Text of the determination
Case No: 290429 Determination Page 1 of 11
Case number: 290429
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Claim Amount - Scope of Works - Cash Settlement Amount
6 May 2013
Background
1. The Applicant holds an Essential Home and Contents policy with the
Financial Services Provider (FSP) which began on 19 October 2002 and has
been renewed annually. The policy was current at the time of the losses.
2. The Applicant‟s home suffered damage from storm events occurring on 11
February 2010, 6 March 2010, 4 February 2011 and 25 December 2011. He
subsequently claimed for the damage suffered in each event, from the FSP.
3. The FSP accepted the claims and after assessing the losses, offered to
settle the A pplicant‟s claims by way of cash settlement in lieu of repairs.
4. The Applicant is agreeable to settling his claims in this manner , however,
believes that the amount offered by the FSP is insufficient to reinstate the
property to its pre-loss condition. He is seeking a cash payment of
approximately $168,000.
Summary of Applicant’s position
5. The Applicant has always been amenable to negotiating a cash settlement;
however, the FSP has refused to negotiate. They have simply sent him
cheques for amounts he considers insufficient. He has returned some of the
cheques.
6. The FSP has not quoted accurately to return the property to its pre-loss
condition. There are numerous areas of damage that the FSP has excluded
from his claims which were damaged in the storm events.
7. The Applicant has sought his own quotations for the damaged areas which
totals to approximately $168,000, well in excess of the FSP‟s offer. He is
unhappy that the FSP has left him with the responsibility of the tarpaulins on
the roof and believes they have not been secured properly.
8. The Applicant disagrees with the conclusions reached by the FSP‟s engineer
and timber expert. The Applicant himself is a flooring and timber expert and
Determination
Case No: 290429 Determination Page 2 of 11
he has prepared a report rebutting the FSP‟s experts , which should be relied
on when considering this dispute.
9. The Applicant states that his home is still unrepaired, with the settling of
these claims being protracted. He is seeking that the FSP waive his
excesses on an ex-gratia basis, in acknowledgement of the delays.
Summary of FSP’s position
10. The FSP says it has accepted the claims from the Applicant, however, there
are a number of areas of damage highlighted by the Applicant which are
attributable to wear and wear and gradual deterioration rather than any
storm event. The FSP says it is entitled to exclude coverage for those areas
from the claims, as the cause of the damage is not as a result of storm or
any other insured event.
11. The FSP denies it has unduly delayed the claims process. It says it has
managed the claims in a timely manner and undertaken to resolve any
issues that arose promptly. The FSP says the Applicant has been in ill health
over the course of the claims, which has not assisted in achieving an
expedient outcome.
12. The FSP has sourced reports from an engineer and a timber and flooring
expert and says in the absence of any conflicting information it is entitled to
rely on the findings of those experts when determining what damage should
be excluded. The FSP is satisfied that the quotes obtained represent a fair
and reasonable cost for all claim related repairs to the property.
13. The FSP has promptly issued settlement cheques for all claims; however,
these have been returned or held by the Applicant. Therefore, the FSP does
not agree that it has unreasonably withheld settlement.
14. The FSP has sent its contractors back to the Applicant‟s premises to re -
secure the tarpaulins, after he made them aware they were not fastened
properly.
15. The FSP relies on the following policy provisions:
“ Making a Claim
Claims for your home
If your home is insured and we agree to pay a claim, we will pay up to your
home sum insured, or any lesser limit that applies, less any applicable
excess.
If your home is destroyed or damaged as a result of an insured event, which
occurs during the period of insurance, we will rebuild or repair your home as
new, or pay you the cost of rebuilding or replacing it, at our discretion.
We will only pay to repair or rebuild that part of your home that was damaged.
We do not cover any additional expenses to replace undamaged parts of your
home to create a uniform appearance.
Case No: 290429 Determination Page 3 of 11
...
General Exclusions
Like most insurance policies, there are general exclusions that apply to
all covers.
You are not covered for any loss or damage caused by or resulting from,
or the costs incurred from or of:
Gradual deterioration, including wear and tear, rust, corrosion,
depreciation, fading or deterioration from exposure to light;
Poor maintenance. ”
Issues
16. Whether the FSP has correctly assessed the extent of the loss.
17. Whether the FSP‟s offer of settlement adequately discharges their liability
under the terms of the policy.
