Determination 288443

Partial denial of Cyclone Yasi storm damage claim and poor claim handling

FirmFinancial Firm (Unknown - Insurer)
Decided2013-07-19
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss$3,000
Amount claimed—
SourceAFCA PDF

Summary

The FSP partly denied a Cyclone Yasi storm damage claim on an investor home policy, paying a cash settlement of $6,631.63 after an 18-month delay. AFCA required the FSP to cover the lounge flooring and window, assess the air conditioners, pay interest, and pay $3,000 for non-financial loss, while upholding the denial of roof, hallway flooring and house movement.

Storm damage is covered where the evidence links it to the event, while the handling delays and poor communication caused considerable inconvenience warranting non-financial loss compensation under the Terms of Reference.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interestpay non financial lossreassess claimrepair or rectify

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 288443 Determination Page 1 of 11 Case number: 288443 General Insurance - Domestic Insurance - Home Building - Partial Denial of Claim 25 June 2013 Background 1. The Applicant holds an investor home and contents policy with the Financial Services Provider (FSP). The policy was current at the time of the loss. 2. On 09 February 2011, the Applicant contacted the FSP to claim for storm damage (Cyclone Yasi) that occurred to the insured property and contents on 2 February 2011. 3. The FSP engaged assessors “ RP ” , “ DK ” and “ SW ” to assess the damage claimed for. 4. Upon receipt of the associated assessment reports, the FSP partially denied the claim on the basis that some damage claimed for, was not caused by the insured event of storm. 5. The Applicant disagrees with the FSP’s decisio n and expects it to honour the entire claim. Summary of Applicant’s position 6. The Applicant submits the following:  Roof The roof has remained unfixed for approximately two years, and since then many nails loosened up during the storm have rusted.  Lounge / Hallway Flooring The edge of the vinyl flooring in the lounge has lifted due to water ingress during the storm. Associated water damage to the curtains and lounge suite (in the immediate vicinity) has been accepted by the FSP. The hallway flooring has the same pattern as that in the lounge, and therefore should also be replaced to maintain a uniform appearance.  Lounge Window Determination Case No: 288443 Determination Page 2 of 11 Following the storm, water now enters through the lounge window during periods of heavy rain. This water ingress has become worse since the claim was initially lodged, and continues even after the roof gutters have been cleared.  Air Conditioners The air conditioners failed to work following the storm.  House Movement The timber near the front steps has shifted away from where it was originally joined by large screws or nails. This suggests the house has moved during the storm. 7. She has received an amount of $6,631.63 which is not adequate to fix all of the damage claimed for. Summary of FSP’s position 8. The FSP disagrees the damage in dispute was caused by the storm. It submits:  Roof It has agreed to replace the roof sheet that was impacted by a tree branch during the storm. In relation to the remainder of the roof, the damage is due to general maintenance related issues.  Lounge / Hallway Flooring There is no evidence of water damage to the vinyl flooring, and deterioration in the lounge room has occurred over time due to constant sun exposure.  Lounge Windows (The FSP makes no specific submission on this point.)  Air Conditioners There is no evidence the units have been damaged by the storm.  House Movement (The FSP makes no specific submission on this point.) 9. The FSP has provided the Applicant with `cash settlement in the amount of $6,631.63. This is the amount it would cost the FSP to repair the damage it accepts under the claim, and is based on the most complete and economical quote. 10. The FSP relies on the following policy provisions: “ What you are covered for Case No: 288443 Determination Page 3 of 11 Insured events 1 to 12 When covered under this policy, the home and contents are insured for loss or damage at the insured address by any of the 12 insured events, if they happen in the period of insurance. ... 6. Storm and flood We cover Loss and damage caused by storm and flood e.g. rain, wind, hail, storm and damage caused by flooding from rivers, streets and canals. ... What you are not covered for This section details what is not covered under any part of your policy. ... We do not cover loss, damage: ... Failing to take care of the home or contents Caused by, or as a result of, your failure to: - take reasonable care of the home and contents - keep the home and contents in good condition and well maintained - fix faults and defects as soon as you become aware of them. ... We do not cover the cost of repairing, replacing or fixing: ... Wear, tear, rust, mould The results of or loss or damage from wear, tear, rust, fading, gradual deterioration, mould, rising damp, mildew, action of light, atmospheric or climatic conditions, corrosion or rot unless this is covered under: - storm and flood (insured event 6) ... How we settle your claim We choose how your claim is settled If we agree to pay a claim for loss, theft or damage to the home, unit or contents we will decide if we will: - repair damage new for old or - replace home or contents new for old or - pay you what it would cost us to repair or replace the home or contents new for old. Case No: 288443 Determination Page 4 of 11 Issue 11. Whether the FSP is entitled to deny liability for the damage in dispute. Reasons for decision 12. The Financial Ombudsman Service (FOS) has considered it is appropriate to expedite the dispute in accordance with clause 8.6 of our Terms of Reference. This is because of the nature of the issue in dispute. