Text of the determination
Case No: 290835 Determination Page 1 of 11
Case number: 290835
General Insurance - Domestic Insurance - Home Building & Contents - FSP
Decision – Flood - Denial of claim
10 January 2013
Background
1. The Applicant held a Home Building and Contents Insurance Policy (the
policy) with the Financial Services Provider (FSP).
2. The insured property in Charlton sustained extensive damage when
inundated by water on 14 January 2011 following the significant weather
events experienced in Victoria in January 2011.
3. The Applicant made a claim for damage to the building and contents
following the inundation of the property. The FSP has rejected the claim on
the basis the damage was due to flood which is a policy exclusion.
4. The Applicant remains dissatisfied with the FSP‟s decision to decline her
claim and maintains her property was inundated by stormwater run-off.
Summary of Applicant’s position
5. The Applicant in disputing the FSP‟s decision to decline the claim has sought
the assistance of legal representatives “M”. In the interest of brevity both M
and the Applicant will be referred to as the “the Applicant” for the purpose of
this determination.
6. The Applicant maintains:
She suffered damage to the insured building and contents on 14
January 2011 following heavy rainfall and the subsequent inundation of
the property by stormwater run-off.
The Applicant relies upon a hydrology report prepared and submitted
by her preferred hydrologist „PM‟.
She was evacuated from her property at around 5.30pm at which time
water was very close to inundating her home.
The FSP‟s preferred hydrologists‟ (W) original report dated 18 February
2011 commissioned by the FSP is of limited utility, general and clearly
excludes consideration of eye witness accounts, topographical and
drainage data. In saying that, it does acknowledge that inundation of
Determination
Case No: 290835 Determination Page 2 of 11
the properties east of Armstrong Street early in the morning can be
attributed to stormwater flooding.
Irrespective of whether Yeungroon Creek (the creek) can be defined as
a watercourse or not, water must be able to „escape‟ from it to
constitute floodwater. It is clear that water cannot be contained in the
upper aspects of Yeungroon Creek (the creek) and so water from it
cannot be floodwater for the purpose of the policy.
The FSP bears the burden to establish the exclusion relied upon which
the Applicant does not believe it has been able to do in this instance.
W‟s report of 22 August 2012 differs from its earlier reports in a number
of aspects. More importantly, W‟s earlier evidence concluded
stormwater inundation of properties prior to the arrival of floodwater
from the Avoca River (the river) was possible east of Armstrong Street.
In its report it now maintains all earlier inundation is likely to have been
sourced from tributaries not mentioned earlier.
The Applicant is seeking for her claim to be covered in full by the FSP
due to the damage arising from stormwater inundation being covered
under the policy.
Summary of FSP’s position
7. The Applicant has not made available any evidence based upon a site
specific assessment of the property in response to the reports made
available to the Service by the FSP.
8. The report dated 3 November 2011submitted by PM is quite general and the
FSP maintains that it was only ever intended to address inundation occurring
on 13 January 2011 and early on 14 January 2011. So as the inundation of
the Applicant‟s home occurred at around 5.45pm on 14 January this falls
outside PM‟s consideration.
9. PM‟s analysis of rainfall data is problematic as it is based on radar data as
opposed to pluviograph data which should be preferred and was used by its
preferred hydrologists‟ „W‟. An analysis of the superior data indicates that the
rainfall in Charlton was insufficiently intense to have resulted in stormwater
run-off.
10. Although the insured property may have been inundated earlier the FSP
notes the inundation of her home did not occur till late on 14 January. The
FSP notes that even PM concedes that any inundation occurring in the later
afternoon on 14 January was due to overbank flow from the Avoca River (the
river).
11. In the instance the Service does not accept the earlier inundation of the
Applicant‟s home to be due to floodwater the FSP maintains it was due to a
combination of water which was flood and water that was not flood and
Case No: 290835 Determination Page 3 of 11
therefore constitutes floodwater for the purpose of the policy as per the
Wayne Tank principle.
12. In respect to the classification of Yeungroon Creek (the creek), the policy
definition of the event „flood‟ does not require the creek to have banks, rather
only whether it is considered a watercourse or not. Even PM in his report of
3 November 2011 acknowledges the creek as a „named watercourse‟.
13. Therefore, in line with the available evidence and the relevant policy
limitations the FSP was entitled to decline indemnity to the Applicant for the
damage to the insured property.