Reasons for decision
18. Due to the nature of this dispute, FOS has considered it appropriate to
expedite the dispute in accordance with the Operational Guidelines to the
FOS Terms of Reference. This dispute has not been the subject of a FOS
Recommendation and has proceeded directly to Determination.
19. I am satisfied a full exchange of information has taken place between the
parties and each party has had the opportunity to address any issues raised.
20. It is settled insurance law that the Applicant bears the onus of proving that
the losses for which he is claiming are as a result of an event covered by the
policy. As this dispute involves four claims, for the sake of clarity, I will
address each claim separately, where appropriate.
Claim 1 – date of loss 11 February 2010
21. The loss arose as a result of storm water overflow from the guttering, with
the Applicant reporting damage to the kitchen bench top, kitchen cedar
window frame, interior timber floor and exterior timber floor in the alfresco
area.
22. The FSP authorised builders „TS‟ to undertake repairs to the Applicant‟s
home. However, repairs were not commenced and this claim was
subsequently withdrawn as a result of claim 2 (see below).
Case No: 290429 Determination Page 4 of 11
Claim 2 – date of loss 6 March 2010
23. This loss arose as a result of storm water overflow from the guttering and a
hail storm. The damage was reported by the Applicant as being to kitchen
bench top and shelving, kitchen cedar window frame, corked floor in the
kitchen and bathroom/laundry, brush box flooring in the kitchen, jarrah
decking floor, pergola guttering and downpipe, internal plaster wall in the
garage, laser light sheeting, the roof of the house, exterior garage wall,
timber decking on the veranda, masonry paving, corroded pot belly stove
and the exterior cladding on the house .
24. As the damage from claim 2 overlapped the damage from claim 1, it was
agreed by the FSP that claim 1 would be withdrawn and all damage
considered solely under claim 2.
25. Loss adjuster „EA‟ was appointed to inspect the home in order to ascertain if
all damage being claimed had arisen as a result of the storm event. The FSP
subsequently arranged for engineer „A‟ and timber flooring expert „D‟ to
inspect the damaged areas.
26. Both A and D found that whilst there was damage to the home consistent
with the storm event, other areas of damage were considered to have arisen
as a result of a combination of general wear and tear, deterioration,
atmospheric moisture and incorrect building materials. A also noted that any
upgrades to the guttering at the premises to prevent further water ingress,
was to be at the Applicant‟s expense as part of the routine maintenance of
the property.
27. The FSP subsequently agreed to accept the costs to repair the bathroom
and WC cedar windows, timber heading of bedroom one window, carpet in
the bedroom and plaster in the garage. These repairs were quoted at $3,432
(less $300 policy excess).
Claim 3 – date of loss 4 February 2011
28. This loss also arose from storm water ingress with the damage reported by
the Applicant as being to the kitchen bench top and kitchen cedar window
frame. A again inspected the premises and determined that the damage
from claim 2 and claim 3 overlapped, but had been exacerbate by claim 3.
29. Settlement was subsequently calculated as $4,290 (less policy excess of
$300) and contribution already made for claim 2, leaving a settlement
amount of $558.
Claim 4 – date of loss 25 December 2011
30. This loss arose as a result of a severe hailstorm, which caused damage to
the colour bond roofing of the main premises and garage, laser light roofing
of the pergola, roof mounted air conditioning unit covers and whirly bird
ventilation units.
Case No: 290429 Determination Page 5 of 11
31. The FSP arranged for builders „ ABC ‟ to quote and upon obtaining agreement
with the Applicant regarding the scope of works (SOW), authorised ABC to
undertake repairs. ABC considered that they could also repair the damage
sustained from claim 2 and claim 3 at the same time , if the Applicant was
agreeable to this course of action. However, shortly prior to repairs, the
Applicant withdrew his authority and requested a cash settlement in lieu of
repairs.
32. The FSP agreed to this request and offered the Applicant a cash settlement
of $69,289 (less $500 excess). The FSP paid the Applicant the sum of
$59,192 but has held an amount of $9,597 representing the hire and
provision of tarpaulins. The FSP say that they will pay this amount to the
Applicant when he returns the tarpaulins.
Is the SOW correct for all claims?
