Text of the determination
Case No: 291084 Determination Page 1 of 10
Case number: 291084
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of Claim - Storm - Policy Exclusion - Earth Movement No Matter How
Caused - Proximate Cause
2 May 2013
Background
1. The Applicant holds a home building insurance policy with the Financial
Services Provider (FSP).
2. On 7 December 2010, a storm occurred in the area where the insured
property is located.
3. On 4 July 2011, the Applicant lodged a claim for damage to the building due
to the 7 December 2010 storm.
4. The FSP’s loss adjuster, C, and the FSP’s engineer, M, inspected the
property and issued their respective reports.
5. The FSP denied the claim on the ground of the policy exclusion of earth
movement. In its Internal Dispute Resolution letter dated 15 May 2012, the
FSP wrote:
“Although the earth movement may have been caused in part by stormwater
run-off from the storm event, the proximate cause of the damage to the
building is earth movement (including saturation and expansion) and damage
directly caused by earth movement is excluded from cover under the policy no
matter how that earth movement was caused”.
6. The Applicant does not agree with the FSP’s decision, hence this dispute.
Summary of Applicant’s position
7. The Applicant, assisted by an insurance broker, says the storm was the
proximate cause of the loss. That is, the storm was “the active, efficient
cause that sets in motion a chain of events, which brings about a result,
without the intervention of any new or in dependent force”.
Determination
Case No: 291084 Determination Page 2 of 10
Summary of FSP’s position
8. The FSP says that earth movement was the proximate cause of the damage
to the building. Earth movement, no matter how caused, is excluded from
cover under the policy.
9. It relies on the following policy provisions contained on page 12 of the
Product Disclosure Statement (PDS):
“ What You are insured against
This policy insures You against accidental damage...occurring during the
Period of insurance.
...
What is not insured
1 damage directly caused by:
...
earth movement (except earthquake) no matter how caused, including
erosion, vibration, subsidence, seepage, saturation, creeping, landslip,
mudslide, collapse, shrinkage, settling, expansion or heaving”.
Issues
10. What was the proximate cause of the damage to the building, storm or earth
movement.
11. Whether the FSP is entitled to deny the claim on the ground of the policy
exclusion of earth movement.
Reasons for decision
12. Due to the nature of the dispute, the FOS has considered it appropriate to
expedite the dispute in accordance with the Operational Guidelines to the
FOS Terms of Reference. Thus, this dispute has not been the subject of a
FOS Recommendation and has proceeded directly to Determination. The
parties have been previously advised that a Determina tion will be issued in
this case.
Expert evidence
13. The parties have submitted copies of expert reports and emails from the
FSP’s experts, Loss Adjuster C and Engineer M. I note in particular the
following.
14. Engineer M’s report dated 23 January 2012 releva ntly reads:
“The insured reported that during the heavy rains of 7 December 2010, (which
has been well documented and taken as fact) surface water flowed under the
dwelling originating from the south. Water was seen to flow generally under
Case No: 291084 Determination Page 3 of 10
floor of the ensuite, toilet, laundry and travel through under the family and dine
in a generally northerly direction. The surface water washed the gravel from
the driveway.
...
SUCTION TESTING
...
The results of the soil suction testing in borehole 1, 2 and 3 indicate that
borehole 2 (located where the maximum flow of the inundation entered the
insured's property) increased in "wetness" between the 0.5 metre to 1.0 metre
depth range. Borehole 3 was also relatively moist at 0.5 metre, but was
somewhat surprisingly extremely dry at 1.0 metre. This was not consistent
with the visual description recorded on the soil borelog streets at the same
depth. However, borehole 3 became wetter at a depth between 1.0 metre to
2.0 metres and approached the same soil suction level as the borehole 1 at
depth. At depth, borehole 2 remained significantly wetter than borehole 3, with
borehole 3 at the 4.0 metre depth reaching the desiccated soil suction state.
Borehole 1 is located away from the main flow of the inundation and is
noticeably drier than borehole 2 which was located in the path of the
inundation.
