Home / Financial Firm (Unknown - Insurer) / Determination 291482
Determination 291482
Denial of flood-related water inundation claim
Summary
The applicants' Yeronga home was inundated during the January 2011 Queensland floods, and the FSP declined the claim as flood, which the policy excludes. AFCA found the inundation came from stormwater drains backing up together with overtopping river water, which the policy defines as flood, and upheld the decline.
The policy's definition of flood covers water escaping from watercourses and water discharged from waste water systems under flood pressure, so the combined inundation was excluded flood.
Issues
- Claim denial primary · not upheld
“the Panel is satisfied the FSP is entitled to rely on the flood exclusion to deny liability for the claim.”
- Inadequate claim investigation secondary · not upheld
“The Panel does not agree that the site specific hydrology report should not be relied upon due to its completion some time after the event.”
Subjects and remedies
home or building damagenatural disasterno remedy
Text of the determination
Case No: 291482 Determination Page 1 of 7
Case number: 291482
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim
25 February 2013
Background
1. The Applicants hold a Personal Insurance Policy underwritten by the
Financial Services Provider (FSP). The policy covered a residential property
between 27 May 2010 and 27 May 2011.
2. The Applicants lodged a claim for loss and damage to their property in
Yeronga resulting from water inundation following the severe weather events
in Queensland in January 2011.
3. The FSP declined the claim on the basis the loss and damage resulted from
flood inundation which is excluded from cover under the policy.
4. The Applicants have disputed the declinature on the basis the loss and
damage arose from stormwater inundation which is covered under the
policy.
Summary of Applicants ’ position
5. The Applicants accept that the policy does not cover damage caused by
flood, that they were aware of this prior to the inundation. The FSP made no
statements about flood being covered either before or during flood.
6. The male Applicant has provided the following information:
The water entered the property through back up from stormwater
drains.
The 1974 flood level was approximately 1.2 metres higher than the
2011 flood. In 1974 the flood broke over the banks of the river whereas
in 2011 the high water entered our property from the rear through the
stormwater drains.
We evacuated the property around 11.00pm on Tuesday 11 January
2011. The water entered the bottom of the street through the
stormwater drains that afternoon, so from previous experience the
Applicants decided to evacuate. The water did not enter the yard until
early morning on Thursday 13 January 2011.
Determination
Case No: 291482 Determination Page 2 of 7
They returned to live at the property about 7-10 days after the flood.
The water marks indicated that the water reached a height of 40cms
through the granny flat at the rear and double garage in the front.
However, no water entered the main living area.
7. The Applicants contend there is cover for storm or rainwater inundation and
submit the damage to the property was the result of storm or rainwater.
8. The Applicants note the following concerns in relation to the expert reports
from the assessor and hydrologist:
The loss adjuster‟s report refers to the loss arising from stormwater
backing up through drains and joining with flood waters. If the
inundation of the property occurred due to storm or rainwater before t he
arrival of flood waters then the policy will respond. It is a matter for the
FSP to demonstrate the inundation occurred due to an excluded event.
The ICA hydrology report does not take account of the local factors
such as stormwater drain placement, local watercourses and local
rainfall. The report is inadequate to demonstrate the cause of
inundation at the Applicants‟ particular property.
The site specific hydrology report was obtained after a significant
amount of time had elapsed and accordingly will be of little assistance.
9. The Applicants have also refuted the FSP‟s allegation that they denied the
hydrologist access to conduct an onsite inspection for a further hydrology
report. To the Applicants‟ knowledge, neither the FSP nor its hydrologist ever
specifically requested that the Applicants allow access to the hydrologist.
Had they done so, then they would have been most welcome.
Summary of FSP’s position
10. The FSP relies on the following policy terms and conditions:
“ Words with special meaning
...
Flood means the inundation of normally dry land by water escaping, or being
released from, the normal confines of a reservoir, natural watercourse or lake
(whether or not they have been altered or modified). Flood also includes water
discharge from any sewerage or waste water systems due to pressure
induced by flood water.
...
What you are not insured for
...
2. Loss or damage to your property caused by:
a. Flood, the action of water from the sea, high sea water, tidal action or
Tsunami;”
Case No: 291482 Determination Page 3 of 7
11. The FSP has enclosed the claim form completed by the Applicants. The
Panel notes the Applicants stated the stormwater backed up through drains
joining with flood water. The date of loss was provided as 13 January 2011.
12. The FSP has enclosed an assessor ‟s report dated 9 February 2011. The
assessor ‟s report records the following:
The insured was present at the time the water first entered the property
at 2.00am on 12 January 2011.
The water rose quickly and was contaminated with sewerage.
The water came from stormwater drains.
The nearest waterway is the Brisbane River which is approximately 200
meters away.
The property sits on a slab foundation and there is approximately
0.25m between floor level and ground level.
The water peaked at the property at 1m and the property was
inundated for approximately 24 hours.
The Applicants were previously aware flood may occur at the property
due to the 1974 floods.
