Home / Financial Firm (Unknown - Insurer) / Determination 290429

Determination 290429

Scope of storm damage repairs and adequacy of cash settlement

FirmFinancial Firm (Unknown - Insurer)
Decided2013-05-08
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$16,936
Non-financial loss—
Amount claimed$168,930
SourceAFCA PDF

Summary

Applicant disputed the scope and cash settlement of four storm damage claims on his home and sought about $168,000. AFCA accepted the FSP's scope of works as correct and its offer as fair, but ordered further payments of $16,935.95 including the tarpaulin funds.

The applicant bears the onus of proving losses fall within the policy, and the expert reports were preferred over his unsupported evidence on the scope of damage.

Issues

Subjects and remedies

home or building damagenatural disasterpay claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 290429 Determination Page 1 of 11 Case number: 290429 General Insurance - Domestic Insurance - Home Building - FSP Decision - Claim Amount - Scope of Works - Cash Settlement Amount 6 May 2013 Background 1. The Applicant holds an Essential Home and Contents policy with the Financial Services Provider (FSP) which began on 19 October 2002 and has been renewed annually. The policy was current at the time of the losses. 2. The Applicant‟s home suffered damage from storm events occurring on 11 February 2010, 6 March 2010, 4 February 2011 and 25 December 2011. He subsequently claimed for the damage suffered in each event, from the FSP. 3. The FSP accepted the claims and after assessing the losses, offered to settle the A pplicant‟s claims by way of cash settlement in lieu of repairs. 4. The Applicant is agreeable to settling his claims in this manner , however, believes that the amount offered by the FSP is insufficient to reinstate the property to its pre-loss condition. He is seeking a cash payment of approximately $168,000. Summary of Applicant’s position 5. The Applicant has always been amenable to negotiating a cash settlement; however, the FSP has refused to negotiate. They have simply sent him cheques for amounts he considers insufficient. He has returned some of the cheques. 6. The FSP has not quoted accurately to return the property to its pre-loss condition. There are numerous areas of damage that the FSP has excluded from his claims which were damaged in the storm events. 7. The Applicant has sought his own quotations for the damaged areas which totals to approximately $168,000, well in excess of the FSP‟s offer. He is unhappy that the FSP has left him with the responsibility of the tarpaulins on the roof and believes they have not been secured properly. 8. The Applicant disagrees with the conclusions reached by the FSP‟s engineer and timber expert. The Applicant himself is a flooring and timber expert and Determination Case No: 290429 Determination Page 2 of 11 he has prepared a report rebutting the FSP‟s experts , which should be relied on when considering this dispute. 9. The Applicant states that his home is still unrepaired, with the settling of these claims being protracted. He is seeking that the FSP waive his excesses on an ex-gratia basis, in acknowledgement of the delays. Summary of FSP’s position 10. The FSP says it has accepted the claims from the Applicant, however, there are a number of areas of damage highlighted by the Applicant which are attributable to wear and wear and gradual deterioration rather than any storm event. The FSP says it is entitled to exclude coverage for those areas from the claims, as the cause of the damage is not as a result of storm or any other insured event. 11. The FSP denies it has unduly delayed the claims process. It says it has managed the claims in a timely manner and undertaken to resolve any issues that arose promptly. The FSP says the Applicant has been in ill health over the course of the claims, which has not assisted in achieving an expedient outcome. 12. The FSP has sourced reports from an engineer and a timber and flooring expert and says in the absence of any conflicting information it is entitled to rely on the findings of those experts when determining what damage should be excluded. The FSP is satisfied that the quotes obtained represent a fair and reasonable cost for all claim related repairs to the property. 13. The FSP has promptly issued settlement cheques for all claims; however, these have been returned or held by the Applicant. Therefore, the FSP does not agree that it has unreasonably withheld settlement. 14. The FSP has sent its contractors back to the Applicant‟s premises to re - secure the tarpaulins, after he made them aware they were not fastened properly. 