In the writer's opinion, it is likely the reactive clay soil moisture content has
increased due to the 7 December 2010 inundation resulting in a lifting of the
dwelling's footings which is generally consistent with the majority of the
pattern of damage to the dwelling.
INTERNAL FLOOR LEVEL SURVEY
Two internal floor surveys had been undertaken, the first on 1 August 2011
the second on 6 January 2012. The purpose of the survey was to firstly
establish a datum on the plane of the floor, and secondly to see if there is any
change in the floor level as the reactive clay soil begins to dry out. The survey
was conducted on the vinyl floor to the kitchen, family and dine only. This
coincided with the general area of the passage of water under the dwelling.
The survey confirmed that the floor level adjacent to the intemal wall between
bedroom 4/office, laundry and the family/dine is higher than the remainder of
the floor. The highest point recorded, is outside bedroom 4's/office door
opening, with lowest point recorded in the middle of the kitchen floor. There is
an approximate 44mm difference in levels. There is a low spot near the family
room's sliding door and bedroom 2 comer. A comparison with the 6 January
2012 survey data suggests there had been minimal change since the 1
August 2011.
In the writer's opinion, based on the available evidence, it is likely there was
already a reasonable difference in floor levels, (not enough to generally
notice) and the inundation had caused a slight lift, sufficient to cause the
pattern of damage. We recommend re-surveying the floor at the end of April
2012 to compare ongoing floor movements to see how the dwelling is
behaving as the soil dries out.
Case No: 291084 Determination Page 4 of 10
DISCUSSION
Examining the physical evidence on the site of the reported damage and from
the surrounding topography, the writer believes the insured dwelling
experienced an overland flow of surface water from the 7 December 2010
rainfall event.
In the writer's opinion, the dwelling had experienced some minor movements
and cracking prior to the inundation as evidenced by the previous repairs to
the cornice wall junctions near the manhole and movement to the family room
cornice next to bedroom four.
Prior to the inundation, the dwelling is likely to have experienced the influence
of seasonal changes in soil moisture content. ...
...
In the writer's opinion, the dwelling has, and will always continue to
experience stump foundation movement due to effects of seasonal and
environmental reactive clay soil moisture content changing influences.
However, in the writer's opinion, we cannot rule out the possibility that the flow
of water underneath the dwelling's subfloor has not affected the reactive clay
soil under the concrete block stump soleplates.
In the writer ’ s opinion, it is likely that some of the recent movement may have
exacerbated some historical movement.
...
SUMMARY
In the writer's opinion, based on the available evidence, the 7 December 2010
rain event had inundated a section of the insured's underfloor space causing
the reactive clay soil to swell and lift some of the masonry stump supports.
In the writer's opinion, the majority of the damage is consistent with a recent
lift in some of the dwelling stumps, causing movement to some areas of the
dwelling that has not experienced comparable movement in the past.
However, it is likely that some of the recent movement may have exacerbated
some of the historical movement. ”
15. Loss Adjuster C’s report to the FSP dated 29 August 2011 relevantly states:
“We have now received advice from [Engineer M] stating that the relatively
recent nature of the movement, ties in with the December 2010 storm e vent.”
16. Loss Adjuster C’s email to the Applicant dated 4 April 2012 reads, in part:
“[FSP has] stated that the policy does not provide cover for damage to
property as a direct result of earth movement, no matter how that earth
movement eventuated.
I tried to reiterate the engineer[’]s findings and that the storm itself was the
cause of the damage/earth movement....”
17. The Applicant has not obtained her own expert reports and has referred to
the findings of C and M.
Case No: 291084 Determination Page 5 of 10
Proximate cause
18. An insurer is liable only for losses proximately caused by the events insured
against. It is settled that “proximate cause” is not the first, or the last or the
sole cause of the loss. It is the effective or dominant or operative cause of
the loss.
19. The policy insures agai nst accidental damage. Damage caused by a storm
or rain event would fall under “accidental damage”.
