The applicant claimed for building and contents damage to her Charlton home inundated on 14 January 2011, which the FSP declined as flood. The Panel found stormwater from a flood plain entered the property before river floodwater, ordered indemnity for the initial inundation up to 150mm, required an expert assessment, and ordered interest on any cash settlement, while rejecting the claimed foundation damage.

Water flowing across a flood plain without defined banks is not water escaping a natural watercourse, so the pre-flood stormwater inundation up to 150mm is covered, but the foundation damage was not established.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interestreassess claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 290835 Determination Page 1 of 11 Case number: 290835 General Insurance - Domestic Insurance - Home Building & Contents - FSP Decision – Flood - Denial of claim 10 January 2013 Background 1. The Applicant held a Home Building and Contents Insurance Policy (the policy) with the Financial Services Provider (FSP). 2. The insured property in Charlton sustained extensive damage when inundated by water on 14 January 2011 following the significant weather events experienced in Victoria in January 2011. 3. The Applicant made a claim for damage to the building and contents following the inundation of the property. The FSP has rejected the claim on the basis the damage was due to flood which is a policy exclusion. 4. The Applicant remains dissatisfied with the FSP‟s decision to decline her claim and maintains her property was inundated by stormwater run-off. Summary of Applicant’s position 5. The Applicant in disputing the FSP‟s decision to decline the claim has sought the assistance of legal representatives “M”. In the interest of brevity both M and the Applicant will be referred to as the “the Applicant” for the purpose of this determination. 6. The Applicant maintains:  She suffered damage to the insured building and contents on 14 January 2011 following heavy rainfall and the subsequent inundation of the property by stormwater run-off.  The Applicant relies upon a hydrology report prepared and submitted by her preferred hydrologist „PM‟.  She was evacuated from her property at around 5.30pm at which time water was very close to inundating her home.  The FSP‟s preferred hydrologists‟ (W) original report dated 18 February 2011 commissioned by the FSP is of limited utility, general and clearly excludes consideration of eye witness accounts, topographical and drainage data. In saying that, it does acknowledge that inundation of Determination Case No: 290835 Determination Page 2 of 11 the properties east of Armstrong Street early in the morning can be attributed to stormwater flooding.  Irrespective of whether Yeungroon Creek (the creek) can be defined as a watercourse or not, water must be able to „escape‟ from it to constitute floodwater. It is clear that water cannot be contained in the upper aspects of Yeungroon Creek (the creek) and so water from it cannot be floodwater for the purpose of the policy.  The FSP bears the burden to establish the exclusion relied upon which the Applicant does not believe it has been able to do in this instance.  W‟s report of 22 August 2012 differs from its earlier reports in a number of aspects. More importantly, W‟s earlier evidence concluded stormwater inundation of properties prior to the arrival of floodwater from the Avoca River (the river) was possible east of Armstrong Street. In its report it now maintains all earlier inundation is likely to have been sourced from tributaries not mentioned earlier.  The Applicant is seeking for her claim to be covered in full by the FSP due to the damage arising from stormwater inundation being covered under the policy. Summary of FSP’s position 7. The Applicant has not made available any evidence based upon a site specific assessment of the property in response to the reports made available to the Service by the FSP. 8. The report dated 3 November 2011submitted by PM is quite general and the FSP maintains that it was only ever intended to address inundation occurring on 13 January 2011 and early on 14 January 2011. So as the inundation of the Applicant‟s home occurred at around 5.45pm on 14 January this falls outside PM‟s consideration. 9. PM‟s analysis of rainfall data is problematic as it is based on radar data as opposed to pluviograph data which should be preferred and was used by its preferred hydrologists‟ „W‟. An analysis of the superior data indicates that the rainfall in Charlton was insufficiently intense to have resulted in stormwater run-off. 10. Although the insured property may have been inundated earlier the FSP notes the inundation of her home did not occur till late on 14 January. The FSP notes that even PM concedes that any inundation occurring in the later afternoon on 14 January was due to overbank flow from the Avoca River (the river). 11. In the instance the Service does not accept the earlier inundation of the Applicant‟s home to be due to floodwater the FSP maintains it was due to a combination of water which was flood and water that was not flood and Case No: 290835 Determination Page 3 of 11 therefore constitutes floodwater for the purpose of the policy as per the Wayne Tank principle. 12. In respect to the classification of Yeungroon Creek (the creek), the policy definition of the event „flood‟ does not require the creek to have banks, rather only whether it is considered a watercourse or not. Even PM in his report of 3 November 2011 acknowledges the creek as a „named watercourse‟. 