Home / Financial Firm (Unknown - Insurer) / Determination 290578

Determination 290578

Further cracking damage to unit denied under settling and ground movement exclusion

FirmFinancial Firm (Unknown - Insurer)
Decided2013-02-26
ProductGeneral Insurance · Strata
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The Applicant sought repair of further cracking to his strata unit after an earlier storm claim was cash settled. The FSP denied the new claim under the settling and ground movement exclusion, relying on an engineer's report. AFCA found the FSP met its onus and was entitled to deny liability.

Bureau of Meteorology rainfall records and the engineer's evidence showed the new cracking was caused by excluded soil movement, not the earlier insured storms.

Issues

Subjects and remedies

home or building damageno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 290578 Determination Page 1 of 7 Case number: 290578 General Insurance – Strata Title Insurance Policy – Damage to building – Storm damage – Policy exclusion, earth movement 22 February 2013 Background 1. The Applicant insured his residential unit under a Residential Strata Insurance Plan Policy. In March 2010 a major storm occurred in the Applicant’s locality and minor repairs were carried out to a leaking roof. However, in early 2011 another storm occurred and the Applicant noted further leaks and subsequent internal cracking. 2. The Financial Services provider (FSP) denied liability for the cost of repairs to the building. It relied upon the policy exclusion in respect to normal settling, creeping, heaving, seepage, shrinkage or expansion in buildings, foundations/footings, walls, bridges, roadways, kerbing, driveways, paths, garden borders and other structural improvement. 3. The Applicant disputed the FSP’s decision and the dispute was referred to FOS for determination. In Recommendation 240734, the Case Manager found that the FSP had not established on the balance of probabilities that it was entitled to rely on an exclusion contained in the terms and conditions of the policy. 4. The FSP and Applicant accepted the Recommendation and based on the Applicant’s builder’s quote f or repairs, the FSP cash settled the claim for the amount of $17,489.70 and the Applicant signed a Discharge for that amount. 5. On or about 22 February 2012, the Applicant lodged a claim for further cracking to the building and submitted a claim on the FSP to have the building repaired to prevent future damage to the building. 6. The FSP has again denied liability and has relied on the policy exclusion: ‘...loss or damage due to normal settling, creeping, heaving, seepage, shrinkage, or expansion in buildings, foundations/footings, walls, bridges, roadways, kerbing, driveways, paths, garden borders and other structural improvements.’ Summary of Applicant’ s Position Determination Case No: 290578 Determination Page 2 of 7 7. The Applicant believes the severe cracking that has again developed in his villa is a continuance of the damage that occurred in 2011. 8. He submits that the cracking to the walls, which has recurred less than six months after the repairs were completed, was repaired without actually fixing the cause of the damage. The repairers were recommended to him by a representative of the FSP. 9. The FSP has stated that an engineer’s report it commissioned persuaded it that the damage was caused by the ground settling down resulting in the house shifting. 10. The Applicant spoke with the person who carried out the soil testing who informed him that normal settling would not have occurred over 35 years which is how old the building is. 11. The Applicant contends that the FSP cannot categorically state what is causing the problem and it should repair his property as soon as possible. Summary of FSP’s Position 12. The FSP submits that the cause of the damage sustained to the building was a result of ground movement and the loss does not attract cover under the policy. 13. The FSP appointed structural engineers, ‘EC’, to inves tigate the cause of the cracking to the Applicant’s building. EC undertook the following inspections:  General observations on 2 April 2012;  Test pit and soil sample taken on 5 April 2012;  Testing of stormwater pipes on 12 April 2012; and  Investigation of roof structure on 26 April 2012. 14. In its soil test report, EC stated, in part:  A compaction test was carried out at the corner of bedroom 1, the corner of the kitchen, and the corner of bedroom 2. The tests could not be finalised because after only 450mm or less a very hard material was encountered that the penetrometer could not penetrate;  On 5 April 2012, at the end of summer, a pit was dug outside bedroom 2, soil was tested and found to be clayey sand;  The penetrometer test probably failed due to the dry clay;  The soil tested was class ‘S’ which describes a site with slightly reactive clays where slight ground movement may occur due to moisture changes. Case No: 290578 Determination Page 3 of 7 15. On 12 April 2012, a camera was inserted down all stormwater pipes to check if there were any leaks. None of the pipes were found to be leaking. A stormwater pipe in front of the study is not plumbed into the main stormwater system and discharges straight onto the garden. 