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 13. There has been an exchange of material between the parties and I am satisfied that each party has had the opportunity to address any issues raised. It is therefore not intended to recite information in this Determination except where considered relevant. 14. It is an accepted principle of general insurance law that an insured bears the onus to establish, on the balance of probabilities, that they have suffered a loss caused by an event or incident to which the policy responds. Once so established, the onus shifts to the insurer to prove that a policy exclusion applies to defeat a claim. 15. I note there is no dispute between the parties that the storm event occurred on 2 February 2011, and that damage caused by the insured event of storm is covered under the policy. 16. For the sake of clarity, I will deal with each aspect of the damage in dispute separately. Roof 17. The Applicant submits the roof has remained unfixed for approximately two years, and since then many nails loosened up during the storm have rusted. 18. The FSP submits it has agreed to replace the roof sheet that was impacted by a tree branch during the storm. With regards to the remainder of the roof, it says the damage is due to general maintenance related issues. 19. The only expert evidence available to me is that provided by the FSP. I note RP’s report dated 15 March 2012 which states: “The roof is in very poor condition and requires replacement, the gutters are packed with debris, large rust holes evident above the damaged area [the lounge]. ... This damage would have taken many years and could not be attributed to an event. Roof and gutters have had no periodical maintenance for many years.” 20. With regards to the Applicant’s submission, from the photographs available to me I cannot identify evidence of nails having been loosened and Case No: 288443 Determination Page 5 of 11 subsequently rusting. In my opinion, the nails (or screws) appear relatively secure and intact. 21. It is clear from the photographs that the roof sheeting itself has been subject to rusting, especially towards the front of the property. In my opinion, this rusting has been occurring over an extended period of time and cannot be attributed to the specific storm event in question. Although the photographs suggest that the roof sheeting was rusting, there is no evidence that this of itself caused any damage to the insured property. 22. I therefore have no evidence before me to establish that the roof requires repair or replacement (beyond the roof sheet already accepted by the FSP) as a result of damage caused by the storm event on 02 February 2011. 23. I am therefore satisfied the FSP is entitled to deny liability for this aspect of the claim (with the exception of the roof sheet that was impacted by a tree branch during the storm). Lounge / Hallway Flooring 24. The Applicant submits the edge of the vinyl flooring in the lounge has lifted due to water ingress during the storm. Associated water damage to the curtains and lounge suite (in the immediate vicinity) has been accepted by the FSP. 25. The FSP submits there is no evidence of water damage to the vinyl flooring, and deterioration in the lounge room has occurred over time due to constant sun exposure. It relies on SW’s report dated 19 June 2011 which states: “There is no water stains or damage evident to the couch or the vinyl fl oor caused by the cyclone. Vinyl is deteriorated along the edge of the window wall but is due to constant exposure to the sun.” [sic] 26. Along with SW’s report and photographs, I have also reviewed RP’s report and photographs dated 15 March 2012. 27. I note the lounge window (against which the area of damaged vinyl flooring is located) has frosted glass installed in its lower frames, and also a sun awning installed above it on the exterior wall. In my opinion, these would limit the tiles ’ ‘constant exposure to sun’ and the associated intensity of that exposure. 28. I also note SW appears to accept water did enter the associated area during the storm by stating (comment against photograph 32): “... water dripped down window mullion and onto vinyl” 29. It also appears the FSP accepted the claim for water damage to the curtains (see FSP policy screen shot of 12 August 2011) and lounge suite (see FSP policy screen shot of 08 September 2011) located in the immediate vicinity of the damaged flooring. Case No: 288443 Determination Page 6 of 11 30. On this basis, I am satisfied (on balance) that damage to the lounge room flooring was a result of water ingress during the storm event, and the FSP is liable to indemnify the Applicant for this damage. 31. In relation to the hallway flooring, the Applicant does not allege any damage sustained to it was a result of the storm, but submits the FSP is liable to replace it in order to maintain a uniform appearance with the lounge flooring. 32. Although not specifically addressed by the FSP, I note the relevant section of the product disclosure statement regarding the repair of undamaged parts states: “ When we will repair or rebuild undamaged parts If we cannot match the new materials with the undamaged parts, if necessary, we will only pay extra to create a uniform appearance when: ... - floor coverings are damaged (including tiles) we will pay extra to replace continuously joined undamaged floor coverings of the same material in the same room, stairs, hallway or passageway where the damage occurred” 33. As the policy deems a hallway to be a separate room, I am satisfied that the FSP is not liable to indemnify the Applicant in relation to replacement of this undamaged flooring. Lounge Windows 34. The Applicant submits that ever since the storm, when it rains water enters through the lounge window and has become worse since the claim was initially lodged. 