33. The FSP has sought reports from A and D regarding the damage evident as
well as relying on the reports from EA for claim 2 and claim 3. A‟s final report
is extensive and detailed and provides the following conclusion:
“6.1 In the opinion of the writer, the following building damage claimed by the
Insured is considered to be of a consequence to the major storm event in the
region on the 6 th March 2010.
9.1.1 Water markings to the timber weatherboard cladding along the
western perimeter of the dwelling.
9.1.2 Hail damage to the external west facing timber window frames to the
bathroom and WC.
9.1.3 Water staining to the Bedroom 1 window frame and carpet floor
coverings.
9.1.4 Water damage to the plasterboard wall linings along the southern side
of the workshop.
9.2 In the opinion of the writer, the following building damage claimed by the
insured is considered to be the consequence of a major storm event
experienced in the region on the 6 th March 2010 and has significantly
worsened as a result of a storm event recently experienced on the 5 th
February 2011.
9.2.1 Water related damage to the polished-timber Kitchen bench top.
9.3 The writer is unable to substantiate that the balance of the building
damage claimed by the insured is storm related.
9.4 With consideration to the recent history of water leakages during heavy
downpours of rain it is highly recommended that the capacity/size of the gutter
above the Kitchen bay window is increased and an appropriate overflow
provision is also incorporated.
Furthermore, it is recommended that the glazing to the top of the Kitchen bay
window is sealed and the upper panel of the Kitchen bay window modified to
self- drain (externally) in the event of water inundation.”
34. Likewise, D‟s report is extensive and detailed and provides the following
conclusion:
Case No: 290429 Determination Page 6 of 11
“Observation of the specific concerns identified were considered to be
discernible and of minor significance relative to the age and type of flooring
installation, and not specifically attributable to the moisture/storm event in
question.
It is considered that the dimensional variation of the individual floorboards and
resultant gapping is likely to have been caused by movement in the flooring
related to normal seasonal variation over an extended period of time, and if
contributed to by flooding the effect was minor and not considered to be the
primary cause of the concern raised.
Of the specific concerns raised:
The kitchen bench top was not considered significant or specifically
attributed to the storm event
The brushbox flooring was considered to be exhibiting some gapping,
which was discernible, but not specifically attributed to the storm
event. No cupping or “widespread” variation as would normally be
associated with storm related damage was observed
The delamination of the coating whist (sic) the storm event may have
has (sic) some bearing, the product delaminating is not designed or
warranted (sic) for exterior use
The “show through” of the masonite sheet in the bathroom is not
considered to be attributable to the storm event reported.
It is considered that these concerns as identified were of minor significance
and were considered to be the culmination of normal seasonal variation in a
flooring installation of this type and age, and would benefit from normal
maintenance works as expected in the instance of an internal timber flooring
installation.”
35. The report ABC prepared for claim 4, provides the following:
“According to the observations of the writer, the following hail -related building
damage was evident to the insu red‟s property at the time of our inspection:
1. Widespread pitting and scoring to the Colorbond roof sheeting and
ridge capping throughout the insured‟s dwelling, garage, and large
pergola structure (which is situated between the dwelling and
garage).
...
2. Widespread breakages to the translucent roof sheeting to the
pergola and veranda structures adjoining the insured‟s dwelling
and to the western end of the garage.
...
3. Denting to the „whirly bird‟.
...
4. Broken grills/coils to the evaporative air conditioning unit.
...
According to the observations of the writer and in the opinion of the writer the
building damage identified above is consistent with hail (impact) damage.
Case No: 290429 Determination Page 7 of 11
In the opinion of the writer, the hail-damaged building elements identified
above warrant to tal replacement, as necessary to restore the insured‟s
property to its pre- existing condition.”
36. On the basis of the reports obtained, the FSP determined that the balance of
the items being claimed by the Applicant did not arise as a result of the
storm or any other insured event and were excluded from cover. These
items were: splitting of the timber weather board cladding, rotted timber
weatherboard cladding abutting the down pipe, widespread gapping of
floorboards, minor cork peaking of cork tiles, internal shelving of cabinetry to
kitchen cavity, timber decking surface coating, masonry paving, corrosion to
the pot belly stove, localised timber rot of timber decking of the western
verandah and splitting of northern perimeter timber weatherboard cladding to
garage. I note the FSP gave the Applicant the benefit of the doubt regarding
the kitchen bench top.