13. Therefore, in line with the available evidence and the relevant policy limitations the FSP was entitled to decline indemnity to the Applicant for the damage to the insured property. 14. The FSP relies on the following policy provisions: “Section A - Home Cover Accidental Damage Cover We will pay for Accidental Loss of or Damage to your Building or Contents at the insured address other than the Occurrences o r items referred to in “What you are not insured for” … Section A - Home Cover All subsections What you are not insured for Under Section A – Home Cover we will not pay for 2. Loss of or Damage to your property caused by: a. Flood, the action of water from the sea, high sea water, tidal action or Tsunami; ” Issues 15. Whether damage to the Applicant‟s property was caused by floodwater as defined by the policy. 16. Whether the FSP was entitled to decline indemnity to the Applicant under the policy. Reasons for decision 17. As advised to the parties, FOS has considered it appropriate to refer this dispute directly to the Panel in accordance with the Operational Guidelines to the FOS Terms of Reference. This is because of the complex nature of the issues. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. Case No: 290835 Determination Page 4 of 11 18. This decision has been made by a Panel consisting of an Ombudsman, a representative with extensive experience in the insurance industry and a representative with extensive experience in consumer claims. 19. There has been an exchange of material between the parties. Each party therefore is aware of the issues and has had the opportunity comment. In these circumstances the details contained in the relevant hydrological reports will not be recited in this determination except where considered relevant. 20. On 10 December 2012 the Panel Chair Ombudsman and Panel member attended on site with the Applicant and a representative of the FSP. 21. Prior to arriving at a determination the Panel has read and considered all the material submitted by the parties to FOS. 22. The Panel is satisfied the parties do not dispute the following:  The Applicant held an active Building and Contents insurance policy with the FSP at the time of loss.  The FSP provided and the Applicant received the relevant policy documentation including the Product Disclosure Statement (PDS) and Certificate of Insurance.  The insured property suffered extensive damage due to water inundation arising from the significant weathe r events experienced in the area during January 2011.  The Applicant was not present at the insured property when the inundation occurred.  The policy provides indemnity for loss or damage arising from accidental damage, however, excludes from cover loss arising from the event „Flood‟. 23. The Panel having reviewed the available evidence is satisfied that the policy provides cover for accidental loss or damage subject to the specified policy exclusions including flood damage. Further, that the main issue in contention between the parties is whether the insured property was initially inundated by stormwater prior to the arrival of floodwaters which would give rise to a degree of indemnity under the policy. 24. The Panel is satisfied that the property was ultimately inundated by floodwater to the maximum level however consideration as to whether there was an extent of initial stormwater inundation has been considered below. Cause of the Loss 24 The parties to the dispute have each obtained and rely upon information made available by their appointed consultants. The Panel notes that this information has been exchanged between the parties, each having had the opportunity to comment. Accordingly, in the interest of brevity, the Panel will only recite information from these reports it deems relevant in providing this Determination. Case No: 290835 Determination Page 5 of 11 PM’s Charlton Floods - January 2011 dated 3 November 2011  The town of Charlton experienced heavy rainfall between 10 January - 14 January 2011 with extensive flooding in the area from the Avoca River from 14 January onwards.  Total rainfall over this period was recorded at 168.6mm with 66.2mm falling between 9.00am on 13 January and 9.00am on 14 January.  The highest intensity rainfall recorded was 15mm/hr between 7.00am - 8.00am on 13 January. There was no rainfall recorded after 8.00am on 14 January.  Although the records calculate the rainfall intensity on an hourly basis, rainfall periods at Charlton were highly concentrated in short duration burst e.g. 10 to 12 minute intervals. Accordingly, if calcula ted on this basis it would represent 20-50 year ARI rainfall events as opposed to 1- 2 year ARI events (based on hourly intervals).  Accordingly, overflow from local drainage systems and culverts were highly likely as these systems are only designed to cope with 2-5 year ARI rainfall events.  Time of overflow would have to correspond closely with the timing of the intense rainfall periods and based on this the first stormwater drainage overflow event would have occurred at around 7.00am on 13 January.  There are two possible sources of rainwater run-off in Charlton, run-off in the town which does not enter the stormwater drainage system and run-off from surrounding rural areas.  