Home / Financial Firm (Unknown - Insurer) / Determination 288633

Determination 288633

Flood limitation applied to January 2011 inundation claim

FirmFinancial Firm (Unknown - Insurer)
Decided2013-02-15
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

Homeowners' flood claim was largely limited to the $20,000 flood cover after AFCA found the home was inundated mainly by flood. AFCA ordered the FSP to pay outbuilding and contents losses from stormwater to 150mm, with interest on the settled amount.

Flood damage is limited to the flood sub-limit, but stormwater that inundated ground-level structures before the river flood arrived is covered to a fair estimated level.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 288633 Determination Page 1 of 11 Case number: 288633 General Insurance - Domestic Insurance - Home Building - FSP Decision – Flood – Policy Exclusion - Denial of claim 14 December 2012 Background 1. The Applicants held a Home Buildings and Contents Insurance Policy (the policy) with the Financial Services Provider (FSP) which provides cover for Accidental Damage subject to the relevant policy limitations. 2. The insured property in Charlton sustained extensive damage when inundated by water on 14 and 15 January 2011 following the significant weather events experienced in Victoria in January 2011. 3. The FSP partially accepted the Applicants‟ claim in so far as the policy allows (applicable sub-limits) and has declined indemnity for a major portion of the Applicants‟ claim on the basis it is due to the event „flood‟. 4. The Applicants remain dissatisfied with the FSP‟s decision to decline to provide indemnity for a major portion of her loss. Summary of Applicants ’ position 5. The Applicants in disputing the FSP‟s decision to decline the claim have sought the assistance of representatives. In the interest of brevity both the Applicants and their representatives will be referred to as the “the Applicants” for the purpose of this determination. 6. The FSP has accepted their claim under the limited cover available for flood damage under the policy and for which it has cash settled them in the amount of $20,000 less the applicable excess. 7. The Applicants in disputing the FSP‟s position in respect to their claim rely upon the evidence ma de available by their preferred hydrologist „PM‟ in his report dated November 2011. 8. The information generated through the computer modelling by the FSP‟s hydrologists „W‟ was based on guesswork and therefore should not be treated as actual evidence. On rai sing similar concerns with the FSP‟s hydrologists „W‟ the Applicants were advised the outcomes were based on educated guesses. Determination Case No: 288633 Determination Page 2 of 11 9. The hydrologists in submitting their reports disregarded evidence of two other home owners present at the meeting held between the parties. While W‟s conclusions are based on assumptions and guess work, the witnesses‟ evidence relies on firsthand experience having been present to witness the unfolding of the significant weather event. 10. In respect to W‟s report dated 19 July 2012, the Applicants note it claims to be based on discussions with owners of the numerous properties however it provides no details of the discussions alleged to have been held. The one time the consultant met with the Applicants he seemed to be pre-occupied with hydraulic modelling and appeared to take little interest in anything the Applicants had to say to him. 11. The burden to establish the application of the exclusion relied upon lies with the FSP and which the Applicants do not believe the FSP has been able to establish through its submissions to the Service. 12. It was unlikely that FSP‟s assessor‟ „C‟ was adequately qualified to make an assertion in respect to the cause of the inundation being due to „flood‟. 13. The Applicants are seeking for the FSP to cover their claim in full on the basis the insured property was inundated by stormwater run-off rather than flood and therefore is covered under the policy. Summary of FSP’s position 14. The FSP maintains that PM‟s report dated November 2011 does not provide evidence suff icient to support the Applicants‟ claim that the insured property (building and contents) was damaged by stormwater. 15. The FSP does not dispute that there may have been stormwater run-off evident upon the property and through the township of Charlton during the day of 14 January 2011. However all evidence supports the fact that inundation above floor level at the insured property was due to flood. 16. The Applicants have consistently maintained that inundation of their home occurred at approximately 7.00pm on 14 January which supports over bank floodwater inundation. They evacuated the property at 9.00pm on 14 January at which time water had inundated the property to a depth of approximately 300mm. 17. The FSP provides that at no stage had it relied upon C‟s report to conclude that the insured property was inundated by floodwater rather it is the commissioned hydrologists‟ evidence upon which it has sought to decline the Applicants‟ claim. 18. While it may be accepted that the property was initially inundated by clear water the FSP maintains that this in itself is not determinative of whether this was stormwater rather than floodwater. The Applicants have not made Case No: 288633 Determination Page 3 of 11 available any site specific hydrology evidence to support their position that their home was inundated by stormwater run-off rather than floodwater. 