Text of the determination
Case No: 288511 Determination Page 1 of 8
Case number: 288511
General Insurance - Small Business/Farm Insurance - Commercial Property -
FSP Decision - Denial of claim
10 April 2013
Background
1. The Applicants held a small business insurance policy with the Financial
Services Provider (FSP). The policy, which the Applicants arranged through
their broker, provided insured events cover and accidental damage cover
over their contents items at the business premises they rented.
2. After their business premises were inundated with water in March 2012, the
Applicants lodged a claim through their broker with the FSP for the resultant
damage to their contents items.
3. The FSP denied the claim on the basis that the damage was caused by
flood, which is excluded from cover under the policy.
4. The Applicants disagree with the decision and want the FSP to pay their
claim.
Summary of Applicants ’ position
5. They say that it rained heavily in the week preceding the inundation, with six
and an half inches of rain falling in the final 24 hours.
6. This rain could not get away and severely damaged their office premises.
7. The Applicants say that the storm insurance claims made by owners of
several other nearby properties have been paid.
8. In the days before the event, the roof of their office premises had developed
a leak which they reported several times to the building owner. During the
storm, the water was pouring in through the roof as well.
9. They say that the report by the FSP‟s assessor indicated that the damage
appears to have been caused by excessive rain falling in one area.
Determination
Case No: 288511 Determination Page 2 of 8
10. They also question the degree to which the hydrology report, upon which the
FSP relies to deny their claim, conclusively establishes that flood was the
cause of the damage.
Summary of FSP’s position
11. The FSP says that the hydrological evidence it has obtained shows that the
inundation of the Applicants‟ business premise s was caused by water which
escaped the confines of a defined watercourse.
12. The report by its hydrologist also confirmed that the stormwater generated
by the rainfall in the area was not sufficient to inundate the Applicants‟
business premises above floor level.
13. It says that it has confirmed with the Applicants that no damage was caused
to their contents as a result of water entering the building‟s roof or from
overflowing gutters.
14. The FSP says the damage was caused by flood which is excluded from
cover and therefore the Applicants have no policy entitlement.
15. It says it is unable to consider the decisions of other insurers with respect to
damage to other properties as the evidence upon which they rely is not
available to it and their decisions are based on different policy wordings.
16. The FSP relies on the following policy provisions:
“ General Definitions
...
Flood is when water from a river, creek, lake, swamp, watercourse, reservoir,
dam or navigable canal (whether they are in their original state or have been
modified), overflows, onto normally dry land. Water that escapes from an
irrigation canal is not flood. We regard rainwater on your property:
1. that cannot run off into a river, creek, lake, swamp, watercourse,
reservoir, dam or navigable canal (whether they are in their
original state or have been modified) because it is overflowing in
flood; and/or
2. that mixes with floodwater coming from the river, creek, lake,
swamp, watercourse, reservoir, dam or navigable canal (whether
they are in their original state or have been modified),
as water coming from a flood.
...
Section 1
Property
Case No: 288511 Determination Page 3 of 8
...
Cover
We will indemnify You for Damage caused by Fire and Perils or Accidental
Damage to Property Insured, whilst at the Situation.
...
Definitions
In this Section:
Accidental Damage means damage to Property insured but does not include
Damage,
(a) caused by, or as a consequence of:
(1) Fire and Perils, Anything that is specifically excluded under Fire and
Perils is also excluded from this cover.
...
Fire and Perils means,
...
4. Storm, tempest, rainwater, snow, sleet, wind, hail, but not Damage
caused:
(a) By water from or action of the sea, tidal wave, storm surge,
high water, Flood.
... ”
5. Water, liquids or substances discharged, overflowing or leaking
from fixed apparatus, fixed appliances, fixed pipes or other
systems.
Issue
17. Whether the damage to the Applicants‟ contents at their business premise s
was caused by flood.
Reasons for decision
18. Due to the nature of the dispute, it has been referred to the Panel for
Determination in accordance with the Operational Guidelines to the Financial
Ombudsman Service‟s Terms of Reference.
19. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in insurance industry matters and a
representative with extensive experience in consumer claims.
20. There has been an exchange of information between the parties and the
Panel is satisfied that each party has had an opportunity to address the
issues raised.
