A strata unit owner claimed for water damage following a storm and roof leaks. The insurer referred her to the builder and body corporate manager, and declined the hallway and bedroom ceilings as age-related. AFCA upheld the declinature for those ceilings, found the roof delay excessive, and ordered $500 non-financial loss and reimbursement of a $400 assessment fee.

An insurer relying on an exclusion must prove it, and an insurer that delegates claim management to third parties is responsible for unreasonable delay in resolving the claim.

Issues

Subjects and remedies

home or building damagepay claimpay compensationpay non financial loss

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 290139 Determination Page 1 of 13 Case number: 290139 General Insurance - Domestic Insurance - Home Building - Service - Delay in claim handling 22 January 2013 Background 1. The Applicant is a unit owner forming part of a body corporate. The property is insured under a Residential Strata Insurance Plan issued by the Financial Services Provider (FSP). 2. On 28 December 2011 the Applicant informed the FSP of damage to the building caused by a tree which fell during a storm. On 3 January 2012 the Applicant reported water damage to eaves over her balcony with water coming through and flooding the balcony. The Applicant claimed for water damage to the interior of her unit including rectification work in accordance with recommendations made by a consultant commissioned by her and to the eave over her balcony. 3. The FSP maintains the issues in relation to the lounge room, kitchen and bathroom areas has been resolved with the only outstanding work in dispute being the hallway area. The FSP denied rectification of the hallway and bedroom ceiling areas, on the ground the damage was age related. Summary of Applicant’s position 4. The Applicant’s compl aint not only involves the extent of water damage to the insured building, but also the manner in which her claim had been dealt with by the FSP, the building company ‘SG’ a ppointed by the FSP and/or the body corporate manager (the Manager), the loss adjuster and the body corporation’s authorised representative (the Manager). The Applicant argues the FSP is ultimately responsible for the actions of these parties where there is either a principal/agent and/or contractual relationship in place. 5. The Manager has been managing the claim in her capacity as an FSP authorised representative. The Manager regularly appoints the building company SG to attend to insurance claims. 6. The Applicant states she had the distinct impression the FSP differentiated the level of service and respect provided to lot owners such as herself, as opposed to the body corporate manager. Individual lot owners are also an ‘insured' and should be treated accor dingly. Determination Case No: 290139 Determination Page 2 of 13 7. The Applicant submits the FSP has breached the General Insurance Code of Practice. 8. On 2 December 2011 prior to the storms on 28 December 2010 the builder SG had been appointed to inspect and carry out any repairs to the roof of the premises. When she reported the damage on 28 December 2011 the FSP advised the body corporate manager would arrange for a builder to attend to repairs. 9. SG was appointed and confirmed it would attend to repairs to the eaves above her balcony and opposite her kitchen/bathroom. The eaves above her balcony were repaired on 23 January 2012. 10. On 27 February 2012 the Applicant informed the Manager and the builder that rainwater was still coming in over her balcony via the repaired eaves. She observed gaps where the builder had applied putty. The builder had not replaced the rotted plank in the eaves. 11. She also brought to their attention the eaves opposite her kitchen and bath room area were not repaired. 12. On 9 March an assessor and a roofing engineer inspected the roof to locate the area of ingress. She was not asked about any internal water damage. 13. On 5 March she received an intimidating call from the FSP advising that damaged eaves are not an insurance matter but ongoing maintenance. The FSP declined the roof damage as it was due to a lack of maintenance notwithstanding the builder had been contracted to maintain the roof on 2 December 2011. However the FSP agreed to pay for the resultant damaged eaves. 14. On 30 May she informed the FSP and assessor about obvious cracks in her bathroom wall and ceiling opposite the damaged eaves and asked for it to be assessed with other damage in her lounge room and internal corridor opposite the common corridor with a water damage mark. The entire common corridor had been rain affected for some years and was completely replaced by the FSP under a water damage claim submitted by the Manager. 