Home / Financial Firm (Unknown - Insurer) / Determination 291673

Determination 291673

Denial of driveway collapse and home demolition claim; no insured event established

FirmFinancial Firm (Unknown - Insurer)
Decided2013-03-13
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicant's home was demolished after a collapse under the driveway linked to a decommissioned mineshaft, and the FSP declined the building claim because no insured event caused the loss. AFCA found the damage developed over a long period and the January 2011 rain was at most the last step in the causal chain, so the FSP is not obliged to cover.

Under the proximate cause test, the applicant did not establish that a storm or escaping liquid event within 72 hours was the dominant cause of the erosion.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 291673 Determination Page 1 of 9 Case number: 291673 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of Claim - Consideration of Insurance Event 6 March 2013 Background 1. The Applicant held home building insurance with the Financial Services Provider (FSP) from 19 October 2010 for a property purchased by his partner. The purchase was settled on or about 25 October 2010. The policy provided building cover for up to $300,000. 2. In or around 10-14 January 2011, the home was subject to heavy rainfall during a period in which much of Victoria was affected. A widening of cracks was noticed by the Applicant on the exterior of the home and subsidence in the driveway. The Applicant chipped away a section of concrete and found a hole underneath. He subsequently retained a civil engineer, CM, to arrange excavation and found the remains of an abandoned mineshaft adjacent to his home and under the driveway. The matter was reported to the local Council and it was determined that the area was unsafe and a substantial part of the home had to be demolished. A claim was lodged. 3. The FSP investigated and ultimately declined the claim on the basis that there was no insured event to account for the loss. Whilst the damage under the driveway may have been due (in part) to erosion and/or stormwater run- off, both of which are covered under certain circumstances, it is of the view that the loss had occurred over a long period of time and not as a result of one particular event. 4. The Applicant considers this position unfair and seeks indemnity for the loss of his home. Summary of Applicant’s position 5. The Applicant says that he is a certified property valuer and took every precaution with his wife in the purchase of their home. 6. He relies upon the written opinions provided by his expert, CM, to attest to the loss being caused by the events from 10 -14 January 2011, which led to an enormous amount of water flowing onto and under the property. This accounted for the damage underneath the driveway and subsequent Determination Case No: 291673 Determination Page 2 of 9 condemnation of the property. This is an insured event and he should be indemnified. Summary of FSP’s position 7. The FSP says that the damage to the property occurred over a significant period of time, possibly over 50 years and no single definable event can be established for the loss. 8. Whilst the rain event from January 2011, almost certainly contributed to the loss, it was not the proximate cause. 9. At the time of the reported loss, the property had been on risk for only two and a half months and the damage observed had been occurring over a much longer period than this. 10. The abandoned mineshaft under the driveway appeared to be uncapped when it was decommissioned and this left an instability in the soil composition which was ultimately eroded over time. Such a loss is not an insured event and not covered by the policy. 11. The FSP relies on the following policy provisions: Pages 16-21 of the Product Disclosure Statement (PDS) “ Section 2: Cover for your home and contents – Insured events What you are insured against and what you are NOT You are insured for loss or damage to your home, contents or both, caused directly by any of the „insured events‟ set out in the left column of the following table except to the extent indicated in the right column of the table... You are insured against loss or damage caused directly by the following insured events But not (a) ... (b) Storm... and/or rain ... (c) ... (h) Bursting leaking, discharging or overflowing of... fixed pipes used to hold or carry liquid of any kind. Loss or damage caused by gradual deterioration or lack of maintenance. ... ... (o) erosion, subsidence, landslide or earth movement but only if it is directly as a result of one of the following insured events; Any other erosion, subsidence, landslide or earth movement event. Case No: 291673 Determination Page 3 of 9 - ... - (h) escaping liquid and it occurs no more than 72 hours after the insured event. ... ” Pages 53-54 of the PDS “ Additional exclusions applying to this Policy ... This Policy does not cover: ... (b) loss or damage resulting from or caused by:  ...  inherent defects, structural defects, faulty workmanship, faulty design or any gradual process  wear, tear, rust, corrosion, depreciation or gradual deterioration  ...  