19. The FSP in cash settling the Applicants for the maximum amount of cover under the policy for flood damage ($20,000 less policy excess) has fulfilled its obligations under the policy. Further, the FSP has also paid the Applicants $2,670.11 for what it assessed to be storm damage to a ceiling and accidental damage to fence at the insured property caused by emergency workers. 20. Accordingly, the FSP maintains that it has fulfilled its obligations to the Applicants under the claim. 21. The FSP relies on the following policy provisions: “ What you are insured against This policy insures You against accidental damage, burglary and theft occurring during the Period of Insurance. … What is not insured This policy does not insure You against: 1. damage directly caused by: - Rain, hail or snow to Contents unless they are in a Domestic Building when damaged - Flood, except as described under the additional benefit „Flood cover‟ - … - Earth movement (except earthquake) no matter how caused, including erosion, vibration, subsidence, seepage, saturation, creeping, landslip, mudslide, collapse, shrinkage, settling, expansion or heaving … Flood to Your Home directly caused by Flood during the Period of Insurance arsing out of one event. If „Contents‟ is shown on the certificate of insurance, We pay up to $10,000 for damage to Contents in Your Home directly caused by Flood during the Period of Insurance arsing out of one event. We pay up to $20,000 for all damage to your Home and Contents at any one location arising out of the one event.” Issues 22. Whether the inundation of the Applicants‟ property was caused by flood water as defined by the policy. 23. Whether the FSP is entitled to decline indemnity to the Applicants under the claim. Case No: 288633 Determination Page 4 of 11 Reasons for decision 24. As advised to the parties, FOS has considered it appropriate to refer this dispute directly to the Panel in accordance with the Operational Guidelines to the FOS Terms of Reference. This is because of the complex nature of the issues. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 25. This decision has been made by a Panel consisting of an Ombudsman, a representative with extensive experience in the insurance industry and a representative with extensive experience in consumer claims. 26. There has been an exchange of material between the parties. Each party therefore is aware of the issues and has had the opportunity to comment. In these circumstances the details contained in the relevant hydrological reports will not be recited in this determination except where considered relevant. 27. Prior to arriving at a determination the Panel has read and considered all the material submitted by the parties to FOS. 28. The Panel notes that the parties do not dispute the following:  The Applicants held an active home building and contents insurance policy with the FSP at the time of loss.  The FSP provided and the Applicants received the relevant policy documentation including the Product Disclosure Statement (PDS).  The insured property suffered significant damage arising from the weather events experienced in the area during January 2011.  The Applicants evacuated the property at approximately 9.00pm on 14 January 2011 at which time the water quickly began to come up through the home floorboards and inundate the dwelling.  The policy covers accidental loss or damage to the insured property subject to the specified policy limitations. 29. The Panel having reviewed the available evidence is satisfied that the main issue in contention between the parties pertains to whether the insured property was initially inundated by stormwater which would give rise to a degree of indemnity under the policy. The Panel is satisfied that the property was ultimately inundated by floodwater to the maximum level; however, consideration as to whether there was an extent of initial stormwater inundation has been detailed below. Cause of the Loss 30. The Panel has been provided with multiple consultants‟ reports obtained and relied upon by the parties. The Panel notes that this information has been exchanged between the parties, each having had the opportunity to comment. Accordingly, in the interest of brevity, the Panel will only restate Case No: 288633 Determination Page 5 of 11 information from these reports if found necessary in providing this Determination. Consultant’s Reports C’S Report dated  The premises is a private dwelling of approximately 20 years, maintained in a good condition and constructed of brick veneer over timber frame walls and colour bond roof.  There was water around the property early in the morning and afternoon of 14 January 2011. Water entered the home at 7.00pm and the Applicants vacated the home at around 9.00pm at which point there was inundation of up to 300mm within the home.  The water was initially clear but later became dirty and black.  The assessor noted extensive damage to the insured building and contents.  The Applicants suggested that the loss was due to stormwater inundation. PM’s Charlton Floods - January 2011 dated 3 November 2011  The town of Charlton experienced heavy rainfall between 10 January- 14 January (2011), with extensive flooding in the area from the Avoca River from 14 January onwards.  