14. The FSP relies on the following policy provisions:
“Section A - Home Cover
Accidental Damage Cover
We will pay for Accidental Loss of or Damage to your Building or Contents at
the insured address other than the Occurrences o r items referred to in “What
you are not insured for”
…
Section A - Home Cover
All subsections
What you are not insured for
Under Section A – Home Cover we will not pay for
2. Loss of or Damage to your property caused by:
a. Flood, the action of water from the sea, high sea water, tidal action or
Tsunami; ”
Issues
15. Whether damage to the Applicant‟s property was caused by floodwater as
defined by the policy.
16. Whether the FSP was entitled to decline indemnity to the Applicant under the
policy.
Reasons for decision
17. As advised to the parties, FOS has considered it appropriate to refer this
dispute directly to the Panel in accordance with the Operational Guidelines
to the FOS Terms of Reference. This is because of the complex nature of
the issues. This dispute has not been the subject of a FOS Recommendation
and has proceeded directly to Determination.
Case No: 290835 Determination Page 4 of 11
18. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in the insurance industry and a
representative with extensive experience in consumer claims.
19. There has been an exchange of material between the parties. Each party
therefore is aware of the issues and has had the opportunity comment. In
these circumstances the details contained in the relevant hydrological
reports will not be recited in this determination except where considered
relevant.
20. On 10 December 2012 the Panel Chair Ombudsman and Panel member
attended on site with the Applicant and a representative of the FSP.
21. Prior to arriving at a determination the Panel has read and considered all the
material submitted by the parties to FOS.
22. The Panel is satisfied the parties do not dispute the following:
The Applicant held an active Building and Contents insurance policy
with the FSP at the time of loss.
The FSP provided and the Applicant received the relevant policy
documentation including the Product Disclosure Statement (PDS) and
Certificate of Insurance.
The insured property suffered extensive damage due to water
inundation arising from the significant weathe r events experienced in
the area during January 2011.
The Applicant was not present at the insured property when the
inundation occurred.
The policy provides indemnity for loss or damage arising from
accidental damage, however, excludes from cover loss arising from the
event „Flood‟.
23. The Panel having reviewed the available evidence is satisfied that the policy
provides cover for accidental loss or damage subject to the specified policy
exclusions including flood damage. Further, that the main issue in contention
between the parties is whether the insured property was initially inundated
by stormwater prior to the arrival of floodwaters which would give rise to a
degree of indemnity under the policy.
24. The Panel is satisfied that the property was ultimately inundated by
floodwater to the maximum level however consideration as to whether there
was an extent of initial stormwater inundation has been considered below.
Cause of the Loss
24 The parties to the dispute have each obtained and rely upon information
made available by their appointed consultants. The Panel notes that this
information has been exchanged between the parties, each having had the
opportunity to comment. Accordingly, in the interest of brevity, the Panel will
only recite information from these reports it deems relevant in providing this
Determination.
Case No: 290835 Determination Page 5 of 11
PM’s Charlton Floods - January 2011 dated 3 November 2011
The town of Charlton experienced heavy rainfall between 10 January -
14 January 2011 with extensive flooding in the area from the Avoca
River from 14 January onwards.
Total rainfall over this period was recorded at 168.6mm with 66.2mm
falling between 9.00am on 13 January and 9.00am on 14 January.
The highest intensity rainfall recorded was 15mm/hr between 7.00am -
8.00am on 13 January. There was no rainfall recorded after 8.00am on
14 January.
Although the records calculate the rainfall intensity on an hourly basis,
rainfall periods at Charlton were highly concentrated in short duration
burst e.g. 10 to 12 minute intervals. Accordingly, if calcula ted on this
basis it would represent 20-50 year ARI rainfall events as opposed to 1-
2 year ARI events (based on hourly intervals).
Accordingly, overflow from local drainage systems and culverts were
highly likely as these systems are only designed to cope with 2-5 year
ARI rainfall events.
Time of overflow would have to correspond closely with the timing of
the intense rainfall periods and based on this the first stormwater
drainage overflow event would have occurred at around 7.00am on 13
January.
There are two possible sources of rainwater run-off in Charlton, run-off
in the town which does not enter the stormwater drainage system and
run-off from surrounding rural areas.
All rainfall that fell on 13 January and 14 January would have become
saturated overland flow and followed natural drainage lines into
Charlton. This would have led to the inundation of Charlton on these
dates prior to the arrival of floodwaters from Avoca River.
Floodwaters from Avoca River would be of high sediment loads
(muddy/mucky) and would not be clear. Clear water inundation would
support that prior to the arrival of floodwaters from Avoca River there
was water sourced from local stormwater.
