Home / Financial Firm (Unknown - Insurer) / Determination 289357

Determination 289357

Flood exclusion denial of water tank and workshop floor damage

FirmFinancial Firm (Unknown - Insurer)
Decided2013-04-10
ProductGeneral Insurance · Business / commercial
OutcomeFor the complainant
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The farm owner's claim for flood-related damage to a workshop floor and concrete water tank was denied under the flood exclusion. The Panel found the damage was caused by sheet flow before river flooding, within cover, and ordered the claim settled with interest from the denial date; no amount was stated.

Damage caused by stormwater sheet flow before river overflow is not excluded as flood under the policy definition, and the insurer must cash settle with interest.

Issues

Subjects and remedies

natural disasterpay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 289357 Determination Page 1 of 5 Case number: 289357 General Insurance - Small Business/Farm Insurance - Commercial Property - FSP Decision – Flood - Claim amount 20 March 2013 Background 1. The Applicant owns and operates a rural property in the Charlton Victoria district. Some improvements and machinery on the property are insured by two insurers: the Financial Services Provider (FSP) and another insurer. 2. On 13 January 2011 the property was inundated by water following intense rainfall in the area causing damage to the dwelling, contents of the dwelling, machinery and farm buildings. The Applicant lodged claims with both FSPs for damage to property insured by the policies held by each FSP. 3. This matter involves a dispute arising from water damage to the concrete floor of a workshop and a 5,000 gallon concrete water tank. 4. The FSP denied the claim on the ground the damage was a result of the Avoca River overflowing and as such was excluded form cover provided by the policy. The FSP accepted the claim for damage to the machinery shed sliding door. Summary of Applicant’s position 5. The Applicant disputes the FSP‟s denial for the following reasons:  The home is located at the northern end of the property and is about 149m above sea level. The sheds where the damage occurred are 147- 148m above sea level.  It has been accepted that 50mm of rainwater entered the dwelling. The water then ran down the slope and was captured in the sheds and banked up against the walls. The level of water in the sheds was above the level of his gum boots being about 500mm.  The damage claimed is for water runoff in a direction away from the river.  The shed and the slab were at an easterly aspect.  The force of the water came from the east. The Avoca River is to the western side of the property. Determination Case No: 289357 Determination Page 2 of 5  The assessor‟s photographs showing the damage are geographically correct in that the top of the page is north. This shows the gouging effect that was behind the water.  The water tank photo clearly shows the sand base of the tank was eroded by water from the same direction.  The force of this water caused concave destruction to about 150mm to the base of the tank and flooring in the shed to about 250mm.  The photographic evidence shows the direction of flow, depth and force of the water. Summary of FSP’s position 6. The FSP refers to and relies on a hydrological report commissioned by it to argue the cause for the damage to the water tank and workshop floor was „flood‟ and therefore excl uded from cover. 7. The FSP relies on the following policy terms: “ Words with special meaning ... “Flood” means the inundation of normally dry land by water escaping, or being released from the normal confines of a reservoir, natural watercourse or lake, (whether or not they have been altered or modified). ... ... Section A – Farm Property Cover ... What you are not insured for 1. Flood ...” Issue 8. Whether the FSP was entitled to deny liability for damage to the water tank and workshop floor. Reasons for decision 9. Due to the complex nature of this dispute, FOS has considered it appropriate to refer this dispute to a Panel in accordance with the Operational Guidelines to the FOS Terms of Reference. The dispute has not been the subject of a FOS Recommendation and has proceeded direct to Determination. 10. The decision has been made by a Panel consisting of an Ombudsman, a representative with extensive experience in the insurance industry and a representative with extensive experience in consumer claims. Case No: 289357 Determination Page 3 of 5 11. On 21 February 2013, the Panel Chair Ombudsman attended on site where he met with the Applicant and a representative of the FSP. 12. There has been an exchange of material between the parties. Each party therefore is aware of the issues and has had the opportunity to respond. 13. Prior to arriving at a determination, the Panel has read and considered all the material submitted by the parties. The policy 14. For the sake of good order it is appropriate to comment on the currency of a policy insuring the damaged property claimed by the Applicant. 15. In its submission to FOS, the FSP stated a policy covering the damaged property claimed had not been issued, notwithstanding the Applicant had sought a quote from its representative. 16. Following a number of communications between FOS and the par ties, the FSP acknowledged a policy covering the damaged property had been issued and was current at the time of the loss. 17. The Panel will therefore proceed to determine the issues relevant to the dispute. The claim 18. It is common ground between the parties that flooding in the general area occurred on or about 13/14 January 2011, following intense rainfall. 