15. The FSP relies on the following policy provisions: “ Making a Claim Claims for your home If your home is insured and we agree to pay a claim, we will pay up to your home sum insured, or any lesser limit that applies, less any applicable excess. If your home is destroyed or damaged as a result of an insured event, which occurs during the period of insurance, we will rebuild or repair your home as new, or pay you the cost of rebuilding or replacing it, at our discretion. We will only pay to repair or rebuild that part of your home that was damaged. We do not cover any additional expenses to replace undamaged parts of your home to create a uniform appearance. Case No: 290429 Determination Page 3 of 11 ... General Exclusions Like most insurance policies, there are general exclusions that apply to all covers. You are not covered for any loss or damage caused by or resulting from, or the costs incurred from or of:  Gradual deterioration, including wear and tear, rust, corrosion, depreciation, fading or deterioration from exposure to light;  Poor maintenance. ” Issues 16. Whether the FSP has correctly assessed the extent of the loss. 17. Whether the FSP‟s offer of settlement adequately discharges their liability under the terms of the policy. Reasons for decision 18. Due to the nature of this dispute, FOS has considered it appropriate to expedite the dispute in accordance with the Operational Guidelines to the FOS Terms of Reference. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 19. I am satisfied a full exchange of information has taken place between the parties and each party has had the opportunity to address any issues raised. 20. It is settled insurance law that the Applicant bears the onus of proving that the losses for which he is claiming are as a result of an event covered by the policy. As this dispute involves four claims, for the sake of clarity, I will address each claim separately, where appropriate. Claim 1 – date of loss 11 February 2010 21. The loss arose as a result of storm water overflow from the guttering, with the Applicant reporting damage to the kitchen bench top, kitchen cedar window frame, interior timber floor and exterior timber floor in the alfresco area. 22. The FSP authorised builders „TS‟ to undertake repairs to the Applicant‟s home. However, repairs were not commenced and this claim was subsequently withdrawn as a result of claim 2 (see below). Case No: 290429 Determination Page 4 of 11 Claim 2 – date of loss 6 March 2010 23. This loss arose as a result of storm water overflow from the guttering and a hail storm. The damage was reported by the Applicant as being to kitchen bench top and shelving, kitchen cedar window frame, corked floor in the kitchen and bathroom/laundry, brush box flooring in the kitchen, jarrah decking floor, pergola guttering and downpipe, internal plaster wall in the garage, laser light sheeting, the roof of the house, exterior garage wall, timber decking on the veranda, masonry paving, corroded pot belly stove and the exterior cladding on the house . 24. As the damage from claim 2 overlapped the damage from claim 1, it was agreed by the FSP that claim 1 would be withdrawn and all damage considered solely under claim 2. 25. Loss adjuster „EA‟ was appointed to inspect the home in order to ascertain if all damage being claimed had arisen as a result of the storm event. The FSP subsequently arranged for engineer „A‟ and timber flooring expert „D‟ to inspect the damaged areas. 26. Both A and D found that whilst there was damage to the home consistent with the storm event, other areas of damage were considered to have arisen as a result of a combination of general wear and tear, deterioration, atmospheric moisture and incorrect building materials. A also noted that any upgrades to the guttering at the premises to prevent further water ingress, was to be at the Applicant‟s expense as part of the routine maintenance of the property. 27. The FSP subsequently agreed to accept the costs to repair the bathroom and WC cedar windows, timber heading of bedroom one window, carpet in the bedroom and plaster in the garage. These repairs were quoted at $3,432 (less $300 policy excess). Claim 3 – date of loss 4 February 2011 28. This loss also arose from storm water ingress with the damage reported by the Applicant as being to the kitchen bench top and kitchen cedar window frame. A again inspected the premises and determined that the damage from claim 2 and claim 3 overlapped, but had been exacerbate by claim 3. 29. Settlement was subsequently calculated as $4,290 (less policy excess of $300) and contribution already made for claim 2, leaving a settlement amount of $558. Claim 4 – date of loss 25 December 2011 30. This loss arose as a result of a severe hailstorm, which caused damage to the colour bond roofing of the main premises and garage, laser light roofing of the pergola, roof mounted air conditioning unit covers and whirly bird ventilation units. Case No: 290429 Determination Page 5 of 11 31. The FSP arranged for builders „ ABC ‟ to quote and upon obtaining agreement with the Applicant regarding the scope of works (SOW), authorised ABC to undertake repairs. ABC considered that they could also repair the damage sustained from claim 2 and claim 3 at the same time , if the Applicant was agreeable to this course of action. However, shortly prior to repairs, the Applicant withdrew his authority and requested a cash settlement in lieu of repairs. 