Case No: 288511 Determination Page 4 of 8
21. It is an accepted principle of general insurance law that the insured bears the
onus to establish, on the face of the facts, that they have suffered a loss
caused by an event to which the policy responds; this is known as a prima
facie claim. Once so established, the onus shifts to the insurer to prove that
a policy exclusion applies.
22. The Applicants‟ policy provides cover for Fire and Perils, which are defined
as a list of defined events. It also provides cover for Accidental Damage.
23. The Panel has considered the policy wording with respect to the interaction
between the covers for Accidental Damage and for Fire and Perils and finds
that they are complimentary.
24. The policy is a defined event policy which contains limited accidental
damage cover. The policy d efines accidental damage as “anything other
than the defined events or their exclusions”. The onus is therefore on the
Applicant to establish either damage sustained under one of the defined
events or alternatively accidental damage; meaning damage being a nything
other than a defined event or their exclusion.
Cause of damage
25. The FSP has provided a report by hydrologist WP which was produced after
an inspection of the Applicants‟ business premise s on 11 April 2012.
26. The Panel notes that the report includes a section titled “Insured‟s
Recollections” but although the report‟s author met with “C” (the owner of the
building which houses the Applicants‟ business) and recorded C‟s
recollections of the event, it does not appear that either of the Applicants
were present or interviewed.
27. The report by WP included the following with respect to its author‟s
observations about the Applicants‟ business premise s and its surroundings:
The property consists of a double storey brick structure.
A network of drainage channels and pits and pipes convey runoff within
the area and discharge into a channel known as “Main Drain J”.
Mirrool Creek, a tributary of the Murrumbidgee River, is the closest
natural watercourse and is located approximately 5 kilometres
southeast of the property.
The “Main Branch Canal” runs along the north -western boundary of the
village of “Y”, while Main Drain J is located to its south -eastern
boundary.
A railway line runs along the south-western side of Y, approximately
150 m southwest of the property.
The floor level of the building is elevated approximately 350 mm above
the footpath and was inundated above floor level by approximately 100
mm.
Case No: 288511 Determination Page 5 of 8
Stormwater runoff generated within the immediate local catchment
drains into Main Drain J located approximately 100 m south-east of the
property.
Based on topographic maps of the area upstream of Y, it is believed
that Main Drain J received stormwater runoff generated from an
external rural catchment of approximately 1,000 square km.
Main Drain J has limited conveyance capacity. The channel is also
constrained at the Burley Griffin Way and Griffin Road intersection as a
result of the low road and railway crossings over the channel. Under
excessive runoff conditions this constriction is likely to cause flows in
the channel to back-up and rise over the embankment and across the
nearby floodplain.
28. With respect to the cause of inundation, the report provides the following
information about the rainfall around the time of the inundation.
Data for number of rainfall gauges was obtained from the Bureau of
Meteorology and the data indicates that the weather event produced
rainfall spatially similar throughout a large area around the property.
Data from Griffith Airport located approximately 5 km northwest of the
property is considered most representative of the rainfall at the site.
There was no available recorded rainfall data for the catchment area
upstream of Griffith during the event, however given the widespread
nature of the weather event and the inundation noted along Mirroo l
Creek and in several towns upstream of Griffith, it is assumed that the
catchment experienced widespread rainfall.
Moderately heavy rainfall (68 mm in total) is recorded to have fallen at
Griffith between 28 February 2012 and 2 March 2012. The Average
Recurrence Interval (ARI) for short rainfall bursts during this period was
no greater than one year.
However a second period of intense rainfall was also recorded between
8am on 3 March 2012 and 6am 4 March 2012. A total of 146 mm was
recorded during this period, corresponding to an ARI of approximately
100 years.
During 3 March 2012, runoff from the local rainfall would have drained
into the system drainage channels in Y before discharging into Main
Drain J. In the period following 3 March 2012, runoff from the local
catchment would have begun to discharge a significant amount of
runoff into Main Drain J.
During the subsequent days, as runoff from the upstream catchment
continued to drain downstream into the channel, water is likely to have
accumulated to a sufficient level that the banks of Main Drain J would
have been overtopped and inundated the land to the north and south.
Case No: 288511 Determination Page 6 of 8
29. The Applicants have provided photographs of the area outside their business
premises showing a significant amount of water pooling on the road. The
Panel accepts that these photographs were taken around 3.30pm on 3
March 2012.
