Text of the determination
Case No: 291071 Determination Page 1 of 9
Case number: 291071
General Insurance - Domestic Insurance - Residential Strata Title - Storm - FSP
Decision - Cause of Damage
14 August 2013
Background
1. I have reviewed all the material submitted by the parties and save where I
make note specifically, I am satisfied the background as set out in the
Recommendation is accurate and is as follows.
2. The Applicants are beneficiaries under a residential strata title policy held by
a Body Corporate with the Financial Services Provider (FSP). The policy
covers the subject building against accidental damage.
3. The Applicants lodged a claim for storm damage to their building as a result
of severe weather events in Melbourne on 25 December 2011.
4. The FSP has said it is unable to accept or deny the claim until it obtains
further information. The Applicants are dissatisfied with the FSP’s response
and want the FSP to pay their claim in full.
5. The Applicants did not agree with the FSP’s decision, hence the dispute
which was the subject of a Recommendation. The Recommendation was in
favour of the Applicants and not accepted by the FSP. The Applicants
accepted the Recommendation. In the circumstances, the matter has been
referred to me for Determination.
Summary of Applicants’ p osition
6. I have reviewed all the material submitted by the parties and save where I
make note specifically, I am satisfied the Applicants’ position as set out in
the Recommendation is accurate and is as follows.
7. There was severe water damage throughout their building during the end-of-
year storms but the FSP insists the damage was caused by construction
issues – spouting not up to standard and that a spouting overflow outlet was
not installed.
8. The Applicants say that the balcony cannot seep as alleged by the FSP, as
the building passed inspection by all appropriate bodies.
Determination
Case No: 291071 Determination Page 2 of 9
9. As to the overflow outlets, independent plumber, “W”, says that they did not
become mandatory until four years ago. The building was new when
purchased approximately 12 years before in December 1999. They say the
FSP cannot substantiate its claim that the roof was inferior and the spouting
substandard as “nobody went on the roof”.
10. They dispute the FSP’s allegation of previous repairs and contend no work
was done to the property except for an issue with shower taps eight years
before. They swear a Statutory Declaration to this effect.
11. At the time, they say the washers wore out and water was leaking behind the
tile walls, leaving a water stain on the first floor ceiling below the shower
recess. This was the only pre-existing stain prior to the recent rainstorms
relating to spouting and downpipes. They cannot produce receipts for these
repairs as it was about eight years ago.
12. In a telephone conversation of 22 March 2013 with FOS, the female
Applicant explained that the pre-existing damage and previous repairs
referred to by the FSP, are not related to the storm damaged area claimed.
13. She also explained that she is unable to provide any further evidence of
previous repairs as this information is more than eight years old and s he is
not required by law to keep documents that old.
14. They seek the FSP to acknowledge and pay their claim as they have with
other property owners in the Body Corporate.
15. The Applicants accepted the Recommendation and wrote two emails dated
31 May and 17 July 2013 in support of their position which essentially
reiterated their position. They repeat: “we are not claiming for the water stain
on the middle floor ceiling.”
Summary of FSP’ s position
16. I have reviewed all the material submitted by the parties and save where I
make note specifically, I am satisfied the FSP’s position as set out in the
Recommendation is accurate and is as follows.
17. Its loss adjustor, “P”, inspected the claimed damage in the first floor balcony
but also sighted different water damaged areas. P’s observations also
suggest that damage has been ongoing for a period of time. Based on P’s
report, the FSP considers there is insufficient information to proceed with the
claim.
18. It requested further information from the Body Corporate and the Applicants
on several occasions. It also agreed to the damage being independently
assessed as requested by the Applicants but no further documents have
been forthcoming.
Case No: 291071 Determination Page 3 of 9
19. The FSP contends the Applicants wanted the claim independently assessed
and argues it is waiting for the Applicants to provide further expert evidence.
20. As to the Applicants’ additional quotation of 24 September 2012, it contends
that the dispute is not one regarding the areas of damage but regarding the
cause of damage. The onus is on the Applicants to establish on the balance
of probabilities that the cause of damage falls within the cover provided.
