The applicant disputed a cash settlement of $11,998.14 for cyclone Yasi damage to his kitchen, relying on repairer quotations of $19,384.20. AFCA ordered the FSP to revise the scope of works in part, obtain new quotations, cash settle any additional amount with interest, but rejected several other scope items.

The FSP's liability is limited to repairing the damaged parts under the policy, but its scope of works omitted some damage and had to be revised.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interestreassess claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 291582 Determination Page 1 of 10 Case number: 291582 General Insurance - Domestic Insurance - Home Building and Contents - Cyclone Yasi - FSP Decision - Claim Amount - Scope of Works 29 April 2013 Background 1. The Applicant held a home building and contents insurance policy with the Financial Services Provider (FSP) which was in force at the time of the loss. 2. In March 2011, the Applicant lodged a claim for damage occurred to his property on 2 February 2011 following the cyclone Yasi event. 3. The FSP accepted the claim and offered a cash settlement of $11,998.14 for the repair of the property. 4. The Applicant disagrees with the amount in offer and claims that it is insufficient to complete repairs. He seeks to be cash settled for the repairs according to the quotations he has provided. Summary of Applicant’s position 5. The FSP asked building company S to assess the damage in the property (mainly the kitchen). RG, staff member of S, told him to obtain quotations. 6. His builders (AB) and cabinet maker (M) provided quotations for a total of $19,384.20. These were then submitted to S. Afterwards, a staff member of S (ZM) called him to offer $17,000 for the repairs, which he rejected. 7. ZM suggested S sent an assessor to consult with his builder so as to explain the difference in prices. When WS from S attended to assess the damage, he did not consult with his builder who was present at the time. 8. WS issued a scope of works (SOW) for AB and M to issue new quotations. AB and M refused to repeat their quotations. AB stood by his original quotation and M advised it would not do the job if only part of the kitchen bench tops were to be replaced. 9. WS provided an incomplete SOW and thus S’s estimate was only $11,000. After he complained about this, S sent an updated SOW and a few days later ZM offered $11,900 as settlement. He refused this amount. Determination Case No: 291582 Determination Page 2 of 10 10. Further rain has fallen in the area and this is a continuing problem as the damage has not been repaired and the roof is still leaking. There has been no instruction from S or the FSP to do any repairs until the kitchen ceiling is removed and the cause of damage inspected. 11. The amount the FSP is offering would fall very short of the actual cost of repair to bring the residence to the same position it was prior to the loss and would not comply with the FSP ’s policy wording. 12. His nominated repairers have provided fair and competitive quotations and he wants them to complete all repairs. Summary of FSP’s position 13. There was no damage on the roof resulting from cyclone Yasi. It is surprised that the Applicant states that the roof continues to leak and is causing more damage, yet has not addressed the issue. 14. The FSP does not accept that it is required to provide advice as to what the Applicant needs to do to ensure his property is protected against further loss and it cannot be held responsible for any additional damage caused by the failure to protect it. 15. The Applicant seems to believe S’s SOW is deficient and makes assumptions as to how the work should be carried out. The Applicant provides no evidence that these assumptions are based upon any fact. 16. Its proposed SOW reflects the work required to repair the damage. Any additional damage due to ongoing water entry issues are not the FSP’s responsibility. 17. The Applicant suggests that the cost proposed by the FSP is reflective of the expected quality outcome of repairs. AC, who provided the quotation for the FSP, is a licensed builder. There is no evidence to demonstrate that AC is less capable of undertaking the work than the Applicant’s builder AB. 18. The FSP does not accept that the Applicant was ever offered $17,000. There is no record of this. In any event, this argument is of little relevance as the Applicant does not suggest he acted upon this alleged offer to his detriment. 19. According to the policy, it is entitled to choose the most cost effective method of settlement which best puts the Applicant in the same position he was prior to the loss. S’s proposed SOW does just that. It is also entitled to seek the most competitive tender to carry out repairs, which it has done. 20. As the Applicant has not accepted to authorise the FSP’s offer of repair, it has opted to cash settle for what it would cost it to authorise the repairs. 