Text of the determination
Case No: 288443 Determination Page 1 of 11
Case number: 288443
General Insurance - Domestic Insurance - Home Building - Partial Denial of
Claim
25 June 2013
Background
1. The Applicant holds an investor home and contents policy with the Financial
Services Provider (FSP). The policy was current at the time of the loss.
2. On 09 February 2011, the Applicant contacted the FSP to claim for storm
damage (Cyclone Yasi) that occurred to the insured property and contents
on 2 February 2011.
3. The FSP engaged assessors “ RP ” , “ DK ” and “ SW ” to assess the damage
claimed for.
4. Upon receipt of the associated assessment reports, the FSP partially denied
the claim on the basis that some damage claimed for, was not caused by the
insured event of storm.
5. The Applicant disagrees with the FSP’s decisio n and expects it to honour the
entire claim.
Summary of Applicant’s position
6. The Applicant submits the following:
Roof
The roof has remained unfixed for approximately two years, and since then
many nails loosened up during the storm have rusted.
Lounge / Hallway Flooring
The edge of the vinyl flooring in the lounge has lifted due to water ingress
during the storm. Associated water damage to the curtains and lounge suite
(in the immediate vicinity) has been accepted by the FSP.
The hallway flooring has the same pattern as that in the lounge, and
therefore should also be replaced to maintain a uniform appearance.
Lounge Window
Determination
Case No: 288443 Determination Page 2 of 11
Following the storm, water now enters through the lounge window during
periods of heavy rain. This water ingress has become worse since the claim
was initially lodged, and continues even after the roof gutters have been
cleared.
Air Conditioners
The air conditioners failed to work following the storm.
House Movement
The timber near the front steps has shifted away from where it was originally
joined by large screws or nails. This suggests the house has moved during
the storm.
7. She has received an amount of $6,631.63 which is not adequate to fix all of
the damage claimed for.
Summary of FSP’s position
8. The FSP disagrees the damage in dispute was caused by the storm. It
submits:
Roof
It has agreed to replace the roof sheet that was impacted by a tree branch
during the storm. In relation to the remainder of the roof, the damage is due
to general maintenance related issues.
Lounge / Hallway Flooring
There is no evidence of water damage to the vinyl flooring, and deterioration
in the lounge room has occurred over time due to constant sun exposure.
Lounge Windows
(The FSP makes no specific submission on this point.)
Air Conditioners
There is no evidence the units have been damaged by the storm.
House Movement
(The FSP makes no specific submission on this point.)
9. The FSP has provided the Applicant with `cash settlement in the amount of
$6,631.63. This is the amount it would cost the FSP to repair the damage it
accepts under the claim, and is based on the most complete and economical
quote.
10. The FSP relies on the following policy provisions:
“ What you are covered for
Case No: 288443 Determination Page 3 of 11
Insured events 1 to 12
When covered under this policy, the home and contents are insured for
loss or damage at the insured address by any of the 12 insured events,
if they happen in the period of insurance.
...
6. Storm and flood
We cover
Loss and damage caused by storm and flood e.g. rain, wind, hail, storm and
damage caused by flooding from rivers, streets and canals.
...
What you are not covered for
This section details what is not covered under any part of your policy.
...
We do not cover loss, damage:
...
Failing to take care of the home or contents
Caused by, or as a result of, your failure to:
- take reasonable care of the home and contents
- keep the home and contents in good condition and well maintained
- fix faults and defects as soon as you become aware of them.
...
We do not cover the cost of repairing, replacing or fixing:
...
Wear, tear, rust, mould
The results of or loss or damage from wear, tear, rust, fading, gradual
deterioration, mould, rising damp, mildew, action of light, atmospheric or
climatic conditions, corrosion or rot unless this is covered under:
- storm and flood (insured event 6)
...
How we settle your claim
We choose how your claim is settled
If we agree to pay a claim for loss, theft or damage to the home, unit or
contents we will decide if we will:
- repair damage new for old or
- replace home or contents new for old or
- pay you what it would cost us to repair or replace the home or contents
new for old.
Case No: 288443 Determination Page 4 of 11
Issue
11. Whether the FSP is entitled to deny liability for the damage in dispute.
Reasons for decision
12. The Financial Ombudsman Service (FOS) has considered it is appropriate to
expedite the dispute in accordance with clause 8.6 of our Terms of
Reference. This is because of the nature of the issue in dispute. This dispute
has not been the subject of a FOS Recommendation and has proceeded
directly to Determination.
13. There has been an exchange of material between the parties and I am
satisfied that each party has had the opportunity to address any issues
raised. It is therefore not intended to recite information in this Determination
except where considered relevant.
14. It is an accepted principle of general insurance law that an insured bears the
onus to establish, on the balance of probabilities, that they have suffered a
loss caused by an event or incident to which the policy responds. Once so
established, the onus shifts to the insurer to prove that a policy exclusion
applies to defeat a claim.
