Home / Financial Firm (Unknown - Insurer) / Determination 290630

Determination 290630

Cash settlement amount for fire and hail damaged home

FirmFinancial Firm (Unknown - Insurer)
Decided2013-08-05
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded$373,290
Non-financial loss$2,000
Amount claimed$396,028
SourceAFCA PDF

Summary

The applicant's home was damaged by hail and later by fire, and the FSP offered a cash settlement based on its builder's quote, which the applicant rejected. The Ombudsman adopted the applicant's builder's figure, awarded temporary accommodation, $2,000 for non-financial loss, a $2,200 cost contribution and interest.

The insured may choose its own builder, and the insurer's contractor estimates were unreliable and its delays unjustified, so the applicant's quote was the appropriate settlement basis.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay compensationpay interestpay non financial loss

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 290630 Determination Page 1 of 12 Case number: 290630 General Insurance - Domestic Insurance - Home Building - FSP Decision - Claim amount 29 July 2013 Background 1. The Applicant held a home building and contents policy with the Financial Services Provider (FSP) which was current at the time of the loss. 2. The Applicant‟s home was damaged by a hail storm on 25 December 2011, forcing the Applicant and his family to move into temporary accommodation. The Applicant‟s house caught fire while it was vacant and sustained significant further damage. 3. The Applicant lodged a claim for damage to the house and contents. The FSP accepted liability and cash settled the contents portion of the claim. The FSP arranged for a Scope of Works to be prepared and quotes obtained for the repair of the building. 4. The Applicant complained that the Scope of Works obtained by the FSP was inadequate. Following an internal review, the FSP agreed to accept a more extensive Scope of Works prepared by the Applicant‟s architect . The FSP sought updated quotes from its builders based on this Scope of Works accepted the lowest quote (for $276,969). As the Applicant had advised the FSP that he preferred to use his own builder, the FSP offered to cash settle the Applicant for this amount. 5. The Applicant advised the FSP that he had obtained a quote from his own builder (“R”) for $349,800 and therefore considered the FSP‟s offer inadequate. The Applicant noted that both his builder (R) and his architect (“AB”) had advised that mould had developed in the timber framework of the house due to it being without a roof for a lengthy period of time, and accordingly it would be necessary to completely demolish the house (other than the concrete slab). 6. The FSP engaged a building consultant (“S”) who inspected the house and reported that, in his opinion, the existing framework could be repaired and therefore demolition was not required. S also provided a revised Scope of Works , following review of which the FSP‟s builder (“BB”) increased its quote for the repairs to $314,441.60. Determination Case No: 290630 Determination Page 2 of 12 7. The Applicant remains dissatisfied with the FSP‟s offer, as he considers that the amount offered is not sufficient to restore the house to its pre -loss condition. 8. The Applicant is also dissatisfied with the amount offered by the FSP for temporary accommodation expenses. In addition, he seeks reimbursement for certain other expenses incurred in connection with his claim. Summary of Applicant’s position 9. The Applicant has been assisted by his architect in relation to this dispute. For clarity and brevity, submissions made by the Applicant‟s architect will be treated as having been made by the Applicant for the purposes of this Determination. 10. The Applicant says that the initial Scope of Works provided by the FSP‟s assessor was too vague to allow an accurate quotation to be obtained. Accordingly, he had to engage his own architect and spend significant time and effort negotiating with the FSP to arrive at an appropriate Scope of Works. 11. The Applicant seeks an appropriate cash settlement so that he can restore the house to the condition it was in prior to the insured events. The Applicant‟s architec t has estimated the cost of repairs to be $362,177.77, and has provided an itemised breakdown showing the differences between his estimate and the quote prepared by the FSP‟s builder. 12. The Applicant says that the house has been exposed to the elements for a long time as a result of the FSP‟s delays and failure to prepare an adequate Scope of Works. He says that this has resulted in further deterioration of the house, including the growth of mould and the further decay of the timber framework. The Applicant says that both his builder and his architect have confirmed that this represents a potential health issue and therefore the house (other than the concrete slab) should be demolished and rebuilt. 13. The Applicant seeks an additional amount of $31,100 in total for the costs of temporary accommodation while the repairs are carried out, plus the costs of hiring removalists and reconnecting essential services once the repairs are completed. 14. The Applicant also seeks $2,750 in professional fees for the work carried out by his architect to help him progress this dispute. 15. The Applicant says that the FSP‟s delay in finalising his claim has placed a great deal of stress on his marriage and family. Case No: 290630 Determination Page 3 of 12 Summary of FSP’s position 16. The FSP says that it has accepted liability for the claim and has offered the Applicant a cash settlement for the cost of repairs to the house, given that he prefers to use his own builder. 