37. The Applicant has provided a significant volume of material refuting the
conclusions drawn by both A and D regarding the damage to the premises
and timber. The Applicant states he has over 25 years experience with
timber and has detailed his own observations and conclusions in response to
these reports.
38. I have considered the report from the Applicant. However, the Applicant has
not provided any evidence of his professional qualifications or industry
experience which would enable him to provide an expert commentary in this
regard. Further, given his ownership of the home, I am not satisfied that the
Applicant can be regarded as a completely independent witness.
Accordingly, I have reservations as to the weight I can give to the Applicant‟s
evidence.
39. The Applicant has chosen not to a ddress ABC‟s report in his application to
this Service; so I must take this omission to mean that he is not contesting
the evidence supplied by ABC. Further, the Applicant has not supplied
sufficient information supporting his contention that the remainder of the
damage for which he is claiming, arose predominantly as a result of rain
water ingress or hail, or any other insured event.
40. On this basis, I prefer the evidence submitted by A, D and ABC. In the
absence of any conflicting information I accept that the scope of damages
outlined in each report correctly identifies the damage sustained to the home
in the various storm events. Therefore, I accept that the FSP is entitled to
exclude the remainder of the damage on the basis that it did not arise from
this, or any other, insured event.
Is the amount offered by the FSP sufficient to return the property to its pre-
loss condition?
41. The FSP has offered a revised total of $72,753.45 for claim 4. The FSP has
based this amount on quotations prepared by ABC and ba sed on the SOW‟s
provided by A.
Case No: 290429 Determination Page 8 of 11
42. The Applicant contends this is insufficient and is seeking approximately
$168,000 in settlement of his claims, which he has calculated from quotes
sourced by him. The breakdown consists of :
Construction $86,150 Roofing $41,448
Air cooler $3,950 Plumber $480
Plasterer $1,760 Electrical $4,345
Oven $400 Painting $9,510
Paving $3,290 Sandblasting $400
Joinery $9,545 Carpet $1,150
Flooring $6,040 Pressure clean $462
Total $168,930
43. At the outset, I note that the Applicant‟s quotes include a number of items
that were not included on the SOW for any of the three claims, but which the
Applicant still maintains should be included (such as the pavers and pot
bellied stove, kitchen cabinetry and flooring). As I have previously accepted
the various SOW‟s are correct , I am therefore not prepared to consider those
items when determining if the cost offered by the FSP is fair and reasonable.
44. In addition, some of the Applicant‟s quotations overlap in the ite ms quoted
for. In particular, I note that the roofing costs are included in the
„construction‟ quote and are also quoted separately on the „roofing‟ quote.
Therefore, the simple addition of all quotes sourced by the Applicant has
resulted in significant duplication of items. I also note that there are items
included such as a new oven, microwave and garage cupboards, which have
not been raised at any point before and it would therefore be inappropriate to
consider these items as part of this review.
45. The result is that a strict comparison of the quotes is unfair, as they differ
vastly in the items included within. In order to determine if the costs allowed
by the FSP are sufficient for reinstatement, the opposing quotes should have
been prepared using the SO W‟s as a common basis. That is not the case
here.
46. Therefore, I am not persuaded the Applicant has demonstrated that the
settlement offer by the FSP is insufficient to cover all of the claim related
damage to the home. Rather, he has demonstrated that it is not sufficient to
undertake all of the works he desires completed, which I am satisfied is not
the same thing.
47. As the Applicant has not demonstrated that the claim related repairs cannot
be satisfactorily undertaken for the amount offered by the FSP, then I accept
that the settlement offer by the FSP is fair and reasonable and adequately
discharges their liability under the terms of the policy.
48. However, I note the original quotation prepared by ABC is only valid for 30
days. I have confirmed with the FSP that due to the delay in settling this
matter, this quotation is no longer valid. The FSP sought an updated
Case No: 290429 Determination Page 9 of 11
quotation from ABC, setting out the revised cost of repairs as $72,753.45.
Further, the FSP has confirmed ABC is willing to undertake the claim related
repairs for the Applicant at that price.
49. I note that the Applicant has been sent settlement cheques which he has
returned to the FSP for claim 2 and claim 3, although he has since accepted
an amount of $59,192 for claim 4, as partial payment. I therefore do not
believe it is appropriate for an award of interest under the circumstances.