15. On 12 June a contractor was appointed to assess and quote on the internal water damage. On 21 June the assessor provided her with a copy of the report which rejected damage to the lounge room and corridor ceilings. On 20 June she received a letter offering a cash settlement of $7,898 for repairs to the eaves and her internal damage. The offer was rejected as she required all the internal damage repaired. 16. On 21 June 2012 during persistent rain, water was observed pouring down her bathroom wall. Case No: 290139 Determination Page 3 of 13 17. On 26 June following a visit by the assessor the builder inspected the roof to ascertain the source of the leak. She was advised they would only need to move a couple of tiles. 18. On 4 July she requested access to the ‘claims preparation’ benefit under the policy as she had serious concerns with the lack of action and wanted an independent builder to provide advice. 19. On 5 July the builder advised that it would be necessary to cut a manhole in the ceiling in order to establish the source of the leak into the bathroom. The assessor also advised her that as she had escalated the matter to FOS he was unable to communicate directly with her unless instructed by the FSP. The manhole was cut on 9 July. 20. As the assessor would not communicate with her, she arranged for a water and fire restoration contractor to inspect the premises who advised the builder should investigate the ventilation pipe as the cause for the ingress. 21. The builder inspected the ventilation pipe and found lead flashing around the pipe had worn which was replaced. The Applicant questions why the roof engineer and the assessor who both inspected the roof did not find this problem. 22. On 24 July, the FSP, the builder and the assessor were asked for the repairs to be authorised following the final roof repairs undertaken by the builder on 17 July. The assessor had by letter dated 28 March 2012 stated that the resultant water damage could not be repaired until all recommended roof repairs had been carried out. She received no reply. 23. The Applicant states the source of the water ingress was rectified following one phone call by her. She was concerned that the builder misrepresented this in its report on 8 August to the FSP and assessor saying that they had located the missing flashing when the manhole was constructed on 9 July. The Applicant alleges this was a blatant lie. 24. On 30 July she reported ongoing rainwater seeping through the eaves above the balcony. She insisted the builder re-bed and re-point the area above her unit. The builder had advised on 10 January he would arrange for this work to be carried out which was obviously not done at that time. The roof repairs were carried out by the builder on 3 August 2012. This appeared to fix the problem in this area. 25. The resultant damage has not been authorised. 26. During a meeting with the body corporate chairpersons on 15 August, they agreed the peeling paint in her corridor appeared to be consistent with other water damage in her unit and with the common corridor immediately outside her internal corridor. They also agreed the repairs to the eaves above her balcony were inadequate. Case No: 290139 Determination Page 4 of 13 27. On 21 August the water restoration consultant engaged by her inspected the internal damage and provided a report. The consultant confirmed there was evidence of rain water damage to her unit which is an insured peril covered by the policy. This was evidenced by the peeling paint, existing moisture levels and delamination. 28. The Applicant is seeking: a. To have all the internal water damage areas caused by the resultant ingress of water repaired including the recommendations made by the water and fire damage rectification consultant. b. Have the assessor authorise commencement of the repairs to the eaves and the internal damage to her unit including the recommendations made by the water and fire damage consultant including airmovers and dehumidifiers to dry the wet areas. c. The FSP to compensate her for the $400 fee incurred in contracting the water and fire rectification consultant. d. Investigate possible breaches of the General Insurance Code of Practice by the FSP, the assessor, and the Manager. e. Investigate payment of any damages that may be awarded to her due to the circumstances set out in her correspondence and the protracted length of time in getting the repairs attended to. Summary of FSP’s position 29. The FSP submits that since the Applicant lodged her compliant with the FOS her dispute for the most part has been resolved. 30. Following instructions from the body corporate, the builder SG was appointed to undertake repairs to the Applicant’s unit in addition to the external or common areas which form part of the claim. 31. On 3 August 2012 the builder attended the complex to commence the works to the tiled roof above the Applicant’s unit. The builder also quoted on the internal damage to the Applicant’s unit, namely the lounge room, kitch en and bath room areas. 