19. The hydrologist commissioned by the FSP carried out a site specific assessment of the Applicant‟s property and provided the following relevant information:  “The owner stated that water started to enter the house around 8am on the Friday morning. Based on detailed hydraulic modelling of the site the following details can be ascertained:  The main flood wave from the Avoca River broke out south of the township of Charlton reaching the town late on the afternoon of the 14 th January  The predominant method of flooding of this property was from the Avoca River flows reaching the property late on the afternoon of the 14 th January.  This far south of town (the Appli cant‟s property) the breakout from the Avoca River was much earlier in the day, between 8am and 10am.  Rainfall was heavy in the area and significant sheetflow off the “Gower” Range would have occurred early in the morning.  Detailed mapping of the flood modelling can be seen in Figure 8-3. From this it can be seen that up to 50mm of sheet flow depth is possible in the morning. It is likely that the actual depth entering the residency was lower than this, but Case No: 289357 Determination Page 4 of 5 50mm gives a reasonable level of certainty (subject of a dispute with another insurer).  Flood depths above this 50mm were a result of overflows from the Avoca River. i. The damage associated with the scour hole in the workshop to the west of the house is clearly associated with high velocities and stream powers. This is not possible through sheer runoff and is clearly associated with the river flows. ii. The damage associate with the 5000 gallon concrete tank is associated with higher stream powers and would not be possible from sheet flow associated with the storms and is again clearly associated with river flows. iii. The damage to the shed door is less clear, and could not be commented on without detailed modelling and structural evaluation of the door failure mechanism” . 20. The hydrologist concluded:  “The predominant cause of flooding on site was a result of elevated flows in the Avoca River breaking out south of the township and making their way through the property. Flooding occurred at least 12 hours after any significant rainfall.  Some flooding of up to 50mm may have been experienced on site earlier than the Avoca flows. This flooding was associated with storm water sheet flows across the area” . 21. The hydrologist refers to up to 50mm of sheet water at the site. The hydrologist also confirms significant sheet flow off the “Gower” Range, early in the morning. 22. Further, according to the hydrologist, water from the Avoca River would have reached the Applicant‟s property late in the afternoon. Hence sheet water was flowing over the site for a considerable period of time before the river water reached the property. 23. In addition, the Panel Chair Ombudsman noted the ground level at the house is about one metre higher than the ground level where the workshop is located. As the sheet flow was moving from the direction of the house to the workshop and down a gradient it is reasonable to conclude the water had more momentum at the time it arrived at the workshop than it would otherwise have by travelling on flat ground. 24. Thus it is reasonable to conclude that the water which entered the workshop and surrounded the water tank would have been moving faster than had it been covering flat ground and for some hours before the arrival of the river water. 25. The Panel Chair Ombudsman noted that of significance, the damage to the concrete slab of the workshop is at the eastern end of the workshop, that is, the end from which the sheet flow of stormwater runoff arrived. It is also the opposite end of the workshop to that nearest the Avoca River. Case No: 289357 Determination Page 5 of 5 26. The Panel Chair Ombudsman also noted that the workshop slab is surrounded by fine coarse sand and that the concrete tank had been sitting on a bed of the same fine coarse sand. 27. Having considered all of the evidence and given the significant sheet flow through the property and the location of the damage to the concrete slab (the opposite direction to the Avoca River) the Panel is satisfied that the sheet flow built up in the area of the eastern wall of the workshop and washed away the fine coarse sand in that area. As a result of the fine coarse sand being washed away the underpinning of the concrete slab was compromised and the resultant damage occurred. 28. Accordingly, the Panel considers on the balance of probabilities that the damage to the concrete slab of the workshop falls within the cover provided by the policy. 29. While the hydrologist considered it would not be possible for the sheet flow to cause the damage claimed to the water tank, his report makes no reference to the material on which the tank rests. The Applicant refers to the base being „sand based‟. The Applicant also refers to the sand base erosion being in the same direction as the water flow. 30. Given the period of time the sheet water was flowing around the tank before arrival of the river water, the momentum of that water and the sandy base, the Panel is persuaded that the erosion was initially caused or contributed to by the sheet water with the river water exacerbating the process. 31. Accordingly the Panel considers on balance the damage to the water tank also falls within the cover provided by the policy. Determination 32. On the basis of the available information the Panel determines that the Applicant is entitled to be covered for his loss in respect of both the concrete slab of the workshop and the concrete water tank, within the terms of the policy. 33. In the event the FSP elects to cash settle the claim, pursuant to section 57 of the Insurance Contracts Act 1984 , the FSP is to pay interest on the sum payable from 1 May 2012, being the date on which the claim was denied, to the date of payment.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.