15. I note there is no dispute between the parties that the storm event occurred
on 2 February 2011, and that damage caused by the insured event of storm
is covered under the policy.
16. For the sake of clarity, I will deal with each aspect of the damage in dispute
separately.
Roof
17. The Applicant submits the roof has remained unfixed for approximately two
years, and since then many nails loosened up during the storm have rusted.
18. The FSP submits it has agreed to replace the roof sheet that was impacted
by a tree branch during the storm. With regards to the remainder of the roof,
it says the damage is due to general maintenance related issues.
19. The only expert evidence available to me is that provided by the FSP. I note
RP’s report dated 15 March 2012 which states:
“The roof is in very poor condition and requires replacement, the gutters are
packed with debris, large rust holes evident above the damaged area [the
lounge]. ... This damage would have taken many years and could not be
attributed to an event. Roof and gutters have had no periodical maintenance
for many years.”
20. With regards to the Applicant’s submission, from the photographs available
to me I cannot identify evidence of nails having been loosened and
Case No: 288443 Determination Page 5 of 11
subsequently rusting. In my opinion, the nails (or screws) appear relatively
secure and intact.
21. It is clear from the photographs that the roof sheeting itself has been subject
to rusting, especially towards the front of the property. In my opinion, this
rusting has been occurring over an extended period of time and cannot be
attributed to the specific storm event in question. Although the photographs
suggest that the roof sheeting was rusting, there is no evidence that this of
itself caused any damage to the insured property.
22. I therefore have no evidence before me to establish that the roof requires
repair or replacement (beyond the roof sheet already accepted by the FSP)
as a result of damage caused by the storm event on 02 February 2011.
23. I am therefore satisfied the FSP is entitled to deny liability for this aspect of
the claim (with the exception of the roof sheet that was impacted by a tree
branch during the storm).
Lounge / Hallway Flooring
24. The Applicant submits the edge of the vinyl flooring in the lounge has lifted
due to water ingress during the storm. Associated water damage to the
curtains and lounge suite (in the immediate vicinity) has been accepted by
the FSP.
25. The FSP submits there is no evidence of water damage to the vinyl flooring,
and deterioration in the lounge room has occurred over time due to constant
sun exposure. It relies on SW’s report dated 19 June 2011 which states:
“There is no water stains or damage evident to the couch or the vinyl fl oor
caused by the cyclone. Vinyl is deteriorated along the edge of the window wall
but is due to constant exposure to the sun.” [sic]
26. Along with SW’s report and photographs, I have also reviewed RP’s report
and photographs dated 15 March 2012.
27. I note the lounge window (against which the area of damaged vinyl flooring
is located) has frosted glass installed in its lower frames, and also a sun
awning installed above it on the exterior wall. In my opinion, these would limit
the tiles ’ ‘constant exposure to sun’ and the associated intensity of that
exposure.
28. I also note SW appears to accept water did enter the associated area during
the storm by stating (comment against photograph 32):
“... water dripped down window mullion and onto vinyl”
29. It also appears the FSP accepted the claim for water damage to the curtains
(see FSP policy screen shot of 12 August 2011) and lounge suite (see FSP
policy screen shot of 08 September 2011) located in the immediate vicinity of
the damaged flooring.
Case No: 288443 Determination Page 6 of 11
30. On this basis, I am satisfied (on balance) that damage to the lounge room
flooring was a result of water ingress during the storm event, and the FSP is
liable to indemnify the Applicant for this damage.
31. In relation to the hallway flooring, the Applicant does not allege any damage
sustained to it was a result of the storm, but submits the FSP is liable to
replace it in order to maintain a uniform appearance with the lounge flooring.
32. Although not specifically addressed by the FSP, I note the relevant section of
the product disclosure statement regarding the repair of undamaged parts
states:
“ When we will repair or rebuild undamaged parts
If we cannot match the new materials with the undamaged parts, if necessary,
we will only pay extra to create a uniform appearance when:
...
- floor coverings are damaged (including tiles)
we will pay extra to replace continuously joined undamaged floor
coverings of the same material in the same room, stairs, hallway or
passageway where the damage occurred”
33. As the policy deems a hallway to be a separate room, I am satisfied that the
FSP is not liable to indemnify the Applicant in relation to replacement of this
undamaged flooring.
Lounge Windows
34. The Applicant submits that ever since the storm, when it rains water enters
through the lounge window and has become worse since the claim was
initially lodged.