20. There is no dispute that a storm occurred on 7 December 2010.
21. The FSP’s own experts have provided opinions directly linking the 7
December 2010 storm to the damage to the insured building.
22. In terms of cause and effect, the 7 December 2010 storm was the direct
cause and earth movement and damage to the building were the indirect
consequences of the storm and the exclusion for damage directly caused by
earth movement is not applicable.
23. Thus, in my view, the storm on 7 December 2010 was the effective or
dominant or operative cause of the damage to the insured building.
The policy exclusion
24. The FSP relies upon the fact that the policy excludes damage directly
caused by earth movement “no matter how caused”.
25. The FSP states that it is entitled to rely upon this exclusion. Put simply,
except in the unlikely event of an earthquake, whatever the cause of the
movement of earth, if the earth movement is ultimately responsible for the
damage to the property, then no claim can succeed.
26. In support of this contention the FSP has referred to two earlier decisions of
this Service, in matters 265948 and 255143. (The FSP also sought to rely
upon two other Decisions notably 237298 and 254555. Whilst I have read
both of these Decisions, I do not consider that they are of assistance to the
FSP’s submission. )
27. However, there is no doubt that in the two earlier matters to which I have
referred, the decision to disallow the claims was based directly upon the
exclusion which the FSP relies upon in this matter.
The events leading up to the refusal of the claim
28. I have grave concern about the events leading up to the decision to deny the
claim which was conveyed to the Applicant on 7 April 2012.
29. The claim was first notified to the FSP in July 2011. As set out earlier, loss
adjuster C was immediately instructed and Ms S of that firm inspected the
Case No: 291084 Determination Page 6 of 10
property on 6 July 2011. As a consequence, C described the circumstances
of the event as –
“typ e of claim – storm
relating to – rainwater runoff”.
C commented that “in order to verify the exact cause of damage, we have
engaged [Engineer M]. We have requested they attend and conduct the
necessary testing to ascertain if rainwater runoff from the storm in December
2010, is the cause of the damages claimed.”
30. I make the following comment as to this report. In my view, the appropriate
officer within the FSP, upon receipt of this report, should have realised that
having regard to the nature of the damage claimed (cracking and movement
throughout the home), the stormwater runoff, of itself, would be unlikely to
have caused such damage. Rather, it should have been plain that the
stormwater runoff may have affected the soils, thus leading to the damage
sustained to the house.
31. I accept that it was certainly an appropriate course to obtain a first report
from Engineer M.
32. By 16 August 2011, C was able to forward to the Applicant a summary of an
opinion by IB, of Engineer M . In that opinion, IB commented that “ at this
point in time and without further investigation (see below) we cannot rule out
the influence the inundation may have had on the dwelling. It is likely the wet
area bathroom has been affected. The inundation part is close to the
bathroom.”
33. IB then commented that
“ in order to minimise the likelihood of any further damage and potential
expensive and extensive waterproofing repairs, we recommend the immediate
repair of the failed flexible sealant joints and cracked tile grout joints to the
bathroom. The attached drawing and note in three to find the extent of
damage to the bathroom.”
34. Further on in his report, IB comments that
“we may still need to carry out our own soil testing to establish the potential
reactive nature of the soil and perform a series of soil suction tests to
determine the level of the soil moisture at various depth. The inundation
having been a relatively rapid event, and the compacted based (sic) under the
dwelling being relatively impermeable, the water may not have had an effect
to the soil at depth and more likely there may have been slight disturbance or
undermining surrounding the concrete block stumps.”
35. As a consequence of IB’s report, his firm was commissioned to carry out soil
test, at very considerable expense and by 3 October 2011, the Applicant was
informed of this fact.
36. Again, I make the following comment. I find it hard to understand why, after
the FSP had received the first report from Engineer M, it was not apparent to
the person or persons handling the claim, that effectively Engineer M was
Case No: 291084 Determination Page 7 of 10
commenting that the damage may well have arisen as a result of soil
movement. Again, I cannot understand why, even at this stage, the FSP did
not alert the Applicant to the possibility that the claim would be denied on the
basis of the exclusion for damage caused by earth movement. Yet nothing
was done to alert her to the possibility that in the circumstances outlined by
Engineer M, the claim would be almost certainly denied. It also seems clear
that the FSP has not alerted C or Engineer M to the exclusion.