16. On 26 April 2012, the roof was inspected and in EC’s opinion the roof structure is having little impact on the brick walls. Crack patterns  Bedroom 1 – vertical crack is closed at the bottom and open at the top which suggests that there has been some settlement of the foundations; this is confirmed by the hairline cracking around the window on the opposite wall, the movement in the external brick at the window and the movement in the external brick near the laundry;  Kitchen – horizontal crack in the internal leaf of brick and the corresponding crack in the mortar in the external leaf of brick suggests there has been some settlement of the foundations; this could also explain the vertical crack in the external leaf of brick in the garage;  Study – vertical crack in the external brickwork beneath the study window, corresponding crack in internal leaf of brick to the right of the study window, and movement at the front door suggests that there has been some settlement;  Bedroom 2 – cracking to the internal leaf of brick, cracking to the brick mortar in the external leaf of brick in the corner and the movement in the ceiling outside bedroom 2 suggests that there has been some settlement. Based on these observations, EC is of the opinion that the most likely cause of the cracking seen in the house is the differential settlement of the foundation material. Reasons for settlement 17. The FSP notes that EC provided two opinions on the possible ways settlement could have occurred. (i) Seasonal swelling and shrinking of the clayey sand; (ii) Movement in the soil at the deeper level. Seasonal swelling and shrinking  Although not as reactive as other clay material, it will swell as it absorbs moisture and shrink as it dries out as in 2010, a particularly dry year in Perth;  It was likely that over the last few summers the clay foundational material dried out more than would normally be expected; Case No: 290578 Determination Page 4 of 7  The soil beneath the foundations has shrunk and settled causing settlement of the foundations and the eventual cracking of the brickwork; Movement at a deeper level  EC reported that the excavated pit was 1400mm deep and the material was found to be hard, more than likely because the excavation had been completed at the end of summer once the clayey sand had dried out; 18. EC stated in its summary: ‘In my opinion the crack patterns observed on site suggest that the damage has been caused by differential settlement of the foundational material. This settlement has either been caused by the drying out and subsequent shrinkage of the clayey sand beneath the foundations, or movement in soils beneath this clayey sand. Further, geotechnical testing will be required to determine if the problem is caused by movement in deeper soils.’ 19. The FSP submits that based on the evidence submitted by EC, the dominant or effective cause of the damage to the building was due to gradual ground movement. Such damage is clearly excluded from the cover provided by the policy. 20. The Applicant has stated that ineffective repairs were carried out in 2011 by the contractors who were recommended to him by the FSP. The FSP refutes this allegation as the original claim was cash settled in accordance with the quotation obtained by the Applicant. 21. The FSP relies on the following policy/contract provisions: ‘Exclusions – what we do not insure 1. We will not pay for loss or damage: ... m due to normal settling, creeping, heaving, seepage, shrinkage, or expansion in buildings, foundations/footings, walls, bridges, roadways, kerbing, driveways, paths, garden borders and other structural improv ements.’ Issue 22. Whether the FSP is entitled to deny indemnity to the Applicant for the cost of repairing the damage to his house. Reasons for Decision 23. Due to the nature of the dispute, the FOS has considered it appropriate to expedite the dispute in accordance with the Operational Guidelines to the FOS Terms of Reference. Thus, this dispute has not been subject to a FOS Recommendation and has proceeded directly to Determination. The parties have been previously advised that a Determination will be issued in this case. Case No: 290578 Determination Page 5 of 7 24. The Applicant’s policy covers accidental loss or damage to the insured property. The Applicant’s house was accepted to have been accidentally damaged in 2010-2011, therefore, the onus shifts to the FSP to show, on the balance of probabilities that the loss does not relate to the damage referred to in claim 240734. Alternatively the Applicant has the onus of establishing that the present damage is a result of a separate insured event. 