30. In a memorandum dated 8 June 2012, WP commented about the
photographs provided by the Applicants, saying that at the time they were
taken and given the amount and intensity of the rainfall, the stormwater
infrastructure would have been overwhelmed, resulting in ponding in low
lying areas of “E” Street.
31. The evidence would suggest that there was significant stormwater runoff
during the intense rainfall on 3 March 2012. In addition, the evidence also
suggests that there was a significant discharge of water from the network of
drainage channels, pits and pipes. Such discharge would arguably fit within
the policy definition, under fire and perils insured event of: „ water, liquids or
substances discharge, overflowing or leaking from fixed apparatus, fixed
appliances, fixed pipes or other systems.’
32. It is apparent that there was a system of pipes that operated to convey the
stormwater runoff. The Panel notes the FSP concedes under paragraph 5.6
of its Notice of Response that the policy provides indemnity for losses
resulting from water escaping a fixed pipe and clearly a stormwater drain is a
fixed pipe and accordingly prima facie it could seem that, if stormwater drain
discharge caused the inundation, then the loss is covered. The Panel is
satisfied based on the information exchanged the Applicants have
established a prima facie claim under the policy.
33. The onus is therefore for the FSP to establish firstly the application of the
flood exclusion with respect to the defined event of storm, tempest,
rainwater; and in the event of being able to establish flood, that the Wayne
Tank Principle then applies to defeat the other potential claim under the
defined event of „ water overflowing or leaking ..... from fixed pipes etc. ‟
34. The WP memorandum goes on to dismiss the likelihood of stormwater
accumulating to the extent that the ponding reached the floor level of the
Applicants‟ busines s premises, given the recorded rainfall amounts and the
terrain data.
35. WP says that by the time of the reported over-floor inundation — which it
notes was “sometime after 10 pm on Saturday the 3 rd March 2012” — it is
likely that the elevated levels in Main Drain J, as a result of upstream flows,
would have contributed to the ponding in E Street.
36. However in its report dated 27 April 2012, the report‟s author states that in
the days subsequent to 3 March 2012, water is likely to have accumulated to
a sufficient level, that the banks of Main Drain J would be overtopped.
Case No: 288511 Determination Page 7 of 8
37. Although the Panel agrees that “the days subsequent to 3 March 2012” are
indeed “sometime after 10pm on 3 March 2012”, it does not find WP‟s
explanation of the behaviour of the water levels in Main Drain J to be
convincing.
38. The report by WP states that no stream level gauging station exists for Main
Drain J. The Panel notes that the report contains no information about the
water levels of Mirrool Creek (which is the nearest watercourse to the
property) or Main Branch Canal (which the Panel understands to be an
irrigation canal) around the time of the initial inundation.
39. Further, the report from W does not provide any information about where or
if, Main Drain J, Main Branch Canal and Mirrool Creek are connected to one
another.
40. The Panel notes from the FSP‟s assessor‟s „Property Assessment
Notification‟ the following loss description:
“stormwater over a 24 hour period has gushed through roof and overflowed in
drains. This has caused water damage to carpets, walls, cupboards, desk,
chair, computer, laptop, calculator, phone and vacuum, all of which OI are
responsible according to CLAI.”
41. The hydrology report refers to the significant amount of runoff and refers to
the possibility of water surcharging through the drainage infrastructure along
E Street before the banks of the main drain were overtopped.
42. Having considered the hydrology alongside the information provided by the
Applicants to th e assessor and the Applicants‟ statements, the Panel is of
the view that the evidence as presented by the FSP is not persuasive
enough to establish on the balance of probabilities that the initial inundation
of the Applicants‟ business premise s was due to flood.
43. Whilst it is likely that floodwaters did ultimately inundate the property, in the
Panel‟s view, the initial inundation of the property based on the information
available is likely to have been sufficient to cause the Applicants ‟ loss.
44. Accordingly, as the Applicants have established a prima facie claim under
the terms of the policy, the Panel finds that the FSP is required to indemnify
the Applicants for the damage to their contents items.
Determination
45. On the basis of the available information the Panel determines that the FSP
is required to indemnify the Applicants for the damage to their contents.
Case No: 288511 Determination Page 8 of 8
46. For any part of the claim which is cash settled, the Panel find that the FSP is
required to pay statutory interest pursuant to section 57 of the Insurance
Contracts Act 1984 , calculated from 14 June 2012 being the date of the
FSP‟s final decision to decline the claim to date of payment of the claim.