35. The FSP makes no specific submission on this point. I note SW’s observation (comment against photograph 39 in her report dated 19 June 2011) that: “Tenant has placed cloth along window sill to catch any water t hat drips down window frame” In addition, (comment against photograph 40): “Tenant advised water drips from top of aluminium frame and also along edge of top gyprock cornice when it rains heavily” 36. I am not satisfied that the FSP has properly assessed the potential damage caused to the window itself as a result of the storm event or caused by the ongoing water ingress from the ceiling above the window as reported on by IRP, in his report of 15 March 2012. I note the tenant advised SW (report dated 19 June 2011): “... water entered the house in five locations ... two upper level bedrooms through windows which blew open during the cyclone” Case No: 288443 Determination Page 7 of 11 37. I am satisfied the Applicant has established that the lounge window has been damaged during the storm event and on this basis, the FSP is liable to indemnify the Applicant with respect to the cause of the apparent water ingress and damage sustained to the lounge window. Air Conditioners 38. The Applicant submits that since the storm, two air conditioners at the property have ceased working. 39. The FSP submits the Applicant has been provided the opportunity to supply a cause of damage report for it to re-assess this aspect of the claim, but this has not been forthcoming. 40. The FSP has not, despite having a number of assessor’s atten d the Applicant’s property, conducted any assessment of the actual damage to the air conditioners. Despite this event occurring in February 2011, the FSP had not assessed the condition of the air conditioners. 41. I note SW’s observation (in report dated 19 Ju ne 2011) that: “Stains evident – air conditioning unit working ok” 42. It is unclear whether this is an observation of the air conditioning unit’s working as at the 19 June 2011 or at some other time. 43. I’m therefore of the view that in order to properly determi ne whether the air conditioners have been damaged as a result of an insured event, it is appropriate for the FSP to undertake an assessment as to the nature and extent of any damage sustained to the two air conditioners. House Movement 44. The Applicant submits the timber near the front steps has moved away from where it was joined by large screws or nails, and this suggests the house has moved during the storm. 45. The FSP does not make any specific comments regarding this issue. However, I note SW’s observation o f a brick archway (comment against photograph 62 in her report dated 19 June 2011) that: “Note bricks have been painted where movement occurred some years ago” In addition, SW makes a further observation of a beam dislodgment (comment against photograph 67) that: “Again house painted after movement - exposed nails from beam movement have been painted.” RP’s report dated 21 April 2011 also includes photographs of such damage. Case No: 288443 Determination Page 8 of 11 46. In a telephone conversation between the Applicant and this Service on 22 April 2013, it was confirmed that the property was painted prior to the storm event. 47. On this basis, and from the evidence available to me, I am of the opinion that (on balance) movement to the house has occurred prior to the storm event and prior to when the house was last painted. 48. I am therefore satisfied the FSP is entitled to deny liability for this aspect of the claim. Claim Handling 49. The FSP acknowledges in its final decision letter dated 07 September 2012: “...time taken to assess and authorise repairs could ha ve been lessened through more effective management of your claim on behalf of [FSP]” 50. I have reviewed the history of the claim and in particular, through 2011. 51. I am of the opinion that the Applicant by her actions has not hindered the FSP’s ability to prog ress the claim, especially regarding damage not originally in dispute. 52. I accept the aftermath of Cyclone Yasi put considerable pressure on all insurers’ resources, and that delays did unfortunately occur. 53. The first building assessment report obtained by the FSP was obtained from D, on 30 May 2011. It provided a detailed scope of works and assessed the claim at $36,257. 54. In fact, prior to this, there is a note on 1 March 2011 from a home repair coordinator authorising “ $10,000 do and charge ” to RP and requested an assessment report. 55. Notations on 11 April 2011 indicate the FSP was awaiting an assessor’s report from RP. 56. Nothing else happened, other than an indication on 3 May 2011 that RP’s report had insufficient details. 57. It was on this basis that the report from D was requested. This is then cancelled for some reason although it is apparent on 8 June 2011 that the FSP had reviewed a quote from D. A notation at the same time notes a quote from RP was $11,145.75 with an indication they were unable to inspect the majority of the damage and had not provided an updated report whilst the quote from D was for $36,257. 58. The next notation on the file is the 17 June 2011. This notation refers to awaiting an assessment report. Exactly what report is unclear. Case No: 288443 Determination Page 9 of 11 59. On 24 June 2011 JR from the FSP advised the Applicant who had become upset by the delays that “ it is her responsibility to prove she’d suffered a loss ” . This seems particularly insensitive, given the delays to this point in time. 60. The delays continue. On 6 July 2011, JF notes “can you follow up D for a SOW and RP.” These reports were already in the possession of the FSP. 61. On 18 July 2011, JF requested the appointment of a repairer to attend and quote or proceed with repairs as per assessor mentioned SOW. The assessor appears to be RP despite the notation that they had not completely assessed the property. 