All rainfall that fell on 13 January and 14 January would have become saturated overland flow and followed natural drainage lines into Charlton. This would have led to the inundation of Charlton on these dates prior to the arrival of floodwaters from Avoca River.  Floodwaters from Avoca River would be of high sediment loads (muddy/mucky) and would not be clear. Clear water inundation would support that prior to the arrival of floodwaters from Avoca River there was water sourced from local stormwater.  Depending on the exact locations of the properties, they will have begun to have been inundated by floodwater sometime on the afternoon or early evening 14 January. Any inundation before this time would be from runoff particularly corresponding to times when heavy rainfall were occurring (13 January and early morning 14 January).  Evidence in respect to water inundation of properties which occurred particularly before 5.00pm on 14 January should be taken into account. PM’s Email dated 18 July 2012  The issue of concern is where the water west of the town can from.  Yeungroon Creek only has a channel with defined banks downstream of Charlton. Upstream of Charlton it is basically a shallowed grassed swale. Case No: 290835 Determination Page 6 of 11  All of the water in this area is essentially local water flowing over grass, as acknowledged by the FSP‟s hydrologists „W‟, and is not river water. W ’s Flood Assessment Report 18 February 2011  Multiple site inspections were undertaken on 24 January 2011.  The average rainfall records for the upper regions of the Avoca River catchment are about 600mm per annum.  The Avoca River has flooded the town of Charlton a number of times in the past due to high rainfalls.  The Avoca River catchment soaked from previous rainfalls resulted in a higher than average conversion of rainfall to runoff, increasing the water flowing directly into watercourses and resulting in flooding across Victoria.  Flood warnings were issued for a number of rivers including the Avoca River with one of the towns affected by the flooding being Charlton.  Historically Charlton has been flooded from two directions in a north south plain with an area remaining flood free through the centre of town along the St Arnaud – Charlton Road.  The most intense rainfalls periods in Charlton were experienced in the morning of 11 January (2011) and early morning 13 January (2011), with the maximum flood level in Avoca River reaching its peak early morning 15 January (2011).  Flooding of the township was similar to the September 2010 event, however, a much greater volume of water has been experienced in the eastern end of town on this occasion (January 2011).  Given the timing of the flooding of the eastern edge is similar to that of the gauge readings it is suggested that the Yeurngoon Creek and Avoca River flows merged to become one system.  Any flooding occurring after lunchtime (14 January 2011) can be directly attributed to Avoca River/Yeurngoon Creek flooding.  Some instances of inundation in properties east of Armstrong Street in the early morning of 14 January 2011 can be attributed to stormwater flooding. W’s Flood Assessment Report 21 March 2011  The site is a residential property located along High Street and is about 750m from the Avoca River.  Discussions with the Applicant confirmed:  Flooding during this event was more widespread and deep that the September 2010 event.  Flooding was approximately 300mm at the front of the house and 1200mm at the rear.  Water was noticed at the front of the property at 4.00pm on 14 January 2011. Case No: 290835 Determination Page 7 of 11  Between 4.30pm and 5.00pm on 14 January 2011 water started moving fast down the street and into the Applicant‟s property. W’s Flood As sessment Report 22 August 2012  The insured property included a residential dwelling and shed.  The town of Charlton is surrounded by a high ridge to both the east and west of town constricting the floodplain through the township.  The catchment areas for the following watercourses are:  Yeungroon Creek (the Creek) 72km 2  Charlton St Arnaud Road Tributary (CSAT) 7km 2  Calder Highway Tributary (CHT) 3km 2  The stormwater runoff generated in the catchments will concentrate along drainage lines and normally flow into the Avoca River (the River) upstream of Charlton for CSAT and downstream for CHT, and to the east and further downstream of Charlton for the creek.  Charlton received its largest rainfall total on the Thursday of 66mm recorded to 9.00am on Friday 14 Janua ry. The available date shows the rainfall over the area occurred in three main bursts.  The highest one minute rainfall intensity occurred at 6.28am on 13 January at 1.44mm/per minute.  The maximum rainfall intensities are not exceptional and are generally equivalent to an ARI of 1-2 years.  Locally derived stormwater flows could not have caused significant flooding in Charlton after 7.00am-8.00am on 14 January.  Most of the flows caused by direct stormwater runoff generated from within the town and the catchment of Calder Highway would have passed through the town to the Avoca River by about 8.00am on 14 January.  The continuing flows into Charlton from about 8.00am (14 January) would have been caused by overland flows resulting from breakouts from the CSAT, the creek and the river from further upstream.  Given the size of its catchment, the CSAT would have contributed flows into Charlton prior to the Creek and the River.  The Applicant‟s property is located on the south side of High Street approximately 400m to the south east of Avoca River and 1.8km west of Yeungroon Creek.  