Depending on the exact locations of the properties, they will have
begun to have been inundated by floodwater sometime on the
afternoon or early evening 14 January. Any inundation before this time
would be from runoff particularly corresponding to times when heavy
rainfall were occurring (13 January and early morning 14 January).
Evidence in respect to water inundation of properties which occurred
particularly before 5.00pm on 14 January should be taken into account.
PM’s Email dated 18 July 2012
The issue of concern is where the water west of the town can from.
Yeungroon Creek only has a channel with defined banks downstream
of Charlton. Upstream of Charlton it is basically a shallowed grassed
swale.
Case No: 290835 Determination Page 6 of 11
All of the water in this area is essentially local water flowing over grass,
as acknowledged by the FSP‟s hydrologists „W‟, and is not river water.
W ’s Flood Assessment Report 18 February 2011
Multiple site inspections were undertaken on 24 January 2011.
The average rainfall records for the upper regions of the Avoca River
catchment are about 600mm per annum.
The Avoca River has flooded the town of Charlton a number of times in
the past due to high rainfalls.
The Avoca River catchment soaked from previous rainfalls resulted in a
higher than average conversion of rainfall to runoff, increasing the
water flowing directly into watercourses and resulting in flooding across
Victoria.
Flood warnings were issued for a number of rivers including the Avoca
River with one of the towns affected by the flooding being Charlton.
Historically Charlton has been flooded from two directions in a north
south plain with an area remaining flood free through the centre of town
along the St Arnaud – Charlton Road.
The most intense rainfalls periods in Charlton were experienced in the
morning of 11 January (2011) and early morning 13 January (2011),
with the maximum flood level in Avoca River reaching its peak early
morning 15 January (2011).
Flooding of the township was similar to the September 2010 event,
however, a much greater volume of water has been experienced in the
eastern end of town on this occasion (January 2011).
Given the timing of the flooding of the eastern edge is similar to that of
the gauge readings it is suggested that the Yeurngoon Creek and
Avoca River flows merged to become one system.
Any flooding occurring after lunchtime (14 January 2011) can be
directly attributed to Avoca River/Yeurngoon Creek flooding.
Some instances of inundation in properties east of Armstrong Street in
the early morning of 14 January 2011 can be attributed to stormwater
flooding.
W’s Flood Assessment Report 21 March 2011
The site is a residential property located along High Street and is about
750m from the Avoca River.
Discussions with the Applicant confirmed:
Flooding during this event was more widespread and deep that
the September 2010 event.
Flooding was approximately 300mm at the front of the house
and 1200mm at the rear.
Water was noticed at the front of the property at 4.00pm on 14
January 2011.
Case No: 290835 Determination Page 7 of 11
Between 4.30pm and 5.00pm on 14 January 2011 water started
moving fast down the street and into the Applicant‟s property.
W’s Flood As sessment Report 22 August 2012
The insured property included a residential dwelling and shed.
The town of Charlton is surrounded by a high ridge to both the east and
west of town constricting the floodplain through the township.
The catchment areas for the following watercourses are:
Yeungroon Creek (the Creek) 72km 2
Charlton St Arnaud Road Tributary (CSAT) 7km 2
Calder Highway Tributary (CHT) 3km 2
The stormwater runoff generated in the catchments will concentrate
along drainage lines and normally flow into the Avoca River (the River)
upstream of Charlton for CSAT and downstream for CHT, and to the
east and further downstream of Charlton for the creek.
Charlton received its largest rainfall total on the Thursday of 66mm
recorded to 9.00am on Friday 14 Janua ry. The available date shows
the rainfall over the area occurred in three main bursts.
The highest one minute rainfall intensity occurred at 6.28am on 13
January at 1.44mm/per minute.
The maximum rainfall intensities are not exceptional and are generally
equivalent to an ARI of 1-2 years.
Locally derived stormwater flows could not have caused significant
flooding in Charlton after 7.00am-8.00am on 14 January.
Most of the flows caused by direct stormwater runoff generated from
within the town and the catchment of Calder Highway would have
passed through the town to the Avoca River by about 8.00am on 14
January.
The continuing flows into Charlton from about 8.00am (14 January)
would have been caused by overland flows resulting from breakouts
from the CSAT, the creek and the river from further upstream.
Given the size of its catchment, the CSAT would have contributed flows
into Charlton prior to the Creek and the River.