32. The only outstanding area of work in dispute is the damage to the A pplicant’s hallway area. The FSP considers this damage is not associated with the water damage claim. 33. The FSP considers the claim to the hallway is excluded from cover by application of the following policy terms: “Exclusions – what we do not insure 1 We will not pay for loss or damage: Case No: 290139 Determination Page 5 of 13 ,,, c caused by lack of maintenance, rust, oxidation, corrosion, wear, tear, fading, gradual corrosion or gradual deterioration, concrete or brick cancer, developing flaws, wet or dry rot, or failure to maintain Your Insured Property in a reasonably good state of repair. d caused by non – rectification of an Insured Property defect, error or omission that You were aware of, or should reasonably have been aware of.” Roof repairs 34. The policy provides cover for “Claim preparation costs’ as follows: “ 3. Claim preparation costs and fees We will pay up to $30,000 for the reasonable cost of fees and other expenses You necessarily incur with Our written consent in the preparation of a claim made under the Policy.” 35. The claim for ‘Claim preparation costs and fees’ was declined as the Applicant had been advised on multiple occasions by various builders, loss assessors and tradespeople that the damage was age and maintenance related and as such does not fall within the cover provided by the policy. 36. The roof repairs are not covered by the policy. The cause for the leaks were not storm related and are maintenance issues. Such repairs are excluded from the cover. 37. The resultant water damage to the eaves does fall within the scope of cover contained in the policy. However, it is unable to attend to these repairs until the cause of the water damage is rectified. This lies with the body corporate which is aware of the issue and has responsibility for. The assessor has written to the body corporate seeking confirmation of completion of the works to the roof. 38. It has no responsibility for work carried out by the body corporate regarding repair to and maintenance issues. The work undertaken by the builder SG referred to by the Applicant falls into a category for which it is not involved or responsible. 39. The issue of roof repairs is being attended to by the body corporate and it (the FSP) is not privy to the arrangements or scope of works entered into with the contractor. All aspects associated with maintenance which encompasses repair of the roof including the scope of works prepared by the builder SG relating to roof repairs, is not the FSP’s responsibility. These are matters for the body corporate or the Manager. Case No: 290139 Determination Page 6 of 13 Authorised representative of the FSP 40. The FSP does not give any authority to the body corporate Managers in relation to insurance claims. The body corporate Manager is an authorised representative of the FSP only in arranging insurance. Repairs to hallway and bedroom ceilings 41. On 8 August 2012, the builder SG provided a report and scope of works for the Applicant’s unit. 42. The policy does not provide cover for lack of maintenance, wear, tear, fading, gradual deterioration or failure to maintain the property to a reasonably good state of repair. According to SG ’s report the Applicant’s hallway ceiling and bedroom ceiling is affected by events excluded under the policy. 43. It therefore was entitled to decline the claim for repairs to the Applicant’s hallway and bedroom ceilings. Issues 44. Whether the damage to the hallway and bedroom ceilings falls within the cover provided by the policy. 45. Whether the FSP is responsible for rectifying damage to the eave over the Applicant’s balcony. Reasons for decision 46. There has been an exchange of material between the parties. Each party is therefore aware of the issues and has had the opportunity to respond. 47. Prior to arriving at my decision I have read and consider all the material relied on by the parties. The material includes a large number of emails exchanged by the Applicant with various parties involved in the issues arising from the damage which occurred in December 2011 and January 2012. As this material has been exchanged, reference to the emails will be made only to the information relevant to the issues central to the dispute. 48. By email dated 19 January 2012 the FSP’s claims consultant requ ested the Applicant to direct all her enquires in relation to her claim to the builder SG or the body corporate Manager. 49. In doing so, contrary to the FSP’s assertion the Manager was not authorised to manage claims, the FSP in this matter handed management of the Applicant’s claim to the builder and the Manager. Case No: 290139 Determination Page 7 of 13 50. The initial damage to the building occurred during a storm in December 2011 which caused a tree to impact with the roof of the premises. There is no dispute that this damage was not rectified. 