Text of the determination
Case No: 289281 Determination Page 1 of 8
Case number: 289281
General Insurance - Small Business/Farm Insurance - Commercial Property -
FSP Decision - Claim amount
20 March 2013
Background
1. This matter involves a dispute in relation to water inundation of a property
located in the Charlton District, Victoria area following intense rainfall on
about 13/14 January 2011.
2. The property is insured under separate policies vesting in different (although
related) named insured parties within a Rural Plan issued by the Financial
Services Provider (FSP).
3. The cover is as follows:
I. Insured “IJW”. Farm property damage policy. Insuring Farm
Buildings, Other Property, Unspecified Farm vehicles, and Fencing.
II. “A&RW”, Classic home policy, Building $245,161 and Contents
$60,236.
III. “A&RW” Standard home policy. Building $295,440.
4. Damage caused by flood as defined is excluded from the cover for all
contracts apart from the Classic home policy which provides cover for
damage caused by flood up to $20,000.
5. On 14 January 2011 the Applicant informed the FSP that the home and
contents had been damaged by flood on 13 January 2011.
6. Based on hydrological reports commissioned by it, the FSP accepted water
inundation to a level of 50mm in the home was stormwater runoff and any
damage caused by this water was covered under the Classic home policy
and Farm property cover. The FSP considered any inundation above this
level was flood water as defined by the contract and any damage from this
water was excluded under the policies.
7. Following assessment of the damage the FSP made the following payments:
$20,000 – maximum flood damage cover under the Classic home
policy.
Determination
Case No: 289281 Determination Page 2 of 8
$10,233.50 – for damage to the home building under the Classic home
policy.
$31,100 – for damage to the home contents under the Classic home
Policy.
$9,317.93 – for damage to the farm property under the Farm property
damage policy.
8. The Applicant contends that due to the topography of the land, the damage
caused by runoff rain water was more extensive than allowed by the FSP
and seeks a further payment of $83,681.
Summary of Applicant’s position
9. As there are a number of different insureds named in the Rural Plan,
reference in this Determination to the Applicant will include all the named
insureds in so far as the issues relate to the property.
10. The stormwater which entered the property came from the east flowing
toward the river which is to the west of the property. This water peaked
between 7.30am to 8.00am on 13 January 2011.
11. The flood water arrived at 12 noon to 12.30pm and peaked at about 7.30pm
to 8.00pm on 13 January 2011. The flood water which came later in the day
was higher than one metre.
12. The dispute is over the water which the hydrologist stated was sheet flow to
50mm over the floor of the house, sheds and farm yard.
13. This land is not flat. The house is 149 metres above sea level and the sheds
are about 147.5 metres above sea level.
14. Water in the sheds was over his gum boots which are about 420mm high.
15. The silos are 600mm high and the FSP accepted a claim for water damage
to the grain in the silos.
16. The step into the house is 150mm above ground level and the ground slopes
down to the sheds.
17. Water then flows down a 1500mm slope to the sheds. The offer of damage
to the machinery, cement flooring and shed walls and the like is implausible.
18. He is claiming an additional $83,681 as follows:
House $20,000
Other property $53,000
Farm tools $10,681
Case No: 289281 Determination Page 3 of 8
Summary of FSP’s position
19. The FSP refers to the following policy terms.
“ General definitions applying to words We use in this Plan
Flood means the escape or release of water from the normal confines of a
pond, lake, reservoir, canal, dam or uncovered watercourse.
...
Farm property damage policy
...
The events You are insured against
...
6 wind, rain, hail, snow or escape of liquid
but not from loss or damage:
1. directly caused by Flood
...
What is not insured
This policy does not insure You against
1. damage directly caused by:
...
ii. earth movement (except earthquake) no matter how caused, including
erosion, vibration, subsidence, seepage, saturation, creeping, landslip,
mudslide, collapse, shrinkage. Settling, expansion or heaving
...
Classic home policy
...
The policy does not insure You against:
2. damage directly caused by:
...
iii. Flood, except as described under the additional benefit „Flood cover‟
...
iv. earth movement (except earthquake) no matter how caused, including
erosion, vibration, subsidence, seepage, saturation, creeping, landslip,
mudslide, collapse, shrinkage. Settling, expansion or heaving
v. ...
Additional benefits
...
Flood cover
If “Building” is shown on the certificate of insurance, We pay up to $20,000 for
damage to Your Home directly caused by Flood during the Period of
Insurance arising from the one event.
Case No: 289281 Determination Page 4 of 8
If “Contents” is shown on the certificate of insurance, We pay up to $20,000
for damage to Your Home directly caused by Flood during the Period of
Insurance arising from the one event.