21. Either way, a decision has not yet been made on the claim due to the lack of
evidence to ascertain the timing, cause and extent of water damage. The
Applicants lodged their dispute prematurely with the Financial Ombudsman
Service (FOS) as a decision or review has not been made.
22. It does not rule out acceptance of the claim but says that the claim cannot be
substantiated on the evidence provided. Further information is required prior
to a decision being made and the onus is on the Applicants to provide it.
23. The FSP relies on the following provisions in the Product Disclosure
Statement:
“ What you are covered for / not covered for
Policy 1 – Insured Property
This Policy covers accidental loss or damage to your insured property
(building and common area contents) that occurs during the period of
insurance.
…
Claims information
6 You must assist us
Before we will pay anything under this Policy, You must:
a comply with all the requirements of this Policy, and
b give Us all information and assistance which We reasonably require in
relation to the claim and any proceedings.
…
Exclusions – what we do not insure
1 We will not pay for loss or damage:
c caused by lack of maintenance, rust, oxidation, corrosion, Wear, Tear,
fading, gradual corrosion or gradual deterioration, concrete or brick
cancer, developing flaws, wet or dry rot, or failure to maintain Your
Insured Property in a reasonably good state of repair.
d caused by non-rectification of an Insured Property defect, error or
omission that You were aware of, or should reasonably have been
aware of.
…
2 We will not pay for:
b the cost of rectifying faulty or defective materials or faulty or defective
workmanship ” .
Case No: 291071 Determination Page 4 of 9
24. The FSP rejected the Recommendation and provided two further letters
dated 15 May and 9 July 2013 in support of its position. I will refer to the
submissions made in the body of the Determination.
Issue
25. Whether the FSP is entitled to continue to withhold a decision regarding
liability for the alleged storm damage to the building, under the terms and
conditions of the policy.
Reasons for Decision
26. There has been an exchange of material between each party, and I am
satisfied each party has had an opportunity to reply to the issues raised.
27. Each FOS case is decided on its merits, taking into account the facts of the
case. I have reviewed all the material submitted by the parties both before
and after the Recommendation was issued, in order to reac h my decision. I
will only refer to the relevant submissions and materials raised.
28. The evidence and the photographs support the contention that areas of the
property are water damaged. The issue in dispute is what has caused the
water damage and when that water damage was caused.
29. Insurance law provides that the Applicants have the onus to establish on the
balance of probabilities that the claim falls within the definition of an insured
event. In this case, that the “severe water damage throughout our buildi ng
(resulted) during the end of year storms”.
30. Once that is established, the onus shifts to the insurer to establish the
application of any exclusion on which it relies to deny or limit the claim.
31. The FSP notes the policy was incepted in 2009 and I assume it was
regularly renewed as a Certificate of Insurance provided, shows cover from
15 April 2012 until 15 October 2012.
32. The policy provides cover for accidental loss or damage to the property
which occurs during the period of Insurance. Accidental loss or damage is
not defined in the policy but I accept that if the Applicants can show the
damage was caused as they contend by the insured event of the storm on
25 December 2011, then the policy will respond at first instance.
33. Then the onus will shift to the FSP to establish that the exclusions it relies on
and referred to above apply to this situation.
34. I have reviewed all the material submitted by the parties in support of their
position and save where I make note specifically, I am satisfied the following
relevant material as set out in the Recommendation is accurate and is as
follows:
Case No: 291071 Determination Page 5 of 9
35. The Applicants provided a report by W, dated 14 June 2012, in which W
states that:
When W inspected the roof after the Christmas storms, the roof and
gutters were in good condition but there was no emergency overflow
provision.
As such, regardless of the condition of the roof, a little bit of debris or
clogging from blocked gutters and downpipes can cause flooding.
The gutters and downpipes would have been constructed to comply
with standards when the building was completed. Nowadays it is
mandatory to include emergency overflow provisions on a new building.
36. The Applicants also provided a quotation from painter, “ J ”, dated 24
September 2012, which according to the Applicants, provides a scope of
work for the storm-related repairs only. I note the quote refers to plastering
and painting to the ceiling of level one and level two.
37. The Applicants dispute the FSP’s allegation of previous repairs and contend
no work was done to the property except for an issue with shower taps eight
years before. They swear a Statutory Declaration to this effect on 9 July
2012.