51. The Applicant has provided a chronology of the events during the claims process. These are largely summarised in her letter of 29 August 2012. 52. A roofing consultant was commissioned by the FSP to inspect and report on the condition of the roof over the Applican t’ s unit and comment on the cause of ongoing rainwater leakage to outdoor eaves areas. His report of 22 March 2012 concluded:  A continuing point of rainwater ingress staining over eaves to the eastern side of the Applicant’s unit was the result of isolated cracks in the cement works in the valley directly above the site of the leakage.  Some cracking and deterioration to the valley cement work required repairing.  There was no evidence of storm damage to the roof over the Applicant’s unit. 53. By email dated 22 July 2012 to the Applicant, the builder SG advised:  Repairs had been carried out to the roof penetrations/ventilation pipes which run through the eaves  Lead flashings around the penetrations were removed and replaced. The flashings were beyond repair due to splits and general wear and tear. The fault in the flashings allowed water entry into the roof cavity with water finding its way onto eaves and affecting the wall within the bathroom.  The pipe that runs in the roof space was decommissioned some time ago and is no longer in use.  A report will be issued in relation to all resultant damage. 54. By email dated 25 July 2012 the Manager informed the Applicant SG had previously attended to roof repairs over both the eaves over her balcony and the rear section over the bathroom area. The builder had found and repaired damage to the roof which were maintenance matters and the body corporate ’s responsibility. 55. The builder SG provided a report dated 8 August 2012 which contained the following relevant information: 25/6/12 Works carried out  Cut away excess pointing which was damming a build up of water where flashing meets the gutter. Removed excess water and repaired same. 9/7/12 Case No: 290139 Determination Page 8 of 13  A manhole was cut in the bathroom of the Applicant’s unit to allow an internal inspection of the roof space.  A plumber traced a pipe found in the roof cavity which was old and disconnected.  The plumber identified a stink pipe running through the eaves up through the roof tiles was leaking. Lead flashing around the pipe was causing damage to the eave and bathroom wall within the Applicant’s unit. 12/7/12  The lead flashing around the pipe was removed and replaced.  4 roof tiles were replaced 3/8/12  All bedding and pointing was removed from the valley directly above the Applicant’s front bal cony. The report stated: “It is our view that the roof repairs have been completed in a manner which meets the Australian Roof and Tiling standards. This should now eliminate an ongoing leak that was occurring through the extended eaves to [Applicant’s unit] balcony area. : 56. On 3 August 2012, the builder SG carried out an inspection of the resultant damage to the internal parts of the Applicant’s unit. The builder provided a scope of works which included damage to the following areas:  Kitchen - internal damage to walls and ceiling  Bathroom – removal, re-instatement of manhole, water damage.  Lounge room – ceiling, ornate cornice, wall above fireplace.  External eaves – front above balcony and rear above kitchen and bathroom.  Rear eaves.  Hallway – ceiling, delaminating paint, texture finish.  Common area – corridor ceiling. 57. The Builder SG made the following comments in relation to the external eaves and hallway ceiling:  External eaves above front balcony and above kitchen and bathroom “60 -70 years the building has been up the timber eaves to the property which has moved and changed shape due to general wear and tear. The timber is still in good and sound condition with front eaves only requiring some preparation before being repainted.”  Rear eaves “Have suffered d amage beyond repair. Section of eaves in and around the stink pipe will require removal and replacement. In order to carry out this work Case No: 290139 Determination Page 9 of 13 a scaffold will have to be erected. Unfortunately we can’t use the machine due to the location.”  Hallway and bedroom ceilings “We were shown the hallway ceiling whilst on site but it is our opinion that the delaminating of the ceiling is due to age and wear and tear and not consistent with water damage. An inspection of the bedroom ceiling is also beginning to show signs of delaminating. Again this is due to the long ter m wear and tear.” 58. The Applicant commissioned a water restoration technician ‘CFS’ to provide a water damage assessment. The A pplicant’s unit was examined on 22 August 2012 and the consultant’s report contained the following relevant information.  The internal building appears to be dry with the exception of the hard plaster on the north side wall of the bathroom.  The hard plaster in the lounge room next to the heater registered a lower level of moisture.  