35. The FSP makes no specific submission on this point. I note SW’s
observation (comment against photograph 39 in her report dated 19 June
2011) that:
“Tenant has placed cloth along window sill to catch any water t hat drips down
window frame”
In addition, (comment against photograph 40):
“Tenant advised water drips from top of aluminium frame and also along edge
of top gyprock cornice when it rains heavily”
36. I am not satisfied that the FSP has properly assessed the potential damage
caused to the window itself as a result of the storm event or caused by the
ongoing water ingress from the ceiling above the window as reported on by
IRP, in his report of 15 March 2012. I note the tenant advised SW (report
dated 19 June 2011):
“... water entered the house in five locations ... two upper level bedrooms
through windows which blew open during the cyclone”
Case No: 288443 Determination Page 7 of 11
37. I am satisfied the Applicant has established that the lounge window has
been damaged during the storm event and on this basis, the FSP is liable to
indemnify the Applicant with respect to the cause of the apparent water
ingress and damage sustained to the lounge window.
Air Conditioners
38. The Applicant submits that since the storm, two air conditioners at the
property have ceased working.
39. The FSP submits the Applicant has been provided the opportunity to supply
a cause of damage report for it to re-assess this aspect of the claim, but this
has not been forthcoming.
40. The FSP has not, despite having a number of assessor’s atten d the
Applicant’s property, conducted any assessment of the actual damage to the
air conditioners. Despite this event occurring in February 2011, the FSP had
not assessed the condition of the air conditioners.
41. I note SW’s observation (in report dated 19 Ju ne 2011) that:
“Stains evident – air conditioning unit working ok”
42. It is unclear whether this is an observation of the air conditioning unit’s
working as at the 19 June 2011 or at some other time.
43. I’m therefore of the view that in order to properly determi ne whether the air
conditioners have been damaged as a result of an insured event, it is
appropriate for the FSP to undertake an assessment as to the nature and
extent of any damage sustained to the two air conditioners.
House Movement
44. The Applicant submits the timber near the front steps has moved away from
where it was joined by large screws or nails, and this suggests the house
has moved during the storm.
45. The FSP does not make any specific comments regarding this issue.
However, I note SW’s observation o f a brick archway (comment against
photograph 62 in her report dated 19 June 2011) that:
“Note bricks have been painted where movement occurred some years ago”
In addition, SW makes a further observation of a beam dislodgment
(comment against photograph 67) that:
“Again house painted after movement - exposed nails from beam movement
have been painted.”
RP’s report dated 21 April 2011 also includes photographs of such damage.
Case No: 288443 Determination Page 8 of 11
46. In a telephone conversation between the Applicant and this Service on 22
April 2013, it was confirmed that the property was painted prior to the storm
event.
47. On this basis, and from the evidence available to me, I am of the opinion that
(on balance) movement to the house has occurred prior to the storm event
and prior to when the house was last painted.
48. I am therefore satisfied the FSP is entitled to deny liability for this aspect of
the claim.
Claim Handling
49. The FSP acknowledges in its final decision letter dated 07 September 2012:
“...time taken to assess and authorise repairs could ha ve been lessened
through more effective management of your claim on behalf of [FSP]”
50. I have reviewed the history of the claim and in particular, through 2011.
51. I am of the opinion that the Applicant by her actions has not hindered the
FSP’s ability to prog ress the claim, especially regarding damage not
originally in dispute.
52. I accept the aftermath of Cyclone Yasi put considerable pressure on all
insurers’ resources, and that delays did unfortunately occur.
53. The first building assessment report obtained by the FSP was obtained from
D, on 30 May 2011. It provided a detailed scope of works and assessed the
claim at $36,257.
54. In fact, prior to this, there is a note on 1 March 2011 from a home repair
coordinator authorising “ $10,000 do and charge ” to RP and requested an
assessment report.
55. Notations on 11 April 2011 indicate the FSP was awaiting an assessor’s
report from RP.
56. Nothing else happened, other than an indication on 3 May 2011 that RP’s
report had insufficient details.
57. It was on this basis that the report from D was requested. This is then
cancelled for some reason although it is apparent on 8 June 2011 that the
FSP had reviewed a quote from D. A notation at the same time notes a
quote from RP was $11,145.75 with an indication they were unable to
inspect the majority of the damage and had not provided an updated report
whilst the quote from D was for $36,257.
58. The next notation on the file is the 17 June 2011. This notation refers to
awaiting an assessment report. Exactly what report is unclear.
Case No: 288443 Determination Page 9 of 11
59. On 24 June 2011 JR from the FSP advised the Applicant who had become
upset by the delays that “ it is her responsibility to prove she’d suffered a
loss ” . This seems particularly insensitive, given the delays to this point in
time.
60. The delays continue. On 6 July 2011, JF notes “can you follow up D for a
SOW and RP.” These reports were already in the possession of the FSP.
61. On 18 July 2011, JF requested the appointment of a repairer to attend and
quote or proceed with repairs as per assessor mentioned SOW. The
assessor appears to be RP despite the notation that they had not completely
assessed the property.