25. There has been an exchange of material which the parties rely on. Each party has had access to the material on which the other party bases its case. As a consequence it is not necessary to go into all of this material other than when relevant. 26. The Applicant’s house suffered cracking damage following storms in 2010 and 2011. The FSP did not accept that the damage was caused accidentally by storm and it denied liability for the cost of repairs. 27. However, the Applicant disputed that decision and referred the matter to FOS where a Recommendation was made in favour of the Applicant, the core reason being the FSP did not establish that, on the balance of probabilities, it was entitled to rely on a policy exclusion contained in the terms and conditions of the policy. 28. Recommendation 240734 was accepted by both parties and the FSP accepted the Applicant’s builder’s quote for repairs and made a cash settlement to the amount of $17,489.70 which was accepted by the Applicant on 17 October 2011. I am satisfied there was a collaborative decision to select the particular builder and if I considered the present damage is related to the previous repairs, this would have significant implications for the FSP. 29. In February 2012, the Applicant lodged a further claim on the FSP for structural damage to his house. The Applicant submits that the FSP did not identify and repair the cause of the damage to his house at the time of the earlier repairs. 30. The FSP engaged a struc tural engineer, ‘EC’, to investigate and report on the possible cause of the damage to the house. EC’s opinion was that the foundations of the Applicant’s house had been affected by normal settling, heaving, shrinkage, or expansion in foundations and footi ngs which is an exclusion from the cover provided by the Applicant’s policy. 31. EC is of the opinion that dry conditions over a long period of time had resulted in the clayey sand shrinking and expanding with increased rainfall. 32. FOS has accessed the Western A ustralian Bureau of Meteorology (BOM) rainfall records for the Perth area with the following result:  The long term rainfall average is 854mm;  The last six years to the end of 2011 were: 2006 466.8mm 2009 608.2mm Case No: 290578 Determination Page 6 of 7 2007 703.0mm 2010 503.8mm 2008 807.8mm 2011 860.8mm 33. The 2011 monthly rainfall totals were: January 20.4mm July 161.0mm February 0.4mm August 112.0mm March nil September 103.8mm April 45.8mm October 55.2mm May 85.0mm November 29.0mm June 172.4mm December 75.8m 34. In March 2010 a major storm resulted in minor damage to the roof of the Applicant’s house which was repaired by the FSP. In February 2011 there were severe storms in the Perth area which produced heavy rainfall. These storms were deemed to be the cause of the initial damage. 35. On or about 22 February 2012, the Applicant reported that his house had developed cracks to the interior and exterior of the building. Not unnaturally the Applicant considers that this further cracking must be due to the storm of March 2010 and February 2011. 36. But the problem confronting the Applicant is that there is simply no evidence to establish the connection. 37. I note that in the five years to 2011, each yearly rainfall was below the yearly average with the years 2006, 2009 and 2010 significantly below. These dry years were then followed by a record year of rainfall in 2011 with a total rainfall of 860.8mm. 38. Of the 2011 yearly total of 860.8mm, 63.8% of that total, that is, 549.2mm, fell in the four months June to September. After the dry year in 2010, the record rainfall in 2011 would be expected to have affected the water table during 2011. 39. These BOM records sup port structural engineer EC’s opinion that founding soils at the Applicant’s locality, on the balance of probabilities, were affected by the dry conditions between 2006 and 2010 inclusive and the significantly wet year of 2011. 40. I feel the greatest sympathy for the Applicant and his wife who are naturally concerned about the cracking in their home. But such cracking has been a common feature in residential properties during recent extremes of climate. All of the available evidence suggests that this is, at least overwhelmingly, new cracking. I cannot find any link between the cracking and the 2010 and 2011 storms. Case No: 290578 Determination Page 7 of 7 41. Therefore, I find that the FSP has met the onus on it to establish that the damage to the Applicant’s house is not related to the repairs carried o ut in October 2011. 42. I note that the Applicant has not submitted any evidence to refute EC’s findings and that in these circumstances the Applicant has failed to establish that the cracking is due to an insured event. Determination 43. Accordingly, I determine that the FSP is entitled to deny liability for the cost of repairs to the Applicant’s house.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.