Text of the determination
Case No: 289912 Determination Page 1 of 9
Case number: 289912
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Claim Amount - Service - Delays
13 September 2013
Background
1. The Applicant held a home building and contents insurance policy with the
Financial Services Provider (FSP) from 6 August 2010 and the policy was
current at the time of the loss.
2. On 31 March 2011, the Applicant lodged a claim with the FSP for damage
sustained to the property as a result of Cyclone Yasi on or around 3
February 2011.
3. The FSP accepted the Applicant’s claim for water damage sustained to the
internals of the property. However, it refused to replace the entire roof on the
grounds the roof had not sustained any cyclone damage and the gap
between the truss and battens was a result of wear and tear, gradual
deterioration and building defect for which cover is excluded under the
policy.
4. The Applicant remains unsatisfied with the FSP’s assessment of th e roof and
expects the FSP to replace the entire roof.
Summary of Applicant’s position
5. The Applicant says she had lived at the insured premises for over six years
and has not had any issues with water entry until after Cyclone Yasi.
6. The Applicant is not satisfied with the FSP appointing its builder, “ TM ”, to
conduct a final inspection (end of 2012) and then reneging to accept TM’s
appointed contractor, “J’s” findings, that the entire roof had sustained
cyclone damage and required replacement.
7. She relies on the builders’ findings that the entire roof of the property
requires replacement, as it had sustained damage (batten uplift), as a result
of Cyclone Yasi.
8. The Applicant is not satisfied with the delays caused by the FSP and says
she has been inconvenienced, has been in distress and has missed out on
Determination
Case No: 289912 Determination Page 2 of 9
job opportunities in line with her plan to rent the home and relocate. She has
also suffered emotional and financial stress.
Summary of FSP’s position
9. The FSP relies on its experts’ evidence the roof of the insured property has
not sustained any cyclone damage.
10. The FSP says the issues relating to the gap between the battens and truss is
related to wear and tear, graduation deterioration and structural
issues/defects and not related to Cyclone Yasi.
11. The FSP is willing to undertake works in accordance with the Applicant’s
recently appointed engineer, “A’s” , recommendations.
12. The FSP apologises for the delays caused during the claims process and
explains the delays were unavoidable due to the catastrophic event and
unavailability of resources.
13. The FSP says the policy wording referred to in its Notice of Response to the
Service is incorrect. The Product Disclosure Statement, which was
presented with the Notice of Response, is the one applicable to the
Applicant’s c laim.
Issues
14. Whether the FSP should replace the entire roof of the Applicant’s property.
15. Whether the Applicant is entitled to receive compensation.
Reasons for decision
16. Due to the nature of this dispute, FOS has considered it appropriate to
expedite the dispute in accordance with the Operational Guidelines to the
FOS Terms of Reference. This dispute has not been the subject of a FOS
Recommendation and has proceeded directly to Determination.
17. I am satisfied a full exchange of information has taken place between the
parties and each party has had the opportunity to address any issues raised.
18. I consider the FOS Terms of Reference (TOR) relevant to this dispute are:
“ 9.3 Other compensation
a) Subject to paragraph 9.3 c) and paragraph 9.7, FOS may decide that the
Financial Services Provider compensate the Applicant for consequential financial
loss or damage up to a maximum amount of $3,000 per claim made in the
Dispute.
Case No: 289912 Determination Page 3 of 9
b) Subject to paragraph 9.3 c) and paragraph 9.7, FOS may decide that the
Financial Services Provider compensate the Applicant for non-financial loss but
only where:
(i) an unusual degree or extent of physical inconvenience, time taken to
resolve the situation or interference with the Applicant’s expectation of
enjoyment or peace of mind has occurred; or
(ii) in the case of a Dispute pertaining to an individual’s privacy rights –
injury has occurred to the Applicant’s feelings or humiliation has been
suffered by the Applicant.
The maximum amount of compensation for non-financial loss will be $3,000
per claim made in the Dispute.
c) Notwithstanding paragraphs 9.3 a) and b), FOS will not provide compensation
for:
(i) consequential financial loss; or
(ii) non-financial loss,
in a Dispute arising as a result of a claim on a General Insurance Policy that
expressly excludes such liability.
d) The cap on liability in paragraph 9.3 a) does not in any way restrict FOS’s
ability to make an interest award under paragraph 9.5.”
Roof replacement
19. The onus of proof rests on the Applicant to establish, on the balance of
probabilities, she has suffered a loss caused by an insured risk. Once the
Applicant has established the loss was caused by a risk insured under the
policy, the onus then shifts to the FSP to show on the balance of
probabilities, the loss falls within an exclusion clause in the policy.