We pay up to $20,000 for all damage to Your Home and Contents at any one
location arising out of the one event.”
20. The FSP accepts the hydrologist “WT‟s” evidence that water inundation to a
depth of 50mm could be attributed to storm or rainwater runoff. However,
any inundation above that level was the result of overflow from the Avoca
River.
21. The FSP acknowledges that the elevation of the shed may be 2 metres
lower than the elevation of the house. However, this does not change the
fact that sheet flow depth of rainwater runoff on the ground was up to 50mm.
In other words the stormwater sheet flows ran across the ground level of the
property up to a depth of 50mm from the ground at whatever elevation the
ground was.
22. The hydrologist confirmed flood water from the Avoca River was the cause
for any inundation above 50mm and may have caused inundation in the
shed to a higher depth than the house due to the manner of the flood water
rising. However, the flow of rain water would have travelled at ground level
which the hydrologist confirmed was to a maximum of 50mm depth
throughout the premises including the home building and shed.
23. The Applicant‟s entitlement under the property damage policy is therefore
limited to damage attributed to water inundation up to 50mm. Any damage
as a result of inundation above this level is not insured.
24. The Applicant‟s claim for damage to “other property” caused by inundation
up to 50mm has been assessed.
25. The assessor confirmed damage to rainwater tanks, workshop floor and
veranda was a result of storm and/or flood water having washed away the
foundations under these areas. As this damage was caused by earth
movement the damage is specifically excluded from the cover. Damage
caused by earth movement is excluded from the cover no matter how
caused.
26. The ride on mower and self propelled mower were excluded from the
settlement as the damage to these items was not caused by the 50mm of
water but was from flood water.
Issue
27. Whether the F SP‟s settlement of the claim was according to the terms of the
policies.
Case No: 289281 Determination Page 5 of 8
Reasons for decision
28. Due to the complex nature of this dispute, FOS has considered it appropriate
to refer this dispute directly to a Panel in accordance with the Operational
Guidelines to the FOS Terms of Reference. The dispute has not been the
subject of a FOS Recommendation and has proceeded direct to
Determination.
29. The decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in the insurance industry and a
representative with extensive experience in consumer claims.
30. The Panel Chair Ombudsman attended on site where he met with the
Applicant and a representative of the FSP.
31. There has been an exchange of material between the parties. Each party
therefore is aware of the issues and has had the opportunity to respond.
32. Prior to arriving at a determination the Panel has read and considered all the
material submitted by the parties.
33. The Applicant is seeking a benefit under the policy and therefore has the
responsibility to establish on the balance of probabilities that he is entitled to
the benefit.
34. The FSP commissioned hydrological reports provided by WT. As these
reports have been exchanged between the parties it is not intended to recite
the detail in full, in this Determination. However, the reports contain the
following relevant information.
Report dated 19 July 2011
Local flooding – Charlton township
The Yeungroon Creek catchment responded to the rainfall more quickly
on Thursday and Friday. At about 8.00am the peak extent of
Yeungroon Creek was reached.
From about 5.00pm the Avoca River rose sharply.
Flooding at the site
The site is about 10km south of Charlton.
At 6.00am (13 January 2011) the owner witnessed sheet flow through
the low areas around the house and into the site sheds and other
assorted farm equipment.
The owner said water started to enter the house at about 8.00am on
Friday morning (14 January).
The main flood wave from the Avoca River broke out south of the town
reaching the town late afternoon on 14 January.
Case No: 289281 Determination Page 6 of 8
The predominate (sic) method of flooding of the property was from the
Avoca River flows reaching the property late in the afternoon of 14
January.
This far south of the town the breakout from the Avoca River was much
earlier in the day between 8.00am and 10.00am.
Rainfall was heavy in the area and significant sheetflow off the “Gower”
Range would have occurred early in the morning.
It is possible up to 50mm of sheetflow depth is possible in the morning.
It is likely the actual depth entering the residency was lower than this
but 50mm gives a reasonable certainty.
Flood depths above this 50mm were a result of overflow from the
Avoca River.
Summary
35. According to the hydrologist the predominant method of flooding of the
property was from Avoca River flows reaching the property in the late
afternoon on 14 January 2011.
36. Based on modelling, the hydrologist established that 50mm of sheet flow
depth was possible in the morning and that it was likely that the actual depth
entering the residency was lower than this but considered 50mm gave a
reasonable level of certainty.
37. Based on this information the FSP accepted liability for damage caused by
water to the level of 50mm in the dwelling and the sheds.