32. The FSP agreed to this request and offered the Applicant a cash settlement of $69,289 (less $500 excess). The FSP paid the Applicant the sum of $59,192 but has held an amount of $9,597 representing the hire and provision of tarpaulins. The FSP say that they will pay this amount to the Applicant when he returns the tarpaulins. Is the SOW correct for all claims? 33. The FSP has sought reports from A and D regarding the damage evident as well as relying on the reports from EA for claim 2 and claim 3. A‟s final report is extensive and detailed and provides the following conclusion: “6.1 In the opinion of the writer, the following building damage claimed by the Insured is considered to be of a consequence to the major storm event in the region on the 6 th March 2010. 9.1.1 Water markings to the timber weatherboard cladding along the western perimeter of the dwelling. 9.1.2 Hail damage to the external west facing timber window frames to the bathroom and WC. 9.1.3 Water staining to the Bedroom 1 window frame and carpet floor coverings. 9.1.4 Water damage to the plasterboard wall linings along the southern side of the workshop. 9.2 In the opinion of the writer, the following building damage claimed by the insured is considered to be the consequence of a major storm event experienced in the region on the 6 th March 2010 and has significantly worsened as a result of a storm event recently experienced on the 5 th February 2011. 9.2.1 Water related damage to the polished-timber Kitchen bench top. 9.3 The writer is unable to substantiate that the balance of the building damage claimed by the insured is storm related. 9.4 With consideration to the recent history of water leakages during heavy downpours of rain it is highly recommended that the capacity/size of the gutter above the Kitchen bay window is increased and an appropriate overflow provision is also incorporated. Furthermore, it is recommended that the glazing to the top of the Kitchen bay window is sealed and the upper panel of the Kitchen bay window modified to self- drain (externally) in the event of water inundation.” 34. Likewise, D‟s report is extensive and detailed and provides the following conclusion: Case No: 290429 Determination Page 6 of 11 “Observation of the specific concerns identified were considered to be discernible and of minor significance relative to the age and type of flooring installation, and not specifically attributable to the moisture/storm event in question. It is considered that the dimensional variation of the individual floorboards and resultant gapping is likely to have been caused by movement in the flooring related to normal seasonal variation over an extended period of time, and if contributed to by flooding the effect was minor and not considered to be the primary cause of the concern raised. Of the specific concerns raised:  The kitchen bench top was not considered significant or specifically attributed to the storm event  The brushbox flooring was considered to be exhibiting some gapping, which was discernible, but not specifically attributed to the storm event. No cupping or “widespread” variation as would normally be associated with storm related damage was observed  The delamination of the coating whist (sic) the storm event may have has (sic) some bearing, the product delaminating is not designed or warranted (sic) for exterior use  The “show through” of the masonite sheet in the bathroom is not considered to be attributable to the storm event reported. It is considered that these concerns as identified were of minor significance and were considered to be the culmination of normal seasonal variation in a flooring installation of this type and age, and would benefit from normal maintenance works as expected in the instance of an internal timber flooring installation.” 35. The report ABC prepared for claim 4, provides the following: “According to the observations of the writer, the following hail -related building damage was evident to the insu red‟s property at the time of our inspection: 1. Widespread pitting and scoring to the Colorbond roof sheeting and ridge capping throughout the insured‟s dwelling, garage, and large pergola structure (which is situated between the dwelling and garage). ... 2. Widespread breakages to the translucent roof sheeting to the pergola and veranda structures adjoining the insured‟s dwelling and to the western end of the garage. ... 3. Denting to the „whirly bird‟. ... 4. Broken grills/coils to the evaporative air conditioning unit. ... According to the observations of the writer and in the opinion of the writer the building damage identified above is consistent with hail (impact) damage. Case No: 290429 Determination Page 7 of 11 In the opinion of the writer, the hail-damaged building elements identified above warrant to tal replacement, as necessary to restore the insured‟s property to its pre- existing condition.” 