20. Accordingly, the onus first and foremost remains with the Applicant to
establish the entire roof of the property had sustained cyclone damage.
21. The Applicant has not raised any concerns regarding receipt of the policy
documents and in the circumstances, I am satisfied the FSP has fulfilled its
obligations of informing her of the terms and conditions of the policy.
22. I note the Applicant appointed builder, “ TC ”, to inspect the property, after the
cyclone event and in his report dated 5 April 2011, he recommended the
entire roof of the property be replaced, as below:
“A roof inspection was carried out to inspect damages from cyclone Yasi.
Water had entered through the screws causing damage onto some ceilings
inside.
I inspected the roof cavity to see if any battens had lifted due to strong winds
and uplift from the cyclone. I found majority of the battens had lifted leaving a
separation from the batten to the truss. Back when the house was built the
code was to nail the battens to the truss, this has been compromised due to
the strong winds from Yasi. To rectify the damage caused full replacement of
Case No: 289912 Determination Page 4 of 9
the roof will be needed so we can batten screw the battens down to the
trusses and bring the roof upto the current standard.” (sic)
23. Subsequent to receiving the above report, the FSP appointed building
consultant, “ C ”, to investigate the roof of the insured property and his
findings (dated 25 May 2011), are listed below:
He did not agree with TC’s findings that the moisture had entered
through the screws because if this was the case, he expected random
moisture staining to be evident to most ceilings throughout the
residence.
The roof covering was in a satisfactory serviceable condition and he
was unable to identify a storm created opening.
The moisture ingress in the kitchen area had occurred via the Perspex
dome due to maintenance issues. He was of the opinion if this damage
had occurred due to impact, the dome would have been made available
for inspection.
The minor moisture staining to the north-east bedroom ceiling and
cornice was a result of moisture ingress through the roof covering as a
result of wind driven moisture penetrating through the hip capping and
roof sheet juncture. There was no evidence of previous or recent
impact damage to the roof covering.
The gap between the battens and the truss top-chords was a result of
material shrinkage (both truss and batten) and not as a result of batten
uplift. The roof timber was made of green timber (without natural or
mechanical drying and unseasoned hardwood) that can shrink up to
10%.
24. A file note from C dated 27 May 2011, in response to TC’s report states:
“I agree that the battens have been fixed with nails however the Report fails to
disclose that the battens have also been strapped to the roof frame with
proprietary metal “batten straps” and in an acceptable pattern across the roof
area.
...
The Report also neglects to discuss the aspect of material shrinkage.
...
and in my opinion the material shrinkage is the only cause of the gapping.
...
It is fact that the roof frame has not sustained damage as a result of batten
uplift and therefore removal of the roof covering is not required for the
purpose of securing the roof battens to the roof frame.
It is my opinion that the roof sheeting and cappings are in a satisfactory
condition and as there has not been any impact damage as a result of the
Storm Event to the roof sheeting, then replacement of the roof sheeting is not
warranted.” (sic)
Case No: 289912 Determination Page 5 of 9
25. The FSP then appointed an engineer, “ N ”, whose findings (dated 30 August
2011), are below:
The separation (gaps) between the hardwood trusses and battens
made of green timber was a result of material shrinkage and warp due
to age and high moisture levels.
He did not notice batten lift throughout the roof and was of the opinion
the gap in the truss/batten connections was not as a result of the
cyclone.
Water had leaked into the kitchen ceiling via the flashing to the skylight
dome.
Water leak in one corner of the ceiling in the rear bedrooms was a
result of the water entry via roof screws with cyclone caps. The leak
was a result of the seal under the cyclone caps hardening with age and
not related to the cyclone event.
Water penetration may occur via an unidentified source which was not
visible at the time of the inspection.
26. Subsequent to the above findings, the FSP authorised repairs on 8
September 2011, with its builder, TM. Further repairs were authorised to the
manhole cover in the residence, on 18 November 2011.
27. I note TM re-screwed the loose screws as suggested by N and at that time
raised concerns with the Applicant that this may not arrest the water leaking
issue.
28. The Applicant says the building works were completed by 1 January 2012
and the roof leaked at the same location in the bedroom, on or around 17
March 2012.
29. The Applicant contacted the FSP in relation to the new damage and the FSP
refused to accept cover. The Applicant says TM inspected the property, on
or about 27 April 2012 and recommended the entire roof to be replaced.