38. The Applicant does not dispute the hydrological evidence.
39. However, the Applicant argues the level of water in the sheds and silos was
much higher than that allowed by the FSP.
40. The Applicant based his argument on the following:
The floor level of the house is 150mm above ground level.
The hydrologist considered 50mm of sheet water entered the house.
The water in the shed during the morning was about 450mm high.
The ground level on which the sheds and silos are located are between
1-2 metres lower that the ground level of the house.
41. The Panel is of the opinion the Applicant‟s argument has merit.
42. The Panel Chair Ombudsman when on site observed the step up to the floor
of the house was approximately 120mm – one brick and one tile in height.
43. Given the floor level of the house was 120mm above ground level and it was
accepted 50mm of surface runoff rainwater entered the house it follows that
Case No: 289281 Determination Page 7 of 8
the FSP has accepted the water level above ground level at the time it
entered the dwelling would have been up to 170mm.
44. Further, the hydrologist reference to the actual depth of sheet water flow of
50mm was to the dwelling only. No reference was made to the water level in
the sheds or silos.
45. According to the Applicant the dwelling is 149 metres above sea level, the
sheds 147.5-148 metres above sea level and land behind the sheds also
slopes down from the sheds. The Panel Chair Ombudsman observed that
the land slopes downhill from the dwelling and past the sheds. As such the
flow of water would be in that direction, that is, towards the Avoca River.
46. The Applicant informed a FOS Case Manager he was in the shed during the
morning inundation moving items above the water. The Applicant advised
the shed had three walls and one open wall. He went on to say the water
had entered the shed and having nowhere to go banked up against the walls
causing the level to rise above the level of his gum boots which are 420mm
high.
47. The Applicant advised that the shed floors were at ground level. This was
confirmed by the Panel Chair Ombudsman, on site.
48. The Panel accepts that the flow of water down the slope would be at a
consistent depth. Nevertheless, it is reasonable to conclude that once it had
entered the sheds, the water would bank up against the shed walls thus
increasing the height of that water in the shed as described by the Applicant.
49. Given that it was not until late in the afternoon that water from the river
entered the property, any water which banked up in the sheds during the
morning must be regarded as surface runoff rainwater.
50. For these reasons the Panel is persuaded that the level of sheet flow water
which entered the Applicant‟s property at about 8 .00am was about 170mm
above ground level and in the sheds was about 450mm above ground level.
51. In these circumstances the Panel considers on balance the Applicant has
established that damage to the shed, unspecified farm vehicles and other
property insured by the policy contained in the shed was caused by water to
the level of 450mm which falls within the cover provided by the policy. In
addition, any damage caused by water to a level of 170mm above the
ground, to unspecified farm vehicles and other property insured by the policy
located outside the sheds falls within the terms of the policy.
52. The P anel has considered the Applicant‟s submission that the FSP paid for
grain lost as a consequence of inundation to a level of 600mm and the FSP
should provide a coverage through the property, to this level.
53. The FSP says that this aspect of the claim was paid in error, but that they
are not seeking recovery of amounts paid.
Case No: 289281 Determination Page 8 of 8
54. In any event, the Panel is satisfied there is no evidence, hydrological or
eyewitness that supports stormwater runoff to the level of 600mm. Further,
the Panel is not satisfied the FSP sho uld be bound by any decision it made
with regard to the grain, in the context of this Determination. For the sake of
completeness the Panel notes the FSP‟s admission regarding the „erroneous
grain indemnification‟ and declares it has no bearing on this Det ermination.
Determination
55. On the basis of the available information the Panel determines the FSP is
liable for:
a) damage to the shed (with the exception of the concrete floor), unspecified
farm vehicles and other property insured by the policies contained in the
shed caused by water to the level of 450mm and
b) damage to unspecified farm vehicles and other property insured by the
policy located outside the shed caused by water to a level of 170mm
above ground.
c) These payments are to be in addition to the $20,000 payment made
under the Classic home cover for flood damage.
56. The Panel is unable to calculate the cost of any additional payment to the
Applicant from the available material. The FSP is therefore to prepare a
Scope of Works based on current prices, but based on the water levels as
set out in paragraphs a) and b). The FSP is then required to settle the
Applicant‟s claim, as detailed above, either by replacing the claimed items or
repairing at its option.
The FSP is not liable for any damage to the dwelling or contents caused by
ingress of water in excess of 50mm.
57. Given that the FSP is required to undertake a current scope of works in
respect of the loss, the Panel is satisfied that it is not appropriate to award
interest in this dispute.