21. Its offer is entirely fair and reasonable and the Applicant is not entitled to further payment with respect to this claim. Case No: 291582 Determination Page 3 of 10 22. The FSP relies on the following policy provisions contained in the Product Disclosure Statement (PDS): “ Your Home Settling your Claim If your certificate of insurance shows that you have home insurance we will cover your home for loss or damage as a result of an insured event occurring during the period of insurance. We may choose at our option to:  rebuild or repair your home as new; or  pay you the cost to us of rebuilding or repairing your home as new including any additional costs (relating only to that part of the home that was damaged) necessary to comply with government or local government laws existing at the time of damage occurring, provided that at the time of original construction the laws and by-laws prevailing then were complied with; or  pay you the home sum insured; or  settle, when allowance for wear and tear or lack of maintenance of the property is to be made, as explained in “Claims settlement other than on an as new basis” on page 26. We will pay up to the home sum insured shown in your certificate of insurance less any applicable excess. ... We will pay for materials of a similar kind and quality if the original materials are not readily available in Australia. ” Issue 23. Whether the FSP’s settlement offer is fair in al l the circumstances. Reasons for decision 24. As advised to the parties, due to the nature of the dispute, the Financial Ombudsman Service (FOS) has considered it appropriate to expedite the dispute to Determination in accordance with the Operational Guidelines to the FOS Terms of Reference. 25. I have reviewed the submissions of the parties and observe there is no dispute that the property was water damaged during the cyclone Yasi event. 26. The central issue in dispute is whether the FSP’s offer to cash settle the Ap plicant based on S’s SOW is fair in all the circumstances. Case No: 291582 Determination Page 4 of 10 Whether the FSP’s settlement offer is fair in all the circumstances The Evidence 27. The Applicant has provided quotations from AB and M to support his position. AB’s quotation of 10 September 2011 is for $13,158.20 and describes its proposed scope of works as follows: “QUOTE TO REPLACE GYPROCK CEILING IN KITCHEN DUE TO WATER DAMAGE FROM STORM. ALSO REPLACE CORNICE TO CEILING REPLACE WALL SHEETING IN KITCHEN AND COVERSTRIPS AROUND WINDOW. ALSO REPLACE AND RESHEET KITCHEN DINING ROOM WALLS DUE TO WATER DAMAGE FROM STORM. REPLACE INSULATION IN CEILING. PLASTER ALL GYPROCK JOINTS AND SAND ALSO REPLACE SKIRTING BOARDS. ALSO REPAIR WATER DAMAGED PINE BOARD FLOORING IN KITCHEN. FIX 4x2 HARDWOOD TO JOISTS ... PAINTING CEILING & WALLS & ARCHITRAES ELECTRICAL. REMOVE 2 AIR CONDITIONERS AND RECONNECT. ALSO CONNECT POWER POINTS & LIGHTS. PLUMBER TO REPLACE FLASHING ON ROOF AND SCREW. PLUMBER TO DISCONNECT AND RECONNECT KITCHEN TAP. AND CONNECT WASTE PIPES” [sic]. 28. M’ s quotation of 25 July 2011 provides an estimate of $6,226 for the following work: “ Joinery Design: To replace all existing floor cupboard carcass’s & benchtops ,also overhead cabinets between wall and pantry on western side of kitchen. [M] has allowed for removal of all benchtops and carcass’s as it is not possible to replace the existing water damaged sections alone without causing further damage to other areas of the kitchen such as the tiled splashback. *please not there has been no allowance for plumbing or electrical costs associated with the removal and installation of the above mentioned work ” [sic]. 29. The Applicant has not provided any additional evidence, aside from comments and notations to the FSP’s material. 30. The FSP has provided reports and SOWs from S. S’s first report of 6 May 2011 says that:  The property was inspected on 20 April 2011. Case No: 291582 Determination Page 5 of 10  There is damage to the shed due to wind and to the kitchen plasterwork due to storm conditions allowing rainwater to enter the home through guttering and flashings.  The guttering is in good overall condition but needs maintenance to prevent further ingress.  The damage has resulted from a single identifiable event which appears to be covered under the insured event of “storm”. 31. S’s SOW attached to this report refers to repairs to sheds and the kitchen. As to the kitchen damage it says that removal and fitting of plasterboard ceiling sheeting is required as well as removal and replacement of cornice and painting of the ceiling and cornice. 32. This first report also contains photographs of the property. I note that the roof in the images seems to be in a general good condition. 33. S’s report of 12 May 2011 relevantly says that S has engaged the lowest tender to commence repairs as per the SOW. 34. A third report from S dated 27 June 2011 says:  S attended the site to discuss with the Applicant as he had stated that several items needed to be added to the SOW.  The mouldy area of the soffit is located outside the kitchen window and it corresponds with water damage to the kitchen ceiling lining.  The kitchen bench tops show areas of swelling consistent with water running down the wall frame between the damaged kitchen ceiling lining and stained soffit, indicating it had resulted from the same cause. The Applicant confirmed that the kitchen bench tops are five years old.  The staining to the internal wall is in the vicinity of the damaged kitchen lining and consistent water ingress from the same flashing was the cause. 35. Additional images have been attached showing the damage to the kitchen bench tops and cupboards, as well as the staining to the internal wall and the stained soffit. 