30. The FSP appointed another engineer, “ MM ”, (from the same company as N),
to conduct further investigations and his findings of 25 May 2012, are below:
The area of concern was the rear left (northwest) corner of the house
where water marks was observed on the underside of the plasterboard
ceiling.
Significant rain in the form of gusty showers had preceded the
inspection for 48 hours.
No water was found in the roof space or water marks on the framing
from the r ecent rain, “it appears leak only occurs in abnormal
conditions”.
He ruled out the issue with leaking screws as he did not observe screw
penetration due to capillary action.
Case No: 289912 Determination Page 6 of 9
It appeared the water is entering the truss and running towards the side
of the sheet. As the plasterboard had not deteriorated significantly he
considered the leak to be minor.
He considered the roof pitch to be relatively flat for a hip style roof and
believed the water spray was driven along the roof up under the
flashing and into the roof space during windy conditions.
He believes the issue could be avoided by providing wide flashing to
the barge and hip over the existing flashing.
31. TM was not satisfied with MM’s proposed scope of works and expressed his
views on 27 September 2012, as follows:
“In mid March 2012 I was contacted by [Applicant] and was advised that after
recent heavy rains had occurred water damage to the plasterboard ceiling of
the master bedroom (northeast corner) was visible.
This was of great concerns to me as I had previously voiced my concerns to
[FSP] about the limited repairs [TM’s company] were authorised to carry out in
direct relation to this area of concern.
...
After a thorough inspection of the ceiling space and roof area, I was unable to
identify the point of entry allowing water ingress to the ceiling space in the
vicinity of the water damaged plaster board.
I informed the insured of my concerns in relation to this problematic section of
the roof and that I was of the opinion that this section of roof should be
replaced with new to ensure water tight integrity.
...
I was contacted by the insured and informed that an engineer was been
arranged and she requested that I attend. I made myself available and on or
about the 25th May 2012 I met with the engineer at the residence and
together we conducted a thorough inspection.
Once again both the engineer and I were unable to identify the cause of the
leak.
...
I am of the opinion that these recommendations to provide a wider flashing to
the barge and hip area are sound, although this will not identify the cause or
guaranty to fix the problem and prevent further damage.
From Builders prospective it is my recommendation to remove the section of
sheet metal roofing and associated capping and flashings in the vicinity of the
leak to identify the cause of the leak, carry out repairs as required and relace
the removed section with new to match existing. Carry out required repairs to
the damaged section of water damaged plaster board and paint.” (sic)
32. Based on the above suggestion and the discussions with the Service and the
Applicant, by the end of 2012, the FSP agreed to pay for TM’s investigation
costs, to the leaking section of the roof, over the bedroom.
33. It was agreed by the FSP that if the cause of the damage was related to
Cyclone Yasi, it would pay the cost of roof replacement of this section and if
Case No: 289912 Determination Page 7 of 9
the cause was not related to the cyclone, the Applicant was to pay for the
repair/replacement of same.
34. In any event, the FSP agreed to pay for the internal damage sustained to
this section of the property, whether the roof damage was related to Cyclone
Yasi or not.
35. TM then appointed builder, “ J ”, to complete the recommended investigations
and J’s report dated 27 January 2013 , is below:
“ On inspection of the dwelling I found water has been penetrating the roof
through in several areas, mainly In the North East hip area, but also the
Northern section and the Eastern side as well.
The roof has sufficient lap lifting damage over the majority over all sections,
there is enough stretching of the sheet laps to allow water penetration in any
weather events.
There is evidence of water damage to the plaster board, inside the ceiling
space, under the damaged roof sheet areas that are previously mentioned.
The insured has stated that this damaged has occurred after the Cyclone Yasi
event, I believe to the best of my knowledge that this is to be true.
The following is a scope of works recommended to repair the damages.
1 – Patch and paint approximately 20m2 of plaster board ceiling in bed room
2 – Remove dispose and replace the entire Trim deck roof approximately
220m2
Includ ing all ridge caps and flashings” (sic)
36. Upon receipt of the above findings, the FSP authorised TM to replace the
roof but on the same day, the FSP withdrew the authority, stating the entire
roof did not require replacement.
37. The Applicant by this time was very unhappy because the FSP had failed to
abide by its own conditions, stipulated by the end of 2012, that it would
accept the replacement of the roof, if this inspection (by TM/J), found the
damage was related to Cyclone Yasi.
38. Subsequently, the Applicant appointed her own engineer A and the FSP is in
agreement to complete the works recommended by A. The FSP has also
agreed to reimburse the Applicant for A’s s ervices . The following is from A’s
report of 2 August 2013:
“ 4 Conclusion and Recommendations
...