The Applicant‟s property is located on the south side of High Street
approximately 400m to the south east of Avoca River and 1.8km west
of Yeungroon Creek.
A Land Subject to Inundation Overlay (LSIO) and Floodway Overlay
(FO) indicate that the property lies just outside the LSIO for the Avoca
River. The LSIO and FO were likely to be based o n historic flood
events which were exceeded in January 2011.
The Applicant advised the consultant that:
On the morning of 14 January there was some shallow water
sitting around the property but not deep enough to cause any
Case No: 290835 Determination Page 8 of 11
damage to the property. During this time her neighbour was
trying to assist water to drain into nearby stormwater drains.
At approximately 4.45pm water started flowing across the Calder
Highway from the south and began overtopping sandbags
placed at the front of the property.
The Applicant evacuated at approximately 5.30pm at which point
water had not yet entered the house and she was not present at
the property for the remainder of the event.
Flood water inundated the dwelling up to 16-17 inches (400-
430mm) in some areas. The Applicant believes the property was
inundated by stormwater run-off.
The consultant recorded measurements of the inundation level at the
property as 588mm above ground level at garage door, the floor level
of the house was 240mm above ground level on the eastern side of the
house and the depth of inundation in the front room was 360mm.
Given the size of the catchment it would respond within two hours of
peak intensity rainfall. The peak discharge associated with this rainfall
would have been expected to have occurred by the time that rainfall
ceased around 5.02am 14 January.
Any significant continuing flows in the tributary from after about 8.00am
would have been caused by overland flows resulting from breakouts
from, the creek, the Charlton- St Arnaud Road tributary and later the
Avoca River.
It was the consultants‟ opinion that clear water is not necessarily an
indicator of stormwater, it is more an indicator of where the water has
come from, in this case a flat vegetated catchment with little opportunity
to pick up sediment, rather than a bare river channel.
25. The Panel notes the following points:
Rainfall in the area ceased at around 5.02am on 14 January 2011.
At 5.30pm on 14 January 2011 water had surrounded the home but
water had not entered the dwelling above floor level.
At about 6.00pm or thereafter on 14 January 2011, water from the river
would have directly inundated the township.
26. The Ombudsman, Panel member and FOS Case Manager, together with,
FSP representatives and a number of local residents have visited the
Charlton area on a number of occasions as part of their site inspections.
27. Having attended on site in Charlton and the surrounding area, the Panel is
satisfied that prior to the arrival of floodwater from the Avoca River, there
was a strong flow of water that came from the south/south east and entered
the town. The Panel has considered the impact of the work undertaken at
the Charlton-St Arnaud Road on the natural flow of the water from the
floodplain to the Avoca River. In the Panel‟s view this is an importa nt
consideration.
Case No: 290835 Determination Page 9 of 11
28. The road has been raised to allow access to the airport during floods. In
doing so, it dissects the natural floodplain. Although, a number of
pipes/culverts have been positioned under the road they were not sufficient
to cope with the overland flow and according to locals the flow was diverted
initially east of Armstrong Road and eventually through the town. When the
road was dug up by machinery on 15 January 2012, the level of inundation
within Charlton started to drop.
29. This information was provided by a number of local residents independently
of the Applicant to the Ombudsman and Case Manager, in the presence of
the FSPs representatives. The site visits undertaken by the Panel
representatives of the Charlton area and more specifically individual
properties, have assisted the Service in gaining a greater understanding of
the topography and impact of the stormwater runoff in the area prior to the
arrival of floodwater from Avoca River.
30. Following these visits to the area by FOS personnel, and based on
discussion with all parties, the Panel is of the opinion the landscape over
which the water flowed from the south and east of the town cannot be
regarded as a natural watercourse. Although the area from which the water
flowed is designated as “Yeungroon Creek”, that appellation alone cannot be
taken as evidence of a watercourse.
31. The following ruling was made by the High Court in Gartner v Kidman [1962]
HCA 27: 108 CLR 12 (30 May 1962):
“This distinction between watercourse and depression follows the language of
Hood J in Lyons v Winter (1899) 25 VLR 464, who in that case held that a
depression which took rainwater for about three months of a year fell short of
the legal definition of a natural watercourse. To constitute such a watercourse
as a matter of law, there must be a stream of water flowing in a defined
channel or between something in the nature of banks. The stream may be
very small and need not run, nor need the banks be clearly or sharply defined.