17. The FSP says that the quote prepared by its builder differs from the quotes supplied by the Applicant, becaus e the Applicant‟s quotes are based on the assumption that the property (other than the concrete slab) needs to be demolished and rebuilt. However, the building consultant (S) engaged by the FSP has confirmed that the damage to the timber framework can be repaired and is not sufficiently extensive to warrant demolition. The FSP says that, given S ‟s experience in dealing with claims for fire and water damage, his opinion should be accepted. 18. In relation to the specific items which the Applicant has identified as being excluded from the quote provided by the FSP‟s builder (BB), the FSP says that:  the Applicant‟s quote includes an allowance for carpet, blinds and curtains. However, these are classified as contents items under the policy and are therefore covered by the cash settlement already paid to the Applicant for the contents portion of the claim. Accordingly, these items are not included in BB‟s quote; and  the “Supervision” section of BB‟s quote includes an amount for the cost of plans and permits. 19. The FSP says that its settlement offer satisfies its obligations under the policy. Further, as the FSP‟s builder has agreed to undertake the repair works directly for the Applicant if required, the Applicant can be certain that he will be able to have the repairs completed for the quoted amount. 20. The FSP says that the policy does not allow for temporary accommodation for a period longer than 52 weeks. However, it acknowledges that the final quotation from its builder (BB) was not received until 20 November 2012, and that it will take approximately eight months to complete the work. Accordingly, the FSP has offered to cover the Applicant‟s costs of temporary accommodation for nine months from 20 November 2012 (including an additional month to allow for weather delays). 21. The FSP relies on the following policy provisions: “ What we cover as your contents Your contents means your furniture, furnishings, unfixed electrical goods, valuables, portable personal possessions, clothing and unfixed household goods that you own. Contents also includes:  carpet and rugs (fixed and unfixed)  internal blinds and curtains Case No: 290630 Determination Page 4 of 12 … How we settle your claim We choose how your claim is settled If we agree to pay a claim for loss, theft or damage to your home, contents or landlord‟s fixtures and fittings, we will decide if we will:  repair damage new for old or  replace home or contents new for old or  pay you what it would cost us to repair or replace your home or contents new for old. The meaning of new for old is defined below. We will not:  pay extra to replace your home, contents or landlord‟s fixtures and fittings to a better standard, specification or quality than it was before the loss or damage occurred except as stated in „new for old‟ below  fix a fault that existed before the loss or damage occurred. New for old means:  new materials, new items we replace or repair with new items or new materials that are available at the time of replacement or repair from Australian suppliers.  new for old, regardless of age we replace or repair new for old regardless of age, with no allowance for depreciation ...  same type, standard and specification as when new we replace or repair to the same type, standard and specification as when new. If the same is not available, it means of a similar type, standard and specification when new. It can be a different brand. New for old does not:  include paying the extra cost of replacing or purchasing an extended warranty on any home or contents item or  mean of a better standard, specification or quality than when new. … Home claims How we settle home claims If we agree to pay a claim for loss, theft or damage to your home, we will decide if we will:  repair damage new for old or  rebuild your home new for old or  pay you what it would cost us to repair or rebuild your home new for old. Case No: 290630 Determination Page 5 of 12 When we repair or rebuild your home We will do our best to obtain new materials that are the same type, standard and specification as when new. If the same is not available, we will use new materials of a similar type, standard and specification that are commercially available and compliant with the latest building regulations. ” Issue 22. Whether the FSP‟s offer to cash settle the Applicant for $314,441.60 represents an appropriate settlement of the Applicant‟s claim for damage to his house. 23. Whether the Applicant is entitled to compensation for his architect‟s fees for assistance provided in pursuing this dispute. 24. Whether the Applicant is entitled to compensation for non-financial loss due to the manner in which the FSP has handled his claim. Reasons for decision 25. As advised to the parties, this matter has been expedited in accordance with the Operational Guidelines to the Service‟s Terms of Reference due to the complex nature of the issues to be considered. Accordingly, this dispute has not been the subject of a Recommendation but has proceeded directly to Determination. 