settling, shrinkage or expansion in buildings, foundations, walls or pavements  the removal or weakening of supports or foundations for the purposes of alterations, additions, renovations or repair  ...  erosion, subsidence, landslide or earth movement other than as a direct result of one of the following insured events... - storm - ... - escaping liquid and occurring no more than 72 hours after the event...” Issue 12. Whether the Applicant‟s loss is covered under the terms and conditions of the FSP‟s policy. Reasons for decision 13. The Panel is satisfied that a full exchange of the relevant information has taken place between the respective parties and that each party has had the opportunity of addressing any issues raised. Case No: 291673 Determination Page 4 of 9 14. This decision has been made by a Panel consisting of an Ombudsman, an insurance industry representative appointed by the Financial Ombudsman Service Board, and a consumer representative appointed by the Financial Ombudsman Service Board. 15. The Panel accepts that the Applicant and his partner purchased the property in good faith. The Panel cannot and will not consider any ramifications for this matter outside of the question of whether the insurance policy should respond. Applicant’s onus 16. The Applicant‟s loss relates to the collapse of earth underneath the concrete driveway of his property, relating to a mineshaft which (it was later discovered) was thought to have been decommissioned in or around 1909. The collapse of earth was seen to be related to the flow of water through the stormwater system under the driveway and a possible failure to cap the mineshaft when it was decommissioned. 17. The resultant instability for the surrounding land meant that the Applicant‟s property was forcibly razed by order of the Council, as the building was no longer considered safe. This has since been done and all necessary underground work completed to ensure the integrity of the land. 18. There is an onus on an insured to establish on the balance of probabilities that a claim fits the definition of an insured event. This is known as a prima facie claim. Should this onus be discharged, it is then the responsibility of the insurer to establish the application of any exclusion on which it relies to deny the claim. 19. To be entitled to cover from the FSP, the onus therefore rests with the Applicant to establish that his loss fits withi n the scope of what is covered by the FSP‟s policy. 20. The policy provides cover for a series of defined events as outlined in the PDS. It does not provide blanket cover for all types of loss. 21. Amongst the insured events, provided for under the policy, is storm/rain, the bursting/leaking or overflow from fixed pipes and erosion or subsidence which occurs within 72 hours of an insured event. 22. It is the Applicant‟s position that the loss occurred as a direct result of heavy rainfall which occurred in and around 10-14 January 2011. He suggests that this rainfall caused an inordinate amount of water into the stormwater system for the property, which brought about the collapse of the soil under his driveway and subsequently rendered his home uninhabitable. 23. Insofar as the Applicant is to suggest that the soil eroded as a result of this event, the onus is on him to establish that the subsequent loss occurred within 72 hours of the policy defined of either „storm‟ or „escaping liquid‟. Case No: 291673 Determination Page 5 of 9 24. Relevantly, „caused by or occurred as‟ in an insurance sense, by reference to well established Australian case law, means the „proximate‟ cause of the loss, that is the „active, efficient cause‟ and further that „proximity does not mean proximity in time or space and the proximate cause of the loss or damage is not necessarily the most immediate cause or the last step in the causal chain‟ and finally that „the proximate cause of a loss must be capable of being characterised as the effective or operative or dominant cause of the loss‟. Expert opinions 25. Upon discovering an apparent hole under his driveway, the Applicant retained CM to investigate and report on what it was and its implications for his home. CM subsequently provided several reports in relation to the loss and the FSP ultimately retained engineering and building consultant, MC, to consider these findings and report further for its own purposes. 26. The Panel has considered the opinions of both experts and is of the view that both reports were carefully and meticulously prepared with appropriate due diligence and detail. The experts differ in some areas as to their respective conclusions, although this is not unusual. The Panel further notes that only CM viewed the loss firsthand at the property and considers that his contemporaneous observations of the damage are of more value. 27. This is not to say that both opinions should not be appropriately considered, or that the identified outcomes suggested by the respective experts should be adopted. 