Home / Financial Firm (Unknown - Insurer) / Determination 288619

Determination 288619

Claim declined under flood exclusion for basement inundation

FirmFinancial Firm (Unknown - Insurer)
Decided2013-06-04
ProductGeneral Insurance · Strata
OutcomeFor the complainant
Amount awarded$61,275
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

A body corporate sought indemnity for basement flood damage after the insurer declined under the flood exclusion. AFCA found the insurer had not proven the inundation was flood rather than stormwater or sewer backflow, and ordered payment of $61,275.39 plus interest.

The insurer bears the onus of establishing an exclusion, and its hydrology evidence did not establish that the first inundation was caused by flood.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 288619 Determination Page 1 of 7 Case number: 288619 General Insurance - Domestic Insurance - Residential Strata Title - FSP Decision - Denial of Claim – Policy Exclusion – Flood. 21 May 2013 Background 1. The Applicant is a body corporate for a multi-storey brick building situated in St Lucia; a suburb of Brisbane. It is represented by the strata managing agent. For the purposes of this Determination, the parties will be referred to as “the Applicant”. 2. The building and its common contents are insured for accidental loss and damage, under a Residential Strata Insurance policy issued by the Financial Services Provider (FSP). 3. At about 1.50am on 12 January 2011, the basement of the property was inundated by water following the severe weather events affecting Queensland around that time. The Applicant lodged a claim for the loss with the FSP, who declined liability on the basis the loss was caused by flood which the policy excluded. 4. The Applicant believes it is entitled to indemnity because the loss was caused by stormwater runoff and seeks indemnity for the following losses:  Damage to lift well and electric/mechanical components of the lift;  11 fire doors;  Unspecified electrical works in the basement;  Removal of water from basement;  Inspection of fire fighting equipment in the basement;  Damage to external garage doors in the basement area. Summary of Applicant’s position 5. The ICA hydrology report is only of general nature and should not be used to determine the source of the inundation at any particular site. Determination Case No: 288619 Determination Page 2 of 7 6. The “ W ” site specific report is inconclusive and does not provide any specific engineering data and/or analysis of the various drainage structures in the area. The hydrologist’s conclusion that the inundation was caused by pipe backflow is pure speculation as no substantial technical evidence has been provided to support this position. 7. W’s report did not take into con sideration the site specific features of the property. No consideration was given to the local catchment area, its topography and the contribution made by overflow from municipal stormwater drains. 8. The Applicant says that the basement garage’s inundation w as not caused by the flooding as defined by the policy because of the following reasons:  There was over 160mm of rainfall within the local catchment areas around St Lucia between 9 and 11 January 2011 and it was raining heavily all day on 11 January 2011.  The stormwater drainage gully pits in Coldridge Street were overflowing at 14:00 hours on Tuesday 11 January 2011.  Water begun to accumulate in Sir Fred Schonell Drive from about 14:30 hours on Tuesday 11 January 2011.  High volume of rainfall exceeded the capacity of the local stormwater drains. The general catchments in the area are small and due to the terrain under this high intensity event, the velocity of flow from the higher ground could not be accommodated in the lower areas of Macquarie and Munro Streets.  Munro Street is a low point that has flooded up to four occasions previously due to heavy rain and the drainage inlets and overflow paths being blocked.  At all times the Brisbane River level, until it broke its banks, was below the level of the footpath fronting the property in Macquarie Street over which the inundation water to the basement flowed. The Applicant believes there would have been inadequate hydraulic head to allow any piped backflow to occur (especially in the quantities required to fill the basement before 5.30am on 12 January). 9. In addition, substantial development works have been undertaken on properties fronting the channel along which the pipe backflow could have occurred. 10. The claimed pipe backflow is only one potential cause; others include inadequate pipe and/or gully inlet capacities, and/or blocked inlets and drains. The Munro Street gully pits had caused flooding and closing of Munro Street due to fallen tree debris causing a mat over the inlet crates and stopping inflow. Case No: 288619 Determination Page 3 of 7 11. The Applicant maintains they are only seeking damage caused by the first event that occurred during the night of 11 January to early morning on 12 January 2011. They do not seek compensation for the second event which is clearly not covered under the policy as being flood. Summary of FSP’s position 12. The FSP acknowledges that the over bank flow from the Brisbane River did not arrive at the risk property until sometime after 5.30am on 12 January 2011. Whilst the damage to the basement was caused by a separate bod y of water which arrived at approximately 00.00 hours. 