38. The FSP provided reports and correspondence from P, which relevantly say:
The property has suffered storm damage to the first floor balcony,
allegedly from an overflowing gutter.
As there is another balcony above the damaged one, P considers there
are waterproof membrane issues causing the second floor balcony to
leak, which seems to have been occurring for some time.
The Applicants’ son resides at the premises and has several things on
the balcony which trap moisture on the tiles. These items would be
allowing water to sit and penetrate the tiling and grouting.
There are other areas of water damage to the first and second floors,
which appear to be separate incidents. There had already been at least
two areas of plaster ceiling cut out and repaired.
The male Applicant acknowledged that one of the damaged areas
occurred in or around 2004. He was vague as to other damaged areas
but said he had owned the property since it was built in 2000 and had
never carried out any repairs himself.
The male Applicant also mentioned there had been a number of
plumbers trying to repair leaks and that the Body Corporate had
decided to replace the guttering as it was inadequate.
There have also been repairs to the skylight and long term damage
around the air conditioning unit.
The information is insufficient to establish if the damage will be covered
by the policy.
Case No: 291071 Determination Page 6 of 9
It requested further information from the Body Corporate as to the
damage in the building, where it has occurred, who has carried out the
previous patch repairs and what steps were taken to address the issue
of water ingress.
39. P has also provided several photos of the interior and exterior of the
property. Notes and red markings added to the images indicate where
different areas of the property have been damaged and repaired.
40. P wrote to the Applicants on 30 May 2012 seeking more information.
41. The FSP provided an email dated 28 August 2012 from P in which P said he
spoke with the male Applicant, “ A ” . This email says:
A couldn’t answer questions about the different areas of damage or
when they occurred although he did acknowledge one area occurred in
or around 2004.
A said there had been a number of plumbers who attended the property
to try to fix the various leaks in the building but he was unsure of the
outcome.
He said the inadequately sized guttering was going to be replaced .
He took the matter no further shortly thereafter as the matter had been
referred to FOS.
42. The FSP also provided an email dated 28 August 2012 from its underwriti ng
agent C, in which C says it spoke with the female Applicant. This email says:
The female Applicant said that the Body Corporate was organising
repairs to previous roof leaks but these had not been completed yet.
There had been previous repairs due to a leaking shower but she could
not recall who attended to this.
43. The information the FSP wanted was not forthcoming and the FSP wrote to
the Applicants on 23 and 24 August 2012 saying: “at no time has (the FSP)
declined your claim for water damage to the firs t floor balcony” and saying it
required more information so that it can ascertain the cause of the water
damage and when it gets that it “will be able to consider the claim” . It
reiterates in its le tter dated 24 August 2012 that “ the claim remains open ” .
44. The FSP makes several points after the Recommendation. In summary, it
says:
The quote provided by the painter, J, does not relate to the storm
related repairs only.
The onus is on the Applicants to prove that the loss comes within the
policy cover.
If it does, then the claim is subject to exclusion clauses.
The claim was declined as the Applicants had not proven the damage
was caused by accidental damage.
Case No: 291071 Determination Page 7 of 9
The claim was not declined based on the failure of the Applicants to
provide information.
However, the FSP remains willing to reconsider the claim if the
Applicants can prove their claim.
The photographic evidence from P refutes the statutory declaration
provided by the Applicants.
45. Having reviewed all the material, I can see no evidence that the FSP has
actually declined the claim. Its letters written on 23 and 24 August 2012
make it clear the claim is not denied but will be considered once further
information is provided.
46. In my view, the Applicants have established on the balance of probabilities
that damage was caused by the rain event on 25 December 2011. W
establishes that roof and gutters were in good condition and that they may
have overflowed and water damage is noted by P.
47. However, in my view, the Applicants are still to confirm the exact areas of
damage which were caused by the storm. P says “we could see many other
areas of water damage to both the first and second floors ....but (the owner)
became very vague when asked how long each of the damage had been
occurring.”
48. The Applicants have made it clear both before and after the
Recommendation that they are not claiming damage to the water stain on
the middle floor ceiling, yet as the FSP has pointed out, they have submitted
a quote from the painter J that does claim for repairs to both level 1 and level
2.