28. The reports provided are lengthy and the Panel will resist providing in depth analysis of the contents as this has been adequately done in the reports themselves and the parties‟ respective submissions. Each of the reports will be considered briefly. 29. CM‟s initial report suggested that:  there was a decommissioned mineshaft discovered under the driveway on the property, which appears to have been left uncapped and used as a dump before being filled in;  the damage caused by the collapse of the soil under the driveway was “structurally significant” and sho wed evidence of recent movement over the last five years;  based on a review of the photographs prior to and after the purchase of the property by the Applicant and his partner, “movement damage has been ongoing and may well have been occurring since the time of residence construction [in] 1959”;  the condition of the soil and the fill indicates that “heavy water flows have been occurring both recently and long term beneath the house in the vicinity of the kitchen and living room”; Case No: 291673 Determination Page 6 of 9  he identified that the “pri mary cause of damage arises from the concentration and discharge of roof water from the downpipe located on the east side of the chimney on the north wall of the living room” and suggested that the downpipe collects up to half the tiled roof area rainwater for the home;  the drought from the last several years had left the ground conditions “very dry” before more regular rain periods after July 2010. The event in January 2011 was a significant event and was “likely to have triggered a significant collapse of soil material into the disused mineshaft”;  rainfall records showed that more than 200mm of rain was recorded from 11 January 2011 until 14 January 2011 (with these totals usually recorded until 9.00am the day after the rainfall);  the Council records suggest that at the time of the building of the property, the (then) owner was made aware of the mineshaft and encouraged to check with the “Mines Department” as to whether the shaft was filled or covered with timber. It could not be ascertained if this was ever done;  as a result of the “significant undermining of footings to the house, poor sub-surface site drainage and an unsealed adjacent mineshaft over 150m deep” the home was no longer suitable for habitation. It was subsequently demolished. 30. In response to t his, the FSP retained MC to consider CM‟s report and visit the site with CM and the Applicant. This was well after the building had been demolished and MC acknowledged that his report was effectively an examination of “factual information... presented by o thers”. 31. MC was not critical of CM or his methodology and merely stated that he differed with respect to some of the conclusions drawn. His report revealed:  there was some confusion as to the location of the stormwater drains on the site. There should have been a pipe running along the northern fence to pick up downpipes from the garage, although the plan for the block revealed nothing about how rainwater was to be drained from the northern side of the house. Two small drainage outlets were visible from the bluestone open drain on the kerb, allowing for discharge to exit onto the street;  the earthenware pipes in the vicinity of the shaft are “usually coupled by a rubber ring arrangement” if joined underground. Any leakage from these pipes will “gravitate towa rds the mineshaft and send water down it”, along with earth. This, in turn, undermines the strength of the connected pipes and can disconnect them. The photos from the property showed such a disconnection had occurred. Once this happened, the water discharged directly into the soil itself in the vicinity of the decommissioned mineshaft. This, in turn, flushed all the earth down the mineshaft, though this would not have occurred in one storm event; Case No: 291673 Determination Page 7 of 9  the patio slab for the home was poured on top of fill and between surrounding brick walls. It shrank slightly, “creating a separating crack between the slab and the walls”. Rainwater run -off penetrated the crack and the subfloor area and created a “migratory path to the mineshaft”. The natural earth was eroded and followed the fill down the mineshaft over the course of “many years”;  the collapse of the soil under the driveway took up to 50 years to develop. The weight of the eroded earth was estimated at about 90 tonnes and it was “highly unlikely” that this could h ave occurred in a single rainstorm event;  whilst acknowledging that the area was subject to drought conditions, he did not believe that it caused the problem or that it “weakened” the soil structure;  heavier rainfall had affected the area in 1973 and there is no evidence of any damage under or around the insured property from this. The loss which involved the collapse of the soil under the driveway was due to an accumulation of factors over a long period of time;  the photos of the residence prior to purchase by the Applicant (in August 2010) showed a dark patch over the driveway, which was representative of the collapsed area underground. This demonstrates that there was a problem with the driveway prior to the storm event and prior to the Applicant‟s owners hip of the property (and the relevant insurance cover on the home). 