13. The FSP submits that the body of water that impacted on the basement was backflow from the Brisbane River and relies upon the site specific hydrology report prepared by W to maintain the inundation was due to piped backflow. 14. The Insurance Council of Australia (ICA) report relies on rainfall and water level data recorded by federal and state government agencies and by local councils. Therefore, this is the most accurate and independent data available. 15. W is entitled to rely upon the data contained within the ICA report to determine the origins and cause of the water inundation that affected South East Queensland. 16. W concluded that stormwater runoff would not have inundated the property above floor level. Instead, it was due to water overflowing from the stormwater/sewer network due to high water levels in the Brisbane River. 17. The FSP maintains the Applicant obtained no evidence in support of their contention that the cause of the inundation was stormwater runoff and that the Service ought to prefer the conclusions reached by W. 18. With respect to the Applicant’s comments that W had failed to consider site specific features of the property, the FSP advised that they would seek a response from their hydrologist with respect to the further issues raised by the Applicant. Despite notifying the Service that they were seeking this response on 11 October 2012, no further information or response has been provided by the FSP. The FSP relies on the following policy provisions: “ Policy 1- Insured Property What we insure We insure You up to the Sum Insured shown for Policy 1 in the Schedule, against ACCIDENTAL LOSS or DAMAGE to Your Insured Property which occurs during the Period of Insurance. ... Exclusions – what we do not insure 1. We will not pay for loss or damage: Case No: 288619 Determination Page 4 of 7 a. caused by Flood. b. ... General Definitions – the meaning of some words ... Flood Means when water that is normally contained in a Water Catchment System increases because of rainfall or snow melt (whether in the immediate region or elsewhere) or is deliberately released by an authority, and the water overflow onto land that is normally covered by water. ... Water Catchment System Means: a. A river, creek, other natural watercourse or lake, whether they are in their original state or have been modified, are named or unnamed, or normally dry that only run during periods of rain; b. A dam, reservoir, stormwater channel or canal. ” Issue 19. Whether the FSP has established an entitlement to rely on the application of the flood exclusion. Reasons for decision 20. Due to the nature of the dispute, it has been referred to the Panel for Determination in accordance with the Operational Guidelines to the Financial Ombudsman Service’s Terms of Reference. 21. This decision has been made by a Panel consisting of an Ombudsman, a representative with extensive experience in insurance industry matters and a representative with extensive experience in consumer claims. 22. There has been an exchange of material which the parties rely on. Each party has had access to the material on which the other party bases its case. The Panel has had regard to the material exchanged and the detailed submissions made on behalf of the parties. 23. It is an accepted principle of general insurance law that an insured bears the onus to establish, on the face of the facts, that they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie claim. Once so established, the onus shifts to the insurer to pro ve that a policy exclusion applies if it seeks to deny or limit its liability for the claim. Case No: 288619 Determination Page 5 of 7 24. The FSP’s policy provides cover for accidental loss or damage which occurs to the insured building. Accordingly, any accidental loss or damage to the Applicant’s h ome building is, prima facie , covered, unless otherwise excluded. 25. It is not in dispute that the building was damaged in January 2011 and the Panel accepts that this damage was unexpected from the Applicant’s point of view. Accordingly, the Panel is satisfied that the Applicant had established a prima facie claim under the policy. 26. The FSP relies on both the ICA hydrology and a site specific report provided by W dated 27 May 2011. The report notes the following:  Inundation above floor level occurred between 18:00 hours on 11 January 2011 and over 5:30 hours on Wednesday, 12 January 2011.  Inundation of the ground floor of the apartment block to a level of approximately 0.9m, whilst the basement car park was completely inundated. 27. The report found the following:  There was very little rainfall recorded at the Toowong Alert rainfall station after 18:00 hours on Tuesday, 11 January 2011.  Recorded local rainfalls in the vicinity of the property were not particularly severe for short durations.  Given that water from the street had not inundated the basement at 18:00 hours and was not inundated until later on Tuesday night, 11 January 2011, stormwater runoff could not have inundated the subject property above floor level.  