36. After the third report, a new SOW was issued. Aside from repairs to the detached sheds and external painting, this SOW describes repairs to the kitchen as follows:  Remove melamine cupboard lining and Masonite internal wall panelling and replace to match existing.  Remove, store and reinstate two air conditioners on completion of repairs.  Remove kitchen bench top carefully so as not to damage tiled splashback and replace to match existing. Case No: 291582 Determination Page 6 of 10  Remove cornice and ceiling sheeting, replace to match existing and paint them. 37. S issued an updated SOW on 15 November 2011, which refers to repairs to the detached sheds, external painting, waste and construction management and plumbing repairs to the roof (this last item the SOW suggests the Applicant has to address). As to the kitchen, this SOW additionally refers to:  Fix over damaged back of base cupboard below window and overhead cupboard to right hand side to match existing.  Remove timber cornice and replace to match existing.  Remove, store and reinstate light fittings, one air conditioner head unit, a power socket and cook top on completion of repairs.  Remove and replace to match existing four sections of kitc hen bench tops.  Allowance for splashback tiles. 38. In summary, the Applicant has expressed his concern with the S’s SOW as follows:  The kitchen floor is now squeaking and needs addressing.  The internal Masonite wall needs to be wholly re-sheeted and painted as the original wall panelling is no longer available. Further, S’s SOW has no allowance for damage to existing back walls.  The SOW only allows for the patching of the back of the damaged right hand side cupboards without removing them.  The SOW only allows for replacement of 3m 2 of insulation.  As to the kitchen bench tops, the SOW is limited to only replacing the tops.  There is no allowance for wall painting in the “external works”.  Water is still coming into the ceiling cavity. Every time it rains, water leaks into the ceiling and the fibreglass insulation batts soak up the water. As a result, the ceiling is now bellying and the walls are also growing mildew inside and outside the house.  The water running inside the wall and down past the window is causing tiles to be pushed up and could cause them to crack.  The water leaking down the wall has also damaged the melamine backing of the cupboards along the wall under the window, which is causing it to buckle. 39. Both parties have also supplied several photographs of the damaged areas. Case No: 291582 Determination Page 7 of 10 Analysis 40. Following the wording of the PDS, I accept it is the FSP’s choice to either repair the home or pay the insured the “cost to [the FSP]” of repairing the home. 41. The FSP contends that it is willing to authorise its builder to carry out the repairs but the Applicant prefers his builder. 42. The FSP contends that for this reason it has opted to cash settle the claim in the amount of $11,998.14 which it considers is a reasonable cost to repair the damage identified as arising from cyclone Yasi. 43. Having reviewed the material available, I am satisfied that S’s SOW satisfactorily addresses most of the identified damage. I will now address the Applicant’s concerns. Kitchen floor 44. The Applicant alleges that the floor in the kitchen has shifted and is now squeaking as a result of the damage caused during the claimed event. 45. I have found no evidence of investigation, identification or consideration of repair of floors under the SOW. It seems that this damage has not been inspected by the FSP. 46. As such, the FSP should be given the opportunity to inspect the damage and determine whether it is liable for it. If it is accepted that the floor was damaged as a result of the claimed event, the FSP is to include its repair under a new revised SOW. Internal Masonite wall 47. The Applicant says that the SOW’s proposed removal and replacement of panelling is patch work and would not look uniform. He wants the internal wall re-sheeted and painted as the original panelling is no longer available. 48. According to the PDS, when “Rebuilding or repairing ... that part of the home that was damaged or destroyed”, the FSP is not required to “pay for additional expenses for replacing or matching undamaged parts to create a uniform appearance”. 49. I acknowledge that the FSP’s obligati on is to pay the cost to repair the home so to put it to the state it was prior to the loss, but as noted in the PDS, this is limited to the part of the home that was damaged. 50. The Applicant also notes that the SOW has no allowance for any damage to existing back walls. There is evidence of damage to back walls in the SOW or the reports. As such, I am not satisfied there is a need for such an allowance. Case No: 291582 Determination Page 8 of 10 51. In application of the terms of the policy, I am satisfied that the FSP is entitled to source “timber look” panelling to replace the damaged area only. Bench tops 52. The Applicant is concerned about the FSP only replacing some of the kitchen bench top sections. He contends that M is unable to guarantee a satisfactory replacement if not all of the bench tops are replaced. 