37. In a further communication from the Applicant, she has made the point that
once she received the news about the soil testing to be carried out, she
considered that this was a preliminary to deciding when it would be
appropriate for the eventual repairs to be conducted.
38. C, the assessors, continued to keep in touch with the Applicant. On 2
November 2011, they confirmed that Engineer M had advised that they had
collected the appropriate soil samples which were being tested. Then, on 5
December 2011, C again advised the Applicant, on this occasion, that
Engineer M had received the results from soil testing and that “the engineer
anticipates that we should be in receipt of his report and findings before
Christmas.”
39. By 15 February 2012, C again reported to the Applicant,
“we have received all of the required documentation from Engineer M. We
have now submitted our report to (FSP) and await their further instructions on
the matter. Once these further instructions are received, I will be able to
provide you with a copy of the en gineer’s report and findings, along with
confirmation that your insurer has accepted liability in full.”
40. As evidence of the fact that the possibility that further settling within the
house had to take place before repairs could be conducted, on this occasion,
LS, of C, finished her email by commenting,
“at this stage, the engineer has suggested that we continue to allow the home
to settle, with a reinspection pencilled in for April 2012, subject to of course to
the prior approval of (FSP) claim.”
41. Then, on 4 April 2012, Ms LS of C wrote what could only be described as a
very apologetic letter to the Applicant in which she stated that the FSP had
stated that the policy does not provide cover for damage to property as a
direct result of earth movement, no matter how that earth movement
eventuated. She went on to say,
“I tried to reiterate the engineer’s findings and that the storm itself was the
cause of the damage/earth movement.”
She went on to say that the FSP had explained that if the stormwater directly
caused the house to move, i.e. the force of the stormwater has moved the
stumps, then the policy would respond. But because the stormwater has
inundated the underfloor space, in turn causing movement of the earth, they
will not cover the resultant damage.
Case No: 291084 Determination Page 8 of 10
The consequences of the delayed response by the FSP
42. I have set out the matters above in considerable detail because I think they
do demonstrate the extent to which the Applicant was steered in the wrong
direction in this matter.
43. I do not for one minute believe that the FSP deliberately set out to mislead
the Applicant. If I considered that the FSP’s actions were deliberate or that
the FSP had acted with callous disregard for the Applicant’s interest, I would
have to give consideration to sections 13 and 14 of the Act.
44. But I am, nevertheless, satisfied that if as early as it could have done so, the
FSP had made the Applicant aware of the potential exclusion which might
lead to the denial of the claim, the Applicant may well have acted in a very
different manner.
45. First, the Applicant and the experienced broker who has given her advice,
may well have reached the conclusion that they should obtain a report from
someone independent of the FSP.
46. There was nothing whatever in the conduct of Ms LS of C or the conduct of
Engineer M, which in any way suggested to the Applicant that her claim
might be denied. In a recent submission to this Service, the Applicant has
stated that she contemplated obtaining a report of her own, but decided not
to do so as she did not wish to cause any friction with the FSP having regard
to the matter in which the matter was being handled. I think this was a
reasonable course for her to follow in the circumstances, and in view of the
manner in which the FSP’s representatives (C and Engineer M) were
handling the matter, I would have concluded that it was unnecessary for the
Applicant to obtain separate expert advice.
47. It might be said that it is unlikely that whatever report the Applicant obtained,
the outcome would have been the same. But I do not regard this as certain.
The volume of water was huge – the storm was of biblical proportions – and
the possibility that stumps or foundations migh t have been even loosened
by the volume of water, was a real one. The point is however that by April
2012, the obtaining of a further report would have been useless.