It is highly probable the moisture in the bathroom represents damage that has resulted from the issues identified by the assessor who inspected the roof. This is further supported by the eave outside the bathroom and kitchen being rotted as an outcome of water damage.  Although the roof has been repaired there are still damp walls that have not been returned to a dry state. Nor has the rotted eave shared by the kitchen and bathroom been replaced.  If the moisture issue is not attended to urgently further secondary damage in the form of delaminating, mould or mildew could result in the bathroom.  To address the internal bathroom water damage, Airmovers and a dehumidifier should be used to dry the wet surfaces and draw moisture out of the effected environment. The eave outside the bathroom should also be replaced.  Some areas on the ceiling in the hallway, main bedroom and lounge show signs of delamination. These surfaces are now dry but it is highly probable that the delaminating could be the result of past water damage that has occurred due to identified issues with the roof and valleys. It is not possible to prove or dispute this high probability. Summary 59. It is established law that when making a claim under an insurance policy the responsibility rests with the policyholder to establish on the balance or probabilities that the claim falls within the cover provided by the policy. 60. When this has been established an FSP relying a clause in the policy to deny the claim has the burden of establishing on the balance of probabilities that the terms of the relevant clause apply to defeat the claim. Case No: 290139 Determination Page 10 of 13 61. The Applicant is the owner of a unit forming part of a body corporate. The claim for damage which occurred in December 2011 and January 2012 falls under a policy issued by the FSP covering the building owned by the body corporate. 62. The body corporate has appointed a manager (referred to in this Determination as the Manager) to provide a number of services to the body corporate 63. According to the FSP the Manager has been appointed as an agent for the FSP and that this appointment relates to arranging insurance cover. The manager has no authority in relation to insurance claims. 64. Any issues arising from ongoing maintenance to the insured property are a matter for which the body corporate is responsible and in turn the Manager subject to the terms of the agreement between the body corporate and the Manager. As such the FSP cannot be held accountable for any delays in attending to the maintenance issues, in this matter to the roof of the premises. 65. However, in January 2011, being contemporaneous to lodgement of the claim, the FSP advised the Applicant to direct all her enquires in relation to her claim to the builder SG or the body corporate Manager. In doing so the FSP has abrogated its responsibility for management and conduct of the claim to the builder and the body corporate manager. 66. The builder DG was appointed by the Manager to carry out any ongoing maintenance to the roof. In this case, the Manager and the builder were charged with the responsibility to both manage the claim and to rectify any issues regarded as maintenance. Such an arrangement has the potential to blur the issue s relevant to the Applicant’s claim. 67. In this matter, the damage was reported in December 2011 and January 2012. Although repairs to the eave above the balcony were effected in January, the Applicant again reported the ingress of water in this area in February. 68. It was not until July 2012 that the problem with the roof leaking in the vicinity of the Applicant’s unit was corrected. In my opinion a period of seven months to correct this issue appears excessive. During this time the internal damage to the Appli cant’s unit was left in abeyance. 69. In June 2012 a cash settlement of $7,898 was offered to the Applicant. However, the offer excluded damage which the Applicant argued was covered by the policy. As such, the claim had not been resolved and the offer was ineffective in achieving an outcome acceptable to both parties. 70. In any event the offer was made about six months after the loss was reported. It is now about 13 months since the damage was reported and the accepted damage remains unrepaired. Case No: 290139 Determination Page 11 of 13 71. A review of copies of emails submitted to FOS, reveal the Applicant was in constant communication with the FSP, the builder SG and the Manager over the issues concerning her. Due to her inability to have repairs effected to the roof or to the eaves, the Applicant contacted FOS on 5 July 2012. In her submission the Applicant stated (in part): “In the mean time, I’m being told that I just have to wait if and/or when the repairs to the roof are going to be carried out and no one seems to care about the water that literally streams down my bath room walls due to the roof and eaves not being repaired.” 