36. On the basis of the reports obtained, the FSP determined that the balance of the items being claimed by the Applicant did not arise as a result of the storm or any other insured event and were excluded from cover. These items were: splitting of the timber weather board cladding, rotted timber weatherboard cladding abutting the down pipe, widespread gapping of floorboards, minor cork peaking of cork tiles, internal shelving of cabinetry to kitchen cavity, timber decking surface coating, masonry paving, corrosion to the pot belly stove, localised timber rot of timber decking of the western verandah and splitting of northern perimeter timber weatherboard cladding to garage. I note the FSP gave the Applicant the benefit of the doubt regarding the kitchen bench top. 37. The Applicant has provided a significant volume of material refuting the conclusions drawn by both A and D regarding the damage to the premises and timber. The Applicant states he has over 25 years experience with timber and has detailed his own observations and conclusions in response to these reports. 38. I have considered the report from the Applicant. However, the Applicant has not provided any evidence of his professional qualifications or industry experience which would enable him to provide an expert commentary in this regard. Further, given his ownership of the home, I am not satisfied that the Applicant can be regarded as a completely independent witness. Accordingly, I have reservations as to the weight I can give to the Applicant‟s evidence. 39. The Applicant has chosen not to a ddress ABC‟s report in his application to this Service; so I must take this omission to mean that he is not contesting the evidence supplied by ABC. Further, the Applicant has not supplied sufficient information supporting his contention that the remainder of the damage for which he is claiming, arose predominantly as a result of rain water ingress or hail, or any other insured event. 40. On this basis, I prefer the evidence submitted by A, D and ABC. In the absence of any conflicting information I accept that the scope of damages outlined in each report correctly identifies the damage sustained to the home in the various storm events. Therefore, I accept that the FSP is entitled to exclude the remainder of the damage on the basis that it did not arise from this, or any other, insured event. Is the amount offered by the FSP sufficient to return the property to its pre- loss condition? 41. The FSP has offered a revised total of $72,753.45 for claim 4. The FSP has based this amount on quotations prepared by ABC and ba sed on the SOW‟s provided by A. Case No: 290429 Determination Page 8 of 11 42. The Applicant contends this is insufficient and is seeking approximately $168,000 in settlement of his claims, which he has calculated from quotes sourced by him. The breakdown consists of : Construction $86,150 Roofing $41,448 Air cooler $3,950 Plumber $480 Plasterer $1,760 Electrical $4,345 Oven $400 Painting $9,510 Paving $3,290 Sandblasting $400 Joinery $9,545 Carpet $1,150 Flooring $6,040 Pressure clean $462 Total $168,930 43. At the outset, I note that the Applicant‟s quotes include a number of items that were not included on the SOW for any of the three claims, but which the Applicant still maintains should be included (such as the pavers and pot bellied stove, kitchen cabinetry and flooring). As I have previously accepted the various SOW‟s are correct , I am therefore not prepared to consider those items when determining if the cost offered by the FSP is fair and reasonable. 44. In addition, some of the Applicant‟s quotations overlap in the ite ms quoted for. In particular, I note that the roofing costs are included in the „construction‟ quote and are also quoted separately on the „roofing‟ quote. Therefore, the simple addition of all quotes sourced by the Applicant has resulted in significant duplication of items. I also note that there are items included such as a new oven, microwave and garage cupboards, which have not been raised at any point before and it would therefore be inappropriate to consider these items as part of this review. 45. The result is that a strict comparison of the quotes is unfair, as they differ vastly in the items included within. In order to determine if the costs allowed by the FSP are sufficient for reinstatement, the opposing quotes should have been prepared using the SO W‟s as a common basis. That is not the case here. 46. Therefore, I am not persuaded the Applicant has demonstrated that the settlement offer by the FSP is insufficient to cover all of the claim related damage to the home. Rather, he has demonstrated that it is not sufficient to undertake all of the works he desires completed, which I am satisfied is not the same thing. 47. As the Applicant has not demonstrated that the claim related repairs cannot be satisfactorily undertaken for the amount offered by the FSP, then I accept that the settlement offer by the FSP is fair and reasonable and adequately discharges their liability under the terms of the policy. 48. However, I note the original quotation prepared by ABC is only valid for 30 days. I have confirmed with the FSP that due to the delay in settling this matter, this quotation is no longer valid. The FSP sought an updated Case No: 290429 Determination Page 9 of 11 quotation from ABC, setting out the revised cost of repairs as $72,753.45. Further, the FSP has confirmed ABC is willing to undertake the claim related repairs for the Applicant at that price. 