48. The other matter which concerns me is that the Applicant has been obliged
to live with quite extensive damage to her house for a considerable time,
whilst all the indicators were that the FSP would meet the claim and that
repairs would be conducted in accordance with the recommendations of the
FSP’s representatives. I am satisfied if the Applicant had been alerted, as
early as she could have been, to the possibility that the claim would be
denied, she would have obtained her own expert advice as to how the
problems could be rectified as soon as possible. I cannot state with any
precision that she may have been able to carry out the repairs more cheaply
but I consider that effectively she has lost the opportunity to attempt to do so.
49. In all the circumstances, I consider that by reason of its conduct, and more
specifically the conduct of its representatives, but coupled with its failure to
Case No: 291084 Determination Page 9 of 10
alert the Applicant as soon as possible to the existence of the e xclusion, the
FSP is estopped from denying this claim.
50. In paragraphs 47and 48 above, I have set out the prejudice from which the
Applicant has suffered.
Repairs to be made
51. I conclude that a re-inspection/re-assessment of the insured property must
be conducted by the FSP to determine the extent of storm damage and
repairs to be made to the insured property, bearing in mind the following
recommendation by Engineer M in his report:
“ We recommend re-inspecting the dwelling at the end of April 2012 to gauge
an extent to the dwelling's recovery. At this point in time we consider the
extent of damage as shown on Drawing D3 to be a reflection of the maximum
extent the inundation had affected the dwelling. Repairs are likely to include
some localized adjust of the floor to try and close up the gaps between
surfaces, some flexible sealing and tile/grout replacement/repair, plasterboard
crack repair and painting, repair to the kitchen joinery and possible repair to
the gaps and cracks to the master bedroom front elevation. ”
Other matters
52. I note that temporary repairs were made by the Applicant upon the
suggestion of Engineer M and/or to prevent further damage to the insured
property. I determine that, subject to presentation of tax invoices/receipts,
the FSP must reimburse the Applicant for the cost of temporary repairs.
53. The Applicant says a shade cloth was damaged by the force of the rain and
pooling of water. Subject to the payment of applicable contents excess, I
determine that the FSP, in conducting a re-inspection and re-assessment of
the insured property, must also make an assessment on the Applicant’s
claim for damaged shade cloth.
54. The Applicant also claims for gravel stones which have been washed away
during the storm. I agree with the FSP that gravel s tones do not fall within
the meaning of “Your Home” and therefore are not covered by the policy.
55. Although the FSP has apologised for exceptional delays in dealing with this
claim, it nevertheless submits it should not have to pay interest because the
FSP h as at all times acted “in a reasonable and fair manner”. Having regard
to the delays for which it has apologised, I am surprised by this submission
however, I note, that the repairs are yet to be carried out.
Determination
56. On the basis of the available information and for the above reasons I
determine that:
Case No: 291084 Determination Page 10 of 10
a) the 7 December 2010 storm was the proximate cause of the damage
to the insured building;
b) having regard to the matters set out above and the delay in reaching
a decision in this matter, the FSP is not entitled to deny the claim on
the ground of the policy exclusion of earth movement and must
indemnify the Applicant for storm/accidental damage;
c) a re-inspection/re-assessment of the insured property must be
conducted by the FSP to determine the extent of damage and repairs
to be made to the insured property, bearing in mind Engineer M’s
recommendation as noted in paragraph 51 above;
d) subject to presentation of tax invoices/receipts, the FSP must
reimburse the Applicant for the cost of temporary repairs;
e) subject to the payment of applicable contents excess, I determine that
the FSP, in conducting a re-inspection and re-assessment of the
insured property, must also make an assessment on the Applicant’s
claim for damaged shade cloth;
f) the FSP is entitled to deny the claim for gravel stones; and
g) the FSP must pay interest at the statutory rate upon the sums
expended for temporary repairs (see paragraph 56(d) above ).
57. I determine that having regard to the apology which has been expressed by
the FSP for the delays which occurred in this matter and the explanation
which the FSP has provided, this is not an appropriate matter for an award of
compensation pursuant to paragraph 9.3(b)(i) of the Terms of Reference for
this Service.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.