49. The Applicants clarify now they are not claiming for the water damage on the
middle floor ceiling, so I assume they are still claiming for damage to the
other ceiling and to the first floor balcony which they inform P were caused
by overflowing gutters. If there are other areas of damage claimed as a
result of the storm event, the Applicants must make this clear to the FSP.
50. I do not find the Statutory Declaration sworn by the Applicants of particular
probative value. They say they have done no work to the property save for
work regarding the shower taps. It does not assist a determination as to
exactly what was damaged by the storm on 25 December 2011.
Furthermore, in my view, the photographs provided by P do indicate work
has been done in the property at some stage by someone.
51. P indicated in his report that “the property has suffered storm damage to the
first floor balcony, allegedly from overflowing gutters,” but once he re -
attended the property, he formed the view that it was the waterproof
membrane above that balcony that had failed and was causing it to leak. P
also identified other concerns such as the rabbit hutch on that second floor
balcony which was “ trapping moisture and allowing water to sit and or
penetrate the tiling/grouting.”
Case No: 291071 Determination Page 8 of 9
52. He noted other damage to “at least two areas of plaster ceiling”. As noted
earlier, it is clear the Applicants are not seeking to be compensated for the
middle floor ceiling.
53. P concludes that he can’t advise whether the damage will be covered by the
policy and attempts to obtain more information from the Applicants and the
Body Corporate but the matter progresses no further as it comes to FOS.
54. In my view, J, the painter does not help the Applicants or the FSP - he
merely sets out the cost of repairs to the two ceilings. He does not set out
the cause of the damage.
55. In my view, the FSP has not declined the claim although it appears to have
concerns that the damage did not occur when it was on risk or that there is
damage claimed which is caused by a cause which is excluded under the
policy.
56. As the FSP has not declined the claim but has kept it open, I make no
finding about the application or otherwise of the exclusions.
57. The FSP is of the view it has insufficient reasons to decline the claim. It is a
policy condition that the Applicants give it all information and assistance
which it reasonably requires. In my view, the material requested by P is not
unreasonable save for the provision of receipts for work done eight years
ago.
58. Otherwise, in my view, the FSP should re-attend the premises with the
Applicants and its own expert if it wishes and the Applicants are to identify
exactly which areas of the property were damaged in the storm event.
59. The Applicants should then assist the FSP in its enquires with the Body
Corporate and other enquires as set out in P’s letter dated 30 May 2012.
60. However, if the Applicants or the Body Corporate provide no further material,
then I disagree in these circumstances that the Applicants must provide the
evidence of the cause of the damage to the first floor balcony and any other
storm damage identified by the Applicants, I have already made a finding
that prima facie the policy responds.
61. In short, the FSP is entitled to the further information from the Applicants and
the Body Corporate as to the pre-existing damage and previous repairs but if
this information is not forthcoming, then in my view, the FSP must decide
whether to accept the claim or decline the claim because the damage
occurred before it came on risk or because of policy exclusions. The onus is
on the FSP to establish the evidence it requires to rely on policy exclusions.
62. Before the Recommendation, the FSP contended the Applicants brought the
dispute to FOS prematurely as a decision had not been made on the claim
and had not been reviewed by IDR. However, I have already noted that IDR
have dealt with this matter in letters dated 23 and 24 August 2012, so I
disagree with this contention. In any event, the FSP has not persisted with
Case No: 291071 Determination Page 9 of 9
the point after the Recommendation and it no longer appears to be a live
issue.
Determination
63. Should the Applicants accept this Determination, then on the above
information and for the reasons stated, I determine:
Within 14 days, the FSP should re-attend the premises with the
Applicants and the Applicants are to identify exactly which areas of the
property were damaged in the storm event.
Within 14 days after the inspection, the Applicants should then assist
the FSP in its enquires with the Body Corporate and other enquires as
set out in P’s letter dated 30 May 2012 save for the provision of the
material which is 8 years old.
If the Applicants or the Body Corporate provide no further material, then
after 14 days after the request for the information, the FSP must decide
whether to accept or decline the claim and it must forthwith make that
decision and communicate it to the Applicants.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.