62. There appears to be no urgency in the efforts by the FSP at this time to
resolve the issue of the repairs, with only minor sums paid to the Applicant
for contents but otherwise, the building left unrepaired.
63. On 8 September 2011 the Applicant informed the FSP that whilst she heard
from builders, no one had attended the property.
64. On 19 September she was informed that the FSP was still awaiting the RP
quote. The FSP already had this quotation and the quotation of D.
65. On 23 September, there was reference to an amended quote submitted
being the exact same quote submitted in April 2011. The report refers to RP
attending to quote as per the assessor’s statement of works. It is unclear
what RP’s quote related to .
66. I do not propose to go through all of the notations in the policy screen
information, other than to state that this comedy of errors continued and the
Applicant provided very little information by the FSP as to what was
happening.
67. In February 2012, over 12 months after the claim, the FSP, having paid the
Applicant $1,398 for building and $4,600.20 for contents, drafted a partial
decline letter. The Applicant was informed of this on 27 February 2012. On
16 August 2012, the Applicant received a letter advising that the FSP will
cash settle the insured for $6,631.63. This cash settlement was paid to the
Applicant with the excess deducted on 16 August 2012. The FSP relied upon
a revised quote from RP based on an SW assessment received on 20
October 2011.
68. The information provided by the FSP does not adequately explain the
difference in the quotations provided by D, the initial assessment provided by
RP with acknowledgement that they had not fully inspected the property or
the assessment by SW on which they relied to determine the cash
settlement. The quotation does not indicate whether RP inspected the rest of
the property.
69. As can be seen from the body of this Determination, I have determined that
a number of aspects of the Applicant’s claim should have been accepted. I
Case No: 288443 Determination Page 10 of 11
am not satisfied that the process in handling this claim by the FSP has been
fair or thorough. Although the Applicant has now received an amount of
$6,631.63 by way of cash settlement, that amount was in fact paid to the
Applicant eight months after the FSP received that quote on 20 October
2011. There is no explanation given for this delay. The payment was
received 16 months after the FSP received the first report from RP. It is 14
months after they received a building assessment scope of works totalling
$12,670 which is a far more complete scope of works than that provided by
RP and 15 months after they received the quotation and scope of works from
D.
70. The FSP was asked to consider making a submission as to whether
compensation should be awarded to the Applicant for non-financial loss
pursuant to paragraph 9.3 of the Terms of Reference. The FSP by email of
13 June 2013 advised it did not wish to make any comments in relation to
that aspect of the Applicant’s claim.
71. In my view, the conduct of the FSP has caused considerable delay in this
matter and caused the Applicant an unusual degree of inconvenience, delay
and interfere nce with the Applicant’s expectation of enjoyment or peace of
mind.
72. It would appear from the FSP’s claim screen information that the Applicant
was not informed as to the process, was at times misled and that there was
a considerable delay between the FSP’ s actions in obtaining quotations and
then responding to the Applicant.
73. In my view, the Applicant is entitled to compensation for non-financial loss
pursuant to paragraph 9.3 (b) of the Terms of Reference. The Terms of
Reference provide a maximum amount of $3,000 per claim under the head
of non-financial loss and I determine in this dispute, given the extent of the
delay, the FSP should pay the Applicant the sum of $3,000 for the non-
financial loss.
Determination
74. On the basis of the available information, I determine the FSP is liable to
indemnify the Applicant for replacement of the damaged lounge room
flooring. If the FSP chooses to cash settle the Applicant for this damage, it is
to pay interest at the statutory rate in line with the Insurance Contracts Act
1984 , from 1 August 2011 until the date of settlement.
75. I further determine the FSP is liable to meet the cost of repair of the lounge
room window and door, and rectify the cause of water ingress into the
lounge room and indemnify the Applicant accordingly. If the FSP chooses to
cash settle the Applicant for any such charge, I determine it is to pay interest
at the statutory rate pursuant to Section 57 of the Insurance Contracts Act
from 1 August 2011 until the date of payment of the claim.
Case No: 288443 Determination Page 11 of 11
76. I determine that the FSP is to arrange for the assessment of the damage
sustained to the Applicant’s two air conditioners. So far as that damage is
assessed as being related to storm damage, then the FSP is to undertake to
either replace the two air conditioners or if the FSP chooses to cash settle
the Applicant’s claim , to pay interest on the cash settlement amount at the
statutory rate in line with the Insurance Contracts Act 1984 from 1 August
2011 until date of settlement.
77. I also determine that the FSP pay interest at the statutory rate in line with
Section 57 of the Insurance Contracts Act upon the cash settlement amount
of $6,631.63 paid to the Applicant by the FSP on 16 August 2012 for the
period from 1 August 2011 to 16 August 2012.
78. I further determine that the FSP is to pay the Applicant in accordance with
paragraph 9.3 (b) of the Terms of Reference, the sum of $3,000 by way of
compensation for non-financial loss.