53. As indicated in paragraph 48 of this Determination, the FSP’s liability is limited to repair or replacement of the damaged areas only. Accordingly, I am satisfied that the provided SOW is in accordance with the terms and conditions of the policy. Right hand side and below the window cupboards 54. The proposed SOW seeks to fix over the damaged back ply lining. The Applicant says that this is patch work and that the damaged cupboards need to be removed to repair the back ply lining. 55. I note the damage to the cupboards is swelling damage due to water ingress. This has the potential of attracting mould and causing further damage if the affected lining is not removed. 56. As such, in this instance I am not satisfied that a patch work over the back ply lining is a reasonable method of repair to leave this part of the home as close as it was prior to the loss. 57. Therefore, the FSP should update the SOW so that the repair to the ply lining requires the removal of the cupboards and the replacement of the back ply lining. Tiling 58. The Applicant says that water running inside the wall and past the window is causing tiling in the kitchen to be pushed up and could cause them to crack. 59. The most recent SOW allows for 4m 2 of splashback tiling. The Applicant questions the necessity for this. 60. Following paragraph 57 of this Determination and insofar as the SOW should include the removal of cupboards below the window to replace the back ply lining, I am satisfied that an allowance for tiling is appropriate. External works 61. The Applicant contends that there is no allowance for wall painting in the “external works”. I am satisfied that the SOW follows the damaged identified as being consistent with the claimed event. Accordingly, the allowance in the SOW is only for the repainting of the soffit. Case No: 291582 Determination Page 9 of 10 62. The Applicant has not specified or provided any reason as to why there is the need for the painting of external walls. As such, I am not satisfied there is a need to include this in the SOW. Other damage 63. Under the policy, the Applicant “must at [his] expense take all reasonable pre cautions to ... prevent further damage or legal liability occurring”. 64. The evidence to hand indicates that the roof guttering was in good condition save for some maintenance issues. The images provided show a roof that, in my view, is in good condition. 65. Further, there is no evidence indicating that the Applicant was advised to wait until assessment of liability for other parts of the house was completed, prior to performing maintenance works. On the contrary, S’s newest SOW says the Applicant should perform plumbing maintenance works to the roof. 66. Based on the policy terms and in the absence of any evidence to the contrary, I am satisfied that the FSP is not responsible for the repair of the roof and guttering given that the evidence to hand indicates that the issues are maintenance related. 67. It follows that the FSP is also not liable for the repairs of any damage inside and outside the building that are maintenance issues. 68. As to the limitation to only 3m 2 of insulation and the absence of an allowance for painting of internal and external walls, there is no indication or suggestion as to why this is required. 69. If more insulation or external and/or internal wall painting is required as a result of further damage due to lack of maintenance, I am satisfied that the FSP is not liable. 70. Insofar as the Applicant contends that further damage has been caused by cyclone Yasi, the FSP should be allowed to investigate and assess the extent of its liability. Other Issues 71. The Applicant has provided extensive material and photographs from another property which apparently also has kitchen damage. The settlement for the other property is not an issue in dispute for this claim. As such, I have made no reference to the damage or evidence for the other property. 72. The Applicant has made repeated mention of an offer of $17,000 made by ZM, who I understand is a staff member of S. The FSP has contended that there is no record of such an offer and in any case the Applicant has not been prejudiced by it. Case No: 291582 Determination Page 10 of 10 73. I note the Applicant has said that he rejected this offer. Considering this, other than establishing whether this offer was made or not, I am not satisfied there is any adverse consequence to whether this offer was made or not. 74. The evidence to hand is insufficient to establish whether this offer was made and I am not satisfied this is a crucial point to the dispute as the Applicant has stated he had rejected said offer. Determination 75. On the basis of the available information, I determine that:  The FSP is to organise for S to adjust its SOW following the findings of paragraphs 44 – 70 of this Determination.  The FSP is to obtain new quotations based on S’s new SOW as mentioned above.  The FSP is to cash settle any additional amount for the claim based on the new quotations and according to the terms and conditions of the policy.  The FSP is to pay interest on the additional settlement amount only in accordance with section 57 of the Insurance Contracts Act 1984 from 1 March 2012, being the date of the FSP’s final decision, to the date of payment of the claim. 76. The FSP is to finalise the settlement of the claim within 45 days of notification from FOS that the Determination has been accepted by the Applicant.