50. However, it is reasonable to assume that as the price for claim 4 has risen,
so will the prices for claims 2 and 3. If I accept the price for claim 4 rose by
5%, then in my view it is reasonable in the circumstances to apply the same
calculation to the prices for claims 2 and 3.
51. Therefore, the Applicant is entitled to an additional payment of $16,935.95.
52. The figure of $16,935.95 is calculated as follows:
Claim 2 $3,132 (after deduction of the excess)
Claim 3 $558 (after deduction of the excess)
Plus 5% increase for Claim Nos. 2 & 3 $184.50
A total for Claim Nos. 2 & 3 $3,874.50
Claim 4 $72,753.45
Less excess $500
Total $72,253.45
Less sum paid for Claim No 4 $59,192
Balance for Claim 4 $13,061.45
Total for all three Claims $16,935.95
53. The FSP says that they intend to hold an amount of $9,597 being in respect
to the amount invoiced from A building company who provided the
tarpaulins. This invoice includes the amount of $2,250 being in respect to the
purchase of the tarpaulins on site.
54. The FSP say that they have requested the Applicant to return the tarpaulins,
but he has not done so and the FSP intend to retain the amount of $9,597
until the Applicant returns the tarpaulins.
55. I understand that the work at the premises has not been completed and thus,
the tarpaulins are still necessary.
56. I also understand that the balance of the A building company invoice (the
amount of $7,347) relates to the previous hire of the ta rpaulins, labour and
materials.
57. I am satisfied that it is unfair of the FSP to withhold the full amount of the A
building company invoice, pending return to the FSP of the tarpaulins , which
they have purchased.
Case No: 290429 Determination Page 10 of 11
58. In my view, it is reasonable only for the FSP to withhold the amount of
$2,250 as that is the amount which they paid for the tarpaulins.
59. As such, the FSP is to arrange payment of the amount of $14,685.95 to the
Applicant, within 14 days of the date of acceptance of this determination, by
the Applicant.
60. Further, the FSP is to pay the additional sum of $2,250 to the Applicant if
and when the Applicant returns the tarpaulins to the FSP.
61. I am conscious of the fact that the issue of the tarpaulins may not be able to
be resolved in a timely manner. Whilst I urge the parties to work together in a
cooperative manner to resolve this issue, I believe it is appropriate to place a
time limit on the return of the tarpaulins.
62. The Applicant is required to return the tarpaulins at the completion of the
repairs or after three months, whichever is the sooner, from the date of this
Determination and the FSP is required to pay the balance sum of $2,250
upon receipt of the tarpaulins.
Is the Applicant entitled to be reimbursed the policy excesses?
63. The Applicant has requested that the policy excesses be waived by the FSP
on an ex-gratia basis in recognition of the delays experienced in bringing the
claims to a resolution. The Applicant has also requested that claims 2 and 3
be considered one claim and only one excess payable.
64. Firstly, I note that this Service is not empowered to compel an FSP to
provide an ex-gratia payment. Additionally, whilst the claims have been
protracted in reaching a conclusion, I note the Applicant has suffered ill
health throughout which I accept has not assisted in bringing the matters to a
timely conclusion. I am satisfied the FSP has been proactive in managing
the claim and responding to the Applicant‟s concerns as they arose.
Accordingly, I am satisfied the FSP‟s handling of the claims has been
appropriate in the circumstances.
65. Furthermore, I accept that as the Applicant has accessed a benefit under the
policy, the FSP is entitled to charge the appropriate excess as provided for in
the policy terms. I further accept that as claim 2 and claim 3 occurred nearly
12 months apart, despite the overlap of damage, the FSP is entitled to
consider them as two separate losses with each attracting the relevant policy
excess.
Determination
66. I determine that the FSP has fulfilled its obligation under the terms of the
policy. The FSP is to make a payment to the Applicant in the sum of
$14,685.95, in accordance with paragraph 59 above.
Case No: 290429 Determination Page 11 of 11
67. The FSP is to make a further payment to the Applicant of $2,250, upon
receipt from the Applicant of the tarpaulins currently on site, in accordance
with paragraphs 60, 61 and 62 above.
68. I further determine that as the Applicant has accessed a benefit under the
policy, he is required to pay the policy excesses applicable. Furthermore, I
determine the FSP is entitled to consider these as three separate claims and
charge the appropriate excess for each. I note the excess have been
deducted for the purposes of the above mentioned calculations.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.