Based on our observations and review of available information, it appears that
the repair works completed over the main bedroom have not yet addressed
the reported leaking, and a clear and distinct source of the leak has not been
able to be identified by us or by other parties that visited and inspected the
property.
In order to address this issue in a manner that would allow for a meaningful
warranty for repairs to be issued, we recommend that a registered and
suitably qualified builder or roofing contractor is engaged to undertake the
Case No: 289912 Determination Page 8 of 9
scope of work as discussed below. The area has been defined by considering
existing roof sheet lap locations, and represents approximately 15% of the
building’s total roof plan area.
...
In our opinion, the remainder of the roof cladding and flashing appear
generally in a sound condition, having regard for the age of the property and
the observations regarding roofing screws, local corrosion and rib indentation,
as defined earlier in our report.”
39. Considering the varying reports from the experts and the delays caused by
the FSP, the Applicant requested a final determination from the Service.
40. I note that N had initially identified the water entry had occurred via the roof
screws. However, MM has subsequently ruled out this to be the cause of the
water entry. TM was unsure the scope of works proposed by MM would
arrest the current issue relating to water entry.
41. The fact remains, none of the experts were able to identify the source of the
leak. I note that TM and A had similar views, that the section of the roof over
the bedroom area with water damage, should be investigated and replaced.
42. Considering the recent findings and yet an other expert’s (A) inability to
locate the source of water entry, the FSP has now agreed to comply with the
scope of works as recommended by A, which includes the replacement of
the roof over the bedroom section. I am therefore satisfied the FSP should
com ply with A’s recommendation and scope of works in replacing the
selected section of the subject roof.
43. In regards to the Applicant’s request that the entire roof be replaced in
accordance with TC’s and J’s findings that the roof battens had suffered
uplift due to heavy winds, I note C, N, MM and A, are of the view the gaps
are a result of material shrinkage of the roof timber (greenwood).
44. Furthermore, A considered the cyclonic winds which passed the Applicant’s
property would not have generated such force as to cause the damage
noted and he attributed this issue to material shrinkage of the roof timber.
45. Therefore, I am not satisfied the remaining sections of the roof had sustained
batten uplift as a result of Cyclone Yasi and I am persuaded by the findings
of C,N, MM and A in this regard.
46. The policy covers ‘damage’ to the Applicant’s property and the word
‘damage’ is defined as ‘physical loss, damage or destruction’. Since the
remaining sections of the roof have sustained damage (shrinkage of timber
over time, has created wider gap between the truss and batten), the
Applicant would have established a prima facie claim under the policy.
47. However, I am of the opinion the policy exclusions in relation to wear, tear,
gradual deterioration, defects in structure and material used would apply to
the claim, allowing the FSP decline liability for the Applicant’s claim for the
remaining sections of the roof.
Case No: 289912 Determination Page 9 of 9
48. Therefore, the FSP is not required to replace the remaining sections of the
roof.
Compensation
49. The Applicant has raised concerns regarding the delays caused by the FSP
in assessing the claim and the resultant emotional and financial stress and
distress she had suffered.
50. The FSP says the Applicant should not be entitled to compensation because
her engineer A’s findings , are similar to the FSP’s proposed works.
51. I do not agree. The fact remains the FSP initially agreed to investigate the
cause of the loss but did not agree that it would reimburse the Applicant for
the replacement cost of the selected section of the roof.
52. In regards to the delays, I accept the initial delays in claim assessment were
due to the catastrophic event and issues relating to sourcing trades and
experts. However, I do not accept that the explanation can be applied to the
delays caused by the FSP, since the recurrence of the leak, in March 2012.
53. I have carefully reviewed the outline of events and comments presented by
the Applicant, which the FSP has not rebutted and I am satisfied the
Applicant has suffered an unusual degree or extent of physical
inconvenience due to the time taken to resolve the situation and that
interference with the Applicant’s expectation of enjoyment or peace of mind,
has occurred.
54. Accordingly, pursuant to paragraph 9.3b)(i) of the Terms of Reference, I
determine the FSP shall pay $1,000, as compensation to the Applicant.
Determination
55. On the basis of the available information, I determine the FSP should
replace the selected section of the roof, in accordance with engineer A’s
proposed scope of works.
56. The FSP should reimburse th e Applicant for the cost of A’s services.
57. The FSP is not obliged to replace the remaining sections of the roof.
58. The FSP is to pay $1,000, as compensation to the Applicant.