72. I accept that it is not practical for an FSP to authorise repairs for insured internal water damage until such time as the cause for the ingress of the water has been located and rectified. However, I am of the opinion that the management of her claim has been such that delays have occurred which have caused the Applicant considerable distress as indicated in her email of 4 July 2012 to the assessor stating that she was “ unable to sleep due to this ongoing fiasco ”. 73. While according to the Applicant she was initially informed by the FSP the eave damage was a body corporate matter and she should take it up with the Manager, (submission to FOS) the FSP now accepts the resultant water damage to the eave falls within the scope of cover provided by the policy. (see letter 23/8) 74. Clause 9.3 (b) of the FOS Terms of Reference provides FOS may decide that the FSP compensate the Applicant for non-financial, loss when an unusual degree of time has been taken to resolve the situation or interference with the Applicant’s expectation of peace of mind has occurred. 75. In so far as the FSP passed management of the claim to the Manager and builder appointed by the manager thus placing responsibility for both maintenance issues and the claim with them, I am of the opinion that a period of about seven months to resolve the roof problems which contributed to the delay in finalising the Applicant’s claim was excessive.. 76. Accordingly in these circumstances, I am awarding the Applicant the sum of $500 compensation for what I regard to be an unusual degree of time taken to resolve the situation. Internal damage 77. The builder SG inspected the interior of the Applicant’s unit and provided a scope of works which included rectification of all damage observed. The FSP accepted the damage as described on the scope of works apart from the hallway and bedroom ceilings. 78. The builder SG was of the opinion the delamination of the hallway ceiling was due to age and wear and was not consistent with water damage. 79. SG was also of the opinion the signs of delamination on the bedroom ceiling was due to long term wear and tear. Case No: 290139 Determination Page 12 of 13 80. On the other hand the water damage restoration technician commissioned by the Applicant was of the opinion that it was highly probable that delamination on the ceilings in the hallway and bedroom could be the result of past water damage. 81. The evidence thus contains contradictory opinions. However the technician acknowledged that it was not possible to prove or dispute his opinion. In the absence of any acceptable evidence to support the basis for the technicians opinion, I am persuaded the builder SG’s report may be relied on. There is no evidence of water penetration to the hallway or bedroom of the Applicant ’s unit arising from the events giving rise to the claim. Additionally, while delamination may occur as a result of water penetration, it also may occur due to age and gradual deterioration. 82. The policy will not pay for loss or damage caused by wear or gradual deterioration. 83. Accordingly I consider the FSP has discharged the onus that rests with it to show the damage to the hallway and bedroom ceilings does not fall within the cover provided by the policy. 84. The FSP has accepted the damage to eaves falls within the scope of cover provided by the policy. 85. The Applicant incurred a fee of $400 for the water assessment report. The report was obtained as a result of the Applicant’s concerns with ongoing water problems to her unit as late as June which had not been resolved. The report involved an analysis of the moisture content in areas of the Applicant’s unit and included recommendations as a result of these readings. 86. Clause 9.4 of the FOS Terms of Reference provide that FOS may decide that an FSP contribute to professional costs incurred by the Applicant in the course of the dispute. 87. In my opinion, the appointment of the technician in the circumstances was reasonable. 88. Accordingly, pursuant to clause 9.4 of the Terms of Reference I consider the Applicant is entitled to reimbursement of the fee incurred by her for the water assessment report. Determination 89. For the reasons expressed above and having regard to the available evidence I determine: a. The FSP’s liability for the internal damage to the Applicant’s unit is limited to the kitchen walls and ceiling, bathroom walls and ceiling, manhole, lounge room ceiling and external eaves, all as described in the scope of works prepared by the builder SG. Case No: 290139 Determination Page 13 of 13 b. The FSP is not liable for rectifying damage to the hallway or bedroom ceiling. c. Pursuant to clause 9.3 of the Terms of Reference the FSP is to pay the Applicant $500. d. Pursuant to clause 9.4 of the Terms of Reference the FSP is to reimburse the Applicant the $400 fee incurred for the water assessment report.