But there must be a course, marked on earth by visible signs, along which
water usually flows in order to constitute a watercourse such as creates
riparian rights (1899VLR at p485 (at p16)
32. The landscape to the south and south east of the town does not have
evidence of visible banks between which water flows and further, water does
not usually flow along this stretch of land, which is only vaguely described by
a range of indentations and vegetation. The landscape may best be
described as a flood plain over which water flows in a direction determined
by the rise and fall of the land.
33. This view is further supported by the description given by PM who observed
Yeungroon Creek has been infilled with flood deposits over many years. The
course of the creek to the south of the town is marked by linear depressions
and vegetation.
34. The Panel does not accept that PM‟s use of the phrase “named water
course” of itself results in the conclusion that Yeungroon Creek is a water
course for the purposes of the policy. Further, the Panel is satisfied that a
Case No: 290835 Determination Page 10 of 11
consideration of whether the, so named, creek has banks is critical to the
determination of whether it is a water course for the purposes of the policy.
35. Accordingly, the Panel accepts that water which came from the Yeungroon
Creek area to the south and south east of the town may not be regarded as
water which escaped from the normal confines of a natural watercourse.
36. During the course of the onsite visit and previously, the Applicant has given
evidence that she observed a wave of water coming across the vacant land
area to the south side of High Street.
37. Having considered all of the available evidence, the Panel is satisfied that
this water originated from the area of the work carried out on the Charlton-St
Arnaud Road where the culverts were unable to cope with the flow of water
and the flow was dissected down Armstrong Street, towards Charlton and
the Applicant‟s property.
38. The Applicant described leaving the property as this wave of water was
about to overtop the sandbags in front of her property.
39. In the Panel‟s view, stormwater from Armstrong Street is likely to have
inundated the Applicant‟s property prior to the arrival of floodwaters from the
Avoca River.
40. The Panel has carefully reviewed all of the evidence. In considering this
dispute, the Panel notes that the policy provides cover for accidental loss or
damage, subject to various exclusions. In this instance there is no doubt that
the Applicant‟s property suffered damage on 14 January 2011 and therefore
a prima facie claim has been established. The onus therefore switches to the
FSP to prove an exclusion contained within its policy, should it wish to rely
on such to refuse the claim.
41. The Panel is satisfied that water had inundated the property soon after the
time the Applicant left her home at around 5.30pm on 14 January 2011. It
was at a level which surrounded the home and the foundations; however, the
level of inundation is not clear. The question for the Panel to determine is the
level of inundation prior to the arrival of flood water, later in the day.
42. During the onsite inspection, the Panel noted that the property slopes away
from the front to the back; the height of the floor above the ground varied
approximately 300mm at the front to 150mm at the rear; and the floor of the
small shed and garage at the rear of the property were only 50mm above the
ground level.
43. Although there is no precise calculation of the level of inundation of the
property prior to the arrival of the floodwaters, the Panel is satisfied that such
inundation would have been limited. In the absence of precise calculations,
the Panel determines having regard to all of the information available, the
terms of the policy and relevant legal principles, it would be fair in the
circumstances to assess the initial level of stormwater inundation at no more
than 150mm above ground through the property.
Case No: 290835 Determination Page 11 of 11
44. The Panel is mindful of the fact that it has not been provided with sufficient
information which would allow it to come to an informed decision as to the
extent/degree (monetary) of the FSP‟s liability under the claim arising from
the initial stormwater inundation of the home, the sheds and/or garage.
45. The FSP is to engage an appropriately qualified expert to measure the effect
of an inundation of 150mm above the level of the ground, through the
property and also its impact, if any, upon the property including upon the
home, the shed and the garage, to the level of 150mm above the ground.
46. Accordingly, the Panel urges the parties to act in a cooperative manner to
establish the extent of damage to the insured property arising from the initial
stormwater inundation.
47. The Panel acknowledges the Applicant‟s reference to possible damage to
the foundations of the insured building. However, the Applicant has not
provided any evidence to support this aspect of her claim. In the absence of
any substantiating evidence to establish whether the foundations are
damaged and if so to what extent or what was the cause of such damage,
the Panel finds that the Applicant has been unable to establish this aspect of
her claim.
Determination
48. On the basis of the available information the Panel determines that the FSP
is liable under the policy to provide indemnity to the Applicant (within 30 days
of receiving this determination) in line with the matters discussed above.
49. Should the FSP elect to cash settle any part of the claim, the FSP is to pay
to the Applicant interest at the statutory rate, in line with the Insurance
Contracts Act 1984, upon the final settlement figured agreed between the
parties from the date of denial of the claim to final settlement of the claim.