32. Further opinions were provided by CM to more actively support the Applicant‟s claim for cover. He considered that it “could not be established” if there was long term erosion by water drainage into the mineshaft. He accepted that the pipe structure was “mostly unsealed” and would allow for leakage. 33. CM further confirmed that upon the demolishing of the house, an earthenware stormwater drain was located “between the north wall of the hous e and south side of the concrete driveway” draining into the street. It was not located near the northern boundary as required under the building permit. This was consistent with the theory of MC. 34. CM reported that it appeared “more likely that an escape or leakage of rainwater via the downpipe and earthenware drain on the north side of the house is the primary cause of significant erosion into and around the mineshaft”. 35. He remained satisfied that the loss was caused directly by a storm event, noting that the Applicant first contacted him the week after this event, that he received several other calls involving similar problems. The rain from the storms likely caused erosion of the soil under the driveway within 72 hours of the event, as required for cover under the policy. Case No: 291673 Determination Page 8 of 9 Consideration of the evidence 36. Both experts agree that the heavy rainfall in January 2011 contributed to the soil erosion and ultimate discovery of the mineshaft under the Applicant‟s driveway. 37. In very basic terms, CM alleges that this rainfall event, extreme as it was, was the cause of the loss. MC considers that the loss had occurred over many years and that the rainfall from this period merely contributed to and possibly accelerated the loss. 38. CM says that a “natural collapse” of the minesh aft is unlikely to occur over a significant period of time and is “almost always preceded by the sudden entry of water during heavy rain periods”. 39. Even if this is the case, it does not exclude the possibility that such an event served as the “straw that broke the camel‟s back”, rather than as the proximate cause of the loss. 40. CM says further that evidence of the gradual loss through the sagging of the driveway would have been noticed prior to the event, if the loss had not been sudden and unforeseen. Whilst there was deterioration noted at the home and in the driveway after the storms, there is no evidence that the driveway ever actually gave way and it remained in place until the Applicant investigated and ultimately authorised an excavation to learn what had gone wrong. 41. MC identified a dark area of concrete (above the collapsed portion of the mineshaft) which pre-dated the purchase of the home. He theorised that there may have been work done previously (prior to the purchase by the Applicant) to repair sections of the driveway. This may have been indicative of a larger problem. 42. The Panel has considered and weighed the evidence carefully. CM acknowledged in his first report that movement damage was apparent and that the damage appeared to have occurred over a period of time. He has since softened this view to more explicitly place the blame on the major storm event. 43. MC has suggested that the problem has possibly existed since the time the home was constructed, or at least from the time that the patio was built. 44. In consideration of the evidence presented, the Panel determines on the balance of probability and with specific reference to the guiding principles outlined in paragraph 24 above, that the damage had likely occurred over a significant period of time and was influenced by periods of heavy rain, much of which filtered underneath the property and eroded the existing soil to expose the mineshaft. 45. It is extremely unlikely (and ultimately not accepted) that such erosion could have occurred within 72 hours of a single storm, or series of storms as was Case No: 291673 Determination Page 9 of 9 the case in January 2011. At best, the storm(s) were the last step in the causal chain. In order for the Applicant to establish a prima facie claim under the policy, it was necessary for him to establish the proximate cause of the mineshaft‟s collapse was the January 2011 extreme weather events. 46. The Panel concedes that the storm events in January 2011, likely contributed to the damage, but that they were not the proximate cause of the erasure of the soil base. This was a combined effect of a possibly uncapped mineshaft, an ineffective stormwater system to ensure that run-off was properly discharged and the long term exposure to the run-off that eroded the soil base. 47. As a result, the Panel is satisfied that the Applicant is unable to discharge his onus to establish that the loss was caused by an insured event. On this basis, the Panel can only conclude that the FSP is entitled to deny the claim. Determination 48. On the basis of the available information, the Panel determines that the FSP is not obliged to cover the Applicant for his loss.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.