26. I am satisfied that there has been an exchange of material between the parties and that each party has had the opportunity to respond to the issues raised therein. Settlement offer 27. After extended negotiations between the parties during the claim process, the FSP has made a final settlement offer, which has been rejected by the Applicant. Having reviewed the materials, I consider the issues in dispute between the parties in relation to the settlement offer are as follows:  the overall difference of approximately $47,000 between the cost of repairs as quoted by the FSP‟s repairer (BB) and the Applicant‟s architect (AB);  the treatment of the following specific items: carpet, curtains and blinds; plans and permits; supply authority connection costs; removalist costs; and  the date from which payment of temporary accommodation costs should be made. 28. I will consider each of these issues in turn. Case No: 290630 Determination Page 6 of 12 Repair costs 29. Under the terms of the policy, the FSP is entitled to decide whether to repair the Applicant‟s house, rebuild the house or pay the Applicant the amount it would cost the FSP to repair or rebuild the Applicant‟s house. As the Applicant has expressed a preference to use his own builder, the FSP has agreed to cash settle the Applicant for the repair costs. 30. The Applicant has disputed the FSP‟s proposed settlement amount on the basis that it is not sufficient to restore his house to its pre-existing condition. In particular, the Applicant argues that the house (other than the concrete slab) requires complete demolition, due to the damage it has suffered in the fire, which has been exacerbated by exposure to the elements over the intervening 17 months, resulting in mould and decay of the timber framework. 31. The Applicant has provided the following two estimates of the cost of repairing the house:  a quotation for $349,800 prepared by his builder (R) on 16 September 2012; and  an estimate of $362,177.77 provided by his architect (AB) in May 2013. 32. Based on the available evidence, it appears that both estimates have been prepared on the assumption that the house will require demolition (noting that R‟s estimate was prepared at the same time the presence of mould was initially reported). However, the reason for the difference of approximately $12,000 between the two estimates is not apparent. 33. The FSP‟s estimate of $314,441.60 is based on a quotation provided by its builder (BB) on 20 November 2012. In its Additional Response to the Service dated 6 June 2013, the FSP agreed to increase this amount by an additional $3,900 to include two items which the Applicant‟s architect had identified as having been wrongly excluded from BB‟s quote. I note that the revised figure of $315,156.60 referred to in the FSP‟s Additional Response appears incorrect, as adding $3,900 to BB‟s quote of $314,331.60 would produce an updated total of $318,341.60. 34. The FSP‟s estimate is based on a Scope of Works provided by its building consultant (S) who inspected the property in October 2012. While S observed evidence of mould and partial decay to the bottom plates of the walls in the master and second bedroom, he considered that the house had not been sufficiently damaged to warrant demolition of the entire building , as the majority of the wall frames were still intact and struc turally sound or repairable. 35. From the material provided to the Service, it is clear that arriving at an agreed Scope of Works and obtaining quotes has been a lengthy and tortuous process. In particular, I note that:  the initial Scope of Works prepared by the FSP excluded certain parts of the house, based on the view of the FSP‟s assessor that these Case No: 290630 Determination Page 7 of 12 sections had been constructed without the necessary planning approvals. It was not until the FSP‟s inte rnal dispute resolution department (“IDR”) reviewed the handling of the claim in July 2012 that the FSP accepted that these parts of the house should be included in the Scope of Works;  following the IDR decision, the FSP accepted the alternative Scope of Works which had been prepared by the Applicant‟s architect (which in turn was later superseded by the Scope of Works prepared by the FSP‟s building consultant (S)); and  over the course of the claims process, the FSP‟s builder ( BB) has provided a number of quotations for increasingly higher amounts, as summarised below: i. a quote for $187,603.62 in May 2012 (based on the initial, restricted Scope of Works); ii. a quote for $276,969 in August 2012 (based on the Scope of Works prepared by t he Applicant‟s architect); and iii. a quote for $314,441.60 in November 2012 (based on S‟s Scope of Works), which has now effectively increased to $318,341,60 given the FSP‟s Additional Response dated 6 June 2013. 36. In my view, the available evidence casts some doubt on the ability of the FSP‟s contractors to accurately estimate the cost of repairs to the Applicant‟s house. I also consider that the credibility of the comments made by the Applicant‟s architect (AB) is enhanced by the FSP‟s willingness to adopt the Scope of Works he prepared in mid-2012, and to modify its estimates to reflect various views expressed by him throughout the claims process. 37. However, I also note that under the terms of the policy, the FSP is not required to cash settle the Applicant for a ny more than it would cost the FSP to repair the house, even if this is less than the amount it would cost the Applicant to complete the repairs. This reflects the fact that the FSP has offered a cash settlement in lieu of undertaking the repairs itself, which it could reasonably expect to be able to do on a discounted basis having regard to its existing relationships with contractors. 