Total rainfall over this period was recorded at 168.6mm with 66.2mm falling between 9.00am on 13 January and 9.00am on 14 January (2011).  The highest intensity rainfall recorded was 15mm/hr between 7.00am - 8.00am on 13 January. There was no rainfall recorded after 8.00am on 14 January (2011).  Although rainfall intensity is reported on an hourly basis, PM maintains that the rainfall periods at Charlton were highly concentrated in short duration bursts e.g. 10 to 12 minute intervals. Accordingly, if calculated on this basis it would represent 20-50 year ARI rainfall events as opposed to 1-2 year ARI events (based on hourly intervals).  Accordingly, overflow from local drainage systems and culverts was highly likely as these systems are only designed to cope with 2-5 year ARI rainfall events.  Time of overflow would have to correspond closely with the timing of the intense rainfall periods and based on this the first stormwater drainage overflow event would have occurred at around 7.00am on 13 January.  There are two possible sources of rainwater run-off in Charlton, run-off which does not enter the stormwater drainage system and second run- off from surrounding rural areas. Case No: 288633 Determination Page 6 of 11  All rainfall that fell on 13 January and 14 January (2011) would have become saturated overland flow and followed natural drainage lines into Charlton. This would have led to the inundation of Charlton on these dates prior to the arrival of floodwaters from the Avoca River.  Floodwaters from the Avoca River would be of high sediment loads (muddy/mucky) and would not be clear. Clear water inundation would support that prior to the arrival of floodwaters from the Avoca River there was water sourced from local stormwater.  Major flood level was not reached until 5.15pm on 14 January 2011.  Depending on the exact locations of the properties, they will have begun to have been inundated from floodwater sometime on the afternoon or early evening 14 January (2011). Any inundation before this time would be from runoff particularly corresponding to times when heavy rainfall(s) were occurring (13 January and early morning 14 January 2011).  Evidence in respect of water inundation of properties which occurred particularly before 5.00pm on 14 January should be taken into account. W’s Flood Assessment Report 31 January 2011  Multiple site inspections were undertaken on 24 January 2011.  The average rainfall records for the upper regions of the Avoca River catchment are about 600mm per annum.  The Avoca River has flooded the town of Charlton a number of times in the past due to high rainfalls.  The Avoca River catchment soaked from previous rainfalls resulted in a higher than average conversion of rainfall to runoff, increasing the water flowing directly into watercourses and resulting in flooding across Victoria.  Flood warnings were issued for a number of rivers including the Avoca River with the one of the towns affected by the flooding being Charlton.  Historically Charlton has been flooded from two directions in a north south plain with an area remaining flood free through the centre of town along the St Arnaud – Charlton Road.  The most intense rainfalls periods in Charlton were experienced in the morning of 11 January 2011 and early morning 13 January, with the maximum flood level in Avoca River reaching its peak early morning 15 January 2011.  Flooding of the township was similar to the September 2010 event, however, a much greater volume of water has been experienced in the eastern end of town on this occasion (January 2011).  Given the timing of the flooding of the eastern edge is similar to that of the gauge readings it is suggested that the Yeurngoon Creek and Avoca River flows merged to become one system. Case No: 288633 Determination Page 7 of 11  Any flooding occurring after lunchtime (14 January 2011) can be directly attributed to Avoca River/Yeungroon Creek flooding.  Flood inundation that occurred east of Armstrong Street early morning (14 January) can be attributed to stormwater flooding. W’s Flood Assessment Report dated 19 July 2011 (Site Specific)  The residential property is located in the southern half of the township. The Applicants advised:  Water entered the home at 7.00pm on 14 January (2011).  The ceiling damage was recorded during the rainfall event.  Water that initially entered the home was clear becoming muddy later in the evening.  Based on hydraulic modelling of the site:  The predominate (sic) method of flooding of the property was from Avoca River flows reaching the property late on 14 January 2011.  Flooding occurred at least 12 hours after any significant rainfall in the area ceased. W’s Flood Assessment Report dated 5 July 2012 (Site Specific)  The report has been provided by W to describe the general rainfall and stream flow conditions local to Charlton during the January 2011 flood event. Also, to consider the general flooding mechanisms and to provide a response to PM‟s report.  The major tributary relevant to Charlton is Yeungroon Creek (the creek), located 1.5km east of the township within the broader Avoca River (the river) floodplain. Between the creek and the river are two unnamed tributaries or drainage lines.  The first crossing the Charlton – St Arnaud Road whilst the other flows through town under the Calder Highway and they are defined waterways on Vic maps (1:250,000).  