13. The FSP has enclosed the hydrology report dated 15 June 2012 from „W‟
from which the Panel notes the following:
The hydrologi st had received the version of events from the Applicants‟
legal representative.
No rainfall was recorded at a rainfall gauge 4.2kms North-West of the
insured property after 12.00am on 12 January 2011. The peak rainfall
intensity on Tuesday 11 January 2011 was 19mm/hr in the hours to
11.00am. The peak stormwater runoff should have occurred within
about 15 minutes of this peak intensity.
The property is located approximately 200m from the Brisbane River.
The urban drainage in the vicinity of the subject property is well defined
and includes the underground pipe networks and street drains to direct
stormwater runoff away from properties. The actual catchment that
would direct stormwater runoff flows to the subject property would be
minimal, only including a few adjoining allotments.
Floodwater from the Brisbane River would have surcharged from the
drains in the low point of the road in which the insured property is
located prior to overtopping “C Lane”. Floodwater from the Brisbane
River would overtop C Lane at a level of about 5.9m AHD resulting in
direct overland flow towards the subject property.
The peak water level is estimated to have occurred at approximately
3.00am on Thursday 13 January 2011.
W concluded that any water entering the property after 12.00am on 12
January 2011 could not be stormwater run-off because rainfall ceased
at about this time. The actual catchment that would direct stormwater
Case No: 291482 Determination Page 4 of 7
runoff flows to the subject property is minimal. The peak stormwater
runoff at the subject property would have occurred within 15 minutes of
the peak rainfall intensity recorded in the hour to 11.00am on 11
January 2011. The recorded rainfall intensities were not exceptional.
Accordingly, the volumes of stormwater runoff are likely to have been
experienced at the property at least once per year on average.
Topographic data indicates that the ground levels at the subject
property range from approximately 6.4m AHD at the North-Eastern
corner to 8m AHD at the Southern side of the property (a Floodwise
Report was enclosed confirming same). The entire property would have
been inundated by the peak water level of 8m AHD. The minimum
ground level of the subject property is 6.4m AHD which is above the
level at which direct overland flow of floodwaters from the Brisbane
River towards the subject property would begin overtopping C Lane
(5.9m AHD). Any floodwater surcharging from the drains in the low area
to the North and East of the subject property would have joined with the
direct overland flow of floodwater and become o ne body of water prior
to inundation of the yard of the subject property. C Lane would have
been overtopped by floodwaters from the Brisbane River at about
3.30am on 12 January 2011. Initial inundation of the yard of the subject
property by flood water from the Brisbane River is estimated to have
occurred at about 7.00am on 12 January 2011 at least 20 hours after
the peak rainfall in the area had occurred and at least 7 hours after the
rainfall had ceased.
The insured‟s reference to the subject property fi rst being inundated
early morning Thursday 13 January 2011 is not consistent with the
available data. The insured‟s reference to the timing of the initial
inundation to their street and the maximum height of inundation above
floor level is consistent with the available data.
The property is located within the flood extent of the Brisbane River
low-lying areas near the subject property which were initially inundated
by backflow of floodwater through the stormwater pipe drainage
system. However, the river broke its banks and overtopped C Lane
prior to initial inundation of the subject property. The initial inundation of
the subject property did not occur until at least 7 hours after rainfall in
the area had ceased. The initial peak inundation of the subject property
was caused by direct overland flow of floodwaters from the Brisbane
River.
14. The FSP has enclosed emails from the hydrologist from which the Panel
notes the following:
“I called [Applicant‟s representative] re. this claim on 24 May 2012, as person
contact details provided in our instructions from [FSP name] (see attached).
[representative‟s name removed] called me back on 25 May. I clearly
remember the telephone call because [representative name] hung up on me
when she had finished what she wanted to say.”
The hydrologist confirmed details of the conversation with the FSP. The FSP
then wrote to the hydrologist to confirm that the Applicants‟ solicitors had
Case No: 291482 Determination Page 5 of 7
informed the hydrologist that “ they had no instructions from the Insured and that
you are no (sic ) to go onto the Insured‟s property as part of your assessment. I
confirm your advice the solicitor would not provide any additional information on
what „no instructions from the insured‟ meant”
15. The FSP maintains that the inundation was caused by flood and that flood is
excluded under the policy. The inundation commenced at 7 .00am on 12
January 2011 at which time the Brisbane River had already broken its banks
and overtopped C Lane. The FSP maintains it is not liable for any loss or
damage arising out of the claim as this occurrence falls within the policy
definition of flood.
16. The FSP submits the findings of the hydrologist that the property was
inundated at about 7.00am on 12 January 2011 are consistent with the
observations of the Applicants. Rainfall has effectively been ruled out as the
cause of loss due to the timing of the inundation. The hydrologist has opined
that if rainwater was present at the time of inundation, flood water would
have been backing up along the drains due to the high water levels in the
Brisbane River nearby. In such circumstances, where a mixture of river
water and rainwater causes damage to the property the policy will not
respond since one such cause is the subject of policy exclusion under the
Wayne Tank principle.