A Land Subject to Inundation Overlay (LSIO) and Floodway Overlay (FO) indicate that the property lies just outside the LSIO for the Avoca River. The LSIO and FO were likely to be based o n historic flood events which were exceeded in January 2011.  The Applicant advised the consultant that:  On the morning of 14 January there was some shallow water sitting around the property but not deep enough to cause any Case No: 290835 Determination Page 8 of 11 damage to the property. During this time her neighbour was trying to assist water to drain into nearby stormwater drains.  At approximately 4.45pm water started flowing across the Calder Highway from the south and began overtopping sandbags placed at the front of the property.  The Applicant evacuated at approximately 5.30pm at which point water had not yet entered the house and she was not present at the property for the remainder of the event.  Flood water inundated the dwelling up to 16-17 inches (400- 430mm) in some areas. The Applicant believes the property was inundated by stormwater run-off.  The consultant recorded measurements of the inundation level at the property as 588mm above ground level at garage door, the floor level of the house was 240mm above ground level on the eastern side of the house and the depth of inundation in the front room was 360mm.  Given the size of the catchment it would respond within two hours of peak intensity rainfall. The peak discharge associated with this rainfall would have been expected to have occurred by the time that rainfall ceased around 5.02am 14 January.  Any significant continuing flows in the tributary from after about 8.00am would have been caused by overland flows resulting from breakouts from, the creek, the Charlton- St Arnaud Road tributary and later the Avoca River.  It was the consultants‟ opinion that clear water is not necessarily an indicator of stormwater, it is more an indicator of where the water has come from, in this case a flat vegetated catchment with little opportunity to pick up sediment, rather than a bare river channel. 25. The Panel notes the following points:  Rainfall in the area ceased at around 5.02am on 14 January 2011.  At 5.30pm on 14 January 2011 water had surrounded the home but water had not entered the dwelling above floor level.  At about 6.00pm or thereafter on 14 January 2011, water from the river would have directly inundated the township. 26. The Ombudsman, Panel member and FOS Case Manager, together with, FSP representatives and a number of local residents have visited the Charlton area on a number of occasions as part of their site inspections. 27. Having attended on site in Charlton and the surrounding area, the Panel is satisfied that prior to the arrival of floodwater from the Avoca River, there was a strong flow of water that came from the south/south east and entered the town. The Panel has considered the impact of the work undertaken at the Charlton-St Arnaud Road on the natural flow of the water from the floodplain to the Avoca River. In the Panel‟s view this is an importa nt consideration. Case No: 290835 Determination Page 9 of 11 28. The road has been raised to allow access to the airport during floods. In doing so, it dissects the natural floodplain. Although, a number of pipes/culverts have been positioned under the road they were not sufficient to cope with the overland flow and according to locals the flow was diverted initially east of Armstrong Road and eventually through the town. When the road was dug up by machinery on 15 January 2012, the level of inundation within Charlton started to drop. 29. This information was provided by a number of local residents independently of the Applicant to the Ombudsman and Case Manager, in the presence of the FSPs representatives. The site visits undertaken by the Panel representatives of the Charlton area and more specifically individual properties, have assisted the Service in gaining a greater understanding of the topography and impact of the stormwater runoff in the area prior to the arrival of floodwater from Avoca River. 30. Following these visits to the area by FOS personnel, and based on discussion with all parties, the Panel is of the opinion the landscape over which the water flowed from the south and east of the town cannot be regarded as a natural watercourse. Although the area from which the water flowed is designated as “Yeungroon Creek”, that appellation alone cannot be taken as evidence of a watercourse. 31. The following ruling was made by the High Court in Gartner v Kidman [1962] HCA 27: 108 CLR 12 (30 May 1962): “This distinction between watercourse and depression follows the language of Hood J in Lyons v Winter (1899) 25 VLR 464, who in that case held that a depression which took rainwater for about three months of a year fell short of the legal definition of a natural watercourse. To constitute such a watercourse as a matter of law, there must be a stream of water flowing in a defined channel or between something in the nature of banks. The stream may be very small and need not run, nor need the banks be clearly or sharply defined. But there must be a course, marked on earth by visible signs, along which water usually flows in order to constitute a watercourse such as creates riparian rights (1899VLR at p485 (at p16) 32. The landscape to the south and south east of the town does not have evidence of visible banks between which water flows and further, water does not usually flow along this stretch of land, which is only vaguely described by a range of indentations and vegetation. The landscape may best be described as a flood plain over which water flows in a direction determined by the rise and fall of the land. 33. This view is further supported by the description given by PM who observed Yeungroon Creek has been infilled with flood deposits over many years. The course of the creek to the south of the town is marked by linear depressions and vegetation. 