There are two rainfall gauges located in Charlton that record daily totals. Data reveals Charlton received its largest rainfall total on 13 January (2011) with 66mm recorded to 9.00am on 14 January.  River levels at Charlton began to rise steeply from about midday on 12 January continuing to rise throughout the afternoon and reaching minor flood level of 5m at 4.00am on 13 January. Levels reached their peak of 8.05m at 1.15am on 15 January, after which there was a steady decline in the levels.  There is no separate stream flow data available for the creek, the Charlton-St Arnaud Road tributary or the Calder Highway tributary.  Terrain modelling shows the western and northern parts of the town would be expected to drain directly to the river while the main central Case No: 288633 Determination Page 8 of 11 and eastern parts would be expected to drain to the Calder Highway tributary and directly to the creek.  An analysis of the data shows that locally delivered stormwater flows could not have caused significant flooding in Charlton after 7.00am- 8.00am on 14 January.  The continuing flows in the tributaries and other depressions leading into Charlton from after 8.00am on 14 January would have been caused by overland flows resulting from breakouts from Charlton-St Arnaud Road tributary, the creek and later also from the river further upstream.  The Charlton-St Arnaud Road tributary would have contributed flows prior to flows from the creek and river.  Water from the creek and Charlton-St Arnaud Road tributary would have a much lower sediment load and appearing clear because upstream of Charlton the creek channel is poorly defined and surrounding areas are well vegetated. This combined with low velocities due to the flat terrain would have limited the flows picking up sediment.  W maintains that clear water is not necessarily an indicator of stormwater, more so of where the water has come from. W accepts that the inundation of the properties in the east began before the town was inundated by flows from the river, however that this was due to water escaping the creek and its minor tributaries. 31. The Panel has carefully reviewed all of the evidence. The Panel notes that the hydrologists retained by both parties are appropriately qualified and experienced to provide expert analysis and opinion in respect of flood matters. 32. In considering this dispute, the Panel notes that the policy provides cover for accidental loss or damage, subject to various exclusions. In this instance there is no doubt that the Applicants‟ property suffered da mage on 14 January 2011 and so a prima facie claim under the policy has been established. The onus shifts to the FSP to prove an exclusion/limitation contained within its policy, should it wish to rely on such to refuse the claim. 33. The Panel also notes that the FSP has partially settled the Applicants‟ claim in line with what it has accepted to be storm damage and accidental fence damage as well as to the maximum level of cover available for flood damage. The dispute before the Service is in respect to whether there was any loss or damage due to stormwater run-off/inundation prior to the arrival of floodwaters. 34. The Panel notes that the hydrology reports relied upon do not seem to have considered the impact of the work undertaken at the Charlton-St Arnaud Road on the natural flow of the water from the floodplain to the Avoca River. The Ombudsman, FOS and FSP representatives and a number of local residents visited the area as part of a number of site inspections. The road Case No: 288633 Determination Page 9 of 11 has been raised to allow access to the airport during floods. In doing so, it dissects the natural floodplain. Although, a number of pipes/culverts have been positioned under the road they are not sufficient to cope with the overland flow and according to locals the flow is diverted initially east of Armstrong Road and eventually through the town. When the road was dug up by machinery on 15 January 2012, the level of inundation within Charlton started to drop. 35. This information was provided by a number of local residents independently of the Applicants to the Ombudsman and FOS representatives in the presence of the insurance representatives. The site visits undertaken by the Panel representatives of the Charlton area and more specifically individual properties (not including the Applicants‟ address ) have assisted the Panel in gaining a greater understanding of the topography and impact of the stormwater runoff in the area prior to the arrival of floodwater from Avoca River. 36. Given the evidence gathered from the site visits, the Panel has determined in a number of previous disputes before it that water flow from the south and east of Charlton in the afternoon of 14 January 2011 can be properly characterised as stormwater runoff (refer disputes numbers 238492 and 279236) at least until about 5.15pm on 14 January 2011 following which the Avoca River reached its major flood level and floodwater from the river started to inundate properties in the town. 37. The extent to which individual properties would have been inundated after that time by stormwater and then floodwater would depend on each property‟s locat ion, topography and timing. 