It is possible that stormwater/sewer network within the basement of the building surcharged and inundated the basement above floor level prior to the Brisbane River water overflowed from the street into the basement. It is likely that the stormwater/sewer system surcharged due to high water levels in the Brisbane River.  The observed time of initial inundation of the ground floor corresponds reasonably well with the time of the estimated Brisbane River level is 0.9m below the peak.  It is possible the basement of the building was initially inundated above floor level by water overflowing from the stormwater/sewer network due to the high water levels in the Brisbane River but stormwater runoff would not have inundated the property. 28. The FSP argues based on this report and the ICA hydrology report, that the tim ing of the inundation of the Applicant’s property after 18:00 hours on 11 January 2011 is more consistent with it being caused by backwater flooding Case No: 288619 Determination Page 6 of 7 from the Brisbane River and is entirely inconsistent with the notion of stormwater runoff or flash flooding causing the inundation. The FSP argues that based on a reading of the ICA hydrology and the W report that the Applicant’s property was inundated when water, normally contained in the Brisbane River, increased due to the heavy rainfall in the preceding days combined with the releases of large volumes of water from the Wivenhoe Dam which ultimately caused the overflow of the Brisbane River. 29. The Panel notes the report provided by W does not include the relevant levels of the street to the River or include the relevant levels of the property. The Panel notes that the damage claimed by the Applicant occurred during the first period of inundation which according to the Applicant, occurred late evening on 11 January 2011. 30. The Applicant has referred to the stormwater drain gully pits overflowing at 12:00 hours on 11 January with the overflow closing an intersection. The Applicant maintains that the overflowing gully pits had Munro Street inundated to one metre by 16:00 hours. These issues have not been addressed in the hydrology report. 31. The hydrology report does not indicate the height of the backflow or outlets of the Brisbane River and whether those outlets would have been under the level of the Brisbane River at the time of the inundation. The height of the ground level of the basement and the road is not documented. It is unclear if these heights correspond to the outlet heights or to the heights of the water in the Brisbane River. The hydrology does not address the issues raised by the Applicant in the Independent Technical Review of Documentation provided by the Applicant. 32. Whilst the Panel accepts the ICA hydrology reports and BOM reports that rainfall activity in the area was not significant after about 09.00pm, 11 January 2011, this of itself does not explain the Applicant ’s observations, in the event that the Brisbane River was not at a height sufficient to backflow through the stormwater system and then inundate the basement of the property by overflowing from the street. 33. The FSP advised they were consulting with the hydrologist to get his view on the Applicant’s comments with respect to this. The FSP sought an extension of time to enable them to obtain such information which was provided by the Service. Despite this, the FSP has not provided a response. 34. In the circumstances, having considered the available information, the Panel is not satisfied that the FSP has met the onus on it to establish on the balance of probabilities that the initial inundation of the Applicant’s property to the basement area was due t o the excluded event “flood”. 35. The Panel is satisfied that the Applicant has established a prima facie claim for the inundation of the basement area of the property. The Panel notes the claim is with respect to damage to a lift well, the electric or mechanical components of the lift well, a number of fire doors, unspecified electrical works in the basement, fire fighting equipment in the basement and damage Case No: 288619 Determination Page 7 of 7 to external garage doors in the basement area. The Panel notes the inundation through the stormwater pits and sewerage pits is likely to be a combination of water and sewerage. 36. The Panel accepts and notes the acknowledgement of the Applicant that the second inundation that is the inundation that commencing at approximately 5.30am on 12 January 2011, would have occurred after the Brisbane River had breached its bank and would appropriately be classified as flood waters and therefore be excluded from cover under the terms of the policy. Determination 37. Accordingly the Panel determines that the FSP indemnify the Applicant with respect to the loss and damage sustained as a result of the inundation of the basement area of the property and the subsequent damage sustained to the lift well and associated electronic and mechanical workings, the water damaged fire doors, the common property electrical works, the inspection of removal of the water from the basement, inspection of the fire fighting equipment and repair to the external garage doors and the total sum of $61,275.39. 38. The FSP is to pay interest in accordance with Section 57 of the Insurance Contracts Act 1984 from 2 August 2011 being the date of the IDR decision until date of payment of this Determination.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.