38. The FSP has provided a copy of an email from BB confirming that it is prepared to undertake the repair works for the Applicant directly if required, which the FSP says ensures that the Applicant can have the house repaired for the amount quoted. However, in the circumstances, I consider that it is not unreasonable for the Applicant to prefer his own builder, given the amount of time and effort he has expended to date in seeking to have the FSP and its contractors agree on an acceptable Scope of Works and seeking increases in the estimated cost of repairs. 39. The Applicant has provided documents prepared by his architect (AB) which compare:  the Scope of Works prepared by S in November 2012 with the Scope of Works previously prepare by AB; and Case No: 290630 Determination Page 8 of 12  the itemised q uotation provided by BB with AB‟s own estimate for each trade component of the repairs. 40. AB‟s comparison indicates that, in general, the difference between the total overall estimates arises from the cumulative effect of minor differences in the amounts for each line item, rather than the inclusion or exclusion of particular items (other than those specifically considered later in this Determination). 41. In relation to the need to demolish the building (other than the concrete slab) , I acknowledge that the FSP‟s building contractor (S), who is experienced in matters of this nature, has concluded that this is not required. On the other hand, I note that:  in their initial reports prepared in June 2012, t he Applicant‟s builder and architect did not indicate that demolition was required. It was only when they reinspected the house in September 2012 (after it had been without a roof for seven months) that they determined demolition was necessary, due to ongoing mould and decay. In my view, this lends support to their opinion;  the photographs taken by S in October 2012 confirm that the timber framework of the house was beginning to mould and decay at that time;  an additional nine months have now passed since S‟s inspection in October 2012, during which the house has continued to be exposed to the elements;  in an email dated 17 December 2012, the FSP‟s builder ( BB) has noted that, due to continued exposure, the property may continue to deteriorate resulting in unforseen damage which would require a variation of their estimate; and  to a significant degree, the delay in finalising the claim has arisen as a result of the numerous revisions required to the Scope of Works and the quotations prepared by the FSP‟s contractors, and the ti me taken to effect these. 42. In light of the above, I consider that it is appropriate for the Applicant‟s house (other than the concrete slab) to be demolished and rebuilt. 43. I note that the quotation of $349,8 00 prepared by the Applicant‟s builder (R) in September 2012 was based on demolishing the house (other than the concrete slab) prior to rebuilding . Further, the FSP‟s file notes indicate that, when the Applicant‟s arc hitect (AB) challenged the BB quote of $314,441 .60 in November 2011, he did so on the basis that “a successful repair cannot be completed for less than $350,000”. 44. While the Applicant has subsequently provided AB‟s higher estimate of $362,177.70, no evidence has been provided to support the i ncrease over R‟s quote of $349,8 00. Accordingly, I c onsider that R‟s quote of $349,8 00 should be used as the basis for the cash settlement amount. Case No: 290630 Determination Page 9 of 12 45. I will now consider whether this amount should be adjusted in the light of the issues raised by the parties in relation to specific items. Carpet, curtains and blinds 46. The Applicant‟s architect (AB) queried the fact that amounts for carpet, curtains and blinds were not included in S‟s Scope of Works (and therefore BB‟s quote). 47. The policy clearly sets out that carpet, blinds and curtains are contents items and therefore do not fall within the scope of the building cover. As the cash settlement for the contents portion of the claim has been paid, the FSP should not have any further liability for these amounts. 48. The works provided for in R‟s quote includ e carpet, blinds and curtains. Accordingly, I consider that R‟s quote should be reduced by the amount allowed for carpets, blinds and curtains, which R should be asked to confirm. Plans 49. The comparison documents prepared by the Applicant‟s architect (AB) indicate that his estimate included an amount of $7,500 for plans and permits, in addition to an amount of $13,880 for “Supervision” (materials and labour). AB has not provided any further detail as to how he arrived at the estimate of $7,500. 50. AB commented that the quote prepared by the FSP‟s builder (BB) did not include an amount for plans and permits. However, the FSP has subsequently confirmed that the a mount of $14,330 for “Supervision” (materials and labour) in BB‟s quote includes an allowance of $3,530 for plans and permits. 51. It appears that R‟s quote for $349,800 does not include any allowance for plans and permits. In the circumstances, I consider that it is appropriate to adjust R‟s quote so as to include an amount of $5,000 for plans and permits. Removalists 52. The scope of cover under the policy does not extend to costs incurred in moving back into the repaired property. Accordingly, I consider that the FSP is entitled to deny liability for these costs. Supply connection costs 53. The reconnection of essential services was included in S‟s Scope of Works and BB has confirmed that these were also included in its quote. However, it is not clear whether such costs were in cluded in R‟s estimate of $349,8 00, which I have determined should form the basis of the settlement amount. Case No: 290630 Determination Page 10 of 12 54. If R‟s estimate does not include an amount for the costs of connecting essential services, the cash settlement amount should be increased to reflect this. The detailed cost estimate prepared by S includes a total of $1,280 for these items, which I consider is appropriate. Interest 55. I consider that the FSP should be required to pay interest on the total cash settlement for repairs, in accordance with section 57 of the Insurance Contracts Act 1984 (Cth). Interest should be calculated from 20 November 2012, being the date the FSP received BB‟s final quotation . Temporary accommodation expenses 56. Under the policy, the payment of temporary accommodation expenses is limited to 52 weeks and 10% of the sum insured. However, the FSP has agreed to extend this in the circumstances, to pay for temporary accommodation while the dispute is resolved. 