62. There appears to be no urgency in the efforts by the FSP at this time to resolve the issue of the repairs, with only minor sums paid to the Applicant for contents but otherwise, the building left unrepaired. 63. On 8 September 2011 the Applicant informed the FSP that whilst she heard from builders, no one had attended the property. 64. On 19 September she was informed that the FSP was still awaiting the RP quote. The FSP already had this quotation and the quotation of D. 65. On 23 September, there was reference to an amended quote submitted being the exact same quote submitted in April 2011. The report refers to RP attending to quote as per the assessor’s statement of works. It is unclear what RP’s quote related to . 66. I do not propose to go through all of the notations in the policy screen information, other than to state that this comedy of errors continued and the Applicant provided very little information by the FSP as to what was happening. 67. In February 2012, over 12 months after the claim, the FSP, having paid the Applicant $1,398 for building and $4,600.20 for contents, drafted a partial decline letter. The Applicant was informed of this on 27 February 2012. On 16 August 2012, the Applicant received a letter advising that the FSP will cash settle the insured for $6,631.63. This cash settlement was paid to the Applicant with the excess deducted on 16 August 2012. The FSP relied upon a revised quote from RP based on an SW assessment received on 20 October 2011. 68. The information provided by the FSP does not adequately explain the difference in the quotations provided by D, the initial assessment provided by RP with acknowledgement that they had not fully inspected the property or the assessment by SW on which they relied to determine the cash settlement. The quotation does not indicate whether RP inspected the rest of the property. 69. As can be seen from the body of this Determination, I have determined that a number of aspects of the Applicant’s claim should have been accepted. I Case No: 288443 Determination Page 10 of 11 am not satisfied that the process in handling this claim by the FSP has been fair or thorough. Although the Applicant has now received an amount of $6,631.63 by way of cash settlement, that amount was in fact paid to the Applicant eight months after the FSP received that quote on 20 October 2011. There is no explanation given for this delay. The payment was received 16 months after the FSP received the first report from RP. It is 14 months after they received a building assessment scope of works totalling $12,670 which is a far more complete scope of works than that provided by RP and 15 months after they received the quotation and scope of works from D. 70. The FSP was asked to consider making a submission as to whether compensation should be awarded to the Applicant for non-financial loss pursuant to paragraph 9.3 of the Terms of Reference. The FSP by email of 13 June 2013 advised it did not wish to make any comments in relation to that aspect of the Applicant’s claim. 71. In my view, the conduct of the FSP has caused considerable delay in this matter and caused the Applicant an unusual degree of inconvenience, delay and interfere nce with the Applicant’s expectation of enjoyment or peace of mind. 72. It would appear from the FSP’s claim screen information that the Applicant was not informed as to the process, was at times misled and that there was a considerable delay between the FSP’ s actions in obtaining quotations and then responding to the Applicant. 73. In my view, the Applicant is entitled to compensation for non-financial loss pursuant to paragraph 9.3 (b) of the Terms of Reference. The Terms of Reference provide a maximum amount of $3,000 per claim under the head of non-financial loss and I determine in this dispute, given the extent of the delay, the FSP should pay the Applicant the sum of $3,000 for the non- financial loss. Determination 74. On the basis of the available information, I determine the FSP is liable to indemnify the Applicant for replacement of the damaged lounge room flooring. If the FSP chooses to cash settle the Applicant for this damage, it is to pay interest at the statutory rate in line with the Insurance Contracts Act 1984 , from 1 August 2011 until the date of settlement. 75. I further determine the FSP is liable to meet the cost of repair of the lounge room window and door, and rectify the cause of water ingress into the lounge room and indemnify the Applicant accordingly. If the FSP chooses to cash settle the Applicant for any such charge, I determine it is to pay interest at the statutory rate pursuant to Section 57 of the Insurance Contracts Act from 1 August 2011 until the date of payment of the claim. Case No: 288443 Determination Page 11 of 11 76. I determine that the FSP is to arrange for the assessment of the damage sustained to the Applicant’s two air conditioners. So far as that damage is assessed as being related to storm damage, then the FSP is to undertake to either replace the two air conditioners or if the FSP chooses to cash settle the Applicant’s claim , to pay interest on the cash settlement amount at the statutory rate in line with the Insurance Contracts Act 1984 from 1 August 2011 until date of settlement. 77. I also determine that the FSP pay interest at the statutory rate in line with Section 57 of the Insurance Contracts Act upon the cash settlement amount of $6,631.63 paid to the Applicant by the FSP on 16 August 2012 for the period from 1 August 2011 to 16 August 2012. 78. I further determine that the FSP is to pay the Applicant in accordance with paragraph 9.3 (b) of the Terms of Reference, the sum of $3,000 by way of compensation for non-financial loss.