38. Having reviewed this evidence in this dispute, the Panel is satisfied that it is not in dispute that the insured property was inundated by water above floor level of the insured dwelling at or about 7.00pm on 14 January. Further, that the Applicants evacuated the property at around 9.00pm at which point the property was inundated above floor level to approximately 300mm. 39. The Applicants‟ hydrologist PM stated the major flood level for Charlton is 7.5m which was reached at 5.15pm on 14 January 2011. He also states that, depending on the exact locations of the properties, they will have begun to have been inundated from floodwater sometime on the afternoon or early evening 14 January (2011). Any inundation before this time would be from runoff particularly corresponding to times when heavy rainfall(s) were occurring (13 January and early morning 14 January 2011). 40. He further states “Inundation from stormwater accumulating in eastern an d southern Charlton is probable …[during] the morning/early afternoon of the 14 (January 2011)” and that evidence in respect of water inundation of properties which occurred particularly before 5.00pm on 14 January should be taken into account 41. The Panel Chair Ombudsman contacted the male Applicant on 6 December 2012 to clarify the timing of the inundation and whether any outbuildings had Case No: 288633 Determination Page 10 of 11 been inundated prior to the main residence. The Applicant confirmed the house and attached garage had been sandbagged and this area was not inundated until after 7.00pm 14 January 2011. He could not recall precisely what time water first arrived at the property or when on the 14 January it was running through the property. It had certainly arrived earlier than 7.00pm and probably during the afternoon. This is consistent with information obtained by the Panel in relation to other properties in the area. The A pplicant‟s wife has confirmed there are two sheds/outbuildings at ground level that were inundated prior to the inundation of the house above floor level. 42. Based on the above evidence, it is possible that stormwater from the south east of the town may well have inundated the Applicants‟ property in the afternoon of 14 January 2011. However the evidence as to the timing of the inundation at floor level of their home, that is 7.00pm on 14 January 2011, is critical; this was 1 hour 45 minutes after the floodwater from the Avoca River started to inundate properties in the area. 43. In the Panel‟s view, given the evidence above in respect of the river water and the timing of inundation, the inundation of the Applicants‟ home above floor level was not due to stormwater runoff alone. More likely the inundation above floor level and subsequent peak level of inundation was on the balance of probabilities due to a combination of flood and stormwater runoff which would be excluded under the policy. The Panel notes it is not disputed that the home was subsequently inundated by floodwaters which had escaped from the Avoca River. 44. Therefore, t he Panel is satisfied that this component of the Applicants‟ claim is subject to the policy limitations in respect to flood damage specified within the terms of the policy i.e. limited to $20,000 less the applicable policy excess, which the FSP has paid to the Applicants under the claim. 45. In so far as the property contained outbuildings such as garden sheds or appliances such as air-conditioning units constructed at ground level and/or any contents stored within such structures, the Panel accepts that the inundation of such objects would have occurred prior to the arrival of t he waters from the Avoca river. In the Panels view the hydrology evidence is consistent with initial inundation of such structures located at ground level being due to stormwater runoff. Any damage to such structures at ground level including contents stored within, would be covered. In the absence of eye witness information as to level of the initial storm water inundation, and having regard to the relevant policy terms and legal principles, the Panel considers it fair in all the circumstances to determine inundation up to 150mm above ground level due to stormwater runoff. Any damage arising from inundation to a level of 150mm above ground level, to outbuilding or contents would fall within cover available under the policy. 46. Accordingly, the Panel urges the parties to work cooperatively together to reasonably establish whether, and if so to what extent damage may have been occasioned to outbuildings (and their contents) at ground level up to a level of inundation of 150mm. Case No: 288633 Determination Page 11 of 11 Determination 47. The Panel determines:  Damage to the Applicants‟ home at floor level and above was caused by flood, as defined under the policy, and as such the FSP was entitled to limit payment for flood damage to the dwelli ng (above floor level) and its contents to $20,000 being the total sum payable according to the Additional benefits “Flood cover”.  The FSP is liable to meet the loss and damage sustained to outbuildings and contents (including air-conditioning) caused as a result of stormwater runoff to a level of 150mm above ground height.  The FSP is to cash settle any such liability and pay to the Applicants interest at the statutory rate, in line with the Insurance Contracts Act 1984, upon the final settlement figure agreed between the parties from 9 March 2011 (being the date of its rejection of the Applicants‟ claim) to final settlement of the claim.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.