17. The FSP further submits that if the property were to be inundated by
backflow from the drains, the case of K Sika Plastics v Cornhill Insurance
would apply. This case essentially holds that water which cannot enter or
drain into a watercourse because that watercourse is already flooded is
floodwater.
18. The FSP rejects the Applicants‟ submissions in relation to the site specific
report of the hydrologist as there is no evidence to support the view that
information relied on in the site specific report would have differed to the
information that W did rely on, had the report been prepared earlier.
19. The FSP further states that the Applicants refused access to the property
and this raises the inference that the onsite inspection would have detracted
from the Applicants‟ case. The FSP submits that the refusal was unfair given
the policy requires the Applicants‟ to cooperate in relation to claims
investigations. The FSP relies on the hydrologist‟s version of events as
outlined in the email.
Issue
20. Whether the FSP was entitled to decline the Applicants‟ claim.
Reasons for decision
21. There has been an exchange of material between each party and the Panel
is satisfied each party has had an opportunity to reply to the issues raised.
Case No: 291482 Determination Page 6 of 7
22. The Panel has read each party‟s submissions and materials and will only
refer to the relevant submissions and materials raised.
23. The policy is an accidental damages policy and there is no doubt the loss
sustained by the Applicants would be considered accidental. The onus is
therefore on the FSP to establish the loss was due to the excluded event of
flood.
24. The Panel does not agree that the site specific hydrology report should not
be relied upon due to its completion some time after the event. The
hydrology report relied on actual rainfall data, river gauge data, topography,
stormwater drain placement/infrastructure and witness evidence. This
information should not materially alter due to the time elapsed.
25. The Panel notes the allegations regarding non-cooperation. The hydrologist
was informed that the Appl icants‟ solicitors did not have instructions
regarding a site specific visit and that he should not enter the property for the
site specific report. The Applicants in response state that they were not
specifically requested to allow access to the hydrologist.
26. It is unclear why the Applicants were not made aware the hydrologist wished
to enter the property for a site specific hydrology report. It is concerning that
having been made aware of the hydrologist desire to enter the property for a
site specific report, that instructions were not sought or provided on this
issue. The Panel cannot know the exact reason for the failure to respond to
the hydrologist‟s request and given this is reluctant to make any adverse
findings regarding same. The rainfall data pro vided indicates there was
substantial rainfall in the lead up to the inundation. The hydrologist has noted
the rainfall ceased a substantial period prior to the inundation and the rainfall
was insufficient to inundate the property.
27. The Applicants have referred to a document that states stormwater joined
with flood water. This document however is the claim form which was
completed by the Applicants and does not appear to be either the assessor
or hydrologist opinion.
28. The evidence from the hydrologist is that floodwater from the Brisbane River
would have surcharged from the drains in the low point of the road in which
the insured property is located prior to overtopping C Lane. Floodwater from
the Brisbane River would overtop C Lane at a level of about 5.9m AHD
resulting in direct overland flow towards the subject property.
29. It is the Applicants‟ statement that they evacuated the home at around
11.00am on 11 January 2011 but water did not enter the home until early
morning on 13 January 2011. This date of inundation is not consistent with
the hydrologist‟s report. In the Panel‟s experience of the Brisbane floods it is
more likely to have been the morning of 12 January 2011.
30. The Panel accepts the only expert evidence regarding the cause of
inundation is that provided by the hydrologist. It accepts that on the balance
of probabilities there were two sources of water, that of water surcharging
Case No: 291482 Determination Page 7 of 7
through the stormwater drains and overland flood that resulted in the
inundation of the property.
31. The water commenced surcharging the stormwater drains as the river levels
rose. The policy definition of flood includes water discharge from any
sewerage or waste water systems due to pressure induced by flood water.
The Panel notes that the stormwater drainage system would be covered by
the term „waste water systems‟. Accordingly, any water coming from the
drains would be deemed flood for the purposes of the policy.
32. It is clear that river water overtopping the banks of the Brisbane River would
similarly be deemed flood water under the policy definition of flood which
includes water escaping from the confines of a natural watercourse.
33. The Panel note that even if there was some stormwater run-off (not from the
drains) that had pooled and joined with flood water; that under the case of
Eastern Suburbs Leagues Club v Royal & Sun Alliance Australia Limited this
whole body of water would be deemed flood.
34. Having considered the evidence as a whole the Panel is satisfied on the
balance of probabilities that the inundation of the Applicants property was
due to a combination of water back flowing through the stormwater drainage
system and water overtopping the banks of the Brisbane River. Under the
terms of the Applicants policy this is considered flood and the Panel is
satisfied the FSP is entitled to rely on the flood exclusion to deny liability for
the claim.
Determination
35. On the basis of the available information the Panel determines the FSP was
entitled to decline the Applicants‟ claim.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.