57. The FSP says it will also provide cover for tempora ry accommodation costs of $21,600 for the nine month period required to complete the repairs, but argues that this should be backdated to 20 November 2012, when BB provided its updated quotation for $314,441.60. 58. Given my finding that R‟s estimate (and not BB‟s estimate) should be used as the basis for the settlement amount, it follows that the Applicant was justified in disputing the FSP‟s settlement offer. Additionally, a significant portion of the delay in processing his claim was attributable to the actions of the FSP and its contractors. Accordingly, I consider that the Applicant should be entitled to the benefit of temporary accommodation for the period during which the repairs are carried out. Compensation for non-financial loss 59. Under paragraph 9.3(b) of the Service‟s Terms of Reference, compensation for non-financial loss may be awarded where there has been an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with an insured‟s expectation of enjoym ent or peace of mind. 60. As set out above, there have been significant delays in the processing of the Applicant‟s claim and it is now over 18 months since the fire which severely damaged his house. The Applicant says that this has had a significant effect on his marriage and his family, to the extent that his children have required counselling to cope with the ordeal. 61. I accept that not all of the delays in processing the Applicant‟s claim were solely attributable to the actions of the FSP. However, having reviewed the FSP‟s file notes setting out the chronology of the claim, I consider that the FSP and its contractors were responsible for a significant portion of the Case No: 290630 Determination Page 11 of 12 delays because of, among other things, the need to review the Scope of Works and obtain updated quotations on a number of occasions. These delays could have been avoided if the Scope of Works had been prepared properly in the beginning. Even after the Applicant‟s initial claim regarding the Scope of Works was upheld following IDR review, there were further delays in obtaining updated quotations. 62. Given the extensive nature of the damage and the fact that the Applicant and his family were forced out of their home for an extended period of time, it was incumbent on the FSP to process their claim within a reasonable timeframe. Having regard to all of the available evidence, I do not believe that the FSP has done so. Further, the Applicant has been required to spend a significant amount of time and effort, and engage his own consultants, in an attempt to resolve the claim. 63. For the reasons outlined above, I consider that the FSP should be required to pay the Applicant $2,000 as compensation for non-financial loss. Costs in pursuing the matter 64. Under section 9.4 of the Service‟s Terms of Reference, a Financial Services Provider can be required to contribute to professional costs incurred by an Applicant in the course of progressing their dispute. 65. The Applicant has provided a copy of an invoice from his architect (AB) for fees of $2,750 relating to attending the site inspection carried out by S, reviewing S‟s Scope of Works and BB‟s quotes and discussing the Applicant‟s dispute with the Service . While I am satisfied that the work undertaken by AB in reviewing and commenting on the quotation prepared by BB was necessary for the purpose of the dispute, I do not accept that the Applicant required the services of AB to communicate with the Service on his behalf. Accordingly, I consider that it is reasonable to require the FSP to pay the Applicant an amount equal to 80 % of AB‟s invoice, being $ 2,200. Determination 66. On the basis of the available information, I determine that the FSP is required to pay to the Applicant:  in addition to the amount of $314,441.60 quoted by BB, an additional amount of $35,048.40, adjusted as follows: i. reduced by the amount (if any) allowed in R‟s qu otation for $349,800 for carpets, curtains and blinds (to be confirmed by R); ii. increased by $5,000 for the cost of plans and permits; and iii. increased by $1,280 if R‟s quotation for $349,8 00 did not include an allowance for the cost of connecting essential services (to be confirmed by R); Case No: 290630 Determination Page 12 of 12  interest on the total cash settlement for repairs calculated from 20 November 2012 (being the date the FSP received BB‟s final quotation) to the date of settlement, in accordance with section 57 of the Insurance Contracts Act 1984 (Cth);  the amount of $21,600 for temporary accommodation costs;  the amount of $2,000 as compensation for non-financial loss; and  the amount of $2,200 as partial contribution towards the fees payable to the Applicant‟s architect for services provided in the course of this dispute.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.