavy rain over the Brisbane River from about 4.00am that day and
the heavy rain that commenced falling over the Bremer River was the
proximate cause of inundation of many properties downstream of the
Wivenhoe Dam.
43. Given the wording of the FSP‟s policy in respect to flash flood, the Panel has
determined that the inundation in these earlier Determinations is properly
categorised as flash flood providing the inundation occurs within 24 hours of
the commencement of the heavy rainfall.
44. The Panel has considered the further evidence and submissions and the
additional material provided by the FSP in this dispute. The Panel is not
satisfied that the evidence which led to the earlier determinations, in respect
of „flash flood‟ has been significantly challenged in any material way.
45. The Panel is satisfied on the balance of probabilities that notwithstanding the
rain which had fallen prior to 11 January 2011, it was the rain which fell over
the Wivenhoe Dam between 4.00am and 8.00am on 11 January 2011 which
led to the decision to change the release strategy from W3 to W4. This
combined with the heavy rain that fell over the Brisbane River from that time
and the heavy rain that commenced falling over the Bremer River was in the
Panel‟s view the proximate or effective cause of the inundation of the
Applicant‟s property.
46. For the Applicant‟s claim to succeed and fall within the definition of “flash
flood” within the terms of the policy, it is necessary for the Applicant to
establish the property was inundated within 24 hours of this heavy rainfall.
As the Panel accepts the heavy rainfall commenced at approximately
4.00am on 11 January 2011 the inundation would have to occur prior to
4.00am on 12 January 2011.
47. The FSP‟s hydrologist „SC‟ issued a Key Conclusions Statement attached to
his letter of 7 June 2012 which notes:
The height of the Applicants‟ property is from 7.8m AHD to 9.1m AHD
The benchmark level of the home, being the lowest part of the house
on the ground, was7.8m AHD
At 4.00am on 12 January 2011 the river level was 6.9m AHD which
was 0.9m below the benchmark level
The river reached the benchmark level at about 9.00am on 12 January
2011 and by 12.24am on 13 January 2011 would have reached a peak
of 1.4m above benchmark level
Case No: 291858 Determination Page 10 of 10
48. Firstly, the Panel notes that the evidence supports the view that the property
was first inundated on 12 January 2011, rather than 11 January 2011. This
appears consistent with the recording of the male Applic ant‟s call to the FSP
on 12 January 2011.
49. Although the estimates may not be entirely accurate, given this information
was taken from and the estimates were based on data from public records,
in the Panel‟s view, this can be relied upon.
50. Therefore the Panel is of the view that on the balance of probabilities the
property was first inundated by rising water on 12 January 2011.
51. The weight of the evidence supports a finding that the Applicants‟ home was
likely to have been first inundated after 9.00am on 12 Ja nuary 2011. This is
outside the relevant 24 hour period to fall within the flash flood definition of
the policy.
52. Accordingly, the Panel is satisfied the policy does not extend to cover the
loss and it is unnecessary to consider the other issues that arise in this
dispute.
Determination
53. The Panel determines that the FSP is entitled to decline liability in response
to the claim.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.