34. The Panel does not accept that PM‟s use of the phrase “named water course” of itself results in the conclusion that Yeungroon Creek is a water course for the purposes of the policy. Further, the Panel is satisfied that a Case No: 290835 Determination Page 10 of 11 consideration of whether the, so named, creek has banks is critical to the determination of whether it is a water course for the purposes of the policy. 35. Accordingly, the Panel accepts that water which came from the Yeungroon Creek area to the south and south east of the town may not be regarded as water which escaped from the normal confines of a natural watercourse. 36. During the course of the onsite visit and previously, the Applicant has given evidence that she observed a wave of water coming across the vacant land area to the south side of High Street. 37. Having considered all of the available evidence, the Panel is satisfied that this water originated from the area of the work carried out on the Charlton-St Arnaud Road where the culverts were unable to cope with the flow of water and the flow was dissected down Armstrong Street, towards Charlton and the Applicant‟s property. 38. The Applicant described leaving the property as this wave of water was about to overtop the sandbags in front of her property. 39. In the Panel‟s view, stormwater from Armstrong Street is likely to have inundated the Applicant‟s property prior to the arrival of floodwaters from the Avoca River. 40. The Panel has carefully reviewed all of the evidence. In considering this dispute, the Panel notes that the policy provides cover for accidental loss or damage, subject to various exclusions. In this instance there is no doubt that the Applicant‟s property suffered damage on 14 January 2011 and therefore a prima facie claim has been established. The onus therefore switches to the FSP to prove an exclusion contained within its policy, should it wish to rely on such to refuse the claim. 41. The Panel is satisfied that water had inundated the property soon after the time the Applicant left her home at around 5.30pm on 14 January 2011. It was at a level which surrounded the home and the foundations; however, the level of inundation is not clear. The question for the Panel to determine is the level of inundation prior to the arrival of flood water, later in the day. 42. During the onsite inspection, the Panel noted that the property slopes away from the front to the back; the height of the floor above the ground varied approximately 300mm at the front to 150mm at the rear; and the floor of the small shed and garage at the rear of the property were only 50mm above the ground level. 43. Although there is no precise calculation of the level of inundation of the property prior to the arrival of the floodwaters, the Panel is satisfied that such inundation would have been limited. In the absence of precise calculations, the Panel determines having regard to all of the information available, the terms of the policy and relevant legal principles, it would be fair in the circumstances to assess the initial level of stormwater inundation at no more than 150mm above ground through the property. Case No: 290835 Determination Page 11 of 11 44. The Panel is mindful of the fact that it has not been provided with sufficient information which would allow it to come to an informed decision as to the extent/degree (monetary) of the FSP‟s liability under the claim arising from the initial stormwater inundation of the home, the sheds and/or garage. 45. The FSP is to engage an appropriately qualified expert to measure the effect of an inundation of 150mm above the level of the ground, through the property and also its impact, if any, upon the property including upon the home, the shed and the garage, to the level of 150mm above the ground. 46. Accordingly, the Panel urges the parties to act in a cooperative manner to establish the extent of damage to the insured property arising from the initial stormwater inundation. 47. The Panel acknowledges the Applicant‟s reference to possible damage to the foundations of the insured building. However, the Applicant has not provided any evidence to support this aspect of her claim. In the absence of any substantiating evidence to establish whether the foundations are damaged and if so to what extent or what was the cause of such damage, the Panel finds that the Applicant has been unable to establish this aspect of her claim. Determination 48. On the basis of the available information the Panel determines that the FSP is liable under the policy to provide indemnity to the Applicant (within 30 days of receiving this determination) in line with the matters discussed above. 49. Should the FSP elect to cash settle any part of the claim, the FSP is to pay to the Applicant interest at the statutory rate, in line with the Insurance Contracts Act 1984, upon the final settlement figured agreed between the parties from the date of denial of the claim to final settlement of the claim.