49. I note that the Applicant has been sent settlement cheques which he has returned to the FSP for claim 2 and claim 3, although he has since accepted an amount of $59,192 for claim 4, as partial payment. I therefore do not believe it is appropriate for an award of interest under the circumstances. 50. However, it is reasonable to assume that as the price for claim 4 has risen, so will the prices for claims 2 and 3. If I accept the price for claim 4 rose by 5%, then in my view it is reasonable in the circumstances to apply the same calculation to the prices for claims 2 and 3. 51. Therefore, the Applicant is entitled to an additional payment of $16,935.95. 52. The figure of $16,935.95 is calculated as follows: Claim 2 $3,132 (after deduction of the excess) Claim 3 $558 (after deduction of the excess) Plus 5% increase for Claim Nos. 2 & 3 $184.50 A total for Claim Nos. 2 & 3 $3,874.50 Claim 4 $72,753.45 Less excess $500 Total $72,253.45 Less sum paid for Claim No 4 $59,192 Balance for Claim 4 $13,061.45 Total for all three Claims $16,935.95 53. The FSP says that they intend to hold an amount of $9,597 being in respect to the amount invoiced from A building company who provided the tarpaulins. This invoice includes the amount of $2,250 being in respect to the purchase of the tarpaulins on site. 54. The FSP say that they have requested the Applicant to return the tarpaulins, but he has not done so and the FSP intend to retain the amount of $9,597 until the Applicant returns the tarpaulins. 55. I understand that the work at the premises has not been completed and thus, the tarpaulins are still necessary. 56. I also understand that the balance of the A building company invoice (the amount of $7,347) relates to the previous hire of the ta rpaulins, labour and materials. 57. I am satisfied that it is unfair of the FSP to withhold the full amount of the A building company invoice, pending return to the FSP of the tarpaulins , which they have purchased. Case No: 290429 Determination Page 10 of 11 58. In my view, it is reasonable only for the FSP to withhold the amount of $2,250 as that is the amount which they paid for the tarpaulins. 59. As such, the FSP is to arrange payment of the amount of $14,685.95 to the Applicant, within 14 days of the date of acceptance of this determination, by the Applicant. 60. Further, the FSP is to pay the additional sum of $2,250 to the Applicant if and when the Applicant returns the tarpaulins to the FSP. 61. I am conscious of the fact that the issue of the tarpaulins may not be able to be resolved in a timely manner. Whilst I urge the parties to work together in a cooperative manner to resolve this issue, I believe it is appropriate to place a time limit on the return of the tarpaulins. 62. The Applicant is required to return the tarpaulins at the completion of the repairs or after three months, whichever is the sooner, from the date of this Determination and the FSP is required to pay the balance sum of $2,250 upon receipt of the tarpaulins. Is the Applicant entitled to be reimbursed the policy excesses? 63. The Applicant has requested that the policy excesses be waived by the FSP on an ex-gratia basis in recognition of the delays experienced in bringing the claims to a resolution. The Applicant has also requested that claims 2 and 3 be considered one claim and only one excess payable. 64. Firstly, I note that this Service is not empowered to compel an FSP to provide an ex-gratia payment. Additionally, whilst the claims have been protracted in reaching a conclusion, I note the Applicant has suffered ill health throughout which I accept has not assisted in bringing the matters to a timely conclusion. I am satisfied the FSP has been proactive in managing the claim and responding to the Applicant‟s concerns as they arose. Accordingly, I am satisfied the FSP‟s handling of the claims has been appropriate in the circumstances. 65. Furthermore, I accept that as the Applicant has accessed a benefit under the policy, the FSP is entitled to charge the appropriate excess as provided for in the policy terms. I further accept that as claim 2 and claim 3 occurred nearly 12 months apart, despite the overlap of damage, the FSP is entitled to consider them as two separate losses with each attracting the relevant policy excess. Determination 66. I determine that the FSP has fulfilled its obligation under the terms of the policy. The FSP is to make a payment to the Applicant in the sum of $14,685.95, in accordance with paragraph 59 above. Case No: 290429 Determination Page 11 of 11 67. The FSP is to make a further payment to the Applicant of $2,250, upon receipt from the Applicant of the tarpaulins currently on site, in accordance with paragraphs 60, 61 and 62 above. 68. I further determine that as the Applicant has accessed a benefit under the policy, he is required to pay the policy excesses applicable. Furthermore, I determine the FSP is entitled to consider these as three separate claims and charge the appropriate excess for each. I note the excess have been deducted for the purposes of the above mentioned calculations.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.